11. SCOPE OF WORK CHECKLIST
The scope of work should specify the data/activities detailed below, for each hydrostatic
pressure test.
Section/ Description Value
Reference
2.3 PRE-TESTING
Is any pre-testing of assemblies required? Yes [ ] No [ ]
If yes, specify these assemblies
4. CORROSION PRODUCTS
5. TEST EQUIPMENT
9.2 DOCUMENTATION
12. TEST PROCEDURE CHECKLIST
The test procedure should specify the data/activities detailed below, for each pressure
testing operation.
Section/ Activity/Procedure Completed
Reference
2.2 Sequence, personnel and procedure
List of nominated personnel and their qualifications [ ... ]
Detailed schedule incl. mobilisation date(s) of nominated personnel [ ... ]
2.3 Test sections and assemblies
Number of locations: [ ... ]
Geometrical data and steel grades: [ ... ]
(length, diameter, wall thickness, internal volume, elevation
difference/profile)
Number and locations of pre‐tests, if appropriate: [ ... ]
3. Safety and environment
Emergency plan [ ... ]
Locations of warning notices [ ... ]
Locations of test equipment [ ... ]
(chemicals, filters, break tank, pumps, safety relief valve, test heads and
test cabin)
Notification and consultation, if appropriate [ ... ]
(persons, companies, authorities and local police)
Patrols to watch special points of hazard [ ... ]
(crossings, test sites, etc.)
Seasonal environmental status [ ... ]
(water source)
Type of waste and location of disposal [ ... ]
(dyes, chemicals, debris from cleaning operation)
4/A4 Line‐fill water
Source of water [ ... ]
Location and method of water withdrawal [ ... ]
Independent testing laboratory, if applicable [ ... ]
Water analysis report, if appropriate [ ... ]
Chemical treatments and injection rates, if appropriate [ ... ]
Dyes and injection rates, if appropriate [ ... ]
Location and method of water discharge/disposal [ ... ]
Details of winter testing, if appropriate [ ... ]
Permits from the local authorities [ ... ]