Construction of NH-24 Four Lane Bypass Starting from KM. 479.500 OF NH-24 and terminating at KM. 17.

600 of MDR-77C (
NHPD Phase
Activity

12/1/2019
12/2/2019
12/3/2019
12/4/2019
12/5/2019
12/6/2019
S.No. Type of Activity START DATE END DATE DURATION STATUS

1 Excavation
Abutment Wall A1 12/1/2019 12/25/2019 25 Completed ComComComComComCom
Abutment Wall A2 12/10/2019 12/19/2019 10 Completed
Bottom Raf 12/3/2019 12/7/2019 5 Ongoing OngOngOngOng
RE Wall 1 12/4/2019 12/8/2019 5 Completed ComComCom
RE Wall 2 12/5/2019 12/9/2019 5 Pending PenPen
RE Wall 3 12/6/2019 12/10/2019 5 Ongoing Ong
RE Wall 4 12/7/2019 12/11/2019 5 Completed
2 Laying of PCC M15
Abutment Wall A1 12/9/2019 12/13/2019 5 Ongoing
Abutment Wall A2 12/10/2019 12/19/2019 10 Completed
Bottom Raf 12/11/2019 12/15/2019 5 Pending
RE Wall 1 12/12/2019 12/16/2019 5 Ongoing
RE Wall 2 12/13/2019 12/17/2019 5 Completed
RE Wall 3 12/14/2019 12/18/2019 5 Pending
RE Wall 4 12/15/2019 12/19/2019 5 Ongoing
Approach Slab 12/16/2019 12/20/2019 5 Completed
3 Casting of Bottom Raf
Shuttering 12/18/2019 12/22/2019 5 Ongoing
Reinforcement Laying 12/19/2019 12/23/2019 5 Completed
Pouring of concrete 12/20/2019 12/24/2019 5 Pending
4 Casting of Abutment Wall A1
1st Lif 12/22/2019 12/26/2019 5 Completed
Shuttering 12/23/2019 12/27/2019 5 Pending
Reinforcement Laying 12/24/2019 12/28/2019 5 Ongoing
Pouring of concrete 12/25/2019 12/29/2019 5 Completed
2nd Lif 12/26/2019 12/30/2019 5 Pending
Shuttering 12/27/2019 12/31/2019 5 Ongoing
Reinforcement Laying 12/28/2019 1/1/2020 5 Completed
Pouring of concrete 12/29/2019 1/2/2020 5 Pending
3rd Lif 12/30/2019 1/3/2020 5 Ongoing
Shuttering 12/31/2019 1/4/2020 5 Completed
Reinforcement Laying 1/1/2020 1/5/2020 5 Pending
Pouring of concrete 1/2/2020 1/6/2020 5 Ongoing
5 Casting of Abutment Wall A2
1st Lif 1/4/2020 1/8/2020 5 Pending
Shuttering 1/5/2020 1/9/2020 5 Ongoing
Reinforcement Laying 1/6/2020 1/10/2020 5 Completed
Pouring of concrete 1/7/2020 1/11/2020 5 Pending
2nd Lif 1/8/2020 1/12/2020 5 Ongoing
Shuttering 1/9/2020 1/13/2020 5 Completed
Reinforcement Laying 1/10/2020 1/14/2020 5 Pending
Pouring of concrete 1/11/2020 1/15/2020 5 Ongoing
3rd Lif 1/12/2020 1/16/2020 5 Completed
Shuttering 1/13/2020 1/17/2020 5 Pending
Reinforcement Laying 1/14/2020 1/18/2020 5 Ongoing
Pouring of concrete 1/15/2020 1/19/2020 5 Completed
6 Placing of Facia Panels
RE Wall 1 1/17/2020 1/21/2020 5 Ongoing
RE Wall 2 1/18/2020 1/22/2020 5 Completed
RE Wall 3 1/19/2020 1/23/2020 5 Pending
