By:JFG,GUT87764,10-10-2018
1 PURPOSE:
1.1 This procedure describes the standard steps taken to protect pumps prior to shipment when no special
2 SCOPE:
2.1 The steps described in this procedure apply to SFO pump lines.
3 PROCEDURE
3.1 The preservation and packaging process takes place in several areas during the course of assembly and
3.2 For specific preservation & packaging requirements see table 3.3.
"Printed Copies of this Procedure are Uncontrolled and must DISCARDED after use"
GOULDS PUMPS MANUFACTURING CONTROL
ITT INDUSTRIES PROCEDURE EP 27
Seneca Falls Operations REV. 1 Page 2 of 4
Power End Station Spray bearing housings Sunvis 968 or compatible oil
Assembly Floor Fog all pumps through Crow n 6011 or equivalent Not if EPR O-ring is used
Test and Assembly Floor After run test drain water, Crown 6011 or equivalent Flush 3935 and 3335 pumps with ethylene glycol,
Power End Station and Lubricate “O” rings and Parker “ O” ring lubricant
Assembly Floor paper gaskets
"Printed Copies of this Procedure are Uncontrolled and must DISCARDED after use"
GOULDS PUMPS MANUFACTURING CONTROL
ITT INDUSTRIES PROCEDURE EP 27
Seneca Falls Operations REV. 1 Page 3 of 4
c.exposed shafts
d. hubs
per E-2354
casings
i. Other Stainless Steel components if specified on
Goulds order
m. Instrumentation
a standard)
ANSI Z53.1-67
Shipping Floor Skid all pumps mounted on Large pumps may not be skidded
bedplates
Protect piping configuration Hardboard flange protectors API Pumps use gasketed metal flange protectors
construction as needed
openings
Install plastic plugs in model
openings
(text deleted) Apply preservation to all
Crown 6011 or equivalent
API Pumps are coated with firm film preservative
unpainted surfaces including
(Marvelpack 22 preservative
waterway
Non bedplated pumps are Small 3333 and 3935 pumps are packed in boxes
skidded or mounted to a
requirements
Customer Store pumps in original If pump is stored out doors or installed with delayed