Documente Academic
Documente Profesional
Documente Cultură
City of Kirkland
Attachment 1
Adopted: (DRAFT)
Contact:
Table of
1. Overview ............................1
3. Land Use.............................5
4. Urban Design.....................37
5. Environment......................57
6. Transportation..................65
7. Housing..............................83
8. Economic Development...85
9. Public Facilities.................91
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
1. OVERVIEW
This consolidated plan has been compiled to Figures titled GD and marked * have been
accompany the City of Kirkland’s application created for this consolidated plan.
to King County and the Puget Sound
Regional Council (PSRC) for designation of
Greater Downtown Kirkland as an Urban
Center. Urban Centers are regionally-
designated places that contain a mix of uses
and activities, are connected by efficient
transportation, and are well-suited to
accommodate future growth. Policy LU
5.5 of the City of Kirkland Comprehensive
Plan supports the designation of Greater
Downtown as an Urban Center.
1
Forbes Lake
Park
CRO
SS
K
ST
116TH AVE NE
IRK
112TH AVE NE
LA
Highlands Beach Property
ND
ST
ST
NE 90TH ST
Cedar View
MARKET
Tot Lot
CO R
Park
6TH
Park
3RD
North Rose Hill
RID
Norkirk
R O
124TH AVE NE
7TH AVE
Market
120TH AVE NE
Lake Ave W
Park
NE 85TH ST
122ND AVE NE
NE 85TH ST
Heritage
Park
AY
L W
RA
W
NT
CE
AV
RE
LY
Open Space Rose Hill Meadows
W Ohde Ave Pea Patch Park
AY
Peter Kirk
Park
Kirkland Cemetery
KIRKLAND AVE
NE 80TH ST
Marina
Park
T
HS
LAKE S S
Everest
Park
Street End City of Kirkland, WA
Park
Everest
OR
Greater Downtown Urban Center Plan
ID
RR
Brink Figure GD-1
CO
Park
L
Greater Downtown Area Boundaries
A
ND
K
K LA
E
116TH AVE NE
K IR
Downtown Urban Center (proposed)
6TH ST S
SS
8TH ST S
W
Neighborhoods
CRO
STATE ST S
A
Within proposed Downtown Urban Center:
S H
Lakeview
Everest
LAKE ST S
Elem
I N G
Highlands
Settler's Landing
Park Moss Bay
T O N
Norkirk
Bridle Bridle Rose Hill
NorthTrails
NE 68TH ST
Trails South Rose Hill
Marsh
Park
Lakeview 0 0.25 Mile
Terrace
Central Houghton
Taylor Fields
Park
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
2
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
2. VISION STATEMENT
Downtown Kirkland provides a strong sense NE 85th Street itself continues to serve as a
of community identity for all of Kirkland. This primary transportation link between Kirkland,
identity is derived from Downtown’s physical Redmond, and the reconfigured I-405/
setting along the lakefront, its distinctive NE 85th Street interchange with a Sound
topography, and the human scale of existing Transit station. Modifications to NE 85th
development. This identity is reinforced in the Street have improved its ability to be used by
minds of Kirkland residents by Downtown’s pedestrians and transit, while maintaining or
historic role as the cultural and civic heart of slightly increasing its capacity for vehicles.
the community. Downtown Kirkland is also Steps also have been taken to minimize
a vibrant, walkable community where many “cutthrough” traffic and other traffic impacts
choose to live and work. in the residential areas north and south of the
business district.
Future growth and development of the
Downtown must recognize its unique identity, The appearance of the district, as it has
complement ongoing civic activities, clarify evolved, has benefited from a coordinated
Downtown’s natural physical setting, enhance effort by the City, business owners and
the open space network, and add pedestrian property owners to improve the image of the
amenities. These qualities will be encouraged area. As properties redevelop architectural
by attracting economic development that and landscape design standards for new or
emphasizes diversity and quality within a remodeled retail, commercial and multifamily
hometown setting of human scale.1 residential buildings have improved the
appearance of the district. These standards
require ample landscaping or other
techniques to ease the transition between
different adjacent land uses. These standards
also generally require new commercial or
mixed-use buildings to be oriented to the
sidewalks (with parking behind or to the side),
and promote neighborhood character with
coordinated signage and less of a “strip mall”
feel.2
3
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
4
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
3. LAND USE
In terms of land use, the Moss Bay For properties within the shoreline
Neighborhood is Kirkland’s most complex jurisdiction, the policies in the Shoreline
area. Situated on the shores of Lake Area chapter and shoreline management
Washington, the area contains a wide variety regulations in the Kirkland Zoning Code
of land uses, including Downtown retail should be observed.1
businesses, industrial activities, offices, well
established single-family areas, large-scale
multifamily development, a marina, a baseball
facility, a post office, and the Cross Kirkland
Corridor
5
Forbes Lake
Park
CRO
SS
K
ST
