Documente Academic
Documente Profesional
Documente Cultură
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
Contents
Section A Register of Revisions
Section B Scope of Works to be undertaken:
Section C Location of the Project
Section D Location of the Works to be Undertaken with the Project
Section E Site Access/Egress and Access to the Work Zone
Section F Emergency Contacts Details and Procedures:
Section G McLaren Site Specific HSE Safety Induction:
Section H Welfare facilities:
Section I Personal Protective Equipment
Section J Plant/Equipment and tools to be Used
Section K Materials To be used.
Section L Communication/Toolbox Talks/Training Requirements:
Section M Works Permits
Section N Environmental and Waste Management:
Section O Programme for the Works:
Section P Housekeeping and Storage:
Section Q Hygiene and cleanliness
Section R Working at Height
Section S Occupational Health
Section T Sequence of Works/Activities
Appendices
Appendix A Site Logistic Plans and Other Design Information Relative to the Works
Appendix B Crisis/Emergency Plan
Appendix C COSHH Assessments and Material Data Sheets (to be provided by Subcontractor)
Appendix D Risk Assessments (to be provided by Subcontractor)
Appendix E Technical Information (to be provided by the Subcontractor)
Appendix F Risk Assessment
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
Revision Date Reason for Amendment Amended By Signature Has this amendment been briefed
No (Name) to the operatives involved and have
the operatives signed the register.
(to be commented only if revised and submitted)
This method statement has been prepared in conjunction with the following documents;
1. OSHAD regulation and requirements
2. OHSAD- Code of Practices, HSE Regulations, Technical Guidelines, Mechanisms
3. GR HSE Guidelines and Requirements
4. Federal Environmental Authority Law No 24/1999 and its supplements.
5. Federal Labour Law No 8
6. Articles (3,4,5,7) Local Law No 21/2005 (Waste Management)
7. McLaren SHE Procedures
8. McLaren’s site specific SHEQ Plan (including TMMS, SWMP, EPP).
9. McLaren’s Integrated Management System Policy Statement (IMS).
Our project is located is located AMC CONCOURSE BRIDGE in between Almaryha and Galleria Mall as marked
below.
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
The following staff from both McLaren and will be on site during the execution of the works and will be
responsible for managing the works;
Name Position Company Contact Details
Paul Carlin Operations Director McLaren 056-1054691
Luke Watson Project manager McLaren 052-1022402
Prabhu Srinivasulu Construction Manager McLaren 050-9709963
Joby John HSE Manager (First Aider) McLaren 050-6372060
Evangeline Huerto First Aider McLaren 056-1852727
Jijo Mathew Safety Advisor/First Aider McLaren 055-2152903
Ramil Magano QA/QC Engineer (Fire marshal) McLaren 050-2923058
Biju MEP Engineer McLaren 056-8059139
Syed Faisal Ahmed Project Manager Genfocus 056-5465814
Anu Baby Project Engineer Genfocus 0565465807
Prabir Kumar Chattarjee Safety Officer Genfocus 0547937312
Prabir Kumar Chattarjee First Aider Genfocus 0547937312
In case of an Emergency/fire Alarm, all operatives, Staff and Visitors are required to report to the Assembly Point,
which is indicated on the site logistics drawing, as indicated by the symbol below. Where the registers will be
checked to ensure that no one is un-accounted. No one will be allowed to leave the assembly point until the
Emergency response Controller confirms that it is safe to do so.
Please refer to the attached Crisis/Emergency Plan, (Appendix B) which is to be implemented where the need
arises.
The Qualified First Aiders for the Project are listed below, and the first Aid Boxes will be available either in the
Induction/First Aid Room or in the Main Office.
McLaren: (details of First Aiders) Subcontractors(Details of First Aiders )
Joby John- 050-6372060 Syed Faisal Ahmed 056-5465814
Jijo Mathew 055-2152903
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
Prior to any works taking place, all Operatives arriving at AMC project will be required to undergo a
Multiplex/Gulf Related safety induction followed by McLaren Site Safety induction, which will be held in the
induction room, by McLaren’s HSE Representative or other designated person. Once the operatives have received
the site specific safety induction, they then will be briefed on the contents of this RAMS, by their respective Site
Supervisor, from which they will then be required a sign a RAMS Briefing Register (SAF019 UAE) confirming that
they have been briefed and that they fully understand the RAMS and what is expected from them during the
execution of the site works. The Operatives will also be briefed on the Emergency and Security Procedures for the
project, which is also a part of site safety induction programme.
Any operative who will be operating any plant and equipment will be required to produce a copy of their
competency certificate/card carried out by an OSHAD approved third party training provider, to enable McLaren
to issue them with the Plant Operators Authorisation (SAF023 UAE).
Section H- Welfare facilities:
Drinking Water-
Clean drinking water will be provided on site (as per approved Logistics plan) and all operatives are to ensure they
take on enough fluids throughout the day.
It is anticipated that the following hand tool will be used during the execution of the works; other items will also
be identified on the schedule below;
*Note: All relevant competency certificates (as per OHSAD /GR requirements) to be submitted to HSE
Manager/Eng./Advisor prior to start of any activity.
