Nov-19 Dec-19 Jan-1 Feb-1 March -2020 Peak load for the Year 2019-20

Type of Capacity of
Sl. Name of Sub- Station Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer % Loading
Generation transformer REMARKS
No. Station Code Max. in Date & Date & HV Side in LV Side in Date & HV Side in LV Side in Max. in Date & Date & HV Side in LV Side in Date & HV Side in LV Side in Max. in Date & Date & Date & HV Side in LV Side in Date & HV Side in LV Side in Max. in Date & Date & Date & HV Side in LV Side in Date & HV Side in LV Side in Max. in Date & Date & Date & HV Side in LV Side in Date & HV Side in LV Side in Max. in Date & Date & HV Side in LV Side in Date & HV Side in LV Side in of Tfr.
plant in MVA Min. in MW MW Date & Time MW Min. in MW MW Date & Time MW Min. in MW MW MW Min. in MW MW MW Min. in MW MW MW Min. in MW MW MW
MW Time Time Amps Amps Time Amps Amps MW Time Time Amps Amps Time Amps Amps MW Time Time Time Amps Amps Time Amps Amps MW Time Time Time Amps Amps Time Amps Amps MW Time Time Time Amps Amps Time Amps Amps MW Time Time Amps Amps Time Amps Amps
1 2 3 4 6 14 15 16 14 15 16 14 15 16 17 18 20

Work under progress for


30.11.19/09:
8 3.9 39 280 0 0 0 0 6.6 66.1 400 95.24 replacement of 8by 12.5 MVA
00
Tr

Akkihebbalu
load will be redused after
1 25.11.19/02: commissioning of new
12.5 5 50 300 0 0 0 0 9.9 98.6 590 89.80
00 substaion at Beeruvally and
Madhuvinakodi

M/s Trishul Power 1.11.19/08: 21.11.19


Hydel 1.5 0.5 0 - - - 0 0 0
Private Ltd., 00 /21:00

5.11.19/17: 22.11.19 20.02.2019


M/s CHEL Hydel 2.5 0.5 1.2 0 - 0 0 0
00 /23:00 &11:00

17/11/2019 & TCCM proposal submitted for


12.5 7.1 71 430 0 0 0 0 11.8 110.8 710 108.07
12:00 additional 12.5MVA Tr
2 Bookankere
17/11/2019 &
12.5 6.5 65 430 0 0 0 0 8.8 88 530 80.67
15:00

17/11/2019
100 53.5 144 483 0 0 0 0 66.2 192 612 69.86
&15:00

17/11/2019 &
100 53.3 142 475 0 0 0 0 66.8 194 615 70.21
15:00
3 Huygoanahally
30/11/2019
8 3.4 37 221 0 0 0 0 4.8 52 309 73.57
&12:00

28/11/2019
12.5 4.8 52 320 0.00
&14:00

12.5 2.1 0 0.8 0 #REF! 82 484 73.67


load will be redused after
14.11.2019 commissioning of new
Kikkeri (Mandagere) 12.5 6.4 72 430 0 0 0 0 8.5 87 518 78.84
&14:00 substaion at Beeruvally and
4 Madhuvinakodi
14.11.2019
12.5 7.2 70 416 0 0 0 0 7.2 70 416 63.32
&14:00

01.11.2019 07.11.20 21.11.2019 &


M/s Bhoruka power Hydel 1.2 0.6 5.9 64 350 #REF! #REF! #REF! #REF! 5.9 64 350
& 09:00 19 & 05: 15:00
Corporation
00
TCCM proposal submitted for
17.11.2019 & replacement of 12.5 MVA by
12.5 6 60 355 0 0 0 0 8.9 90 540 82.19
14:00 20 MVA.

5 K.R. Pet TCCM proposal submitted for


17.11.2019 replacement of 12.5 MVA by
12.5 6 60 400 0 0 0 0 7.9 79 480 73.06
&13:00 20 MVA.