116TH AVE NE
IRK
112TH AVE NE
LA
Beach Property
ND
ST
ST
NE 90TH ST
Cedar View
MARKET
Tot Lot
CO R
Park
6TH
Park
3RD
RID
R O
124TH AVE NE
120TH AVE NE
7TH AVE
Lake Ave W
Park
NE 85TH ST
122ND AVE NE
NE 85TH ST
Heritage
Park
AY
W
L W
AV
RA
E
NT
CE
R
LY
Open Space Rose Hill Meadows
W Ohde Ave Pea Patch Park
AY
Peter Kirk
Park
Kirkland Cemetery
KIRK LAND AVE
NE 80TH ST
Marina
Park
Lk. Washington HS
City of Kirkland, WA
Neal-Landguth
Park Greater Downtown Urban Center Plan
Lk. Washington
Figure GD-2 HS
405
§
¨
¦
T
LAKE S S
Greater Downtown Land Use
Street End
Park Everest
Park
Downtown Urban Center (proposed)
OR
ID
RR
Brink Comprehensive Plan Land Use*
CO
Park
L
Commercial Mixed Use
A
ND
K
Light Industry/Technology
K LA
E
116TH AVE NE
K IR
Greenbelt/Urban Separator
6TH ST S
SS
Transit Oriented Development
8TH ST S
W
CRO
STATE ST S
Office Mixed Use
A
Office/Multi-Family
S H
Lakeview High Density Residential
LAKE ST S
Elem
I N G
Settler's Landing
Medium Density Residential
Park Low Density Residential
T O N
Institutions
Park/Open Space
NE 68TH ST
* As of 12/11/2018
Marsh
Park 0 0.25 Mile
6
7
CRO
SS
K
ST
116TH AVE NE
IRK
112TH AVE NE
LA
RH 1B
ND
ST
ST
NE 90TH ST
MARKET
CO R
6TH
RH
3RD
RID
O
1B
R
124TH AVE NE
RH 1A 120TH AVE NE
7TH AVE
RM 3.6
PLA 7C LIT
CBD 6 RH 3
NE 85TH ST
122ND AVE NE
NE 85TH ST
PLA 7B
CBD 7 PLA 5C LIT RH 5A
RH 2A
PO
PLA 7A
Y
WA
W
L CBD 5A PLA 5D
RA
AV
CBD 8 NT RH 2B
E
CE
R
LY PLA 5A
W P PLA 5B
AY
CBD CBD 5 RH 2C
1B Peter Kirk Park PLA 5E
CBD 1A
RM 2.4
CBD 2 RM 3.6 PR
P KIRKLAND AVE
PR 2.4 3.6
RS 8.5 LIT
CBD 4 PLA 6J
L A KE
405
WD I
§
¨
¦
ST S
PLA 6G
Street End Park PLA 6B
PLA 6A LIT
P
OR
WD I PLA City of Kirkland, WA
ID
Brink PLA 6I 6K
RR
Park PR Greater Downtown Urban Center Plan
CO
P
L
PLA 6H PLA 6E 5.0
A
Figure GD-3
ND
K
K LA
E
116TH AVE NE
K IR
5.0 7.2 PLA 6F PLA 6TH ST S
SS
6G
8TH ST S
W
RS 8.5
CRO
STATE ST S
A
LIT Land Use and Zoning Designations
S H
Settlers WD I (C) Commercial Mixed Use (HDR) High Density Residential
Lakeview
Landing
LAKE ST S
Elem (IND) Industrial Mixed Use (MDR) Medium Density Residential
I N G
Park
P RM 3.6 RS 8.5 (G-US) Greenbelt/Urban Separator (LDR) Low Density Residential
BN
T O N
WD I HENC 1 HENC (TOD) Transit Oriented Development (I) Institutions
3
(O) Office Mixed Use (P) Park/Open Space
NE 68TH ST
(O/MF) Office/Multi-Family LIT Zoning boundary/code
0 0.25 Mile
Attachment 1
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Central Business District1 The enhancement of the area for retail and
service businesses will best be served by
concentrating such uses in the pedestrian core
Policy MB 5: and shoreline districts and by encouraging a
A critical mass of retail uses and services is substantial increase in the amount of housing
essential to the economic vitality of the and office floor area either within or adjacent
Downtown area. to the core. In implementing this land use
concept as a part of Downtown’s vision, care
The Downtown area is appropriate for a must be taken to respect and enhance the
wide variety of permitted uses. The area’s existing features, patterns, and opportunities
economic vitality and identity as a commercial discussed in the following plan sections on
center will depend upon its ability to establish urban design, public facilities, and circulation.
and retain a critical mass of retail uses and
services, primarily located west of 3rd Street. Policy MB 6:
If this objective is not reached, it relegates
the Downtown to a weaker and narrower Land use districts in the Downtown area are
commercial focus (i.e., restaurants and offices identified in Figure MB-5.
only) and lessens the opportunities and
reasons for Kirkland residents and employees Figure MB-5 identifies five land use
to frequent the Downtown. districts within the Downtown area. The
districts are structured according to natural
constraints such as topographical change,
the appropriateness of pedestrian and/
or automobile-oriented uses within the
district, and linkages with nearby residential
neighborhoods and other commercial activity
centers.
8
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
9TH AVE
W
ST
D
2N 8TH AVE
5TH ST
7TH AVE
4TH ST
2ND ST
1ST ST
3RD ST
5TH AVE
NE Core
6TH ST
AV
E Frame
4T H
4TH AVE
4TH AVE
VE
3RD A
TR A
LW
A Y
East
2 ND
CE N
3RD AVE
Core
PL
Frame
NW Core
CTR
AVE
2ND
Frame
E
AC
PL
RK
PA
K LN T
PA R 6TH C
Y
WA
LA K
ND
LA
E
K
ST
LA K IR
K
ES
H
O
Core
R
E
Area KIRKL AND AVE
ST S
P
LZ
KIRKLAND AVE
MA IN
ST
A TE
1ST AVE
ST South
S
Core
S
1ST AVE S
Frame
2ND AVE S
3RD ST S
3RD LN S
4TH ST S
5TH PL S
2ND ST S
LAK E
3RD AVE S
Lake
6TH ST S
ST S
Washington 4TH CT S
STATE ST S
4TH AVE S
3R D
R
DO
LN S
RI
S
OR
5TH AVE S
PL
DC
5T H
LAN
5TH AVE S
IRK
4TH ST S
SS K
5TH ST S
CR O
6TH AVE S
9
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
10
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
11
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
A broad range of commercial uses should be Development in the East Core Frame should
encouraged in the Northeast Core Frame. be in large, intensively developed mixed-use
projects.
