Documente Academic
Documente Profesional
Documente Cultură
2 - RISK EVALUATION
1 - HAZARD IDENTIFICATION
(Refer Risk Matrix)
COOLING TOWER
1 To stop unit before start work Communication/buddy Inform owner before start service
system/spill hazard and after service
LOTO tool
energised equipment apply LOTO prior to work
2 TO REPLACE COOLING TOWER BLOWER BEARING HANDRILL .TEST electrical 1. Check ELCB before use.
AND PULLEY SET KIT 2.Use ELCB all the time.
4 To visually monitor unit after service None energised not allow to contact with
-water level ,water flow equipment moving part if there is
-unit abnormal or normal,
abnormality