15.11.2019 &
12.5 5.6 56 345 0 0 0 0 6.8 68 430 65.45
14:00

18.11.2019 &
12.5 6.4 66 400 0 0 0 0 6.6 74 434 66.06
10:00
Santhebachahally
23.11.2019 &
6 12.5 4.1 43 254 0 0 0 0 50 72 420 63.93
10:00
07.11.20
M/s Sourashakthi Solar 1.74 16.11.2019 1.86 0 0.6 0 0 0 0
19 & 16:
Energy & 13:00 0.08
00
30/11/2019 &
8 2.1 21 126 0 0 0 0 3.1 31 190 45.24
09:00
7 Sheelunere
20/11/2019 &
12.5 3.3 33 200 0 0 0 0 6 60 360 54.79
09:00
TCCM proposal submitted for
24.11.2019 & replacement of 6.3MVA by
6.3 2.9 26 159 0 0 0 0 3.9 38 230 69.49
23:00 12.5 MVA
8 Anegola

24.11.2019 &
8 3.2 29 173 0 0 0 0 4.4 45 259 61.67
23:00
TCCM proposal submitted for
28/11/2019 replacement of 6.3MVA by
6.3 5.3 52 331 0 0 0 0 5.3 52 331 100.00
@18:00 12.5 MVA

9 Dundanahally
TCCM proposal submitted for
26/11/2019@1 replacement of 12.5 MVA by
12.5 7.6 74 655 0 0 0 0 9.2 90 655 99.70
5:00 20 MVA

Estimate submitted for DPR


26.11.19/18: for replacement of 8MVA by
8 5.3 54 318 0 0 0 0 5.7 58 348 82.86
00 12.5 MVA

10 K.Honnalagere
Estimate submitted for DPR
for replacement of 8MVA by
8 40 228 0 0 0 0 6.9 70 416 99.05
12.5 MVA
3.8 15.11.19/11:00
Awiting for 12.5 MVA Tr
25-11-2019
for replacement of 8MVA by
8 6.5 & 65 392 14.4 0 0 0 7.3 73 438 104.29
12.5 MVA
03:00
Koppa
Approved in 78th TCCM
11 26-11-2019
for replacement of 12.5 MVA
12.5 5.4 & 54 324 0 0 0 0 #REF! 97 582 88.58
by 20 MVA.
18:00

21-11-2019 2-11-
Hydel 14.4 & 2019 #REF! 0 3.8 0 0 0 0
M/s SCM(NSL) Sugars 1.2
13:00 &
12:00 TCCM proposal submitted for
21.11.2019 &
12.5 1 12 72 13 0 0 0 #REF! #REF! #REF! #REF! addition 8MVA
9:00
K.M.Doddi

22.11.2019 &
12.5 5.4 60 360 0 0 0 0 8 0 87 13.24
13:00
12
4.11.201
20.11.2019
M/s Chamundeshwari Co-Gen 10.9 1.3 9 & 18: #REF! #REF! 1.8 0 0 0 0
& 10:00
Sugar 00
22.11.20
26.11.2019
M/s Vijayalakshmi Hydel 1.5 0.1 19 & 10: #REF! #REF! #REF! 0 1.2 0.3 0
&18:00
Hydro power 00
17.11.19/23: Approved in 78th TCCM
20 7.2 74 408 0 0 0 0 14 142 848 80.69 for Additional 20MVA
00
13 Maddur
12.11.19/19:
20 6.8 64 356 0 0 0 0 10.8 109 648 61.66
00

20.11.2019 &
8 3.7 34 202 0 0 0 0 5.9 56 330 78.57
15:00

TCCM proposal submitted for


14 B.G.Pura
replacement of 8 MVA by 20
25.11.2019 &
12.5 4.4 39 232 0 0 0 0 7.3 70 412 62.71 MVA.
11:00
Date of Augmentation:
27.08.18

TCCM proposal submitted for


18/11/19@
6.3 2.5 25 150 0 0 0 0 3.9 39 232 70.09 replacement of 6.3MVA by 12.5
11:00
15 Halagur MVA
3.29/11/19@
8 3.2 32 192 0 0 0 0 6.4 64 388 92.38
17:00

8/11/19@ 11: Work under progress for Additional


16 Hadle 8 3.2 32 192 0 0 0 0 5.6 56 336 80.00 12.5 MVA
00

19/11/19 @ TCCM proposal submitted for


12.5 4.9 49 294 0 0 0 0 9.8 98 586 89.19
10:00 replacement of 12.5 MVA by 20 MVA.
Kirugavalu