Redevelopment or new development in this
area should be encouraged to represent a The East Core Frame is located east of Peter
broad range of commercial uses with an Kirk Park, extending from Kirkland Way
increased emphasis on pedestrian character. northerly to 7th Avenue. The area includes the
Future development should set the bulk Kirkland Parkplace shopping center as well
of structures back from the street while as several large office buildings and large
providing low, one-story retail shops at residential complexes. South of Central Way,
the edge of the sidewalk. This will present the area is largely commercial and provides
an open, green face to Central Way and, significant opportunities for redevelopment.
in conjunction with Peter Kirk Park on the Because this area provides the best
south side of the street, create a tree-lined opportunities in the Downtown for creating a
boulevard effect as one approaches the core strong employment base, redevelopment for
area from the east. office use should be emphasized. Within the
Parkplace Center site, however, retail uses
should be a significant component of a mixed-
use complex.
12
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
13
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Policy RH 9:
14
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
15
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
16
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Single
family homes in Moss Bay
17
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Policy MB 37:
18
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
19
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
20
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Highlands Multifamily9
Policy H-6.3:
Highlands Multifamily
9 Highlands Neighborhood Plan
21
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
22
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
23
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
24
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
West B Subarea
Policy MB 44:
High-density residential and office uses The southern portion of Subarea B is adjacent
permitted in Planned Area 5. to 6th Street and the entire subarea is south
of 4th Avenue. Subarea B is heavily impacted
The eastern portion of the Moss Bay by traffic, as well as existing and future
Neighborhood has been designated commercial uses and offices to the west. The
as Planned Area 5. Due to topographic noise and traffic make this area inappropriate
conditions and circulation patterns, land for single-family use, while its ease of access
in Planned Area 5 is relatively secluded. and proximity to the Downtown makes it
The area has been designated for high- appropriate for both offices and multifamily
density residential and office uses because uses at a density of up to 24 dwelling units
of the ability to buffer such high-density per acre. New development in this subarea
development from other uses in the area. The should minimize access points directly onto
area is developed primarily in high-density 6th Street. Access for offices, however, should
residential development while limited office be provided exclusively from 6th Street or 4th
uses exist in the northwestern portion of the Avenue and precluded from Kirkland Way.
area. This planned area is divided into five Structures should be limited to three stories
subareas, based on the unique conditions for in height.
development within each area.
Policy MB 45:
Central A Subarea
25
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Subarea C, located north of Subareas B and The easternmost third of PLA 5 is identified
A, and north and west of Subarea D, contains as Subarea D. This area has developed in
office development and the U.S. Post Office high-density multifamily uses. Any future
facility serving Greater Kirkland. Remaining development should be multifamily residential
land should develop as professional office or at a density of up to 24 dwelling units per acre.
multifamily residential with no designated
density limit. Structures up to five or six Policy MB 49:
stories in height are appropriate in the area South E Subarea
north of Subareas B and A for developments
containing at least one acre. The adjacent The most southerly subarea is the smallest
steep hillside limits potential view obstruction and is somewhat isolated from the other
from tall buildings. At the same time, taller subareas. Lying between 2nd Avenue and
than normal structures could themselves Kirkland Way, this area could develop with
take advantage of views to the west while high-density multifamily residential (up to 24
maintaining greater open area on site and units per acre). Due to sight distance problems
enhancing the greenbelt spine. Structures on Kirkland Way, access to and from this area
up to four stories in height are appropriate should be restricted to 2nd Avenue.
in the eastern portion near Subarea 5D for
developments containing at least one acre, if
additional building setbacks are provided from
residential development to the east in Subarea
5D.
26
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Concept of “Subareas” discussed. The lands along State Street are designated
as Subarea B. Much of this land is already
The bulk of the land south of Kirkland Avenue developed with office uses making future
is contained in Planned Area 6 (Figure GD- office development also appropriate.
3*). Within this planned area, land is divided Multifamily development should also
into a number of subareas, based on unique be allowed due to its compatibility with
conditions including use conflicts, various offices and adjacent residential uses. Such
parcel ownerships, traffic problems, lack multifamily development should occur at a
of utilities, and other factors which may density of 12 dwelling units per acre.
influence future development of the land. Due Standards for future professional office
to its location, this planned area also has a development along State Street are listed.
special relationship with the Downtown. Future professional offices along State
Street should locate only north of 7th Avenue
Policy MB 51: South, in order to encourage a compact office
corridor.
Land use in Subarea A discussed.
27
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
28
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Natural constraints exist in northeast corner of Subarea F is appropriate for medium-density (12
Subarea D. dwelling units per acre) residential development.
29
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Buffering of industrial development in Subarea G Traffic from uses in Subarea G should be routed
from nearby residences is discussed. to the east.
While the Cross Kirkland Corridor Industrial and office traffic should not be
borders Subarea G to the east, residential permitted on 4th, 5th, 6th, or 7th Avenue
developments lie to the west and north. South, since it is not compatible with single-
Existing industrial uses are not adequately family homes in the area. Industrial and
buffered from adjoining residential uses. Prior office traffic should be routed to the east on
to any expansion of industrial development in 5th Place South. In addition, pedestrian and
this area, landscaped buffers and acoustical bicycle enhancements, including sidewalks,
barriers should be installed where necessary curbs, gutters, and crosswalks, should be
with particular attention to mitigating noise developed along 7th Avenue South to provide
and lighting impacts. safe access to and from Lakeview Elementary
School.
Special precautions should be taken to
buffer new light industrial or office uses Policy MB 60:
from adjoining residential uses. Existing light Access concerns for expansion of industrial
industrial development is not adequately development along the Cross Kirkland Corridor
buffered from adjoining residential uses. are discussed.
