Sunteți pe pagina 1din 2

See discussions, stats, and author profiles for this publication at: https://www.researchgate.

net/publication/313255145

Shear Connector Design of Steel Belt Truss-to-Concrete Mega Column


Connection

Article  in  Aci Structural Journal · January 2017


DOI: 10.14359/51689255

CITATIONS READS

0 602

4 authors, including:

Jang-Woon Baek Hyeon-Jong Hwang


Korea Military Academy Hunan University
13 PUBLICATIONS   21 CITATIONS    62 PUBLICATIONS   166 CITATIONS   

SEE PROFILE SEE PROFILE

Tae-Sung Eom
Dankook University
76 PUBLICATIONS   343 CITATIONS   

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

A hybrid shear connector View project

Nuclear power plant walls with Grade 550 MPa re-bars View project

All content following this page was uploaded by Hyeon-Jong Hwang on 12 March 2019.

The user has requested enhancement of the downloaded file.


ACI STRUCTURAL JOURNAL TECHNICAL PAPER
Title No. 114-S42

Shear Connector Design of Steel Belt Truss-to-Concrete


Mega Column Connection
by Hong-Gun Park, Jang-Woon Baek, Hyeon-Jong Hwang, and Tae-Sung Eom

The structural performance of a steel belt truss-to-concrete mega ible shear connectors, are generally used for large interface
column connection in a 123-story building was studied. For the connections.1-7 Due to the ductile behavior of the headed
connection, a four-story-high steel belt truss is connected to the shear studs, shear force can be successfully redistributed
exterior face of the concrete mega columns by hundreds of shear among the shear connectors. The force-transfer mecha-
connectors that consist of embedded shear plates and dowel bars.
nism and design strength of headed shear studs are well-
In this study, shear tests were performed for short connection spec-
established in current design codes such as AISC 360-108 and
imens with a unit length of 900 mm (35.4 in.). The peak strength,
residual strength, and stiffness were investigated using various Eurocode 4.9 On the other hand, rigid shear connectors such
shear-transfer mechanisms, such as concrete bearing, shear fric- as channel and angle sections can also be used. Slutter and
tion, and strut-and-tie mechanism. Based on the results, a behavior Driscoll10 developed a design equation for the shear strength
model for the shear connection unit was proposed. The proposed of channel shear connectors on the basis of the results of
model was applied to nonlinear numerical analysis for the proto- pushout tests. The equation was modified and adopted in
type shear connection with the full length of 14,400 mm (47.2 ft). AISC 360-10.8 Basically, the channel shear connectors are
The strength, displacement, and force redistribution of the proto- very rigid because shear force is resisted by concrete bearing.
type connection were investigated under the service and ultimate Therefore, to prevent premature uplift failure and to enhance
load conditions. shear-redistribution capacity, special details are required.11
Keywords: belt truss; dowel bar; mega column; shear connection; shear
Perfobond rib plates can be used as an alternative to the
connector; shear plate; shear stud. conventional shear connectors.12 Unlike the rigid channel
shear connectors, the perfobond rib plates are placed in the
INTRODUCTION same direction as the shear force to be considered. By making
A 555 m (1821 ft) high-rise building with 123 stories is holes in the perfobond rib plates, the shear strength and
under construction in South Korea. To support the extremely uplift resistance can be increased. The shear strength can be
large gravity and wind loads, the primary structural system further increased by placing transverse bars passing through
consists of a reinforced concrete (RC) core wall and eight the holes.13-15 Vianna et al.16 studied the performance of the
concrete mega columns on the perimeter of the floor plan T-perfobond rib connectors with a flanged section. The test
(refer to Fig. 1(a)). To resist wind load, steel outrigger trusses results showed that, when compared to conventional perfo-
connect the mega columns to the core wall between the 39th bond rib connectors, the strength and stiffness of the T-perfo-
and 44th floors and between the 72nd and 76th floors. In bond rib connectors were greater, but the ductility was less.
addition, a four-story-high steel belt truss is connected to In the design of the shear connection between the steel belt
the mega columns (refer to Fig. 1(a)) to transfer the large truss and concrete mega column used from the 72nd to the
gravity load of the steel superstructures between the 76th 76th floors of the high-rise building, unlike conventional shear
and 107th floors. The concrete mega columns have square connections, the shear demand (120,000 kN [27,000  kip])
cross sections varying from 3500 x 3500 mm (138 x 138 in.) is very large. Further, as shown in Fig. 2(b), large-diameter
on the lower floors to 2000 x 2000 mm (78.7 x 78.7 in.) on bar grids of longitudinal D51 bars (diameter Db = 50.8 mm
the 76th floor. For fast construction, auto-climbing forms are [2.00 in.]) and transverse D19 hoops (diameter db = 19.1 mm
used for the concrete work of the mega columns, thereby [0.75 in.]) are densely placed. Thus, available connection
minimizing any intervention of intersecting steel beams. methods that can fit the space are limited; it is practically
After the concrete work, the belt truss from the 72nd to the infeasible to use perforated channels or rib plates. More
76th floors is connected to the exterior face of the mega importantly, in the vertical four-story-high connection, unlike
columns by shear connectors (that is, embedded shear plates horizontal connections, uplift failure can cause catastrophic
and dowel bars; refer to Fig. 1(b)). In particular, because the failure of the overall connection (refer to Fig. 2(a)). Therefore,
vertical shear demand at the interface between the belt truss a hybrid shear connector using embedded shear plates and
and mega column is as much as 120,000 kN (27,000 kip), dowel bars, which are simple in detailing and fabrication, was
many shear connectors are required. Therefore, the perfor- considered. By placing the rigid shear plates in the transverse
mance of the shear connectors at the interface is crucial to ACI Structural Journal, V. 114, No.2, March-April 2017.
the structural safety of the entire structure. MS No. S-2016-083.R1, doi: 10.14359/51689255, was received March 18, 2016,
and reviewed under Institute publication policies. Copyright ©  2017, American
Since the 1960s, various types of shear connectors have Concrete Institute. All rights reserved, including the making of copies unless
been developed for the shear connection between steel beams permission is obtained from the copyright proprietors. Pertinent discussion including
author’s closure, if any, will be published ten months from this journal’s date if the
and concrete slabs. Headed shear studs, which are flex- discussion is received within four months of the paper’s print publication.

ACI Structural Journal/March-April 2017 499