N/A
During the Preparation of this RAMS the following training for the staff and operatives has been identified;
Item Description of Training Has the Training been If not, when will be
completed? (Yes/No) completed(Date)
1 Competency of Electricians to carry out the Attached
task
*Note: All relevant certificates will be submitted prior to works commencing or during induction. Where the
training has not been carried out, it must do so prior to the works/activities commencing.
Item Description of the Work Permit Permit Issued By Tick only applicable
1 Permit to Enter Confined Space McLaren
2 Permit for Lifting Operations. McLaren
3 Permit to Dig McLaren
4 Permit to work Hot cutting or Welding McLaren
5 Permit to Work in Ceiling Void McLaren
6 Permit for Roof Access McLaren
7 Permit to Work with Ladders, steps McLaren
8 Permit to Work at Height McLaren
9 Permit to Work – Electrical above 110V McLaren
10 Permit to Work with COSHH Items McLaren
11 Permit to Work at External Face of The Building McLaren
12 Permit for Removal of Existing Fall Protections McLaren
13 Permit for Existing MEP Service Isolation McLaren
Any other permits if required to be added
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
3 Supervisor to ensure all operatives have received a McLaren and Multiplex site basic induction
4 Supervisor to ensure all operatives have adequate PPE for the job including Full body harness.
5 Supervisor to ensure that the site is clean and ready to start the work.
6 Supervisor to ensure adequate tools are provided and advise Site manager if more tools are needed.
Works will be carried out in such a way as to minimize the impact of the work. Take all reasonable steps
7
to minimize the creation of dust.
The client / AMC/ GALLARIA Mall Facility Management will make arrangements and permits for the
8
disconnection of the services to the site.
9 Concourse area SMDBA out going feeder to be isolated.
10 Removing of out cable from SMDB-A and De-energizing of FDBs, Equipment’s and wiring systems.
11 Provided warning labels on SMDB and Incoming cable.
12 Danger tags and warning tape are fixed at the live SMDB and Cable.
Multi-meter will be used by the site supervisor to test for live electric cables prior to commencement on
13
site.
Warning signs (as described below) will be displayed at the appropriate points around the perimeter of
the site:
14 • Live Panel and Cable.
• Isolation points.
• Personal Protective Equipment requirements.
No cable-stripping work will commence until the electrical supplies to the site have been irreversibly
16
isolated to the main distribution board by the Galleria Mall Facility management.
17 Isolation check list and drawing will be required and to be submitted to main contractor.
18 As per the Demolition chilled hot water drawing find out exact location of isolating valves for CHWS/R.
19 Ensure Equipment’s power supply should be isolated before starting drain.
20 Main isolation valve should be closed (from Galleria) before starting drain.
21 Ensure isolating valve properly closed from Existing Galleria chilled water line.
22 CHW pipe should be drained through strainer or drain cock.
23 CHW pipe properly drained and dis-connected from FAHU.
24 As per the Demolition water supply drawing find out exact location of gate valves for water supply.
25 Main gate valve should be closed (from Galleria) before starting water supply drain.
26 Ensure gate valve properly closed from Existing Galleria water supply line.
27 Cut the PPR pipe for draining, and tank will be arranged to collect the drained water.
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
APPENDIX A
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
APPENDIX B
CRISIS PLAN
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
CRISIS PLAN
1. Upon an incident, being discovered the first member of McLaren’s staff or the site operative
discovering the incident shall inform the Project Manager and Site HSE team through AMC Project
emergency Contact No-056-7459621.
2. Both the HSE Engineer/advisor and the First Aider are to attend the scene with their mobile. The
project Manager or authorised person waits in office ready to contact relevant emergency
services.
3. Both the HSE Engineer/advisor and the first Aider are to assess the situation and put in place the
relevant systems to end/deal with the emergency.
4. Both the HSE Engineer/advisor and the first Aider are to ensure all trades are gathered at the
assembly point and liaise with supervisor to account for all operatives - no person should leave
site.
5. Either the HSE Engineer/advisor or the first Aider phones the project Manager or site receptionist
and informs him/her of which emergency services are required.
7. Both the HSE Engineer/advisor and the first Aider waits for the emergency services at scene.
8. Once emergency services arrive, The Project Manager will telephone the relevant authorities, i.e.
the HSE/Client’s Safety Advisor/QHSE Manager/McLaren’s operations Director.
9. Both the HSE Engineer/advisor and the first Aider keep trades informed of the situation and
releases trades to return to work or leave site only when emergency services or The Project
Manager instruct that it is safe to do so, and all names of witnesses are recorded.
10. Project Manager or Construction Manager are to arrange for photographs of the scene to be
taken, and if necessary the area to be cordoned.
A full investigation of the Incident is to be carried out, with a written report being submitted the
SHEQ Director, as soon as practicably possible after the incident, including all witness statements,
11. photos of the scene, induction and method statement records, recommendation to prevent a re-
occurrence and what action has been taken since the incident taking place.
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
APPENDIX C
(Not Applicable)
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
APPENDIX- D
RISK ASSESSMENTS
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
APPENDIX-E
TECHNICAL INFORMATION
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019
Method Statement Title MEP ISOLATION SERVICES Doc Ref No: MCL-ME-A-MST-MSS-002
Project Location: AMC Concourse Bridge Project, AD Revision No: 01
Prepared By Syed Faisal Ahmed Approved By Revision Date: 20-02-2019