Therefore, prior to any expansion, landscaped
buffers and acoustical barriers should be Fifth Place South, adjacent to the Cross
in-stalled where necessary with particular Kirkland Corridor, has been improved from
attention to mitigating noise and lighting 7th Avenue South to 6th Street South. It was
impacts. opened in part to alleviate incompatible traffic
impacts generated from light industrial uses
onto residential uses to the west. Measures
should be taken to prevent 7th Avenue South
from becoming a through route between State
Street and 6th Street South.
30
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
31
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
32
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Policy EV 14:
33
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
34
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Professional office uses permitted east of 6th Professional office and limited commercial
Street South. activities are appropriate in the NE 85th Street
freeway interchange. Expansion of these
Land along the east side of 6th Street South activities is to be limited.
is suitable for professional office use as a
transition to the residential area to the east. Conditions in the vicinity of the NE 85th
Such development should be oriented toward Street freeway interchange are somewhat
and take access only from 6th Street South. different. Although much of the surrounding
The easterly extension of such development land to the south is developed for single-
also should be strictly limited to the midblock family use, convenient access to NE 85th
line between 6th and 7th Streets South. and Interstate 405 makes this area attractive
for limited commercial activity. The existing
Policy EV 19: office building north of Ohde Avenue takes
advantage of this location while limiting
There should be an effective transition between
impacts to the nearby single-family area.
single-family neighborhoods and higher density
Expansion of existing storage facilities along
residential and commercial uses to minimize
the Cross Kirkland Corridor is discouraged. As
impacts between uses.
redevelopment occurs along the Corridor, uses
should be encouraged that will complement
Along transition areas between uses, higher
the use of the CKC, and provide connections
density and commercial development should
to the trail that will benefit the pedestrian
minimize impacts on adjacent low density
and bicycle users of the trail. See Land Use
single-family neighborhoods with techniques
Element policies from the Cross Kirkland
such as landscape buffers, tree retention,
Corridor Overlay.
the size, width and height of structures,
compatible uses, adequate parking on site,
and low lighting and noise levels.
35
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
36
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
4. URBAN DESIGN1
The urban design of Downtown Kirkland
consists of many disparate elements
which, together, define its identity and
“sense of place.” This document provides
policy guidelines for the design of private
development and a master plan for the
development of the public framework of
streets, pedestrian pathways, public facilities,
parks, public buildings, and other public
improvements (see Figure GD-6*).
37
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
38
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
39
Maximum Number of Stories
(See text for specific allowances)
1-2
2
1A 2-3* Discretionary Approval for
Heights over 2 Stories
1B 2-4*
6
3
7 4
1 Discretionary Approval for
5 3-5 Heights over 2 Stories
Pursuant to KZC and
5A 3-8 Parkplace Master Plan and
2
3 5A Design Guidelines
5 3-6
1 3
1B
3
Lake Washington
40
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
41
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
The portions of Design District 1 designated The portions of Design District 1 designated
as 1A in Figure MB-7 should be limited to as 1B in Figure MB-7 provide the best
a maximum height of three stories. As an opportunities for new development that could
incentive to encourage residential use of contribute to the pedestrian fabric of the
upper floors and to strengthen the retail Downtown. Much of the existing development
fabric of the Core Area, a fourth story of in these areas consists of older auto-oriented
height may be allowed. This additional story uses defined by surface parking lots and poor
may be considered by the Design Review pedestrian orientation. To provide incentive
Board for projects where at least two of for redevelopment and because these larger
the upper stories are residential, the total sites have more flexibility to accommodate
height is not more than four feet taller than additional height, a mix of two to four stories
the height that would result from an office in height is appropriate. East of Main Street,
project with two stories of office over ground development should combine modulations in
floor retail, stories above the second story building heights with modulations of facade
are set back significantly from the street and widths to break large buildings into the
the building form is stepped back at the third appearance of multiple smaller buildings.
and fourth stories to mitigate the additional South of Kirkland Avenue, building forms
building mass, and the project provides should step up from the north and west with
superior retail space at the street level. the tallest portions at the base of the hillside
Rooftop appurtenances and related screening to help moderate the mass of large buildings
should not exceed the total allowed height, on top of the bluff. Buildings over two stories
and should be integrated into the height and in height should generally reduce the building
design of any peaked roofs or parapets. mass above the second story.
42
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
43
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
44
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Maximum building height is three stories in Maximum building height to be four stories in
Design Districts 3 and 7. Design District 4.
These districts are east of 3rd Street, north This district is located south of 1st Avenue
of Central Way, and south of Peter Kirk Park. South, east of 1st Street South. Land in this
Maximum building height should be three area is appropriate for developments of four
stories, with a minimum front yard setback stories in height.
of 20 feet and maximum lot coverage of 80
percent. Lower portions of projects with a The method for calculating building height
pedestrian orientation should be allowed should be modified for this area as described
to encroach into the setbacks to stimulate in the discussion of height calculation for
pedestrian activity and links to eastern structures in District 8. The opportunity to
portions of the Downtown. Street trees take advantage of substantial grade changes
and ground cover are appropriate along with terraced building forms also exists in the
Kirkland Avenue and Central Way. By keeping western half of District 4.
structures in this area relatively low-rise and
set back from the street, views from upland Vehicular circulation will be an important
residences can be preserved and the openness consideration in project design in this
around Peter Kirk Park enhanced. area. The restriction of access points to
In Design District 3, the restriction of access nonresidential streets in order to prevent a
points to nonresidential streets may be negative impact of development in this area on
necessary in order to prevent a negative the single-family enclave which exists to the
impact of development in this area on the south may be necessary.
single-family enclave which exists to the
south.