07/11/19 @
17 12.5 2.8 28 195 0 0 0 0 7.6 76 463 70.47
14:00

M/s Malavally
Bio-Gas 0 0 0 0 0 0 0 0 0 0 0 No Generation
power plant

M/s Jnanakshi 25/11/19 02/11/1


Solar 1.7 0.06 9 @ 18: 1.7 0 0.1 0 1.6 0 0
Energy @ 12:00
00
20/11/19 @ 9:
20 8.8 88 530 0 0 0 0 12.9 128 776 73.83
00
18 Malavalli
18/11/2019
20 8.6 86 516 0 0 0 0 13.2 132 792 75.36
@10:00

20.11.2019 Awaiting for Transformer for


6.3 3.7 37 226 0 0 0 0 4.8 48 291 87.92
&12:00 replacement of 6.3MVA by 12.5 MVA
19 Basaralu
17.11.2019 & TCCM proposal to be submitted for
8 4.9 49 306 0 0 0 0 6.7 69 401 95.48
15:00 replacement of 8MVA by 12.5 MVA

20.11.2019&
8 2.6 26 156 0 0 0 0 4.4 44 272 64.76
18:00
20 Besagarahalli
26.11.2019& TCCM proposal submitted for
8 3.2 32 196 0 0 0 0 5.9 59 354 84.29 replacement of 8 MVA by 20 MVA.
12:00

15/11/2019&
8 3.9 39 239 0 0 0 0 5.4 54 324 77.14
19:00 TCCM proposal submitted for
replacement 8MVA by 12.5 MVA
21 Chikkamandya
Approved in 78th TCCM
18/11/2019& for replacement of 8MVA by 20
8 25 2.5 154 0 0 0 0 66 68 408 97.14
9:00 MVA

TCCM proposal submitted for


30.11.2019 replacement of Addidtional
12.5 4.7 49 282 0.3 12/13 18 21 0 0 0 0 9.1 93 556 84.63
&18:00 12.5 MVA
Hampapura

27.11.2019
22 12.5 8.3 81 506 8.1 28/10 83 504 0 0 0 0 8.5 87 527 80.21
&15:00

M/s Venika Green 07.11.2019 2.11.201


Hydel 0.18 0 0.22 0 0 0 0.26 19 0
power &1:00 9& 3:00

M/s L.K Power 12.11.2019 3.11.201


Hydel 1 0.3 63 0 0.31 0 1.07 61 0
corporatiion &1:00 9&3:00

28.11.19/09: Re tendered due to single bidder for


12.5 3.15 36 203 0 43745.70833 0 0 7.84 89 489 74.43 replacement of 12.5 MVA by 20 MVA.
00
KIADB Mandya
TCCM proposal submitted for
20.11.19/10: replacement of 12.5 MVA by 20 MVA.
12.5 4.85 53 485 0 0 0 0 7.51 85 485 73.82
23 00

Co-Gen 0.93 #REF! 0 #REF! 0 0 0


M/s Mysugar
12.11.19 21.11.19
0.9 0.01 #REF! #REF! 0.06 #REF! 0 0 0
M/s Kilara Power Hydel /24:00 /01:00

20.11.2019&
24 12.5 4.6 48 276 0 0 0 0 9.5 97 572 87.06 Awaiting for Transformer for
15:00
replacement of Additional 8MVA
Kolakaranadoddi

20.11.2019&
2.9 32 178
11:00

20.11.19/18:
20 1 6.71 65 407 6.71 0 65 1 #REF! #REF! 523 49.76
00
25 Mandya
25.11.19/18:
20 8.2 84 520 0 0 0 0 12.62 133 777 73.93
00

26.11.19/13; TCCM proposal submitted for


8 4.6 44 276 0 0 0 0 6.9 68 414 98.57
00 replacement of Addidtional 12.5 MVA
26 Shivalli (V.C.farm)

8 3.6 20.11.19/8:00 36 216 0 0 0 0 5.1 51 306 72.86

Awaiting for Transformer of


100 0 0 0 0 87 269 819 93.49
replacement of 12.5 MVA Spare
22.4 26/11/2019 & 15:00 62 205