RE Wall 4 1/20/2020 1/24/2020 5 Ongoing
7 Earth Filling
Filter Media & Suitable Soil 1/22/2020 1/26/2020 5 Pending
8 Coping
RE Wall 1 1/24/2020 1/28/2020 5 Completed
RE Wall 2 1/25/2020 1/29/2020 5 Pending
RE Wall 3 1/26/2020 1/30/2020 5 Ongoing
RE Wall 4 1/27/2020 1/31/2020 5 Completed
9 Approach Slab
A1 Side 1/29/2020 2/2/2020 5 Ongoing
Shuttering 1/30/2020 2/3/2020 5 Completed
Reinforcement Laying 1/31/2020 2/4/2020 5 Pending
Pouring of concrete 2/1/2020 2/5/2020 5 Ongoing
A2 Side 2/2/2020 2/6/2020 5 Completed
Shuttering 2/3/2020 2/7/2020 5 Pending
Reinforcement Laying 2/4/2020 2/8/2020 5 Ongoing
Pouring of concrete 2/5/2020 2/9/2020 5 Completed
10 Crash Barrier & Friction Slab
RE Wall 1 2/7/2020 2/11/2020 5 Ongoing
RE Wall 2 2/8/2020 2/12/2020 5 Completed
RE Wall 3 2/9/2020 2/13/2020 5 Pending
RE Wall 4 2/10/2020 2/14/2020 5 Ongoing
Top Slab 2/11/2020 2/15/2020 5 Completed
11 Casting of Top Slab
Shuttering 2/13/2020 2/17/2020 5 Ongoing
Reinforcement Laying 2/14/2020 2/18/2020 5 Completed
Pouring of concrete 2/15/2020 2/19/2020 5 Pending
12 Crust Work
GSB 2/17/2020 2/21/2020 5 Completed
A 1 Side 2/18/2020 2/22/2020 5 Pending
A 2 Side 2/19/2020 2/23/2020 5 Ongoing
WWM1 2/20/2020 2/24/2020 5 Completed
A 1 Side 2/21/2020 2/25/2020 5 Pending
A 2 Side 2/22/2020 2/26/2020 5 Ongoing
WWM2 2/23/2020 2/27/2020 5 Completed
A 1 Side 2/24/2020 2/28/2020 5 Pending
A 2 Side 2/25/2020 2/29/2020 5 Ongoing
DBM 2/26/2020 3/1/2020 5 Completed
BC 2/27/2020 3/2/2020 5 Pending
13 Floor Aproon
PCC 2/29/2020 3/4/2020 5 Completed
Wall 1 Side 3/1/2020 3/5/2020 5 Pending
Wall 2 Side 3/2/2020 3/6/2020 5 Ongoing
Wall 3Side 3/3/2020 3/7/2020 5 Completed
Wall 4 Side 3/4/2020 3/8/2020 5 Pending
Boulder Placing
Wall 1 Side 3/6/2020 3/10/2020 5 Completed
Wall 2 Side 3/7/2020 3/11/2020 5 Pending
Wall 3Side 3/8/2020 3/12/2020 5 Ongoing
Wall 4 Side 3/9/2020 3/13/2020 5 Ongoing
M. 17.600 of MDR-77C (BYPASS CHAINAGE FROM KM. -64.900/64.380 TO KM. 79.516/79.00 Total Length 14.618 KM. ) in the state of utta
NHPD Phase -VII on EPC MODE.
Activity Chart for VUP
12/10/2019
12/11/2019
12/12/2019
12/13/2019
12/14/2019
12/15/2019
12/16/2019
12/17/2019
12/18/2019
12/19/2019
12/20/2019
12/21/2019
12/22/2019
12/23/2019
12/24/2019
12/25/2019
12/26/2019
12/27/2019
12/28/2019
12/29/2019
12/30/2019
12/31/2019
12/7/2019
12/8/2019
12/9/2019

1/1/2020
1/2/2020
1/3/2020
1/4/2020
1/5/2020
1/6/2020
1/7/2020
ComComComComComComComComComComComComComComComComComComCom
ComComComComComComComComComCom
Ong
ComCom
PenPenPen
OngOngOngOng
ComComComComCom