45
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
46
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Redevelopment of this area should be Because of the intensity of land use in 5A,
governed by the Kirkland Parkplace Master the design of the buildings and site should
Plan and Design Guidelines as set forth in incorporate aggressive sustainability
the Kirkland Municipal Code. Heights of up to measures, including low impact development
eight stories are appropriate as an incentive measures, deconstruction, green buildings,
to create a network of public open spaces and transportation demand management.
around which is organized a dynamic retail
destination. Development under the Master
47
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
48
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
49
Forbes Lake
Park
CRO
SS
K
ST
116TH AVE NE
IRK
112TH AVE NE
LA
Beach Property
ND
ST
ST
NE 90TH ST
Cedar View
MARKET
Tot Lot
CO R
Park
6TH
Park
3RD
RID
R O
124TH AVE NE
120TH AVE NE
7TH AVE
Lake Ave W
Park
NE 85TH ST Future bus/
122ND AVE NE
W
L W r op o
e (p
AV
RA enad
E
NT
CE
R
P r om
LY
Walk Open Space Rose Hill Meadows
W Pa r k Ohde Ave Pea Patch Park
AY
Peter Kirk
3 Park
2
Kirkland Kirkland Cemetery
Æ
ac
Transit CenterÆ3
â
A1 # 2
KIRKLAND AVE
â
NE 80TH ST
Marina
â
LA K
Park
(2)
E
4
ñ
ST S
â
Neal-Landguth
Park
â
Lk. Washington
HS
405
§
¨
¦
Street End
Park
ñ Everest City of Kirkland, WA
Park
OR
Greater Downtown Urban Center Plan
ID
RR
Brink
ñ Figure GD-6
CO
Park
L
A
ND
Greater Downtown Urban Design
K
K LA
E
116TH AVE NE
Features
K IR
6TH ST S
SS
8TH ST S
W
Public Parking
CRO
STATE ST S
A
1 - Lakeshore Plaza Site
2 - Park Lane Site Gateway
S H
3 - Peter Kirk Park/Library Site
Lakeview c
Æ Library
LAKE ST S
Elem
I N G
Public Facilities
Settler's Landing View (in direction of arrow)
â
Park
1 - City Hall
2 - Peter Kirk Civic and Cultural Center Historic structure
T O N
3 - Transit Center
ñ
4 - Tour Boat Dock ñ Historic site
NE 68TH ST
Proposed Public/Private Projects # Historic object
Marsh A - Lakeshore Plaza 0 0.25 Mile
Park B - Park Walk Promenade
Terrace Taylor Fields
Park
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
50
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
51
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Other outstanding visual landmarks include There are a number of features in and nearby
the large green expanse of Peter Kirk Park, the Downtown area with historic significance
which provides an open space relief to the which add to its visual character and historic
densely developed Downtown core to the flavor. These landmarks include the historic
west. The Peter Kirk Park civic and cultural buildings on Market Street and the old ferry
facilities (Library, Municipal Garage, Peter clock on Lake Street at Kirkland Avenue.
Kirk Pool, Kirkland Performance Center, Peter These structures should be recognized for
Kirk Community Center, Teen Union Building) their community and historic value, and
located at the south edge of Peter Kirk Park, their preservation and enhancement should
as well as the METRO transit center at the have a high priority. In contrast to the bland
western boundary of the park, are also well- architecture of many of the buildings in the
known local landmarks. Downtown constructed since the 1940s,
some of the older structures help define the
The City Hall facility provides an important character of the Downtown. The City will
visual and civic landmark on the northern consider preserving this character through a
slope above the Downtown. Marina Park and process of inventorying these structures and
the pavilion structure situated there are also adopting historic protection regulations. New
symbolic reference points of community, regulations could range from protecting the
recreational, and cultural activities. character of designated historic buildings to
protecting the actual structure. Some form of
preservation would provide continuity between
the Downtown vision and its unique past.
52
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
53
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
54
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
55
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Policy MB 29:
56
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
5. ENVIRONMENT
Comprehensive Plan1
57
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Improve management of stormwater runoff from Retrofit existing impervious surfaces for water
impervious surfaces by employing low impact quality treatment and look for opportunities to
development practices through City projects, provide regional facilities.
incentive programs, and development standards.
New development has limitations on
As land is developed, the loss of impervious surfaces and requires water
vegetation, the compaction of soils, and the quality treatment of stormwater based on
transformation of land to impervious surface adopted stormwater design regulations.
all combine to cause uncontrolled stormwater
runoff to degrade streams, wetlands and While it is important to regulate new
associated habitat; to increase flooding, and development, the bulk of change in Kirkland’s
to make many properties wetter. Low impact stormwater infrastructure will occur through
development practices minimize impervious redevelopment. Partnering with private
surfaces, and use vegetated and/or pervious properties may be a cost-efficient way to
areas to treat and infiltrate stormwater. Such achieve regional water quality treatment,
practices can include incentives or standards as it is usually far less expensive to build
for landscaped rain gardens, permeable facilities in parking lots rather than beneath
pavement, narrower roads, vegetated rooftops, public right-of-way which is encumbered by
rain barrels, impervious surface restrictions, numerous utilities. The City should pursue
downspout disconnection programs, “green” grant funding, incentive programs, regulations
buildings, street edge alternatives and soil and planning for retrofitting existing
management. impervious areas to improve water quality
treatment and further the goals of the Surface
Water Master Plan.
58
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Target carbon neutrality by 2050 to greatly Regularly update the City’s Climate Protection
reduce the impacts of climate change Action Plan (CPAP) in order to respond to
Policy’s relevant to air pollution and greenhouse changing conditions.
gasses can be found here
Kirkland’s CPAP should be revised due to
the emission reduction changes required as
part of signing the K4C Joint Commitments
Letter. In addition, implementation strategies
to achieve the CPAP should be monitored,
evaluated and revised as necessary on an
annual basis.
