Page 1 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

Measurement Book
(9 th Running Bill)

Project:Construction of Central Jail (Phase-II) Nuwakot, Contract No.:


DUDBC/Nuwakot/Works/NCB/5-072/73(Signed:2073/06/30)

Site: Bidur, Nuwakot

Date of submission:- 08/01/2076


Page 2 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

Bill No.:- 9th Running Bill

Measurement Book No.:- /2074/075

Fiscal Year:- 2075/76

Contract No.:- DUDBC/Nuwakot/Works/NCB/5-072/73

Total Estmated Amount:-

Total Agreed Amount

Date of Agreement:-

Last due date of work completion:-

Construction Company:- LAMA/RAMAN J/V

Project:- Construction of Central Jail (Phase-II) Nuwakot

Site:- Bidur-6, Maharanidihi, Nuwakot

Date of Measurement

Contractor Engineer

Contractor Karun Shrestha

Measurement taken By:-

Checked By:-

Approved By:-
Page 3 of 593
Lama-Raman JV
Siphal-7, Kathmandu
COST PRICE ADJUSTMENT
REF:CLAUSE NO.45.1 OF SPECIAL CONDITION OF CONTRACT

Project: Construction of Central Jail (Phase II), Nuwakot


Client: Department of Urban Development & Building Construction (PIU-4)
Fiscal Year: 073/074
Escalation Bill : 1
Bid opening date: 2073-02-31 13-Jun-16
Date of Commencement: 19/5/2074 4-Sep-17
Escalation Amount= Ac-A where Ac is Price Adjustment Amount and A is Total Amount of Actual Work Performed by the Contractor of Fiscal year 2073/074. Price Adjustm
non-adjustable factor (15% ) and Bc is adjustable facotor (85%) mentioned in the Contract Data (With refrence to PWD). Imc is Average Index for the respective Quarter 207
before Bid opening date.
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 6-Aug, 2017 National Salary and Wage Rate Index
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 6-Aug, 2017 National Wholesale Price Index - Con
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 6-Aug, 2017 National Wholesale Price Index - Tran

Pn=A+(b*Ln/Lo)+
(c*Mn/Mo)+
Bill Submission Date Current Year Index Symbol Base Year Index (d*En/Eo)
Work done
Weightage Amount
2073/02/01 on 14 May 2016 NRS Price
Non adjustment
Adjustab Adjustab Factor
IPC No. AD BS Index Date Type Index le le Type Index
6-Aug, 2017 365.40
Ln 411.70 A b Lo 0.13
1 4-Sep-17 19/5/2074 July/Aug-
0.15 294.50 22,205,837.35 1.04
017/18 Mn 302.50 c Mo 0.69
En 234.50 d Eo 209.30 0.03

Index of Labours
Index of Construction
Where Ln= used
Indexinofconstruction
Material Lo=
Labours on base year
Index of Construction
Mn= on current
used year
in Construction Mo=
Material on base year
on current year
Equipments, Index of Equipments,
En= ,Machines used in Eo= ,Machines on base
construction on year
074. Price Adjustment Factor Pc = Ac+Bc * Imc/Ioc Where Ac is
ective Quarter 2073/74 and Ioc is the Index Prevailling 28 days
Wage Rate Index
Price Index - Construction Materials
Price Index - Transport Vehicles and Machinary Goods

Total Amount Escalation in


with Price

Remarks
Net Payable Amount after
Adjustment (Ac) Amount (NRs) % weightage Without VAT
(NRs)
(NRs)
= Ac-A

23,067,423.84 861,586.49 3.88 861,586.49

Total NRS. 861,586.49


Lama-Raman JV
Siphal-7, Kathmandu
COST PRICE ADJUSTMENT
REF:CLAUSE NO.45.1 OF SPECIAL CONDITION OF CONTRACT

Project: Construction of Central Jail (Phase II), Nuwakot


Client: Department of Urban Development & Building Construction (PIU-4)
Fiscal Year: 073/074
Escalation Bill : 2
Bid opening date: 2073-02-31 13-Jun-16
Date of Commencement: 10/9/2074 25-Dec-17
Escalation Amount= Ac-A where Ac is Price Adjustment Amount and A is Total Amount of Actual Work Performed by the Contractor of Fiscal year 2073/074. Price Adjustmen
Imc/Ioc Where Ac is non-adjustable factor (15% ) and Bc is adjustable facotor (85%) mentioned in the Contract Data (With refrence to PWD). Imc is Average Index for the resp
and Ioc is the Index Prevailling 28 days before Bid opening date.
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 26-Nov, 2017 National Salary and Wage Rate Index
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 26-Nov, 2017 National Wholesale Price Index - Cons
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 26-Nov, 2017 National Wholesale Price Index - Tran

Pn=A+ Total Amount


(b*Ln/Lo) with Price
+
Bill Submission Date Current Year Index Symbol Base Year Index (c*Mn/Mo
Work done )+
Adjustment (Ac)
Weightage Amount (d*En/Eo)
NRS
2073/02/01 on 14 May 2016 Price
adjustme (NRs)
Non
Adjustab Adjustab nt
IPC No. AD BS Index Date Type Index le le Type Index Factor
26-Nov,
365.40
2017 Ln 416.10 A b Lo 0.13
2 25-Dec-17 10/9/2074 Nov/Dec,20
0.15 294.50 14,720,930.65 1.05 15,477,586.49
17/18 Mn 307.20 c Mo 0.69
En 234.80 d Eo 209.30 0.03

Index of Labours
Index of Construction
Where Ln= used in construction Lo=
Labours on base year
on current year
Index of Material
Index of Construction
Mn= used in Construction
Equipments, Mo=
Material
Index of on base year
Equipments,
En= on
,Machines year
current used in Eo=
,Machines on base year
construction on
Adjustment Factor Pc = Ac+Bc *
or the respective Quarter 2073/74
ate Index
ex - Construction Materials
ex - Transport Vehicles and Machinary Goods

Escalation in

Net Payable
Remarks

Amount after
Amount (NRs) % weightage Without
VAT
(NRs)

= Ac-A

756,655.84 5.14 756,655.84

Total NRS. 756,655.84


Lama-Raman JV
Siphal-7, Kathmandu
COST PRICE ADJUSTMENT
REF:CLAUSE NO.45.1 OF SPECIAL CONDITION OF CONTRACT

Project: Construction of Central Jail (Phase II), Nuwakot


Client: Department of Urban Development & Building Construction (PIU-4)
Fiscal Year: 073/074
Escalation Bill : 3
Bid opening date: 2073-02-31 13-Jun-16
Date of Commencement: 27/11/2074 11-Mar-18
Escalation Amount= Ac-A where Ac is Price Adjustment Amount and A is Total Amount of Actual Work Performed by the Contractor of Fiscal year 2073/074. Price Adjustmen
Ac+Bc * Imc/Ioc Where Ac is non-adjustable factor (15% ) and Bc is adjustable facotor (85%) mentioned in the Contract Data (With refrence to PWD). Imc is Average Index fo
Quarter 2073/74 and Ioc is the Index Prevailling 28 days before Bid opening date.
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 10-Feb, 2018 National Salary and Wage Rate Index
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 10-Feb, 2018 National Wholesale Price Index - Construction M
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 10-Feb, 2018 National Wholesale Price Index - Transport Veh

Pn=A+ Total Amount


(b*Ln/Lo) with Price
+
Bill Submission Date Current Year Index Symbol Base Year Index (c*Mn/Mo
Work done )+
Adjustment (Ac)
Weightage Amount (d*En/Eo)
NRS
2073/02/01 on 14 May 2016 Price
adjustme (NRs)
Non
Adjustab Adjustab nt
IPC No. AD BS Index Date Type Index le le Type Index Factor
10-Feb,
365.40
2018 Ln 424.70 A b Lo 0.13
3 11-Mar-18 27/11/2074 Jan/Feb,201
0.15 294.50 20,015,099.88 1.12 22,430,922.44
7/18 Mn 335.00 c Mo 0.69
En 242.30 d Eo 209.30 0.03

Index of Labours
Construction
Where Ln= used in construction Lo=
Labours on base
on current year
Index of Material
Construction
Mn= used in Construction
Equipments, Mo=
Material on base
Equipments,
En= on
,Machines year
current used in Eo=
,Machines on base
construction on
4. Price Adjustment Factor Pc =
is Average Index for the respective
e Index
x - Construction Materials
x - Transport Vehicles and Machinary Goods

Escalation in

Net Payable Amount


Remarks

after weightage
Amount (NRs) = % Without VAT
(NRs)

Ac-A

2,415,822.56 12.07 2,415,822.56

Total NRS. 2,415,822.56


Lama-Raman JV
Siphal-7, Kathmandu
COST PRICE ADJUSTMENT
REF:CLAUSE NO.45.1 OF SPECIAL CONDITION OF CONTRACT

Project: Construction of Central Jail (Phase II), Nuwakot


Client: Department of Urban Development & Building Construction (PIU-4)
Fiscal Year: 073/074
Escalation Bill : 4
Bid opening date: 2073-02-31 13-Jun-16
Date of Commencement: 3/1/2075 16-Apr-18
Escalation Amount= Ac-A where Ac is Price Adjustment Amount and A is Total Amount of Actual Work Performed by the Contractor of Fiscal year 2073/074. Price Adjustmen
Imc/Ioc Where Ac is non-adjustable factor (15% ) and Bc is adjustable facotor (85%) mentioned in the Contract Data (With refrence to PWD). Imc is Average Index for the resp
Ioc is the Index Prevailling 28 days before Bid opening date.
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 17-Mar, 2018 National Salary and Wage Rate Index
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 17-Mar, 2018 National Wholesale Price Index - Con
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 17-Mar, 2018 National Wholesale Price Index - Tran