100 0 0 0 0 83.5 261 792 90.41


27 Tubinakere 75 20/11/2019 & 14:00 210 689

6.3 0 0 0 0 4.7 47 281 84.89


3.9 19/11/2019 & 9:00 39 234

8 0 0 0 0 5.7 60 342 81.43


4.8 27/11/2019 & 3:00 43 285
29.11.19/16: LOI Issued for replacement of 6.3MVA
6.3 3.4 32 210 0 0 0 0 4.6 48 288 87.01 by 12.5 MVA
00
28 Addihally
29.11.19/16: LOI Issued for replacement of 8 MVA by
8 4.4 42 240 0 0 0 0 6.7 63 390 92.86 12.5 MVA
00

11-12-2019@ New station to be proposed for


12.5 3.7 37 225 0 0 0 0 9.1 91 510 77.63
15:00
29 B.G.Nagar
11-26-2019 bifurcation of load.
12.5 4.6 46 280 0 0 0 0 9 90 515 78.39
@16:00
Approved in 78th TCCM
11-10-2019@ for replacement of 8 by 12.5
8 6 60 370 0 0 0 0 6.4 64 390 92.86
14:00 MVA
30 Guddenahalli
11-13-2019@ Work under progress for replacement
6.3 2.6 26 160 0 0 0 0 5.2 52 316 95.47 of 6.3 by 12.5MVA.
15:00

14.11.2019
12.5 2.4 26 164 0 0 0 0 5.2 54 326 49.62
Haradanahalli 9:00
(Devalapura) 23.11.2019
31 8 3 29 146 0 0 0 0 3.6 38 156 37.14
12:00

Solar 4.6 43651.54167 0.2 0 0 0 0


M/s Laxajeet Renewable
Approved in 78th TCCM
11-13-2019 for replacement of 12.5MVA by
12.5 7.3 73 438 0 0 0 0 8.1 81 488 74.28
@08:00 20 MVA

32 Nagamangala
Approved in 78th TCCM
11-20-2019 for replacement of 12.5MVA by
12.5 4.6 46 280 0 0 0 0 9.1 91 546 83.11
@17:00 20 MVA

Work under progress


11-28-2019
33 Adichunchanagiri 8 3.6 36 203 0 0 0 0 6.2 55 346 82.38 for Addidtional 12.5 MVA
@15:00

29/11/19 @14:
12.5 5.9 59 354 0 0 0 0 6 60 364 55.40 TCCM proposal submitted for r
00
34 Bannangadi replacement of 8 by 12.5MVA

15/11/19@11:
8 5.5 55 338 0 0 0 0 5.5 55 338 80.48
00

11/29/2019
8 3.6 36 220 0 0 0 0 5.4 54 334 79.52
@15 DPR approved.To be Tendered for
replacement of 8 by 12.5MVA
35 Chinakurali
11/16/2019 TCCM proposal submitted but dropped
8 41 4.1 250 0 0 0 0 41 64 388 92.38
@13 due to new station at Baby Betta for
replacement of 8 by 12.5MVA
Approved in 78th TCCM
11/20/2019
8 5 50 300 0 0 0 0 5.7 61 342 81.43 for replacement of 8 by 12.5
@10
MVA
36 Mahadeswarapura
Approved in 78th TCCM
11/27/2019
8 4 44 238 0 0 0 0 5.9 59 354 84.29 for replacement of 8 by 12.5
@10
MVA

11/30/2019 Awaiting for Transformer for


6.3 3.8 38 213 0 0 0 0 5.3 53 300 90.63 replacement of 6.3MVA by 12.5 MVA
Melukote @10:00
37
(Jakkanahally) 11/26/2019 TCCM proposal submitted for
12.5 5.4 54 365 0 0 0 0 6.9 69 396 60.27 replacement of 12.5 MVA by 20 MVA
@11:00
TCCM proposal submitted for
12.5 5.5 17-11-19 AT 14 60 358 0 0 0 0 8.1 82 502 76.41 replacement of 12.5 MVA by 20 MVA
Pandavapura
TCCM proposal submitted for
12.5 7.2 17-11-19 AT 16 66 405 0 0 0 0 10.4 94 598 91.02 replacement of 12.5 MVA by 20 MVA