Policy E-5.3:
59
Forbes Lake
Park
CRO
SS
K
ST
116TH AVE NE
IRK
112TH AVE NE
LA
Beach Property
ND
ST
ST
NE 90TH ST
Cedar View
MARKET
Tot Lot
CO R
Park
6TH
Park
3RD
RID
R O
124TH AVE NE
120TH AVE NE
7TH AVE
Lake Ave W
Park
NE 85TH ST
122ND AVE NE
NE 85TH ST
Heritage
Park
AY
L W
RA
W
NT
CE
AV
RE
LY
Open Space Rose Hill Meadows
W Ohde Ave Pea Patch Park
AY
Peter Kirk
Park
Kirkland Cemetery
KIRK LAND AVE
NE 80TH ST
Marina
Park
Neal-Landguth
Park
Lk. Washington
HS
405
§
¨
¦
T
LAKE S S
Street End
Park Everest
Park
OR
ID
RR
Brink City of Kirkland, WA
CO
Park
L
Greater Downtown Urban Center Plan
A
ND
K
K LA
E
116TH AVE NE
Figure GD-4
K IR
6TH ST S Greater Downtown Wetlands,
SS
8TH ST S
W
CRO
STATE ST S
A
Downtown Urban Center (proposed)
S H
Lakeview
LAKE ST S
Elem Stream in pipe
I N G
Settler's Landing
Park Open stream
T O N
Surface water drainage basin
100-year floodplain
NE 68TH ST
Wetland
Marsh
0 0.25 Mile
Park
Terrace Taylor Fields
Park
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
60
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
61
Forbes Lake
Park
CRO
SS
K
ST
116TH AVE NE
IRK
112TH AVE NE
LA
Beach Property
ND
ST
ST
NE 90TH ST
Cedar View
MARKET
Tot Lot
CO R
Park
6TH
Park
3RD
RID
R O
124TH AVE NE
120TH AVE NE
7TH AVE
Lake Ave W
Park
122ND AVE NE
NE 85TH ST
NE 85TH ST
Heritage
Park
AY
W
L W
AV
RA
E
NT
CE
R
LY
Open Space Rose Hill Meadows
W Ohde Ave Pea Patch Park
AY
Peter Kirk
Park
Kirkland Cemetery
KIRK LAND AVE
NE 80TH ST
Marina
Park
Neal-Landguth
Park
Lk. Washington
HS
405
§
¨
¦
T
LAKE S S
Street End
Park Everest
Park
OR
ID
RR
Brink
CO
Park
L
A
ND
K
City of Kirkland, WA
K LA
E
116TH AVE NE
K IR
Greater Downtown Urban Center Plan
6TH ST S
SS
8TH ST S
Figure GD-5
W
CRO
STATE ST S
A
Greater Downtown Geologically
S H
Hazardous Areas
Lakeview
LAKE ST S
Elem
I N G
Downtown Urban Center (proposed)
Settler's Landing
Park
T O N
High landslide susceptibility
Medium landslide susceptibility
NE 68TH ST
High liquefaction potential
Marsh
0 0.25 Mile
Park
Terrace Taylor Fields
Park
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
62
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
63
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Marina Park and Peter Kirk Park are to be Major pedestrian and bicycle pathways
preserved. considered.
The Moss Bay Neighborhood contains two Pedestrian and bicycle pathways are also part
parks of communitywide and perhaps regional of the park and open space system, in addition
significance. These facilities are Marina Park to providing a transportation function. Major
and Peter Kirk Park. These parks should pathways in the Moss Bay Neighborhood
be maintained not only because of their should be established according to the
importance in terms of recreation, but also designations in Figures GD-8* and GD-9*.
because of their contribution to open space
in the Downtown area. In addition, Lakeview
Elementary School helps meet some of
the recreational needs of residents in the
southern portion of the neighborhood. Street
End Park, David Brink Park, and Settlers
Landing Park also provide further recreational
opportunities as well as a sense of openness
along Lake Street South.
Marina Park
64
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
6. TRANSPORTATION
Policy T-5.1:
Focus on transportation system developments
that expand and improve walkable
neighborhoods.
65
Forbes Lake
Park
CRO
SS
K
ST
116TH AVE NE
IRK
112TH AVE NE
LA
Beach Property
ND
NE 90TH ST
ST
ST
Cedar View
MARKET
Tot Lot
CO R
Park
6TH
Park
3RD
RID
R O
124TH AVE NE
120TH AVE NE
7TH AVE
Lake Ave W
Park
NE 85TH ST Future bus/
122ND AVE NE
AY
W
L W
AV
RA sed)
E
NT r opo
CE
R
e (p
LY e na d Open Space Rose Hill Meadows
W k P r om Ohde Ave Pea Patch Park
AY rk Wal
Peter Kirk Pa
Park
NE 80TH ST
Marina
Park
Lk. Washington HS
Neal-Landguth
Park City of Kirkland, WA
Lk. Washington
HS
Greater Downtown Urban Center Plan
405
§
¨
¦
T
LAKE S S
Figure GD-10
Street End Greater Downtown Walkability
Park Everest
Park
OR
ID
Downtown Urban Center (proposed)
RR
Brink
CO
Park
L
High
A
ND
K
Medium high
K LA
E
116TH AVE NE
K IR
6TH ST S
Medium low
SS
8TH ST S
Low
W
CRO
STATE ST S
A
Public trail
S H
Lakeview
LAKE ST S
Elem
I N G
Settler's Landing Note: The City of Kirkland's Comprehensive Plan
Park bases its 'walkability' score on "...proximity to parks,
transit, schools, certain kinds of retail, as well as
T O N
other factors."