Pn=A+ Total Amount


(b*Ln/Lo) with Price
+
Bill Submission Date Current Year Index Symbol Base Year Index (c*Mn/Mo
Work done )+
Adjustment (Ac)
Weightage Amount (d*En/Eo)
NRS
2073/02/01 on 14 May 2016 Price
adjustme (NRs)
Non
Adjustab Adjustab nt
IPC No. AD BS Index Date Type Index le le Type Index Factor
17-Mar, 2018 Ln 437.90 A b Lo 365.40 0.13
Mar/Apr,2017/
4 16-Apr-18 3/1/2075
18 Mn 340.00
0.15
c Mo
294.50
0.69 15,760,591.86 1.14 17,937,129.60
En 249.20 d Eo 209.30 0.03

Index of Labours
Index of Construction
Where Ln= used in construction Lo=
Labours on base year
on current year
Index of Material
Index of Construction
Mn= used in Construction
Equipments, Mo= Index of on
Equipments,
Material base year
En= on
,Machines year
current used in Eo= ,Machines on base
construction on year
Adjustment Factor Pc = Ac+Bc *
r the respective Quarter 2073/74 and
ate Index
ex - Construction Materials
ex - Transport Vehicles and Machinary Goods

Escalation in

Net Payable
Remarks

Amount after
Amount (NRs) = % weightage Without
VAT
(NRs)

Ac-A

2,176,537.74 13.81 2,176,537.74

Total NRS. 2,176,537.74


Lama-Raman JV
Siphal-7, Kathmandu
COST PRICE ADJUSTMENT
REF:CLAUSE NO.45.1 OF SPECIAL CONDITION OF CONTRACT

Project: Construction of Central Jail (Phase II), Nuwakot


Client: Department of Urban Development & Building Construction (PIU-4)
Fiscal Year: 073/074
Escalation Bill : 5
Bid opening date: 2073-02-31 13-Jun-16
Date of Commencement: 7/2/2075 21-May-18
Escalation Amount= Ac-A where Ac is Price Adjustment Amount and A is Total Amount of Actual Work Performed by the Contractor of Fiscal year 2073/074. Price Adjustmen
Imc/Ioc Where Ac is non-adjustable factor (15% ) and Bc is adjustable facotor (85%) mentioned in the Contract Data (With refrence to PWD). Imc is Average Index for the resp
and Ioc is the Index Prevailling 28 days before Bid opening date.
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 21-Apr, 2018 National Salary and Wage Rate Index
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 21-Apr, 2018 National Wholesale Price Index - Construc
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 21-Apr, 2018 National Wholesale Price Index - Transpor

Pn=A+ Total Amount


(b*Ln/Lo) with Price
+
Bill Submission Date Current Year Index Symbol Base Year Index (c*Mn/Mo
Work done )+
Adjustment (Ac)
Weightage Amount (d*En/Eo)
NRS
2073/02/01 on 14 May 2016 Price
adjustme (NRs)
Non
Adjustab Adjustab nt
IPC No. AD BS Index Date Type Index le le Type Index Factor
21-Apr, 2018 Ln 443.00 A b Lo 365.40 0.13
Apr/May,2017/
5 21-May-18 7/2/2075
18 Mn 340.90
0.15
c Mo
294.50
0.69 11,588,034.00 1.14 13,219,629.19
En 240.60 d Eo 209.30 0.03

Index of Labours
Index of Construction
Where Ln= used in construction Lo=
Labours on base year
on current year
Index of Material
Index of Construction
Mn= used in Construction
Equipments, Mo= Index of on
Equipments,
Material base year
En= on
,Machines year
current used in Eo= ,Machines on base
construction on year
ice Adjustment Factor Pc = Ac+Bc *
ex for the respective Quarter 2073/74
te Index
x - Construction Materials
x - Transport Vehicles and Machinary Goods

Escalation in

Net Payable
Remarks

Amount after
Amount (NRs) = % weightage
Without VAT
(NRs)

Ac-A

1,631,595.19 14.08 1,631,595.19

Total NRS. 1,631,595.19


Lama-Raman JV
Siphal-7, Kathmandu
COST PRICE ADJUSTMENT
REF:CLAUSE NO.45.1 OF SPECIAL CONDITION OF CONTRACT

Project: Construction of Central Jail (Phase II), Nuwakot


Client: Department of Urban Development & Building Construction (PIU-4)
Fiscal Year: 073/074
Escalation Bill : 6
Bid opening date: 2073-02-31 13-Jun-16
Date of Commencement: 29/3/2075 13-Jul-18
Escalation Amount= Ac-A where Ac is Price Adjustment Amount and A is Total Amount of Actual Work Performed by the Contractor of Fiscal year 2073/074. Price Adjustmen
Ac+Bc * Imc/Ioc Where Ac is non-adjustable factor (15% ) and Bc is adjustable facotor (85%) mentioned in the Contract Data (With refrence to PWD). Imc is Average Index fo
Quarter 2073/74 and Ioc is the Index Prevailling 28 days before Bid opening date.
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc National Salary and Wage Rate Index
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 13-Jun, 2018 National Wholesale Price Index - Constru
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc National Wholesale Price Index - Transpo

Pn=A+ Total Amount


(b*Ln/Lo) with Price
+
Bill Submission Date Current Year Index Symbol Base Year Index (c*Mn/Mo
Work done )+
Adjustment
Weightage Amount (d*En/Eo)
NRS
2073/02/01 on 14 May 2016 Price
adjustme (Ac) (NRs)
Non
Adjustab Adjustab nt
IPC No. AD BS Index Date Type Index le le Type Index Factor
13-Jun,
365.40
2018 Ln 443.00 A b Lo 0.13
6 13-Jul-18 29/3/2075 May/Jun,20
0.15 294.50 4,071,241.14 1.14 4,647,321.76
17/18 Mn 341.20 c Mo 0.69
En 240.60 d Eo 209.30 0.03

Index of Labours
Index of Construction
Where Ln= used in construction Lo=
Labours on base year
on current year
Index of Material
Index of Construction
Mn= used in Construction
Equipments, Mo= Index of on
Equipments,
Material base year
En= on
,Machines year
current used in Eo= ,Machines on base
construction on year
Price Adjustment Factor Pc =
Average Index for the respective
Rate Index
ndex - Construction Materials
ndex - Transport Vehicles and Machinary Goods

Escalation in

Net Payable
Remarks

Amount after
Amount % weightage
Without VAT
(NRs)

(NRs) = Ac-A

576,080.62 14.15 576,080.62

Total NRS. 576,080.62


Lama-Raman JV
Siphal-7, Kathmandu
COST PRICE ADJUSTMENT
REF:CLAUSE NO.45.1 OF SPECIAL CONDITION OF CONTRACT

Project: Construction of Central Jail (Phase II), Nuwakot


Client: Department of Urban Development & Building Construction (PIU-4)
Fiscal Year: 073/074
Escalation Bill : 7
Bid opening date: 2073-02-31 13-Jun-16
Date of Commencement: 4/4/2075
Escalation Amount=20/07//2018
Ac-A where Ac is Price Adjustment Amount and A is Total Amount of Actual Work Performed by the Contractor of Fiscal year 2073/074.
adjustable factor (15% ) and Bc is adjustable facotor (85%) mentioned in the Contract Data (With refrence to PWD). Imc is Average Index for the respective Quarter 2073/7
opening date.
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 19-June, 2018
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc

Bill Submission Date Current Year Index Symbol Base Year Index
Work done
Index Date Weightage Amount
NRS
2073/02/01 on 14 May 2016
Non
IPC No. AD BS Type Index Adjustable Adjustable Type Index
19-June, 2018 Ln 445.90 A b Lo 354.10 0.13
June-July ,
7 20/07//2018 4/4/2075
2017/18 Mn 108.20
0.15
c Mo
91.30
0.69 15,463,264.60
En 100.70 d Eo 82.00 0.03

Index of Labours used


Index of Construction Labours
Where Ln= in construction
Index onused
of Material Lo=
on base
Index year
of Construction Material
Mn= current year
in Construction on Mo=
,Machines used in on base year
Index of Equipments,
En= current year Eo=
construction on ,Machines on base year
T

2073/074. Price Adjustment Factor Pc = Ac+Bc * Imc/Ioc Where Ac is non-


pective Quarter 2073/74 and Ioc is the Index Prevailling 28 days before Bid
National Salary and Wage Rate Index
National Wholesale Price Index - Construction Materials
National Wholesale Price Index - Transport Vehicles and Machinary Goods

Pn=A+ Total Amount Escalation in


(b*Ln/Lo)+ with Price
(c*Mn/Mo)+
(d*En/Eo) Net Payable Amount

Remarks
Adjustment after weightage
Amount (NRs) % Without VAT
(NRs)
Price
(Ac) (NRs)
adjustment
Factor = Ac-A

1.17 18,065,732.03 2,602,467.43 16.83 2,602,467.43

Total NRS. 2,602,467.43


Lama-Raman JV
Siphal-7, Kathmandu
COST PRICE ADJUSTMENT
REF:CLAUSE NO.45.1 OF SPECIAL CONDITION OF CONTRACT

Project: Construction of Central Jail (Phase II), Nuwakot


Client: Department of Urban Development & Building Construction (PIU-4)
Fiscal Year: 073/074
Escalation Bill : 8
Bid opening date: 2073-02-31 13-Jun-16
Date of Commencement: 10/4/2075
Escalation Amount=18/1//2019
Ac-A where Ac is Price Adjustment Amount and A is Total Amount of Actual Work Performed by the Contractor of Fiscal year 2073/074.
Ac is non-adjustable factor (15% ) and Bc is adjustable facotor (85%) mentioned in the Contract Data (With refrence to PWD). Imc is Average Index for the respective Quarter
Prevailling 28 days before Bid opening date.
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc National Salary and Wage Ra
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc 20-Dec, 2018 National Wholesale Price Ind
Original Index ( according to Nepal Rastra Bank) 30 days before bid opening date, Ioc National Wholesale Price Ind

