To provide interconnection
between main and distribution
11 KUR20190926913 2.35
lines at AP Housing board
colony
11
-
Based on the availability, funds may
be allotted
-
Estimation is prepared, to be
forwarded for further approval.
Estimation is prepared, to be
forwarded for further approval.
Estimation is prepared, to be
forwarded for further approval.
Estimation is prepared, to be
forwarded for further approval.
Already CC drains are existing, but the
drain is blocked as the AMRUT
pipeline laid along it. Drain or pipeline
has to be shifted.
Area is extension area. Only few
houses are existing. Work may be
taken up as per funds availability.
Rectified.
SC Sub plan
SC Sub plan
Estimate is prepared.
Estimate is prepared.
Agreement completed
Tender Stage
KURNOOL MUNICIPAL CORPORATION
Information on Financial Community Grievances
1 2 3 4 5 6 7 8 9 10
To provide interconnection
between main and distribution
10 KUR20190926913 2.35 Yes - - - -
lines at AP Housing board
colony
1 2 3 4 5 6 7 8 9 10
KUR201910283207 To provide WBM road at NGO's
12 9.95 Yes - - - -
colony
KUR201910284592 To provide drains at 4th Class
13 9.97 Yes - - - -
KUR201910284651 Emp. Colony
1 2 3 4 5 6 7 8 9 10
24 2019-10285721 Construction of new drain 9.00 Yes - - - -
Total 341.46
If not proposed whether
Centrally the work is included in the
Estimated Municipal 14th Annual
Spandana Grievance sponsore GoAP Finance action plan of the
Sl. Name of Details of the Grievance General
Reference No and cost (in Funds d ULBs as per the guidelines
No. the ULB (Works) of
Date Lakhs) the ULB schemes Funds Commis issued vide this office vide
sion
(CSS) this office ciruclar no.
01/2019-IT, dt: 05.10.2019
1 2 3 4 5 6 7 8 9 10
Superintending Engineer,
Kurnool Municipal Corporation,
Kurnool.
Remarks
11
Estimation is prepared, to be
forwarded for further approval.
Remarks
11
Estimation is prepared, to be
forwarded for further approval.
Estimation is prepared, to be
forwarded for further approval.
Estimation is prepared, to be
forwarded for further approval.
Already CC drains are existing, but the
drain is blocked as the AMRUT
pipeline laid along it. Drain or pipeline
has to be shifted.
Area is extension area. Only few
houses are existing. Work may be
taken up as per funds availability.
Rectified.
SC Sub plan
11
The file is under T.S.
Estimate is prepared.
Estimate is prepared.
Agreement completed
Tender Stage
Remarks
11
Superintending Engineer,
rnool Municipal Corporation,
Kurnool.