PROJECT MANAGEMENT CONSULT

PROJECT: TIRUPATI SM

TIRUPATI SMART CITY CORPO


TIME SHEE
Name: Milan patra Position: Civil Engineer
Date

1/Aug/19

2/Aug/19

3/Aug/19

4/Aug/19

5/Aug/19

6/Aug/19
7/Aug/19

8/Aug/19

9/Aug/19

10/Aug/19

11/Aug/19

12-08-
2019 (
Public
Holiday )

13/Aug/19

14/Aug/19
14/Aug/19

15/Aug/19

16/Aug/19

17/Aug/19

18/Aug/19

19/Aug/19

20/Aug/19

21/Aug/19

22/Aug/19

23/Aug/19

24/Aug/19
24/Aug/19

25/Aug/19

26/Aug/19

27/Aug/19

28/Aug/19

29/Aug/19

30/Aug/19

31/Aug/19
Signature: Date:
PROJECT MANAGEMENT CONSULTANCY (PMC) - TIRUPATI

PROJECT: TIRUPATI SMART CITY

TIRUPATI SMART CITY CORPORATION LIMITED


TIME SHEET
me: Milan patra Position: Civil Engineer Month: August2019
Short Summary of activities
Visited tuda nursery site & checking Raft reinforcement & attended for concreting.

Visited the Garuda Varathi & attended the concerting works of Piles 20/02 which includes the checking the mix proportion of
concrete , sounding depth of concrete and checks on any collaspe of casted piles after removal of casing

Visited BNR site checking columns reinforcement & attended for concreting work.

Viisted Prakrasham Park and inspected the play area and badminaton levels , Kerb levels at shed near skrating ring , horticultural
works for top soil , manure and neem cakes

Attended site meeting with ME2 sir and cleared discripencies in the drawing with disccussions with DTL

Attended the 28 days & 7days Cube testing at Ultra tech plant for Piles and Pier

Visited Padamavathi park with Ultra tech agency for balance stamped concrete works at seating areas

Visited Garuda varathi and attended the concrete works for Piles P20/01 , P18/01 & P18 /01 by inspecting the mix proportion ,
sounding depth and slump tests

Attended pile reinforcement checking for Piles P18 /01 ,P23/03 and P22/03 at Garuda vara thi site location

Sunday

Visited BNR site checking columns reinforcement ,shutter plumbing & attended for concreting.

visited garuda varadhi site & checked utility patch work chipped & concrete work in 4 location from leelamahal to Prakasham park.

Attended trial mix test for pile concereting of sample :02 considering cement content 390kgs and performed 28days / 7 days pile
cube compressive tests

Visited BNR site & checked cube test for 7 days.

Visited BNR site checking columns reinforcement & attended for concreting.

Visited the Garuda Varathi site and attended concrete works for for Piles nos P18 /01 & P19 /03 which includes inpection on
concrete mix proporation , sounding depth and slump test

Visited Prakrasham park and inspected levels of play areas and attended for PCC works
Visited BNR site & checked plumbing work for column shuttering & attended for concrete work.

Visited Prakrasham park and inspected levels of Badminton courts and Gym area and discussion on horticultural works with Vendor
and MAE madam at site .

Inspected the test reports for horticultural works of Top soil , manure and compost for the park

Attended the site visit with ME2 sir at Nehru maidan for finalisation of colour codes for compound wall grill

Attended the Pilnth beam reinforcement checking for Grids H13 to H 07 , H11 to E11 and D4 to H 7 to E11 which preceedings to
concrete works at Art District project site

Viisted Prakrasham park and Inspected reinforcemment matt for Play area and ensured to the vendor spacing of bars should 200mm
C/c

Attended Pile concrete works for Pile no 23/04 which includes inpection on concrete mix proporation , sounding depth and slump test

visited garuda varadhi site for testing cube test at Ultra tech plant.

visited Padmavathi park & checked levels of Entry plaza sub grade levels and attended PCC concrete work.

Visited Nehru maidan and checked the levels for Kerb laying works from Hight mast at SPJNM school to Entry plaza

Visited padamvathi park observed the horticultural trees planatation works at park .

visited garuda varadhi site & checked pier stater reinforcement & attended for concrete work.

Visited Art district Project site for reinforcement , alignment & Shuttering checking for Staircase -02 and given clearnace for
concerting works

Attended Project start up function with Chairman , MLA and Commissioner , Aecom and afcon team members

Visited BNR site for checking staircase reinforcement.

Sunday

Visited Garuda varadhi for checking the Reinforcement , shuttering and Survey Coordinates for pier P6 and given clearance for
Conceret works

Attended the Concerting works for High mast foundation -03 at Nehru maidan after checking the reinforcement and shuttering works

Visited Art district Project site for reinforcement , alignment & Shuttering checking for Staircase -02 and given clearnace for
concerting works

Visited Garuda varadhi for reinforcement and Survey coordinates and levels checking from Pier 03 to P09

Attended cube test for 28days for Test pile P17 -P18 & for 7 days test P4 /P1 at Ultra tech Plant

Visited Art district Project site for reinforcement , alignment & Shuttering checking for Staircase -02 and given clearnace for
concerting works

Visited Garuda varadhi for reinforcement and Survey coordinates and levels checking from Pier 03 to P09
Attended cube test for 28days for Test pile P17 -P18 & for 7 days test P4 /P1 at Ultra tech Plant

Public holiday.