Pn=A+
(b*Ln/Lo)
+
Bill Submission Date Current Year Index Symbol Base Year Index (c*Mn/Mo
Work done )+
Index Date Weightage Amount (d*En/Eo)
NRS
2073/02/01 on 14 May 2016 Price
Non adjustme
Adjustab Adjustab nt
IPC No. AD BS Type Index le le Type Index Factor
20-Dec, 2018 Ln 464.90 A b Lo 354.10 0.13
8 18/1//2019 10/4/2075 Dec/Jan,2018/19 Mn 107.90 0.15 c Mo 91.30 0.69 13,285,143.00 1.17
En 104.10 d Eo 82.00 0.03

Index of Labours
Index of Construction
Where Ln= used
Indexinofconstruction
Material Lo=
Labours on base year
Index of Construction
Mn= on current
used year
in Construction Mo=
Material on base year
on current year
Equipments,
Index of Equipments,
En= ,Machines used in Eo=
,Machines on base year
construction on
3/074. Price Adjustment Factor Pc = Ac+Bc * Imc/Ioc Where
he respective Quarter 2073/74 and Ioc is the Index
l Salary and Wage Rate Index
l Wholesale Price Index - Construction Materials
l Wholesale Price Index - Transport Vehicles and Machinary Goods

Total Amount Escalation in


with Price

Net Payable Amount


Remarks

Adjustment (Ac) after weightage


Amount (NRs) = % Without VAT
(NRs)
(NRs)

Ac-A

15,599,414.91 2,314,271.91 17.42 2,314,271.91

Total NRS. 2,314,271.91


Lama-Raman JV
Siphal-7, Kathmandu
COST PRICE ADJUSTMENT SUMMARY
REF:CLAUSE NO.45.1 OF SPECIAL CONDITION OF CONTRACT

Project: Construction of Central Jail (Phase II), Nuwakot


Client: Department of Urban Development & Building Construction (PIU-4)
Fiscal Year:
Escalation Bill :
Bid opening date:

Price Total Amount with


IPC bill
Bill Amount Civil Work Provisional Sum Adjustment Price Adjustment Escalation Amount
No.
Factor (Ac) (NRs)
1 24,890,333.35 22,205,837.35 2,684,496.00 1.04 23,067,423.84 861,586.49
2 14,720,930.65 14,720,930.65 - 1.05 15,477,586.49 756,655.84
3 20,015,099.88 20,015,099.88 - 1.12 22,430,922.44 2,415,822.56
4 15,817,178.40 15,760,591.86 56,586.54 1.14 17,937,129.60 2,176,537.74
5 11,588,034.00 11,588,034.00 - 1.14 13,219,629.19 1,631,595.19
6 4,082,515.14 4,071,241.14 11,274.00 1.14 4,647,321.76 576,080.62
7 15,571,657.60 15,463,264.60 108,393.00 1.17 18,065,732.03 2,602,467.43
8 13,285,143.00 13,285,143.00 1.17 15,599,414.91 2,314,271.91
9 (73,804.07)
Total 119,970,892.02 130,445,160.25 13,335,017.77
Remarks
g]kfn ;/sf/ Page 29 of 593

ljnsf] qmd ;+Vof M 9th Running Bill ;x/L ljsf; dGqfno 7]Ssfk§fsf] ;+Vof DUDBC/Nuwakot/Works/NCB/5-072/73

lg=Jo=sf] gfd M Lama-Raman JV, Siphal-7, Kathmandu ;x/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL ljnsf] ef}=g+=
cl3Nnf] e'QmfgL ljnsf 8th Running Bill Project Implementation Unit - 4 sfo{ ;DkGg ug'{ kg]{ ldlt M @)&^.)^.@(

sfof{/De cfb]z ldlt M Babarmahal, Kathmandu e'QmfgL ef}r/ g+= M


o{ ;DkGg ePsf] ldlt M xxxxxx e'QmfgL ldlt M

of]hgfsf] gfd M Construction of Centrail Jail (Phase II),Nuwkot 7]Ssf ;DalGw lan gfkL lstfj g++ M

cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf] sfd


qm=;+= sfo{sf] ljj/0f PsfO{ s}lkmot
kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f hDdf d"No
B. Provisional Sum
a Insurance Amount
Insurance Premium for the work,plant and
materials damage for contract work for all risk
i including Roit,Strike,Damage,Malicious damage
and Terrorism for contract work for 3 years +1 year
maintenance period.

Insurance Premium for the Insurance of owner


and consultant staff (named) RS 10,00,000.00 per
ii
person for 25 persons with unlimited number of
occurances for three years Job 1 2,799,536.00 1.00 2,799,536.00

Insurance Premium for construction equipments


iii and machines with value of Rs 50,000,000.00 for 3
years.

Insurance Premium for third party liability personal


ii only per person Rs 500,000.00 for 100 persons
first 3 years with unlimited number of occurance.

Sub-Total a ( Insurance Sum):-


b Laboratory Test
Setting out labouratory in site and Carrying out
different laboratory tests of construction material
like cement, rod, brick, sand, aggregate, filling 1 95,622.44 1.00 169,426.51 (73,804.07)
i Job
materials, concrete cubes etc during construction
work as per specification and direction by site
engineer.
Details are in
Sub-Total b ( Laboratory Test):- 2,895,158.44 2,968,962.51 (73,804.07) measurement sheet

Total of Provision Sum


C. Civil Works
1 Earthwork and earthfilling

Site preparation work with cleaning and disposal of


1.1 debrises, uprooting roots, solid wastes etc. all Sqm 13857.55 5.00 69287.75 13857.55 69,287.75 0.00 -
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils
1.2 in foundation including 10m hauling distance and Cum 5880.52 75.00 441039.32 5766.71 432,503.23 113.81 8,536.10
1.5 m. lift all complete.
Earth filling in 150/150 mm thick layer, watering,
1.3 ramming including supply of filling materials within Cum 2133.65 125.00 266706.78 1879.17 234,896.78 254.48 31,810.00
10 m distance all complete.

Earth filling without supply of filling materials all 3920.06 50.00 196002.75 3475.32 173,766.00 444.74 22,236.75
1.4 Cum
complete.

2 Brick Masonary work


Good quality local chimney made Brickwork in 1:6
C/S mortar up to ground floor in perfect line level
finish including wetting the bricks, racking the Cum 1020.60 12,000.00 12247159.35 913.36 10,960,302.66 107.24 1,286,856.70
joints and curing the work for at least 7 days all
complete.
2.1
g]kfn ;/sf/ Page 30 of 593

ljnsf] qmd ;+Vof M 9th Running Bill ;x/L ljsf; dGqfno 7]Ssfk§fsf] ;+Vof DUDBC/Nuwakot/Works/NCB/5-072/73

lg=Jo=sf] gfd M Lama-Raman JV, Siphal-7, Kathmandu ;x/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL ljnsf] ef}=g+=
cl3Nnf] e'QmfgL ljnsf 8th Running Bill Project Implementation Unit - 4 sfo{ ;DkGg ug'{ kg]{ ldlt M @)&^.)^.@(

sfof{/De cfb]z ldlt M Babarmahal, Kathmandu e'QmfgL ef}r/ g+= M


o{ ;DkGg ePsf] ldlt M xxxxxx e'QmfgL ldlt M

of]hgfsf] gfd M Construction of Centrail Jail (Phase II),Nuwkot 7]Ssf ;DalGw lan gfkL lstfj g++ M

cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf] sfd


qm=;+= sfo{sf] ljj/0f PsfO{ s}lkmot
kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f hDdf d"No
Good quality local chimney made Brickwork in 1:4
C/S mortar up to ground floor in perfect line level
finish including wetting the bricks, racking the Cum 1238.89 12,000.00 14866728.15 1238.42 14,860,999.65 0.48 5,728.50
joints and curing the work for at least 7 days all
complete.
2.2
3 Stone Work
3.1 Stone Masonry in 1:6 cement sand mortar Cum 952.56 6,500.00 6191640.00 907.20 5,896,800.00 45.36 294,840.00
Dry stone laying in foundation and floor including
sand filling in joints, levelling, watering etc. all Cum 82.35 3,000.00 247050.00 82.35 247,050.00 0.00 -
3.2 complete.
4 Plain Cement concrete work
Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved
quality of cement and sand and crushed stone Cum 521.56 8,000.00 4172510.10 484.50 3,875,970.66 37.07 296,539.44
aggregate including mixing, laying, curing etc all
4.1 complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works (1:2:4)


for slab/lintels with approved quality of cement
sand and crushed stone aggregates including Cum 115.02 10,000.00 1150217.77 115.96 1,159,617.78 -0.94 (9,400.00)
mixing,laying,using mixture and vibrator, curing etc
all complete in approval of site engineer.
4.2

Plain cement Concrete (PCC) for RCC works


(1:1.5:3) for slab/lintels with approved quality of
cement and sand and crushed stone aggregate Cum 3693.59 12,000.00 44323094.30 3039.36 36,472,337.69 654.23 7,850,756.62
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.
4.3
Tor steel or TMT reinforcement bar of fe 415/500
grade including straightening, cleaning, cutting,
binding & fixing in position with annealed tying MT 529.85 8,000.00 4238822.46 447.15 3,577,182.72 82.70 661,639.74
binding wire as per drawing, design & instruction
4.4 all complete.
5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
staging,supporting inclusive of wedging and Sqm 1216.22 500.00 608110.00 951.66 475,831.50 264.56 132,278.50
cutting holes for utilization till the support if full
5.1 unyeilding net.