OngOngOngOngOng
ComComComComComComComComComCom
PenPenPenPenPen
OngOngOngOngOng
ComComComComCom
PenPenPenPenPen
OngOngOngOngOng
ComComComComCom

OngOngOngOngOng
ComComComComCom
PenPenPenPenPen

ComComComComCom
PenPenPenPenPen
OngOngOngOngOng
ComComComComCom
PenPenPenPenPen
OngOngOngOngOng
ComComComComCom
PenPenPenPenPen
OngOngOngOngOng
ComComComComCom
PenPenPenPenPen
OngOngOngOngOng

PenPenPenPen
OngOngOng
ComCom
Pen
1/8/2020

Pen
1/9/2020
1/10/2020
1/11/2020
1/12/2020
1/13/2020
1/14/2020
1/15/2020
KM. ) in the state of uttar Pradesh under

1/16/2020

1/17/2020

1/18/2020
OngOng
ComComCom
PenPenPenPen
OngOngOngOngOng
ComComComComCom
PenPenPenPenPen
OngOngOngOngOng
ComComComComCompleted
PenPenPenPending
OngOngOngoing
ComCompleted
S.No. Type of Activity START DATE END DATE PERIOD STATUS Dec-19 Jan-20

1 Embankment W1 W2 W3 W4 W1 W2 W3
64+900 to 65+720
65+720 to 66+170
66+170 to 68+100
68+100 to 68+710
68+710 to 69+250
69+250 to 69+700
69+700 to 70+395
70+395 to 71+005
71+005 to 72+300
72+300 to 73+995
73+995 to 74+595
74+595 to 75+000
75+000 to 76+000
76+000 to 78+000
78+000 to 78+190
78+190 to 79+270
79+270 to 79+516
2 SUBGRADE
64+900 to 65+720
65+720 to 66+170
66+170 to 68+100
68+100 to 68+710
68+710 to 69+250
69+250 to 69+700
69+700 to 70+395
70+395 to 71+005
71+005 to 72+300
72+300 to 73+995
73+995 to 74+595
74+595 to 75+000
75+000 to 76+000
76+000 to 78+000
78+000 to 78+190
78+190 to 79+270
79+270 to 79+516
3 GSB
64+900 to 65+720
65+720 to 66+170
66+170 to 68+100
68+100 to 68+710
68+710 to 69+250
69+250 to 69+700
69+700 to 70+395
70+395 to 71+005
71+005 to 72+300
72+300 to 73+995
73+995 to 74+595
74+595 to 75+000
75+000 to 76+000
76+000 to 78+000
78+000 to 78+190
78+190 to 79+270
79+270 to 79+516
4 WMM
64+900 to 65+720
65+720 to 66+170
66+170 to 68+100
68+100 to 68+710
68+710 to 69+250
69+250 to 69+700
69+700 to 70+395
70+395 to 71+005
71+005 to 72+300
72+300 to 73+995
73+995 to 74+595
74+595 to 75+000
75+000 to 76+000
76+000 to 78+000
78+000 to 78+190
78+190 to 79+270
79+270 to 79+516
5 DBM
64+900 to 65+720
65+720 to 66+170
66+170 to 68+100
68+100 to 68+710
68+710 to 69+250
69+250 to 69+700
69+700 to 70+395
70+395 to 71+005
71+005 to 72+300
72+300 to 73+995
73+995 to 74+595
74+595 to 75+000
75+000 to 76+000
76+000 to 78+000
78+000 to 78+190
78+190 to 79+270
79+270 to 79+516
6 BC
64+900 to 65+720
65+720 to 66+170
66+170 to 68+100
68+100 to 68+710
68+710 to 69+250
69+250 to 69+700
69+700 to 70+395
70+395 to 71+005
71+005 to 72+300
72+300 to 73+995
73+995 to 74+595
74+595 to 75+000
75+000 to 76+000
76+000 to 78+000
78+000 to 78+190
78+190 to 79+270
79+270 to 79+516
Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20

W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
Jul-20 Aug-20 Sep-20 Oct-20 Nov-20

W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4