Documente Academic
Documente Profesional
Documente Cultură
1
Cost-Function relationship
S.No Component Function B S Cost (Rs) %(cost/total)
1 Lead Make Mark B 0.50 10
2 Wood Protect lead S 1.00 20
3 Metal cap Hold eraser S 0.25 5
4 Eraser Remove marks S 0.75 15 60
5 Shaping of wood Provide grip S 0.50 10
6 Printing Display information S 0.50 10
Profit 1.50 30
Price of pencil= Rs 5/- Total 5.00
2
Functional analysis system technique (FAST)
• Charles Bytheway developed FAST Diagrams in 1964.
• Starts with the Basic Function, and builds to the right with supporting
or Secondary Functions.
4
FUNCTION ANALYSIS SYSTEM TECHNIQUE – (FAST)
5
FUNCTION ANALYSIS SYSTEM TECHNIQUE – (FAST)
Secondary Function
Basic Function Secondary Function
Secondary Function
OR logic
AND logic
Secondary Function Ask Why?
Customer Need
Secondary Secondary
Function Function
Ask Why?
Customer Need Customer Need
Pencil FAST Diagram
Overhead projector FAST Diagram
9
Benefits of the Function Analysis System
Technique
• Develop a shared understanding of the project
• Identify missing functions.
• Define, simplify and clarify the problem.
• Organize and understand the relationships between
functions.
• Identify the basic function of the project, process or product.
• Improve communication and consensus.
• Stimulate creativity.
Thank You