D - REVIEWED FOR INFORMATION ONLY


Authorization to proceed does not relieve Contractor/Supplier of its responsibility
or liability under the Contract and or Purchase Order.

By: JFG - Consolidado,GUT87764,10-10-2018

TAG N° 8011-PP-205/ 8011-PP-206

CUSTOMER CODE P047-X005_E202H818-PROC-P-0240

VENDOR CODE E202H818-PROC-P-0240

A FOR APPROVAL 24-Sep-18 SFO A. CASTILLO M. ELIAS

REV DESCRIPTION DATE BY REVIEWED APPROVED

STANDARD PRESERVATION AND PACKING PROCEDURES FOR PUMPS REV. A

GOULDS PUMPS MANUFACTURING CONTROL


ITT INDUSTRIES PROCEDURE EP 27
Seneca Falls Operations REV. 1 Page 1 of 4

TITLE: STANDARD PRESERVATION AND PACKING PROCEDURES FOR PUMPS

1 PURPOSE:

1.1 This procedure describes the standard steps taken to protect pumps prior to shipment when no special

requirements are specified on the Goulds Order.

Goulds Serial No: E202H818-1-2

Item No: 8011-PP-205/206


Project No: Toromocho Expansion

2 SCOPE:

Service: High Pressure Mill Water Pumps

2.1 The steps described in this procedure apply to SFO pump lines.

3 PROCEDURE
3.1 The preservation and packaging process takes place in several areas during the course of assembly and

preparation for shipment.

3.2 For specific preservation & packaging requirements see table 3.3.

Revised By: Bob Duffy Approvals: QA Manager \ Dan DeMeritt


Date of Revision: 3/9/04 Joe Kessler \ Bob Cordovani \Bob Duffy

"Printed Copies of this Procedure are Uncontrolled and must DISCARDED after use"
GOULDS PUMPS MANUFACTURING CONTROL
ITT INDUSTRIES PROCEDURE EP 27
Seneca Falls Operations REV. 1 Page 2 of 4

3.3 Packaging Preservation Requirements

RESPONSIBILITIES ACTIVITIES MATERIALS EXCEPTION

Power End Station Spray bearing housings Sunvis 968 or compatible oil
Assembly Floor Fog all pumps through Crow n 6011 or equivalent Not if EPR O-ring is used

suction & discharge openings

Test and Assembly Floor After run test drain water, Crown 6011 or equivalent Flush 3935 and 3335 pumps with ethylene glycol,

spray flanges and internals drain and attach warning tags

Power End Station and Lubricate “O” rings and Parker “ O” ring lubricant
Assembly Floor paper gaskets

Revised By: Bob Duffy Approvals: QA Manager \ Dan DeMeritt


Date of Revision: 3/9/04 Joe Kessler \ Bob Cordovani \Bob Duffy

"Printed Copies of this Procedure are Uncontrolled and must DISCARDED after use"
GOULDS PUMPS MANUFACTURING CONTROL
ITT INDUSTRIES PROCEDURE EP 27
Seneca Falls Operations REV. 1 Page 3 of 4

RESPONSIBILITIES ACTIVITIES MATERIALS EXCEPTION


Paint Booth Paint all exterior surfaces of
One coat (1.0 mill) Goulds
1. Unless otherwise stated on Goulds Order

assembled pump & bedplate


Standard Paint 2. Do Not paint:
(text deleted) a.flanges
b. machined fits

c.exposed shafts
d. hubs

e.stainless steel glands

f. Under side of fabricated bedplates in Shop#2

g. mounting surfaces on API & ANSI bedplates

per E-2354

h.Stainless Steel casings on model 3333& 3335

casings
i. Other Stainless Steel components if specified on

Goulds order

j. Labyrinth and Mechanical Seals


k. Keys
l. Nameplates

m. Instrumentation

n. API: SS pipe/Tubing(as standard)


Drivers/Lube system/ stainless seal parts (as

a standard)

3. Coupling guards are precoated with baked enamel

in safety color orange per

ANSI Z53.1-67

GOULDS PUMPS MANUFACTURING CONTROL


ITT INDUSTRIES PROCEDURE EP 27
Seneca Falls Operations REV. 1 Page 4 of 4

RESPONSIBILITIES ACTIVITIES MATERIALS EXCEPTION

Shipping Floor Skid all pumps mounted on Large pumps may not be skidded

bedplates

Protect piping configuration Hardboard flange protectors API Pumps use gasketed metal flange protectors

and motor with wood

construction as needed

Cover suction and discharge


Hardboard flange protectors API Pumps use gasketed metal flange protectors

openings
Install plastic plugs in model

3333and 3935 threaded

openings
(text deleted) Apply preservation to all
Crown 6011 or equivalent
API Pumps are coated with firm film preservative
unpainted surfaces including
(Marvelpack 22 preservative

suction and discharge


may be substituted)

waterway

Non bedplated pumps are Small 3333 and 3935 pumps are packed in boxes

skidded or mounted to a

platform depending on size


Goulds order may specify special packaging

requirements

Customer Store pumps in original If pump is stored out doors or installed with delayed

packaging in dry, well startup, additional protection may be required

protected storage areas