TITLE: -
ESTIMATING THE QUANTITY OF ANY ONE CIVIL ENGINEERING PROJECT OF THE
FOLLOWING:
A. UNDERGROUND WATER TANK OR SUMP WELL
B. PIPE CULVERT
C. ROAD OR RAILWAY OR RUNWAYS
D. SEPTIC TANK
E. A FACTORY SHED OF STEEL FRAME
Notes:-
i. Compulsory to use earthwork calculation sheet for project C.
ii. Detailed earthwork calculation by any one method of earthwork quantity for project C.
iii. Use measurement, abstract, face sheet for project calculation.
iv. Compulsory to write the title of Assignment first & attach this copy with Assignment.
v. Illustrated sketches are must for explanation of each question wherever necessary.
vi. Assume any other data if required.
vii. Rate should be taken from current schedule rate book of Pune Region.
A. To prepare detailed project drawing by using AutoCAD software in group of 04 to 05 students with
suitable scale.
QSCT 1 A04