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
necessary propping, scafolding, staging, 6280.07 500.00 3140032.87 4621.10 2,310,549.63 1658.97 829,483.25
Sqm
supporting inclusive of wedging and cutting holes
for utilization till the support if fully unyeilding net .
5.2 Slab

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
scaffolding, staging, supporting inclusive of Sqm 14725.86 500.00 7362930.00 12453.80 6,226,902.30 2272.06 1,136,027.70
wedging and cutting holes for utilization till the
support if fully unyielding net.
5.3
g]kfn ;/sf/ Page 31 of 593

ljnsf] qmd ;+Vof M 9th Running Bill ;x/L ljsf; dGqfno 7]Ssfk§fsf] ;+Vof DUDBC/Nuwakot/Works/NCB/5-072/73

lg=Jo=sf] gfd M Lama-Raman JV, Siphal-7, Kathmandu ;x/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL ljnsf] ef}=g+=
cl3Nnf] e'QmfgL ljnsf 8th Running Bill Project Implementation Unit - 4 sfo{ ;DkGg ug'{ kg]{ ldlt M @)&^.)^.@(

sfof{/De cfb]z ldlt M Babarmahal, Kathmandu e'QmfgL ef}r/ g+= M


o{ ;DkGg ePsf] ldlt M xxxxxx e'QmfgL ldlt M

of]hgfsf] gfd M Construction of Centrail Jail (Phase II),Nuwkot 7]Ssf ;DalGw lan gfkL lstfj g++ M

cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf] sfd


qm=;+= sfo{sf] ljj/0f PsfO{ s}lkmot
kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f hDdf d"No
Formwork, shuttering, centering with 19mm thick
waterproof ply for column, necessary propping,
scaffolding, staging, supporting inclusive of Sqm 12100.56 500.00 6050280.00 12030.11 6,015,055.50 70.45 35,224.50
wedging and cutting holes for utilization till the
support if fully unyielding net.
5.4

- -

6 Roofing Work
0.5mm colour CGI sheet roofing including fixing in
proper shape & size with all necessary nails,
screws, bolts & nuts washers, J & L hooks etc as
Sqm 2940.42 1,000.00 2940415.74 2940.42 2,940,415.74 0.00 -
per drawing & instruction all complete.

6.1
0.50mm colour Ridge on roof including fixing in
proper shape & size with all necessary rails,
screws, bolts & nuts washers, J & L hocks etc as
Rm 203.45 1,000.00 203450.00 203.45 203,450.00 0.00 -
per drawing & instruction all complete.

6.2
0.50mm colour sheet for fixing in gable wall proper
shape & size with all necessary rails, screws, bolts
& nuts washers, J & L hocks etc as per drawing &
Sqm 194.87 1,200.00 233845.56 194.87 233,845.56 0.00 -
instruction all complete.

6.3
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
approved quality including fixing in position with Cum 16.96 180,000.00 3052237.95 16.96 3,052,237.95 0.00 -
necessary M.S. holdfasts as per drawing and
7.3 instructions all complete.
Fixing of glazed shutter in 38x75 mm thick sal
wood frame with 4mm thick plain glass fitted 152.94 10,000.00 1529400.00 138.54 1,385,400.00 14.40 144,000.00
Sqm
including all necessary hardware fittings all
7.5 complete.
8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with
approved quality of O.P. cement & sand and
crushed stone aggregate including mixing, laying, Sqm 3958.99 500.00 1979493.00 3958.99 1,979,493.00 0.00 -
punning, rubbing in hard surface curing etc all
8.1 complete.
Flat dry brick soling on flat in foundation and floor
including sand filling in joints, leveling, ramming Sqm 6949.02 600.00 4169413.56 6601.99 3,961,194.96 347.03 208,218.60
8.4 etc. all complete
Sand filling in flooring including supply of filling 378.45 1,000.00 378446.00 378.45 378,446.00 0.00 -
Cum
8.5 materials, watering, ramming etc. all complete
3mm thick cement sand punning rubbing with
steel trowel to hard, smooth and shining surface Sqm 3798.00 150.00 569700.66 3472.05 520,808.16 325.95 48,892.50
8.7 and curing all
g]kfn ;/sf/ Page 32 of 593

ljnsf] qmd ;+Vof M 9th Running Bill ;x/L ljsf; dGqfno 7]Ssfk§fsf] ;+Vof DUDBC/Nuwakot/Works/NCB/5-072/73

lg=Jo=sf] gfd M Lama-Raman JV, Siphal-7, Kathmandu ;x/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL ljnsf] ef}=g+=
cl3Nnf] e'QmfgL ljnsf 8th Running Bill Project Implementation Unit - 4 sfo{ ;DkGg ug'{ kg]{ ldlt M @)&^.)^.@(

sfof{/De cfb]z ldlt M Babarmahal, Kathmandu e'QmfgL ef}r/ g+= M


o{ ;DkGg ePsf] ldlt M xxxxxx e'QmfgL ldlt M

of]hgfsf] gfd M Construction of Centrail Jail (Phase II),Nuwkot 7]Ssf ;DalGw lan gfkL lstfj g++ M

cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf] sfd


qm=;+= sfo{sf] ljj/0f PsfO{ s}lkmot
kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f hDdf d"No
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
Sqm 2755.20 250.00 688800.00 2755.20 688,800.00 0.00 -
9.1 ceiling Plaster
12.5mm thick cement sand palster in 1:4 ratio on
Sqm 5754.74 250.00 1438685.74 5493.98 1,373,495.74 260.76 65,190.00
9.2 External wall plaster
20 mm thick cement sand palster in 1:4 ratio on
internal wall plaster Sqm 8409.26 300.00 2522777.93 8409.26 2,522,777.93 0.00 -
9.3
Flush ruled pointing 1:2 in stone /Rubble masonry wall
9.4 as per drawing all complete. Sqm 1209.60 100.00 120960.00 - 1209.60 120,960.00

11 Water Proofing Works


Providing and applying Dustban Premise chemical
Sqm 8265.34 250.00 2066335.31 7826.49 1,956,622.81 438.85 109,712.50
11.1 for anti termites treatment
Elastocrete cementitious elastomeric water
proofing coating 2 components capacity per kg Sqm 74.42 400.00 29768.00 74.42 29,768.00 0.00 -
sqft 2 coat including supply and all complete
11.2
g]kfn ;/sf/ Page 33 of 593

ljnsf] qmd ;+Vof M 9th Running Bill ;x/L ljsf; dGqfno 7]Ssfk§fsf] ;+Vof DUDBC/Nuwakot/Works/NCB/5-072/73

lg=Jo=sf] gfd M Lama-Raman JV, Siphal-7, Kathmandu ;x/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL ljnsf] ef}=g+=
cl3Nnf] e'QmfgL ljnsf 8th Running Bill Project Implementation Unit - 4 sfo{ ;DkGg ug'{ kg]{ ldlt M @)&^.)^.@(

sfof{/De cfb]z ldlt M Babarmahal, Kathmandu e'QmfgL ef}r/ g+= M


o{ ;DkGg ePsf] ldlt M xxxxxx e'QmfgL ldlt M

of]hgfsf] gfd M Construction of Centrail Jail (Phase II),Nuwkot 7]Ssf ;DalGw lan gfkL lstfj g++ M

cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf] sfd


qm=;+= sfo{sf] ljj/0f PsfO{ s}lkmot
kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f hDdf d"No
Steel & Iron Works
12
M.S. Black Pipe roof truss & purpin with I.S. or
B.S. section including jointing, fixing, erection and
primer painting with all necessary M.S. Bed Plates, Kg 31467.71 125.00 3933463.27 22507.94 2,813,492.91 8959.76 1,119,970.36
Shoe angles anchor bolts all
12.6
Sub-Total C(Civil Work):- 131,428,804.32 117,029,302.60 14,399,501.75
Total B+C 134,323,962.76 119,998,265.11 14,325,697.68
Price Adjustment bill 13,335,017.77 10,719,898.65 2,615,119.12
Total 147,658,980.53 130,718,163.76 16,940,816.80
VAT 13% 19,195,667.47 16,993,361.29 2,202,306.18

Grand Total 166,854,648.00 147,711,525.05 19,143,122.98

pko'{Qm adf]lhd 7Ls 5 egL k|dfl0ft ug]{


of] ljn adf]lhd hDdf ? lgdf{0f Joj;foLsf] ;xL / 5fk M ===========================================
cl3Nnf] ljnaf6 e'QmfgL ePsf] ?=
s§f ug'{ kg]{ ?= afFls lbg' kg]{ ?=
-s_ k]ZsL ` -v_ dfn;fdfgsf] df]n ======================= -u_ d]lzg cf}hf/sf] axfn ==============================================
-3_ d'No clea{l4 s/ !# % -ª_ w/f}6L M -r_ clu|d cfos/ jfktM
v'b lbg' kg]{ M hfFr ug]{ O{lGhlgo/sf]] ;xL :jLs[t ugl;=l8=O{= sf] ;xL
k]z ug]{ sf] ;xL
bhf{ M bhf{ M
L ================================================================================
hDdf ?= =========================================== sf] r]s g++= =============== af6 k|fKt ePsf] egL ;xL ug]{ 7]s]bf/sf] ;xL / 5fk
Page 34 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Summary of MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Quantity
S.N. Description of Work as Per Quantity Unit Rate Rs.
BOQ
B. Provisional Sum
a Insurance Premium
Insurance Premium for the work,plant and materials
damage for contract work for all risk including
i Roit,Strike,Damage,Malicious damage and Terrorism 1
for contract work for 3 years +1 year maintenance
period.
Insurance Premium for the Insurance of owner and
consultant staff (named) RS 10,00,000.00 per
ii 1
person for 25 persons with unlimited number of
occurances for three years
Insurance Premium for construction equipments and
iii machines with value of Rs 50,000,000.00 for 3 1
years.

Insurance Premium for third party liability personal


iv only per person Rs 500,000.00 for 100 persons first 1
3 years with unlimited number of occurance.

Sub-Total a ( Insurance Sum):-


b Laboratory Test

Setting out labouratory in site and Carrying out


different laboratory tests of construction material like
i cement, rod, brick, sand, aggregate, filling materials, 1
concrete cubes etc during construction work as per
specification and direction by site engineer.