NE 68TH ST
66
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
67
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
68
69
Forbes Lake
Park
CRO
SS
K
ST
116TH AVE NE
IRK
112TH AVE NE
LA
Beach Property
ND
NE 90TH ST
ST
ST
Cedar View
MARKET
Tot Lot
CO R
Park
6TH
Park
3RD
RID
R O
124TH AVE NE
Lake Ave W
Park
NE 85TH ST Future bus/
122ND AVE NE
AY
W
L W
AV
RA sed)
E
NT r opo
CE
R
e (p
LY e na d Open Space Rose Hill Meadows
W k P r om Ohde Ave Pea Patch Park
AY rk Wal
Peter Kirk Pa
Park
NE 80TH ST
Marina
Park
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Neal-Landguth
Park
Lk. Washington
HS
405
§
¨
¦
T
LAKE S S
Street End City of Kirkland, WA
Park Everest
Park
OR
Greater Downtown Urban Center Plan
ID
RR
Brink Figure GD-8
CO
Park
L
A
Greater Downtown Pedestrian System
ND
K
K LA
E
116TH AVE NE
K IR
Downtown Urban Center (proposed)
6TH ST S
SS
8TH ST S
W
Sidewalk Completeness
CRO
STATE ST S
A
No sidewalk
S H
Lakeview Intermittent sidewalk
LAKE ST S
Elem
I N G
Sidewalk complete one side only
Settler's Landing
Park Sidewalk complete both sides
T O N
Other Pedestrian Facilities
NE 68TH ST
Public trail
Marsh
Park 0 0.25 Mile
70
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
71
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
72
73
Forbes Lake
Park
CRO
SS
K
ST
116TH AVE NE
IRK
112TH AVE NE
LA
Beach Property
ND
ST
ST
NE 90TH ST
Cedar View
MARKET
Tot Lot
CO R
Park
6TH
Park
3RD
RID
R O
124TH AVE NE
120TH AVE NE
7TH AVE
Lake Ave W
Park
NE 85TH ST Future bus/
122ND AVE NE
AY
W
L W
AV
RA
E
NT
CE
R
LY
Open Space Rose Hill Meadows
W Ohde Ave Pea Patch Park
AY
Peter Kirk
Park
NE 80TH ST
Marina
Park
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Neal-Landguth
Park
Lk. Washington
HS
405
§
¨
¦
T
LAKE S S
Street End
Park Everest
Park
OR
ID
RR
Brink
CO
Park
L
City of Kirkland, WA
A
ND
K
Greater Downtown Urban Center Plan
K LA
E
116TH AVE NE
K IR
6TH ST S
Figure GD-9
SS
8TH ST S
W
CRO
STATE ST S
A
Downtown Urban Center (proposed)
S H
Lakeview
LAKE ST S
Elem Bike lane (existing)
I N G
Settler's Landing
Park Bike lane (planned)
T O N
Greenway (planned)
Multimodal trail (Cross Kirkland Corridor)
NE 68TH ST
Other public trail
Marsh
Park 0 0.25 Mile
74
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
75
Forbes Lake
Park
CRO
SS
K
ST
IRK
116TH AVE NE
112TH AVE NE
LA
Beach Property
ND
ST
ST
NE 90TH ST
CO
Cedar View
MARKET
Tot Lot
Park
6TH
Park
3RD
RRID
OR
124TH AVE NE
120TH AVE NE
7TH AVE
Lake Ave W
Park
NE 85TH ST Future bus/
122ND AVE NE
AY
W
A L W
AV
N TR
ER
CE
LY
Open Space Rose Hill Meadows
W Ohde Ave Pea Patch Park
AY
Peter Kirk
Park
NE 80TH ST
Marina
Park
Neal-Landguth
Park
Lk. Washington
HS
405
§
¨
¦
T
LAKE S S
Street End
Park Everest
Park
OR
ID
RR
Brink
CO
Park
L
D
A
K
City of Kirkland, WA
LA N
K
E
116TH AVE NE
KIR
Greater Downtown Urban Center Plan
6TH ST S
SS
8TH ST S
Figure GD-7
W
CRO
STATE ST S
A
Greater Downtown Street Classification
S H
Lakeview Downtown Urban Center (proposed)
LAKE ST S
Elem
I N G
Settler's Landing
Park Interstate highway; ramp
T O N
Principal arterial
Minor arterial
NE 68TH ST
Collector
Marsh
Park 0 0.25 Mile
76
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
77
Forbes Lake
Park
CRO
SS
K
ST
116TH AVE NE
IRK
112TH AVE NE
LA
Beach Property
ND
ST
ST
NE 90TH ST
Cedar View
MARKET
Tot Lot
CO R
.5-mile radius from
Park
6TH
Park
3RD
Downtown Transit Center
RID
R O
124TH AVE NE
120TH AVE NE
7TH AVE
Lake Ave W
Park
NE 85TH ST Future bus/
122ND AVE NE
W
AV
sed)
E
r opo
R
e (p
LY e na d Open Space Rose Hill Meadows
W k P r om Ohde Ave Pea Patch Park
AY rk Wal
Peter Kirk Pa
Park
Neal-Landguth
Park
Lk. Washington
HS
405
§
¨
¦
T
LAKE S S
Street End
Park Everest
Park
OR
ID
RR
Brink
CO
Park
L
City of Kirkland, WA
A
ND
K
Greater Downtown Urban Center Plan
K LA
E
116TH AVE NE
K IR
6TH ST S Figure GD-11
SS
8TH ST S
W
CRO
STATE ST S
A
Downtown Urban Center (proposed)
S H
Lakeview
LAKE ST S
Elem Primary corridor
I N G
Settler's Landing
Park Secondary corridor
T O N
Public trail
NE 68TH ST
a
Æ Kirkland Transit Center
! Bus stop
Marsh
0 0.25 Mile
Park
Terrace Taylor Fields
Park
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
78
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Vehicular circulation patterns described, and the • Dead-end streets between State Street
following provisions are recommended: and the Cross Kirkland Corridor should be
improved.