38 M/s Atria
Brindavan, Tail 0 0 0 0 0 0 0
Race
M/s Atria
Brindavan, MHS 0 0 0 0 0 0 0
Generation station,
North Bank
TCCM proposal submitted for
6.3 244 0 0 0 0 5.5 55 331 100.00 replacement of 6.3 MVA by 12.5MVA
4.1 25/11/19 @11:00 41
39 Arakere
12.5 212 0 0 0 0 6.3 109 378 57.53
3.5 17/11/19 @16:00 35
TCCM proposal submitted for
22/11/2019 replacement of 6.3 MVA by
6.3 3.6 30 190 0 0 0 0 5.8 52 296 89.43
@19:00 12.5MVA
40 Belagola

16/11/2019
12.5 42 42 294 0 0 0 0 42 50 294 44.75
@11:00

20/11/19 @8:
41 Garudanaukkada 8 4.2 40 258 0 0 0 0 5.3 50 300 71.43
00

7/11/19 @ 15: TCCM proposal submitted for


12.5 6 00
57 344 0 0 0 0 9.2 109 534 81.28 Addidtional 12.5 MVA
42 Gamanahally
17/11/19 @ To be Re-tendered for
8 6 23:00
58 352 0 0 0 0 7.2 70 406 96.67 replacement of 8 by 12.5MVA

6/11/19 @19:
8 2.8 26 166 0 0 0 0 5.4 46 282 67.14
00
43 S.R. Patna
6/11/19 @19:
8 2.7 26 160 0 0 0 0 28 30 192 45.71
00

18.11.2019 TCCM proposal submitted for


Taripura 8 3.3 33 170 4.12 0 0.37 0 5.1 44.4 271 64.52 Addidtional 12.5 MVA
16:00
44
10/11/201 18/11/2 18/11/2019@1
Hydel 3.8 1.02 019 @07: 3.3 30 170 #REF! #REF! #REF! #REF! 4.86 47 170
M/s Soham Renewable 9 @12:00 8:00
00
TCCM proposal to be submitted for
8 5.3 20-11-19 AT 11 46 284 0 0 0 0 #REF! #REF! #REF! #REF! replacement of 8MVA by 12.5 MVA
45 Doddabyadarahalli
TCCM proposal to be submitted for
6.3 2.4 20-11-19 AT 11 21 142 0 0 0 0 #REF! #REF! #REF! #REF! replacement of 6.3MVA by 12.5 MVA

11-30-2019 Work under progress Addidtional 12.5


46 Kadaballi 8 5.7 55 340 0 0 0 0 6.4 66 396 94.29 MVA
@9:00

17-11-2019 Work under progress Addidtional 12.5


47 Mandagere 8 6.5 62 382 0 0 0 0 6.5 62 382 90.95 MVA
@15:00

27.11.19/11: Work under progress Addidtional 12.5


48 Yattambadi 12.5 2.8 26 178 0 0 0 0 5.7 52 354 53.88 MVA
00
TCCM proposal submitted for
49 G.Malligere 8 6.4 27.11.19 64 393 0 0 0 0 6.4 68 393 93.57 Addidtional 12.5 MVA

26.11.2019 & TCCM proposal submitted for


50 Bogadi 8 1.68 17 98 0 0 0 0 4.3 43 258 61.43 Addidtional 12.5 MVA
13:00

19.11.2019 Approved in 75th TCCM


51 Ganjigere 8 5.5 55 330 0 0 0 0 6.5 65 390 92.86 for Addidtional 12.5 MVA
&10:00

17-11-2019 TCCM proposal submitted for


Krishnapura 8 6.2 62 360 0 0 0 0 6.9 69 396 94.29 Addidtional 12.5 MVA
@15:00
52
27-11-2019 29.11.20
Co-Gen 11.1 1 19 @18: 11.6 0 1 0 0 0 0
M/s ICL Sugar @2:00
00
26/11/2019 9: TCCM proposal submitted for
53 Vaderahalli 8 2 22.5 144 12.8 0 0.4 43469.75 5.3 53 340 80.95 Addidtional 12.5 MVA
00

M/s Asian fab Tec 16/11/201 11-12-


13.7 0.3 2019
ltd., 9 12:00
@19
17.11.2019
54 Kasalagere 8 4.6 47 276
13:00

29.11.19/10:
55 KIADB Somanahalli 12.5 7 68 385
00

25/11/2019@1
56 Tumbekere 8 23 23 142
0:00
57 Vadkepura 8 1.8 20.11.2019 & 18:00 19 111