Sub-Total b ( Laboratory Test):-


Sum of Provisional Sum(B)
C. Civil Work
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 13857.55 13857.55 Sqm 5.00
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
foundation including 10m hauling distance and 1.5
1.2 10310.60 5880.52 Cum 75.00
m. lift all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 35 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Summary of MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Quantity
S.N. Description of Work as Per Quantity Unit Rate Rs.
BOQ
Earth filling in 150/150 mm thick layer, watering,
1.3 ramming including supply of filling materials within 3308.46 2133.65 Cum 125.00
10 m distance all complete.

Earth filling without supply of filling materials all


1.4 complete. 5159.87 3920.06 Cum 50.00
2 Brick Masonary work
Good quality local chimney made Brickwork in 1:4
C/S mortar up to ground floor in perfect line level
2.1 finish including wetting the bricks, racking the joints 3640.07 1020.60 Cum 12,000.00
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in Super Structure with perfect line level
2.2 1696.64 1238.89 Cum 12,000.00
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

3 Stone Masonary Work


3.1 Stone Masonry in 1:6 cement sand mortar 2573.99 952.56 Cum 6,500.00
Dry stone laying in foundation and floor including
3.2 sand filling in joints, leveling, watering etc. all 82.35 82.35 Cum 3,000.00
complete.

4 Plain Cement concrete work


Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved quality
of cement and sand and crushed stone aggregate
4.1 including mixing, laying using mixture & Vibrator, 842.62 521.56 Cum 8,000.00
curing etc all complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 36 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Summary of MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Quantity
S.N. Description of Work as Per Quantity Unit Rate Rs.
BOQ

Plain cement concrete(PCC) for Rcc works (1:2:4)


for slab/lintels with approved quality of cement sand
4.2 and crushed stone aggregates including 1674.82 115.02 Cum 10,000.00
mixing,laying,using mixture and vibrator, curing etc
all complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works


(1:1.5:3) for slab/lintels with approved quality of
cement and sand and crushed stone aggregate
4.3 including mixing, laying using mixture & Vibrator, 6620.59 3693.59 Cum 12,000.00
curing etc all complete in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 binding & fixing in position with annealed tying 1052.098 529.85 Mt 8,000.00
binding wire as per drawing, design & instruction all
complete.

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 1216.22 1216.22 Sqm 500.00
holes for utilization till the support if full unyeilding
net.

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
5.2 necessary propping, scafolding, staging, supporting 17211.91 6280.07 Sqm 500.00
inclusive of wedging and cutting holes for utilization
till the support if fully unyeilding net . Slab

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 14725.86 14725.86 Sqm 500.00
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 12100.56 12100.56 Sqm 500.00
and cutting holes for utilization till the support if fully
unyielding net.

Contractor: Prepared By: Checked By: Approved By:


Page 37 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Summary of MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Quantity
S.N. Description of Work as Per Quantity Unit Rate Rs.
BOQ
6Roofing Work
0.5mm colour CGI sheet roofing including fixing in
proper shape & size with all necessary nails, screws,
6.1 bolts & nuts washers, J & L hooks etc as per drawing 5429.49 2940.42 Sqm 1,000.00
& instruction all complete.
0.50mm colour Ridge on roof including fixing in
proper shape & size with all necessary rails, screws,
6.2 bolts & nuts washers, J & L hocks etc as per drawing 551.51 203.45 Rm 1,000.00
& instruction all complete.
0.50mm colour sheet for fixing in gable wall proper
shape & size with all necessary rails, screws, bolts &
6.3 nuts washers, J & L hocks etc as per drawing & 426.15 194.87 Sqm 1,200.00
instruction all complete.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 60.71 16.96 Cum 180,000.00
necessary M.S. holdfasts as per drawing and
instructions all complete.

Fixing of glazed shutter in 38x75 mm thick sal wood


7.5 frame with 4mm thick plain glass fitted including all 152.94 152.94 Sqm 10,000.00
necessary hardware fittings all complete.

8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with approved
quality of O.P. cement & sand and crushed stone
8.1 aggregate including mixing, laying, punning, rubbing 8359.18 3958.99 Sqm 500.00
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 13443.86 6949.02 Sqm 600.00
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 1449.32 378.45 Cum 1,000.00
3mm thick cement sand punning rubbing with steel
8.7 trowel to hard, smooth and shining surface and 15385.99 3798.00 Sqm 150.00
curing all
9 Plastering Work

Contractor: Prepared By: Checked By: Approved By:


Page 38 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Summary of MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Quantity
S.N. Description of Work as Per Quantity Unit Rate Rs.
BOQ
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster 17123.40 2755.20 Sqm 250.00
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster 16970.47 5754.74 Sqm 250.00
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 38951.98 8409.26 Sqm 300.00
Flush ruled pointing 1:2 in stone /Rubble masonry wall as
9.4 per drawing all complete. 4615.00 1209.60 Sqm 100.00
11.0 Water Proofing Works
Providing and applying Dustban Premise chemical
11.1 for anti termites treatment 9514.50 8265.34 Sqm 250.00
Elastocrete cementitious elastomeric water proofing
11.2 coating 2 components capacity per kg sqft 2 coat 6919.40 74.42 Sqm 400.00
including supply and all complete
12 Steel and Iron Works
M.S. Black Pipe roof truss & purpin with I.S. or B.S.
section including jointing, fixing, erection and primer
12.6 painting with all necessary M.S. Bed Plates, Shoe 83023.63 31467.71 Kg 125.00
angles anchor bolts all
Total Civil (B)

Total A
Total B+C
Price Adjust ment bill
Sum Total
Bill up to 8th Running Bill
Total
Vat 13%
Grand Total

In Words: Nineten million one hundred fourty three thousand one hundred twenty two one and

Contractor: Prepared By: Checked By: Approved By:


Page 39 of 593

nstruction
4

Amount Remarks
Per
Rs

2,799,536.00

95,622.44

onal Sum(B) 2,895,158.44

Sqm 69,287.75

Cum 441,039.32

Contractor: Prepared By: Checked By: Approved By:


Page 40 of 593

nstruction
4

Amount Remarks
Per
Rs

Cum 266,706.78

Cum 196,002.75

Cum 12,247,159.35

Cum 14,866,728.15

Cum 6,191,640.00

Cum 247,050.00

Cum 4,172,510.10

Contractor: Prepared By: Checked By: Approved By:


Page 41 of 593

nstruction
4

Amount Remarks
Per
Rs

Cum 1,150,217.77

Cum 44,323,094.30

Mt 4,238,822.46

Sqm 608,110.00

Sqm 3,140,032.87

Sqm 7,362,930.00

Sqm 6,050,280.00

Contractor: Prepared By: Checked By: Approved By:


Page 42 of 593

nstruction
4

Amount Remarks
Per
Rs

Sqm 2,940,415.74

Rm 203,450.00

Sqm 233,845.56

Cum 3,052,237.95

Cum 1,529,400.00

Sqm 1,979,493.00

Sqm 4,169,413.56

Cum 378,446.00

Sqm 569,700.66

Contractor: Prepared By: Checked By: Approved By:


Page 43 of 593

nstruction
4

Amount Remarks
Per
Rs

Sqm 688,800.00

Sqm 1,438,685.74

Sqm 2,522,777.93

Sqm 120,960.00

Sqm 2,066,335.31

Sqm 29,768.00

Kg 3,933,463.27

Total A 131,428,804.32
Total B+C 134,323,962.76
just ment bill 13,335,017.77
Sum Total 147,658,980.53
Running Bill 130,718,163.76
Total 16,940,816.77
Vat 13% 2,202,306.18
Grand Total 19,143,122.95

y two one and ninty five paisa only.

Contractor: Prepared By: Checked By: Approved By:


Page 44 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construct
Project Implementation Unit - 4
Babarmahal, Kathmandu
Quantity Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail Dormitory Jail workshop Jail Dinning Jail Toilet NP & APF Security wall

B. Provisional Sum
a Insurance Premiumfor the work,plant and
Insurance Premium
materials damage for contract work for all risk
i including Roit,Strike,Damage,Malicious damage
and Terrorism for contract work for 3 years +1
Insurance Premiumperiod.
year maintenance for the Insurance of owner
and consultant staff (named) RS 10,00,000.00
ii
per person for 25 persons with unlimited number
of occurances for three years 1
Insurance Premium for construction equipments
iii and machines with value of Rs 50,000,000.00 for
3 years.
Insurance Premium for third party liability
personal only per person Rs 500,000.00 for 100
iv
persons first 3 years with unlimited number of
occurance.
Sub-Total a ( Insurance Sum):-
Laboratory Test
Lab test charge
Sub-Total b ( Laboratory Test):-

C. Civil Work
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal
1.1 of debrises, uprooting roots, solid wastes etc. all 6094.40 1296.00 2380.00 1,800.00 7,329.82 302.40
complete as per instruction.

Contractor: Prepared By: Checked By: Approved By:


Page 45 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construct
Project Implementation Unit - 4
Babarmahal, Kathmandu
Quantity Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail Dormitory Jail workshop Jail Dinning Jail Toilet NP & APF Security wall

Earthwork in excavation in hard/boulder mix soils


1.2 in foundation including 10m hauling distance and 2506.80 592.44 953.48 501.86 828.84 340.20
1.5 m. lift all complete.
Earth filling in 150/150 mm thick layer, watering,
1.3 ramming including supply of filling materials 1405.82 180.34 206.05 204.44 137.00
within 10 m distance all complete.
Earth filling without supply of filling materials all
1.4 complete. 2478.37 296.19 474.04 250.90 414.41
2 Brick Masonary work
Good quality local chimney made Brickwork in
1:4 C/S mortar up to ground floor in perfect line
2.1 level finish including wetting the bricks, racking 467.07 116.71 146.49 144.51 145.82
the joints and curing the work for at least 7 days
all complete.