Vehicular circulation patterns are fairly well
established in the Moss Bay Neighborhood The dead-end streets between State Street
area (see Figure GD-7*). There is a relatively and the Cross Kirkland Corridor are very
large flow of traffic through the area, in narrow and, in some cases, are in need of
addition to traffic generated by activities within resurfacing. In order to enhance access
the Downtown. The major north/south traffic for residents and emergency vehicles,
corridors include Lake Street, State Street, 3rd appropriate improvements to these streets
Street, and 6th Street South. The major east/ should be made as new development
west corridors include Central Way, Kirkland occurs in the area. In some cases,
Avenue/Kirkland Way, and NE 68th Street. developments should establish a vehicular
connection between these narrow
streets, provided this connection does not
significantly increase traffic volumes on
streets where predominantly single-family
homes exist.
79
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
80
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
81
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
82
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
7. HOUSING1
Goal H-2: Policy H-3.2:
Ensure that Kirkland has a sufficient quantity Require affordable housing when increases to
and variety of housing to meet projected growth development capacity are considered.
and needs of the community
Rezones, height and bulk modifications,
Policy H-2.5: and similar actions often yield greater
development capacity. This can add significant
Allow for the maintenance and redevelopment
value for property owners and an opportunity
of existing developments that do not conform to
to create affordable housing with minimal
current density standards in planned multifamily
(if any additional) cost to the owner. When
areas.
the City considers amendments to the
Comprehensive Plan, Zoning Code, or other
A number of multifamily structures in the
regulations, the City should compare the
City were built at densities above those now
economic value of the increased capacity to
planned for their sites. These structures
the economic cost of providing affordable
provide a valuable source of close-in and
units and decide whether to require affordable
often relatively affordable housing to Kirkland
housing in return.
residents. In order to retain the housing
capacity provided by these units, property Policy H-3.4:
owners should be allowed to maintain,
Preserve, maintain, and improve existing
remodel, or rebuild these structures, while
affordable housing through assistance to
retaining their existing densities.
residents and housing providers.
83
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
84
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
8. ECONOMIC DEVELOPMENT1
Goal ED-1: Policy ED-1.4:
Policy ED-1.1:
Industry clusters are geographic
Support activities that retain and expand existing concentrations of mutually supportive
businesses. Target recruitment activities toward businesses. They can export goods and
new businesses that provide living wage jobs. services, drive job creation, and import
revenue into a city or region. Businesses can
Existing businesses are the foundation of foster a competitive economic advantage by
the Kirkland economy and are encouraged locating near each other to draw consumers,
to thrive and expand. Businesses contribute to be near the wholesale distributor or to
to a stable tax base and are integral to the attract employees with specialized skills or
community as many business owners and experience.
employees are Kirkland residents.
In Downtown Kirkland, restaurants,
Attracting new businesses can help diversify galleries, shops, hotels and performing arts
the local economy and strengthen existing organizations work together to promote the
businesses. Recruitment efforts should focus area as a destination. Kirkland is benefiting
on businesses that provide higher paying from the region’s industry clusters with
jobs and draw customers from outside the growth in aerospace, business services to
community to purchase goods and services in high technology and information technology
Kirkland. companies, healthcare companies and
automobile sales. These businesses provide
new employment opportunities and high wage
rates important to strengthening the economy.
Economic development efforts should strive
to develop new business clusters and identify
ways to strengthen existing clusters, both
locally and within the region.
85
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Strive to maintain a balance of jobs and housing Promote Kirkland as a visitor, cultural, and
to enable residents to live near work. entertainment destination.
86
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
87
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
88
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Provide the infrastructure and public facilities to Create strong multimodal circulation linkages to
support economic activity and growth. and within commercial areas.
89
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Policy ED-4.4:
90
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
9. PUBLIC FACILITIES
As the Vision Statement and Guiding Provide a variety of responses to the demands of
Principles describe, a high priority for growth on capital facilities and utilities.
Kirkland residents is maintaining and
enhancing Kirkland’s strong sense of
community and neighborhood identity. To
achieve this, it is important that public
facilities are compatible in building height,
bulk, and materials with adjacent uses.
91
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Goal CF-4:
Goal CF-5:
Ensure that water, sewer, and transportation
facilities necessary to support new development
are available and adequate, and concurrent with
new development, based on the City’s adopted Pump Station in Downtown Kirkland
level of service standards
2 Moss Bay Neighborhood Plan
92
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
93
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
94
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
Coordinate with neighboring cities, King County, The City and Lake Washington School
the Lake Washington School District, special District should work together on planning
districts and other agencies in the planning, for school facilities consistent with the
provision, and use of joint activities and facilities. City’s Comprehensive Plan. This could mean
using consistent data on population and
The City should look for these types of demographics based on the City’s growth
opportunities in order to make efficient and development projections. The City
use of existing facilities and save on the and School District should confer on the
costs of building new facilities or funding siting and development of school facilities
new programs. Joint use and maintenance needed to serve existing and projected
of school athletic fields and facilities for residential development, as well as the City’s
community programs are examples. development regulations and impacts to other
public services and facilities. The City and
School District should explore opportunities
for jointly developing and maintaining school
sites to maximize community use. The School
District should provide safe pedestrian and
bicycle access to connect schools to the
surrounding neighborhood when new or
expanded schools are proposed. The City
should establish a system of school walk
routes. With the development of new or
expanded schools, the District should ensure
appropriate public involvement.
95
Attachment 1
City of Kirkland | Greater Downtown Kirkland Urban Center Plan
96