1 Sluice pump 100 200 65
2 CCCWP-A 100 200 65
3 CCCWP-B 100 200 65
4 OCC Water A 100 200 65
5 OCC Water B 100 200 65
6 H2 sampling point 100 200 65
7 N2 filling station 100 200 65
8 CO2 filling station 100 200 65
9 Electric water stainer 100 200 65
10 Evaporating cooling unit- A 100 200 65
11 Evaporating cooling unit- B 100 200 65
12 Vaccum pump-A 100 200 65
13 Vaccum pump-B 100 200 65
14 Vaccum pump-C 100 200 65
15 Hydrogen dryer Unit 100 200 65
16 Seal oil system 100 200 65
17 Condenser front side 100 200 65
18 Condenser back side 100 200 65
19 Condenser de watering pump A 100 200 65
20 Condenser de watering pump B 100 200 65
21 Rubber ball recirculating pump 100 200 65
22 Oil transforemer pump area 100 200 65
23 Oil purifying device 100 200 65
24 Bypass EH oil device Unit 100 200 65
25 Oil cooler Unit 100 200 65
26 Jacking Oil Pump Unit 100 200 65
27 Turbine MCC front side 100 200 65
28 Turbine MCC back side 100 200 65
29 Mix bed Unit area 100 200 65
30 fire resistant oil pump 100 200 65
31 Stator cooling water Unit 100 200 65
32 CPU analizer 100 200 65
33 Condenset pump (CEP)-A & B 100 200 65
34 TDBFP Booster pump A 100 200 65
35 TDBFP Booster pump B 100 200 65
36 MDBFP 100 200 65
37 LP heater emergency drain valve Unit 100 200 65
38 Lubricating cooler of the M-BFP Unit 100 200 65
39 CPU regeneration system 100 200 65
40 CPU control room 100 200 65
41 Maintenance Bay of Unit-1 & 2 100 200 65
6.9 M
42 Gland steam vent condensor 100 200 65
43 Deaerator water level Unit 100 200 65
44 Drainage of main steam piping 100 200 65
45 MOT 100 200 65
46 Governing valve unit 100 200 65
47 IP HP control valve station 100 200 65
48 CEP recirculation Unit 100 200 65
49 LP heater-7 100 200 65
50 LP heater-8 100 200 65
51 Exciatation transformer R phase Front 100 200 65
52 Exciatation transformer R phase Back 100 200 65
53 Exciatation transformer Y phase Front 100 200 65
54 Exciatation transformer Y phase Back 100 200 65
55 Exciatation transformer B phase Front 100 200 65
56 Exciatation transformer B phase Back 100 200 65
57 Neutral grounding transformer panel 100 200 65
58 LP heater No.6 100 200 65
59 IP feed water piping 1 100 200 65
60 IP feed water piping 2 100 200 65
61 No 5 LP heater 100 200 65
62 Auxillary steam header Unit 100 200 65
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020
3
400 KV New Control Room LILO-1(Line-11 & 12) 200-300 100 65
Switchyard
Type LILO-3(Line-7 & 8) 100 100 22
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020
Conveyor-8
129 8A&B T.E ,Between 2 lights 70-100 100 22 10
130 8A&B middle 70-100 100 22 2
131 Conveyor-8 8A Middle 70-100 100 22 0
132 8B Middle 70-100 100 22 0
133 8A&B Drive motor,Middle 70-100 100 22 11
8A&B -Drive motor Between 2
134 lights 70-100 100 22 24
135 Con 9A&B inside Mcc Panel 200-300 500 65 8
136 9A&B T.E 70-100 100 22 10
137 9A&B Between Unit-1&2 70-100 100 22 26
138 9A&B Between 2 lights 70-100 100 22 17
Conveyor-9
139 9A&B H.E 70-100 100 22 13
140 9A Middle 70-100 100 22 22
141 9B Middle 70-100 100 22 12
142 9A&B Between 2 lights 70-100 100 22 29
143 Con 10A&B inside Mcc Panel 200-300 500 65 18
144 10A&B T.E 70-100 100 22 11
145 10A&B Between Unit-3&4 70-100 100 22 22
146 10A&B Between 2 lights 70-100 100 22 24
Conveyor-10
147 10A&B H.E 70-100 100 22 13
148 10A Middle 70-100 100 22 27
149 10B Middle 70-100 100 22 10
150 10A&B Between 2 lights 70-100 100 22 24
Note:
Calibration of Lux Meter: PCL/7640/16-17
Serial No: 130925699
Date of Calibration: 22-09-16
Due Date of Calibration: 22-09-17
Note:
Calibration of Lux Meter:
Serial No:
Date of Calibration:
Due Date of Calibration:
ILLUMINATION LEVEL-Boiler Area For Nov-19
As per
Standard Standard Odisha Unit # 1 Target Unit # 2 Target Unit # 3 Target Unit # 4 Target
SN LOCATION AREA as per IS as per IFC Factories Illumina Date Illuminati Date Illuminati Date Illuminati Date
3646 (lux) (lux) Rule tion (lux) on (lux) on (lux) on (lux)
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020
Remark
COMMON/BOP AREA ILLUMINATION LEVEL FOR Nov-19
Note:
Calibration of Lux Meter: 2111649
Serial No: : 2111649
Date of Calibration: : 08.02.2019
Due Date of Calibration : 07.02.2020