Good quality local chimney made Brickwork in


1:4 C/S mortar in Super Structure with perfect
2.2 line level finish including wetting the bricks, 166.36 134.32 299.18 265.22 373.81
racking the joints and curing the work for at least
7 days all complete.
3 Stone Masonary Work
3.1 Stone Masonry in 1:6 c/m - 952.56
Dry stone laying in foundation and floor including
3.2 sand filling in joints, leveling, watering etc. all 47.07 45.36
complete.

Contractor: Prepared By: Checked By: Approved By:


Page 46 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construct
Project Implementation Unit - 4
Babarmahal, Kathmandu
Quantity Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail Dormitory Jail workshop Jail Dinning Jail Toilet NP & APF Security wall

4 Plain Cement concrete work


Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved
quality of cement and sand and crushed stone
4.1 aggregate including mixing, laying using mixture 163.95 27.60 154.20 58.05 114.09
& Vibrator, curing etc all complete in approval of
site engineer.

Plain cement concrete(PCC) for Rcc works


(1:2:4) for slab/lintels with approved quality of
cement sand and crushed stone aggregates
4.2 13.87 16.84 22.35 4.26 35.02 22.68
including mixing,laying,using mixture and vibrator,
curing etc all complete in approval of site
engineer.
Plain cement Concrete (PCC) for RCC works
(1:1.5:3) for slab/lintels with approved quality of
cement and sand and crushed stone aggregate
4.3 including mixing, laying using mixture & Vibrator, 1821.84 362.61 304.40 340.40 623.61 204.12
curing etc all complete in approval of site
engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 binding & fixing in position with annealed tying 258.12 59.58 51.63 49.96 95.57 11.80
binding wire as per drawing, design & instruction
all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 47 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construct
Project Implementation Unit - 4
Babarmahal, Kathmandu
Quantity Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail Dormitory Jail workshop Jail Dinning Jail Toilet NP & APF Security wall

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping,
5.1 scaffolding, staging,supporting inclusive of 120.62 122.49 200.86 47.00 224.45 544.32
wedging and cutting holes for utilization till the
support if full unyeilding net. Sill n lintel

Form work , shuttering, centering with 19mm


thick water proof ply board and steel post for all
works necessary propping, scafolding, staging,
5.2 3370.55 1009.63 0.00 832.87 1,067.01
supporting inclusive of wedging and cutting holes
for utilization till the support if fully unyeilding net .
Slab
Formwork, shuttering, centering with 19mm thick
waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of 6317.47 2077.12 1389.75 2,632.23 2,645.91
wedging and cutting holes for utilization till the
support if fully unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of 8950.74 1002.03 964.63 1,093.68 1,951.74
wedging and cutting holes for utilization till the
support if fully unyielding net.

6 Roofing Work

Contractor: Prepared By: Checked By: Approved By:


Page 48 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construct
Project Implementation Unit - 4
Babarmahal, Kathmandu
Quantity Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail Dormitory Jail workshop Jail Dinning Jail Toilet NP & APF Security wall

0.5mm colour CGI sheet roofing including fixing


in proper shape & size with all necessary nails,
6.1 screws, bolts & nuts washers, J & L hooks etc as 1979.25 254.61 706.55
per drawing & instruction all complete.

0.50mm colour Ridge on roof including fixing in


proper shape & size with all necessary rails,
6.2 screws, bolts & nuts washers, J & L hocks etc as 131.50 17.40 54.55
per drawing & instruction all complete.

0.50mm colour sheet for fixing in gable wall


proper shape & size with all necessary rails,
6.3 screws, bolts & nuts washers, J & L hocks etc as 132.76 19.81 42.30
per drawing & instruction all complete.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 3.29 0.75 4.95 7.97
necessary M.S. holdfasts as per drawing and
instructions all complete.
Fixing of glazed shutter in 38x75 mm thick sal
wood frame with 4mm thick plain glass fitted
including all necessary hardware fittings all 15.17 138.54
complete.
7.5
8 Flooring work

Contractor: Prepared By: Checked By: Approved By:


Page 49 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construct
Project Implementation Unit - 4
Babarmahal, Kathmandu
Quantity Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail Dormitory Jail workshop Jail Dinning Jail Toilet NP & APF Security wall

38mm thick (1:2:4) P.C.C. for flooring with


approved quality of O.P. cement & sand and
8.1 crushed stone aggregate including mixing, laying, 584.03 0.00 1357.20 234.00 1,767.26
punning, rubbing in hard surface curing etc all
complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming 2208.52 367.96 2003.31 684.80 1,627.36
etc. all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 56.77 0.00 121.23 23.40 165.64

3mm thick cement sand punning rubbing with


8.7 steel trowel to hard, smooth and shining surface 584.03 0.00 1683.15 - 1,371.63
and curing all
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster 965.87 0.00 770.64 1,018.69
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster 402.75 1757.31 1,118.47 2,435.65
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 1097.06 1893.35 2,751.98 2,567.12
Flush ruled pointing 1:2 in stone /Rubble masonry wall
9.4 as per drawing all complete. 1,209.60

11.0 Water Proofing Works

Contractor: Prepared By: Checked By: Approved By:


Page 50 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construct
Project Implementation Unit - 4
Babarmahal, Kathmandu
Quantity Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail Dormitory Jail workshop Jail Dinning Jail Toilet NP & APF Security wall

Providing and applying Dustban Premise


11.1 chemical for anti termites treatment all complete. 3510.80 1119.02 1865.03 800.00 970.50

Elastocrete cementitious elastomeric water


proofing coating 2 components capacity per kg
11.2 sqft 2 coat including supply and all complete -

12 Steel and Iron Works


M.S. Black Pipe roof truss & purpin with I.S. or
B.S. section including jointing, fixing, erection and
12.6 primer painting with all necessary M.S. Bed 6611.94 14308.89 4,695.64 5,851.23
Plates, Shoe angles anchor bolts all

Contractor: Prepared By: Checked By: Approved By:


Page 51 of 593

g Construction

Amount Remarks
Water Tank Total Quantity Unit Rate Rs. Per
Rs

1 Job Job 2,799,536.00

95,622.44
1

Sum of Provisional Sum(B) 2,895,158.44

57.06 13857.55 Sqm 5.00 Sqm 69,287.75

Contractor: Prepared By: Checked By: Approved By:


Page 52 of 593

g Construction

Amount Remarks
Water Tank Total Quantity Unit Rate Rs. Per
Rs

156.91 5880.52 Cum 75.00 Cum 441,039.33

- 2133.65 Cum 125.00 Cum 266,706.78

6.15 3920.06 Cum 50.00 Cum 196,002.75

- 1020.60 Cum 12,000.00 Cum 12,247,159.36

- 1238.89 Cum 12,000.00 Cum 14,866,728.15

952.56 Cum 6,500.00 Cum 6,191,640.00

82.35 Cum 3,000.00 Cum 247,050.00

Contractor: Prepared By: Checked By: Approved By:


Page 53 of 593

g Construction

Amount Remarks
Water Tank Total Quantity Unit Rate Rs. Per
Rs
0.00 -

3.67 521.56 Cum 8,000.00 Cum 4,172,510.10

- 115.02 Cum 10,000.00 Cum 1,150,217.78

36.62 3693.59 Cum 12,000.00 Cum 44,323,094.30

3.19 529.85 Mt 8,000.00 Mt 4,238,822.46

Contractor: Prepared By: Checked By: Approved By:


Page 54 of 593

g Construction

Amount Remarks
Water Tank Total Quantity Unit Rate Rs. Per
Rs

1216.22 Sqm 500.00 Sqm 608,110.00

6280.07 Sqm 500.00 Sqm 3,140,032.88

218.12 14725.86 Sqm 500.00 Sqm 7,362,930.00

12100.56 Sqm 500.00 Sqm 6,050,280.00

0.00 -

Contractor: Prepared By: Checked By: Approved By:


Page 55 of 593

g Construction

Amount Remarks
Water Tank Total Quantity Unit Rate Rs. Per
Rs

2940.42 Sqm 1,000.00 Sqm 2,940,415.74

203.45 Rm 1,000.00 Rm 203,450.00

194.87 Sqm 1,200.00 Sqm 233,845.56

16.96 Cum 180,000.00 Cum 3,052,237.95

152.94 Sqm 10,000.00 Sqm 1,529,400.00

Contractor: Prepared By: Checked By: Approved By:


Page 56 of 593

g Construction

Amount Remarks
Water Tank Total Quantity Unit Rate Rs. Per
Rs

16.50 3958.99 Sqm 500.00 Sqm 1,979,493.00

57.06 6949.02 Sqm 600.00 Sqm 4,169,413.56

11.41 378.45 Cum 1,000.00 Cum 378,446.00

159.20 3798.00 Sqm 150.00 Sqm 569,700.66

2755.20 Sqm 250.00 Sqm 688,800.00

40.56 5754.74 Sqm 250.00 Sqm 1,438,685.74

99.74 8409.26 Sqm 300.00 Sqm 2,522,777.93

1209.60 100.00 120,960.00

Contractor: Prepared By: Checked By: Approved By:


Page 57 of 593

g Construction

Amount Remarks
Water Tank Total Quantity Unit Rate Rs. Per
Rs

- 8265.34 Sqm 250.00 Sqm 2,066,335.31

74.42 74.42 Sqm 400.00 Sqm 29,768.00

31467.71 Kg 125.00 Kg 3,933,463.28

Total A 131,428,804.36
Total B+C 134,323,962.80
Price Adjustment bill 13,335,017.77
Sun total 147,658,980.57
Bill up to 8th Running Bill 130,718,163.76
Total 16,940,816.81
Vat 13% 2,202,306.19
Grand Total 19,143,123.00

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Billl Summary Sheet
n of Central Jail (Phase- II) Nuwakot
6, Maharanidihi, Nuwakot Building Code

S.N. Description of Work A2 A5 A9 A10 C16 C17 C18 C19 C20

B. Provisional Sum
a Insurance Premium

Insurance Premium for the work,plant and


materials damage for contract work for all
i risk including Roit,Strike,Damage,Malicious
damage and Terrorism for contract work for 3
years +1 year maintenance period.