58 Kadukothanahalli 3.3 17.11.2019 & 13:00 33 198


Peak load Recorded for Peak load Recorded for Peak load Recorded for Peak load Recorded for Peak load Recorded for
the Month of Nov-19 the Month of Dec-19 the Month of Jan-20 the Month of Feb-20 the Month of Mar-20 Max Peak
Sl % of
Name of Transmission Line District DC/ SC load IN Remarks
No Loading
MW Amps MW Amps MW Amps MW Amps MW Amps AMPS

1 2 3 8 9 10

220 KV Lines

Yatchnalli(Angola limit) to
1 Mandya S/C 91 248 419 47.89
KrishnaRajapete (Huyo)

220kV
2 KR Pet to Thubinakere Mandya S/C 68.7 182 220 25.14 Huygonahal
ly Exp

3 Thubinakere to Basthipra Mandya S/C 92 243 500.4 57.19

66KV Lines 0

4 Tubinakere-Arakere Mandya S/C 15.3 138 189 51.50

tap to gamanahally Mandya S/C 118

tap to taripura Mandya S/C 2.11 20 40.7

Change over load of


5 Tubinakere-G ukada Mandya S/C 33.3 300 300 81.74 Pandavapura line on sr patna
28.11.2016

6 Tubinakere-Pandavapura Mandya S/C 12.7 113 327 89.10 .

tap to doddabyadarahally Mandya S/C

7 Tubinakere-Jaknahalli Mandya S/C 349 95.10 idle charged

Load will be reduced


after commissioning of nagmangala
8 Tubinakere - BG Nagara Mandya S/C 26 236 386 105.18 Addihalli.
220 kV R/s, -2
Nagamangala

tap to Basralu Mandya S/C

tap to Nagamangala Mandya S/C

tap to Haradanahalli Mandya S/C

tap to Addihalli Mandya S/C

tap to v c form Mandya S/C 6.2 62

9 G.ukkada-Pandavapura Mandya S/C 0 0 43562 11869.75

10 Bukanakere-Chinakurali Mandya S/C 14.3 143 245 66.76 outgoing

Tap to chinakurali

11 pandavapura-Chinakurali Mandya S/C 11.8 102 142 38.69

Tap to Bannangaadi Mandya S/C 9.5 95

12 KR.Pete - Akkihebbal-1 Mandya S/C 3.5 35 62 16.89

13 KR.Pete - Akkihebbal-2 Mandya S/C 3.5 35 62 16.89

14 KR.Pete - Kikkeri Mandya S/C 15 150 186 50.68

15 Jakkanahalli - Nagmangala Mandya S/C 19.4 194 290 79.02

Tap to ganjigere Mandya S/C

tap to G.Malligere Mandya S/C

tap to Guddena halli Mandya S/C

Tap to bogadhi Mandya S/C

Load will be reduced


Mahadeshwarapura- after commissioning of
16 Mandya S/C 32.4 303 349 95.10
Jakkanahalli 220 kV R/s,
Nagamangala

17 BG.Nagara - Vaderalli Mandya S/C 11.5 115 132 35.97 vaderhalli

tap to AC giri Mandya S/C 3.6 36


Peak load Recorded for Peak load Recorded for Peak load Recorded for Peak load Recorded for Peak load Recorded for
the Month of Nov-19 the Month of Dec-19 the Month of Jan-20 the Month of Feb-20 the Month of Mar-20 Max Peak
Sl % of
Name of Transmission Line District DC/ SC load IN Remarks
No Loading
MW Amps MW Amps MW Amps MW Amps MW Amps AMPS

vaderalli -Yediyur(Thuruvekere
18 Mandya S/C 10 96 96 #DIV/0!
road)