Visited BNR site checking columns reinforcement & attended for concreting work.

Visited Arts district with DEE sir for retaining wall reinforcememnt , shutterinf alignment and column reinforment for from A1 to b10
which preceedings to concrete works at Art District project site

Visted Ultra Tech plant for 7days / 28 days Cubes testing for Piles and Piers

Saterday

Sunday

Attended cubes tests , Trial Mix proportion tests , slit tests , Aggregate impact tests at Ultra tech batching plant

Attended the Pilnth beam reinforcememnt checking for Grids A10 -B10 , A12 -B12 From D7 to D13 which preceedings to concrete
works at Art District project site

Attended the Concerting works for Pier P-8 starter marking up to height 1.2mts

visited garuda varadhi site & checked Bored depth for pile no A1/01 & attended at site for concrete work.

visited garuda varadhi site & checked cube testing at altratech alant

Visited Padmavathi Park , Nehru maidan & Prakrasham park observed no work progress

Attended pier P-8 reinforcement checking for Pier starter marking and given clearance for concerting works

Attended Reinforcement checking for Portico columns and 1st lift and attended the concerte works for columns at Art district
project site

Site Visit for Garuda Elevated Cooridar for checking the cage reinforcement & Depth of the boring of the Pile no P -A1 /01 and
attended concerte pouring works by checking the sounding level , mix and slump of concerete

Taken Joint measurements for the execuated works of Nehru maidan

Visited Art district site for checking the shuttering works of Beams and slab and had detailed disscusions with BNR project manager
for consolidation of base and Base Floor PCC works

Visited MC003 and checked the pile reinforcement for P-A1/04 ,A1/02 and given clearance for concerting works for Pile no A1/04 .

Attended Joint measurment for RA bill -02 of Prakrasham park with MAE laitha madam and work Inspector Krishna

Attended the cube testing at Ultra tech plant for Pile no P6 / 4 , P5/P2

Public holiday.

visited garuda varadhi site & checked pile bore depth for pile no P26/01 & attended at site for concreting.
Inspected the 1st flight Staircase -01 & Sides beam reinforcement and given clearance for concerting after checking with DEE sir at
Site .

Visited Garuda Varadhi elevated cooridor project site for Pile Cap :-25 bottom & side reinforcement checking and given
recommendations to maintain the lapping of 52Dia as given in the design drawing

Visited Prakrasham park checked the alignent of Kerb laying works , MS grill works for Compound wall , SS railing works for Skrating
ring and Excavation works for Rain water trench at Musical fountain & Speaker cable trench works

Visited Garuda Varadhi for reinforcement checking for Pier -03 and given attended concert works in night up to height 1.6mts

visited garuda varadhi site & checked pile cage reinforcement for pile no P26/03 & also checked bore depth & given clearence for
concreting.
Vsited Arts District site and inspected 2nd Lift Column main reinforcement for Grids no B-3 to B5-2 & C6-3 ,C8-3 & Beam
Reinforcement checking for GFB -22 , GFB21 & 23 and Given snags points for reinforcement checks
Attended Pile Concerte works which includes cage reinforcement checking , pile bored depth for Piles 25/04 ,25/02 and followed with
cubes testing works for pile nos 4 ,5 & 6

Attended the concerting works of Pavillion slab at Compost plant at Prakrasham parks

visited garuda varadhi site & checked pile cage reinforcement for pile no P27/03 & also checked bore depth & given clearence for
concreting.

Visited Indira Maidan with Client DEE sir & disscussed the sizes of the Audio / Green room & toilets , Gallery steps and Pending
works to complete at Site .

Visited Arts District site and inspected Pilnth beam reinforcement for Grids no G-2 to L-2 & N-3 ,P-3 ,P-4 , N-3 ,E-3 D-3 B-3 & Column
2nd Lift concerting works for Portico columns

Attended Pile Concerte works which includes cage reinforcement checking , pile bored depth for Piles 25/03 ,24/01 ,26/03 ,27/03 and
followed with cubes testing works for pile nos 8 ,9 & 10

visited garuda varadhi site & checked pile cage reinforcement for pile no P24/02 & P26/04 & also checked bore depth & given
clearence for concreting.

Attended retaining wall concerting works at Front portico side of the Site

Visited the Garuda Varathi & attended the concerting works of Piles 24/2 ,24/04,23/01 which includes the checking the mix
proportion of concrete , sounding depth of concerting and checks on any collaspe of casted piles after removal of casing

visited garuda varadhi site & checked pile cage reinforcement for pile no P26/02.

Attended Pile cage reforcememnt checking for 24/04, 24/02 at MC003

Attended the slab botttom levels checking and aligning the beam sides to the plumbs and checking the props of slit floor slab

Visited GVS & checked piel bore depth & attended at site for concreting.

visited garuda varadhi site & checked pile cage reinforcement for pile no P23/3 & P23/02 & also checked bore depth & given
clearence for concreting.

Visited BNR site for slab concreting

Visited indira maidan and disscused the pending works at site with DEE Karunakara sir .
TOTAL (Hours)
TOTAL (Days)

nature: Date: Program Director:


No. hours

8
8

8
8

0
0

8
144.00