Insurance Premium for the Insurance of


owner and consultant staff (named) RS
ii 10,00,000.00 per person for 25 persons with
unlimited number of occurances for three
years
Insurance Premium for construction
iii equipments and machines with value of Rs
50,000,000.00 for 3 years.
Insurance Premium for third party liability
personal only per person Rs 500,000.00 for
iv
100 persons first 3 years with unlimited
number of occurance.
Sub-Total a ( Insurance Sum):-
Laboratory Test
Lab test charge
Sub-Total b ( Laboratory Test):-
Sum of Provisional Sum(B)
C. Civil Work
1 Earthwork and Earthfilling
Site preparation work with cleaning and
disposal of debrises, uprooting roots, solid
1.1 wastes etc. all complete as per instruction. 586.80

Earthwork in excavation in hard/boulder mix


soils in foundation including 10m hauling
1.2 distance and 1.5 m. lift all complete. 313.35 1.31 2.28 0.56 1.76

Earth filling in 150/150 mm thick layer,


watering, ramming including supply of filling
1.3 materials within 10 m distance all complete. 122.99 331.68

Earth filling without supply of filling materials


1.4 all complete. 156.67 131.49
2 Brick Masonary work
Good quality local chimney made Brickwork
in 1:4 C/S mortar up to ground floor in
perfect line level finish including wetting the
2.1 bricks, racking the joints and curing the work 39.28 85.87
for at least 7 days all complete.

Good quality local chimney made Brickwork


in 1:4 C/S mortar in Super Structure with
2.2 perfect line level finish including wetting the 2.28 2.83 5.76 2.47 5.75
bricks, racking the joints and curing the work
for at least 7 days all complete.

3 Stone Masonary Work


3.1 Stone Masonry in 1:6 c/m
Dry stone laying in foundation and floor
3.2 including sand filling in joints, leveling,
watering etc. all complete.

4 Plain Cement concrete work


Plain cement Concrete (PCC) in 1:3:6 ratio
for foundations, flooring and walls with
approved quality of cement and sand and
crushed stone aggregate including mixing,
4.1 15.43 4.76 5.00 5.60 0.68 5.60
laying using mixture & Vibrator, curing etc all
complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works


(1:2:4) for slab/lintels with approved quality
of cement sand and crushed stone
4.2 0.00
aggregates including mixing,laying,using
mixture and vibrator, curing etc all complete
in approval of site engineer.

Plain cement Concrete (PCC) for RCC works


(1:1.5:3) for slab/lintels with approved quality
of cement and sand and crushed stone
aggregate including mixing, laying using
4.3 111.62 30.14 265.45 147.54
mixture & Vibrator, curing etc all complete in
approval of site engineer.

Tor steel or TMT reinforcement bar of fe


415/500 grade including straightening,
cleaning, cutting, binding & fixing in position
4.4 with annealed tying binding wire as per 25.19 - 28.24 14.88
drawing, design & instruction all complete.

5 Formwork

Form Work Shuttering, centricn with wooden


form work for all works necessary propping,
5.1 scaffolding, staging,supporting inclusive of 0.00
wedging and cutting holes for utilization till
the support if full unyeilding net. Sill n lintel
Form work , shuttering, centering with 19mm
thick water proof ply board and steel post for
all works necessary propping, scafolding,
5.2 0.00 - 469.05
staging, supporting inclusive of wedging and
cutting holes for utilization till the support if
fully unyeilding net . Slab

Formwork, shuttering, centering with 19mm


thick waterproof ply for beam with steel pipe
propping, scaffolding, staging, supporting
5.3 inclusive of wedging and cutting holes for 328.56 - 1,068.74 716.94
utilization till the support if fully unyielding
net.

Formwork, shuttering, centering with 19mm


thick waterproof ply for column, necessary
propping, scaffolding, staging, supporting
5.4 inclusive of wedging and cutting holes for 753.17 258.30 242.46 678.78
utilization till the support if fully unyielding
net.

6 Roofing Work
0.5mm colour CGI sheet roofing including
fixing in proper shape & size with all
6.1 necessary nails, screws, bolts & nuts
washers, J & L hooks etc as per drawing &
instruction all complete.

0.50mm colour Ridge on roof including fixing


in proper shape & size with all necessary
6.2 rails, screws, bolts & nuts washers, J & L
hocks etc as per drawing & instruction all
complete.

0.50mm colour sheet for fixing in gable wall


proper shape & size with all necessary rails,
screws, bolts & nuts washers, J & L hocks
6.3 etc as per drawing & instruction all complete.

7 Door,window & wooden works


Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good
7.3 finish of approved quality including fixing in
position with necessary M.S. holdfasts as
per drawing and instructions all complete.

Fixing of glazed shutter in 38x75 mm thick


sal wood frame with 4mm thick plain glass
fitted including all necessary hardware
fittings all complete.
7.5
8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with
approved quality of O.P. cement & sand and
8.1 crushed stone aggregate including mixing,
laying, punning, rubbing in hard surface
curing etc all complete.

Flat dry brick soling on flat in foundation and


8.4 floor including sand filling in joints, leveling, 207.74 19.79 19.79 39.96 19.79 39.96
ramming etc. all complete
Sand filling in flooring including supply of
8.5 filling materials, watering, ramming etc. all
complete
3mm thick cement sand punning rubbing
8.7 with steel trowel to hard, smooth and shining 65.19 65.19 65.19 65.19 65.19
surface and curing all
9 Plastering Work
12.5mm thick cement sand palster in 1:3
9.1 ratio on ceiling Plaster
12.5mm thick cement sand palster in 1:4
9.2 ratio on External wall plaster 65.19 65.19 65.19 65.19 65.19
20 mm thick cement sand palster in 1:4 ratio
9.3 on internal wall plaster
Flush ruled pointing 1:2 in stone /Rubble
9.4 masonry wall as per drawing all complete.

11.0 Water Proofing Works


Providing and applying Dustban Premise
11.1 chemical for anti termites treatment all 438.85
complete.
12 Steel and Iron Works
M.S. Black Pipe roof truss & purpin with I.S.
or B.S. section including jointing, fixing,
12.6 erection and primer painting with all
necessary M.S. Bed Plates, Shoe angles
anchor bolts all

6" Deep boring of 150 m long including all


D material and labour cost for for water supply
and electrical connection
onstruction

Total bill Total Bill Remarks


D22 Security Wall Unit Rate Rs.
Quantity Amount

1.00

1.00 35,685.40 35,685.40


18.90 605.70 Sqm 5.00 3,028.50

(107.10) 212.14 Cum 75.00 15,910.76

454.67 Cum 125.00 56,833.13

288.16 Cum 50.00 14,408.00

125.15 Cum 12,000.00 1,501,776.70

19.09 Cum 12,000.00 229,038.30

45.36 45.36 Cum 6,500.00 294,840.00

(1.89) (1.89) Cum 3,000.00 (5,670.00)


37.06 Cum 8,000.00 296,454.90

(0.94) (0.94) Cum 10,000.00 (9,400.00)

34.34 126.17 715.25 Cum 12,000.00 8,583,021.16

5.71 3.16 77.18 Mt 8,000.00 617,402.30

308.07 308.07 Sqm 500.00 154,035.00


208.22 677.27 Sqm 500.00 338,634.00

678.16 2,792.40 Sqm 500.00 1,396,197.90

1,932.71 Sqm 500.00 966,354.00

- Sqm 1,000.00 -

- Rm 1,000.00 -

- Sqm 1,200.00 -
- Cum 180,000.00 -

- Sqm 10,000.00 -

- Sqm 500.00 -

347.04 Sqm 600.00 208,221.30

- Cum 1,000.00 -

325.95 Sqm 150.00 48,892.50

- Sqm 250.00 -

325.95 Sqm 250.00 81,487.50

- Sqm 300.00 -

1,209.60 1,209.60 Sqm 100.00 120,960.00

438.85 Sqm 250.00 109,712.50


- Kg 125.00 -

1.00 LS 1,500,000.00 1,500,000.00

Total A 16,522,138.44
Total B+C 16,557,823.84
Price Adjustment bill 2,615,119.12
Total 19,172,942.96
Vat 13% 2,492,482.58
Grand Total 21,665,425.54
Page 70 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

APF & NP Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work NP Dormitory NP Dinning APF Dormitory APF Dinning Total Quantity Unit Rate Rs.

C. Civil Work
1 Earthwork and Earthfilling
Site preparation work with cleaning and
disposal of debrises, uprooting roots, solid
1.1 wastes etc. all complete as per instruction. 2196.91 400.00 2196.91 2536.00 7,329.82 Sqm 5.00

Earthwork in excavation in hard/boulder


mix soils in foundation including 10m
1.2 hauling distance and 1.5 m. lift all 225.95 177.86 225.95 199.08 828.84 Cum 75.00
complete.
Earth filling in 150/150 mm thick layer,
watering, ramming including supply of
1.3 filling materials within 10 m distance all 28.07 40.43 28.07 40.43 137.00 Cum 125.00
complete.

Earth filling without supply of filling


1.4 materials all complete. 112.97 88.93 112.97 99.54 414.41 Cum 50.00

2 Brick Masonary work


Good quality local chimney made
Brickwork in 1:4 C/S mortar up to ground
floor in perfect line level finish including
2.1 wetting the bricks, racking the joints and 31.10 36.69 31.18 46.84 145.82 Cum 12,000.00
curing the work for at least 7 days all
complete.

Contractor: Prepared By: Checked By: Approved By:


Page 71 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

APF & NP Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work NP Dormitory NP Dinning APF Dormitory APF Dinning Total Quantity Unit Rate Rs.

Good quality local chimney made


Brickwork in 1:4 C/S mortar in Super
Structure with perfect line level finish
2.2 123.89 61.27 138.42 50.24 373.81 Cum 12,000.00
including wetting the bricks, racking the
joints and curing the work for at least 7
days all complete.