19 Mandya-Chik Mandya Mandya S/C 394 107.36 MC3 Hampapura


19.4 185

Chikmandy
20 Chikk Mandya-Hampapura Mandya S/C 10.7 102 296 80.65
a

Load will be reduced


KM Doddi
21 KM Doddi-Mandya Mandya S/C 15.5 155 199 54.22 after commissioning of
OG
220 kV R/s, Maddur

tap to KIADB Mandya S/C 25.8 258

tap to KK Doddi Mandya S/C 0 0.00

Load will be reduced


22 Mandya-Kadukothanahalli Mandya S/C 18 171 340 92.64 after commissioning of T.K halli M2
220 kV R/s, Maddur

23 Kadukothanahalli-Simsha Mandya S/C 18 171 218 59.40

Hadli Mandya S/C

tap to Malavalli Mandya S/C

24 Hampapura-Basaralu Mandya S/C 9.9 99 208 72.98

tap to Koppa Mandya S/C 7 70

Somanahall
25 TK Halli - Halgur Mandya S/C 8 68 140 38.15
i-2

26 SFC-TK Halli Mandya S/C 21 204 355 96.73 shimsha-2

27 Shimsha-TK Halli Mandya S/C 32 283 295 80.38 shimsha-1

28 SFC - Shimsha Mandya S/C 94 25.61 Kept open kept open

29 B G Pura - Talakadu Mandya S/C 14 128 128 34.88 bg pura outgoing

30 KIADB - Maddur Mandya S/C 17.3 170 266 72.48

31 K.Honnalagere-Iglur Mandya S/C 14 142 160 43.60 t.k hally akkur mole

kikkeri - yachnahahalli
32 Mandya S/C 122 11.8 139 37.87 Idle charge CRP
(anegola)

Santhe bachalli (Border)-


33 Mandya S/C 0 0.00 Idle charge
Sravana belgola -

34 Huygonahalli-Santhebachalli Mandya S/C 8.8 89 107 29.16

35 Dundanahalli -Huliyur durga Mandya S/C 12.4 122 135 36.78 Idle charge

36 Huygonahalli-K.R.Pet 2 Mandya S/C 13.7 127 192 52.32

37 Huygonahalli-Bookanakere Mandya S/C 36 337 364 99.18

tap to seelnere Mandya S/C

Huygonahally - Proposal submitted for


38 Mandya S/C 33.6 306 388 105.72
Mahadeshwarapura DC line

Huyoganhally-Krishnarajapet
39 Mandya S/C 16.6 160 294 80.11
line 1

Previous line
Huyoganhally to yachenahally Hygonahally - Huyg-cr
40 Mandya S/C 8.3 78 125 34.06
(Anegola limits). yachenahalli (Anegola patna
limit) made LILO and
commissioned on
04.03.2016.
tap to anegola Mandya S/C

41 Tubinakere-Mandya-MC2 Mandya MC 11.1 105 373 101.63


Load will be reduced
after commissioning of
220 kV R/s, Maddur
42 Tubinakere-Mandya-MC4 Mandya MC 10.9 103 373 101.63

43 G.ukkada-S.R.Patna Mandya S/C 31.6 298 298 81.20 SRP

44 S.R.Patna-Metagally Mandya S/C 27.2 258 258 #DIV/0!


Peak load Recorded for Peak load Recorded for Peak load Recorded for Peak load Recorded for Peak load Recorded for
the Month of Nov-19 the Month of Dec-19 the Month of Jan-20 the Month of Feb-20 the Month of Mar-20 Max Peak
Sl % of
Name of Transmission Line District DC/ SC load IN Remarks
No Loading
MW Amps MW Amps MW Amps MW Amps MW Amps AMPS

45 Maddur-k.honnalagere Mandya SC 6.8 64 147 40.05

46 Besagarahalli-Dundanahalli Mandya SC 6.2 61 131 35.69

47 Koppa-Besagarahally Mandya SC 7 70 148 40.33

TK hally -
K.M.Doddi-T.K.Halli M1 S/C 12.8 127 299 81.47
M1
48 Mandya

Idle tap line S/C

B.G.Pura
49 Megalapura SFC- B.G.Pura Mandya SC 11 100 100 27.25
I/c

BGNagara hirisave (up to kadabally


S/C 66 17.98
Kadabally) I/c
\ Mandya

Tap to Kadballi S/C

Yatambadi
T.K.Hally-Akkurmole S/C 31 295 339 92.37
I/c
51 Mandya
Yatambadi
Tap to Yattambadi S/C
I/c

Huygonahalli-
52 Krishna pura - Yachenahalli Mandya S/C 5.4 54 84 22.89 Yachenahalli( Anegola
limit) made LILO and
commissioned on
04.03.2016 Load not
taken.