checking 10-12
11 Painting Inspection DFT DFT meter, Visual points each on Report P (P) -
gate and guide
frame
Preliminary Test:
1) Inspection of sealing and
measurement of seals gap
2) Setting of limit switch,
EPI and control equipment
3) Inspection of satisfactory
installation of all
components
Testing & commissioning Operation Test:
of gates (After completion Gate leaf, Guide frame & 1) Measurements of
14 100% Report - Project In-Charge
of installation work at Hoisting operation speeds
site) 2) Accuracy of EPI
3) Manual operation of
hoist
5) Leakage during closed
condition of gate
6) Satisfactory operation
under dry and available
maximum water level
conditions
D] Final inspection
15 Review all reports Records Review 100% Review Review Report Review - P -
Handover to the
Project Manager / Project In-
16 Employer after testing & Review all reports Review all reports 100% Official Letter -
Charge
commissioning
Abbreviations
ASME American Society of Mechanical Engineering NDT Non Destructive Test Cust Customer
Sec Section DFT Dry Film Thickness Customer Employer / Client
Art Article MD Mechanical Division,
Gr Grade QD Quality Division,