GENERAL NOTES:-

1. ALL DIMENSIONS ARE IN METERS NOTED OTHERWISE.


2. ALL LEVELS ARE IN METERS.
3. DO NOT SCALE THE DRAWING.
4. ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELATED
0 1 2 3 4 5 6 7 ARCHITECTURAL AND SERVICES DRAWINGS

CONCRETE NOTES:-
1. USE OPC+GGBS MIX FOR BLINDING CONCRETE (P.C.C) OF GRADE C-20
AS PER APPROVED MIX DESIGN.
A C11
B8A
C10
B8B
C9 2. USE OPC+GGBS MIX FOR SUB STRUCTURE AND SUPERSTRUCTURE OF
GRADE C-45 AS PER APPROVED MIX DESIGN
140 420 140 3. ALL REINFORCEMENT SHALL BE HIGH TENSILE DEFORMED BARS CONFIRMING TO

2T12 BOT.
R-S-1

R-S-1
BS4360 AS PER APPROVED QUALITY.

B22B

B16H
4.40

4. ALL CONCRETE SURFACES BELOW PLINTH LEVEL SHALL BE PROTECTED AS


PER CONTRACT SPECIFICATIONS.
5. MAX. AGGREGATE SIZE SHALL BE 20mm DOWN GRADE.
6. MINIMUM LAP LENGTH OF BAR TO BE AS PER STANDARD DRAWING.

70
B9
7. CONCRETE SHALL BE CURED FOR A MINIMUM PERIOD OF 7 DAYS.
B C12 C8

8. ALL METERIAL SHALL BE OF APPROVED QUALITY.

300
2T20 TOP.

2T20 TOP.

230
9. THE FOUNDATION DESIGNED ON AN ASSUMED NET BEARING PRESSURE 150 KPA.
10. USE STEEL GRADE FYU 460 N/mm².

B22A
R-S-2A 11. USE CONC. GRADE FCU 45 N/mm² FOR SUBSTRUCTURES.

2T20 BOT.

2T20 BOT.
12. USE CONC. GRADE FCU 45 N/mm² FOR SUPER STRUCTURE.

R-S-2
13. USE CONC. GRADE FCU 20 N/mm² FOR BLINDING / LEAN CONCRETE.
6.34

OPEN

B22A

B16G
2T25 + 2T20 BOT.
14. ALL REBAR SPLICES WILL BE AS PER ACI RECOMMENDATIONS

160 400 160


2T25 + 2T20 TOP.

MAIN RIB BEAM SECTION (ONE WAY SLAB)

2T25 TOP.

2T25 TOP.
C C43
B1
C28 C13
B9
C7
2.01

R-S-19
B12 G

B12 G

B16F
RIB SLAB R-S-1, R-S-3 TO R-S-13

R-S-4

R-S-3
2T16 BOT.

2T12 TOP.

B11
D C42 B2A
C29
B2B C14
B21A C18 B21B C6

R-S-5
2T12 TOP.
2T16 BOT.

2T16 TOP.

B11
R-S-18
4.25

2T16 BOT.

2T16 BOT.
B12 F

B12 F

B16E
2T25 BOT.

R-S-6
2T12 TOP.

140

B11
B11

OPEN
R-S-5

2T20 BOT.

B3
B11 B10
E

2T20 TOP.
C41 C30 C5
C19
C15
R-S-17

B16D
B11

R-S-7
B12E

B11

80
B12E
4.09

B20

B5A B5B C16 B5C C20 B5D


C40 STAIRCASE C31 C27 C4

200
R-S-17

2T20 TOP.
R-S-10

R-S-9
B12D

B13D

B11

B11
R-S-8
B11
B12D

OPEN

F C39

B3 C32
C26 B6A C17 B6B C21 B6C C3

160
B13C
R-S-16

B16C
B12 C

B12C

B11

R-S-11
R-S-12

2T16 BOT.

2T16 BOT.
2T25 TOP.

2T20 BOT.

2T25 TOP.
6.50

SECONDARY BEAM SECTION (ONE WAY SLAB)


B11

C38
B3
C33 C25 C22 C2

RIB SLAB R-S-1, R-S-3 TO R-S-13


2T16 BOT.

2T16 TOP.

2T16 BOT.

2T16 TOP.

B13B

2T25 TOP.
B12B

B16B
B12B
R-S-15

B11
C37 B7A B7B
C24 C23
G C34 C1
2T20 BOT.

2T20 TOP.

R-S-14
B13A

B16A
R-S-13
B11

B11

OPEN
B3
B11 B11 140 420 140
B12 A
4.75

OPEN
B12

70
H C36
B1
C35

300
1.81

230
I C44 C45
3.78

160 400 160

J
MAIN RIB BEAM SECTION (TWO WAY SLAB)
TYP. SECTION
4.06

GRID 5 TO 7 / B TO C
K C46 C47

1.50 6.50 1.50 2.35 4.42 2.85 6.58


RIB SLAB R-S-2

ROOF FLOOR RIB BEAM LAYOUT