3 Stone Masonary Work

3.1 Stone Masonry in 1:6 cement sand mortar - Cum 6,500.00

Dry stone laying in foundation and floor


including sand filling in joints, leveling,
3.2 watering etc. all complete. 14.20 8.30 14.20 10.38 47.07 Cum 3,000.00

4 Plain Cement concrete work


Plain cement Concrete (PCC) in 1:3:6 ratio
for foundations, flooring and walls with
approved quality of cement and sand and
4.1 crushed stone aggregate including mixing, 31.76 21.03 31.76 29.53 114.09 Cum 8,000.00
laying using mixture & Vibrator, curing etc
all complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 72 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

APF & NP Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work NP Dormitory NP Dinning APF Dormitory APF Dinning Total Quantity Unit Rate Rs.

Plain cement concrete(PCC) for Rcc works


(1:2:4) for slab/lintels with approved quality
of cement sand and crushed stone
4.2 10.04 6.63 9.73 8.62 35.02 Cum 10,000.00
aggregates including mixing,laying,using
mixture and vibrator, curing etc all
complete in approval of site engineer.
Plain cement Concrete (PCC) for RCC
works (1:1.5:3) for slab/lintels with
approved quality of cement and sand and
4.3 crushed stone aggregate including mixing, 235.69 64.61 235.69 87.61 623.61 Cum 12,000.00
laying using mixture & Vibrator, curing etc
all complete in approval of site engineer.

Tor steel or TMT reinforcement bar of fe


415/500 grade including straightening,
4.4 cleaning, cutting, binding & fixing in 35.25 10.70 35.25 14.37 95.57 Mt 8,000.00
position with annealed tying binding wire
as per drawing, design & instruction all
complete.
5 Formwork
Form Work Shuttering, centricn with
wooden form work for all works necessary
propping, scaffolding, staging,supporting
5.1 80.29 28.82 77.86 37.49 224.45 Sqm 500.00
inclusive of wedging and cutting holes for
utilization till the support if full unyeilding
net.

Contractor: Prepared By: Checked By: Approved By:


Page 73 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

APF & NP Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work NP Dormitory NP Dinning APF Dormitory APF Dinning Total Quantity Unit Rate Rs.

Form work , shuttering, centering with


19mm thick water proof ply board and steel
post for all works necessary propping,
5.2 533.51 0.00 533.51 0.00 1,067.01 Sqm 500.00
scafolding, staging, supporting inclusive of
wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab

Formwork, shuttering, centering with


19mm thick waterproof ply for beam with
steel pipe propping, scaffolding, staging,
5.3 supporting inclusive of wedging and cutting 988.59 313.06 988.59 355.67 2,645.91 Sqm 500.00
holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with


19mm thick waterproof ply for column,
necessary propping, scaffolding, staging,
5.4 supporting inclusive of wedging and cutting 765.05 241.75 765.05 179.90 1,951.74 Sqm 500.00
holes for utilization till the support if fully
unyielding net.

6 Roofing Work

Contractor: Prepared By: Checked By: Approved By:


Page 74 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

APF & NP Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work NP Dormitory NP Dinning APF Dormitory APF Dinning Total Quantity Unit Rate Rs.

0.5mm colour CGI sheet roofing including


fixing in proper shape & size with all
necessary nails, screws, bolts & nuts
6.1 washers, J & L hooks etc as per drawing & 283.00 423.55 706.55 Sqm 1,000.00
instruction all complete.

0.50mm colour Ridge on roof including


fixing in proper shape & size with all
6.2 necessary rails, screws, bolts & nuts 23.80 30.75 54.55 Rm 1,000.00
washers, J & L hocks etc as per drawing &
instruction all complete.

0.50mm colour sheet for fixing in gable wall


proper shape & size with all necessary
rails, screws, bolts & nuts washers, J & L
6.3 hocks etc as per drawing & instruction all 20.18 22.11 42.30 Sqm 1,200.00
complete.

7 Door,window & wooden works


Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good
7.3 finish of approved quality including fixing in 2.50 1.08 2.50 1.88 7.97 Cum 180,000.00
position with necessary M.S. holdfasts as
per drawing and instructions all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 75 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

APF & NP Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work NP Dormitory NP Dinning APF Dormitory APF Dinning Total Quantity Unit Rate Rs.

Fixing of glazed shutter in 38x75 mm thick


sal wood frame with 4mm thick plain glass
7.5 59.67 19.20 59.67 138.54 Sqm 10,000.00
fitted including all necessary hardware
fittings all complete.

8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with
approved quality of O.P. cement & sand
and crushed stone aggregate including
8.1 395.63 400.00 395.63 576.00 1,767.26 Sqm 500.00
mixing, laying, punning, rubbing in hard
surface curing etc all complete.

Flat dry brick soling on flat in foundation


8.4 and floor including sand filling in joints, 282.33 434.62 282.33 628.08 1,627.36 Sqm 600.00
leveling, ramming etc. all complete

Sand filling in flooring including supply of


8.5 filling materials, watering, ramming etc. all 19.62 40.00 19.62 86.40 165.64 Cum 1,000.00
complete
8.7 3 mm thick cement sand punning on floor,
skriting, dado etc, including mixing laying
and rubbing with steel trowel to a hard,
395.63 400.00 0.00 576.00 1,371.63 150.00
smooth and shining surface and curing
all complete.

9 Plastering Work
12.5mm thick cement sand palster in 1:3
9.1 ratio on ceiling Plaster 509.34 0.00 509.34 0.00 1,018.69 Sqm 250.00

Contractor: Prepared By: Checked By: Approved By:


Page 76 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

APF & NP Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work NP Dormitory NP Dinning APF Dormitory APF Dinning Total Quantity Unit Rate Rs.

12.5mm thick cement sand palster in 1:4


9.2 ratio on External wall plaster 992.76 171.26 992.76 278.87 2,435.65 Sqm 250.00
20 mm thick cement sand palster in 1:4
9.3 ratio on internal wall plaster 885.54 343.53 885.54 452.51 2,567.12 Sqm 300.00
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment 236.91 186.81 236.91 309.87 970.50 Sqm 250.00

Elastocrete cementitious elastomeric water


proofing coating 2 components capacity
per kg sqft 2 coat including supply and all - 400.00
11.2 complete
12 Steel and Iron Works
M.S. Black Pipe roof truss & purpin with
I.S. or B.S. section including jointing, fixing,
12.6 erection and primer painting with all 2599.01 3252.22 5,851.23 Kg 125.00
necessary M.S. Bed Plates, Shoe angles
anchor bolts all

Total

Contractor: Prepared By: Checked By: Approved By:


Page 77 of 593

F/Y:- 2075/076

Amount Remarks
Per
Rs

Sqm 36,649.10

Cum 62,163.00

Cum 17,125.00

Cum 20,720.50

Cum 1,749,834.06

Contractor: Prepared By: Checked By: Approved By:


Page 78 of 593

F/Y:- 2075/076

Amount Remarks
Per
Rs

Cum 4,485,735.90

Cum -

Cum 141,216.00

Cum 912,737.50

Contractor: Prepared By: Checked By: Approved By:


Page 79 of 593

F/Y:- 2075/076

Amount Remarks
Per
Rs

Cum 350,188.50

Cum 7,483,272.63

Mt 764,562.06

Sqm 112,226.25

Contractor: Prepared By: Checked By: Approved By:


Page 80 of 593

F/Y:- 2075/076

Amount Remarks
Per
Rs

Sqm 533,506.50

Sqm 1,322,954.15

Sqm 975,872.00

Contractor: Prepared By: Checked By: Approved By:


Page 81 of 593

F/Y:- 2075/076

Amount Remarks
Per
Rs

Sqm 706,551.54

Rm 54,550.00

Sqm 50,754.72

Cum 1,433,992.95

Contractor: Prepared By: Checked By: Approved By:


Page 82 of 593

F/Y:- 2075/076

Amount Remarks
Per
Rs

Sqm 1,385,400.00

Sqm 883,628.00

Sqm 976,418.16

Cum 165,637.00

205,744.20

Sqm 254,671.75

Contractor: Prepared By: Checked By: Approved By:


Page 83 of 593

F/Y:- 2075/076

Amount Remarks
Per
Rs
Sqm 608,911.50

Sqm 770,137.20

Sqm 242,625.31

Kg 731,404.07

27,439,189.55

Contractor: Prepared By: Checked By: Approved By:


Page 84 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Toilet Summary Sheet
ction of Central Jail (Phase- II) Nuwakot
dur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail T/B D 21 Jail T/B-D-22 Jail T/B-D-23 Jail T/B-D-24 Jail T/B-D-25 Total Quantity Unit

C. Civil Work
1 Earthwork and Earthfilling
Site preparation work with cleaning and
1.1 disposal of debrises, uprooting roots, solid 260.00 260.00 260.00 760.00 260.00 1800.00 Sqm
wastes etc. all complete as per instruction.
Earthwork in excavation in hard/boulder mix
1.2 soils in foundation including 10m hauling 100.38 100.38 100.38 100.38 100.36 501.86 Cum
distance and 1.5 m. lift all complete.
Earth filling without supply of filling materials
1.4 all complete. 50.18 50.18 50.18 50.18 50.18 250.90 Cum
Earth filling in 150/150 mm thick layer,
1.3 watering, ramming including supply of filling 21.45 21.45 111.52 21.45 28.59 204.44 Cum
materials within 10 m distance all complete.

2 Brick Masonary work


Good quality local chimney made Brickwork
in 1:4 C/S mortar up to ground floor in
2.1 perfect line level finish including wetting the 25.74 25.74 39.77 26.41 26.85 144.51 Cum
bricks, racking the joints and curing the work
for at least 7 days all complete.
Good quality local chimney made Brickwork
in 1:4 C/S mortar in Super Structure with
2.2 perfect line level finish including wetting the 88.49 0.00 88.37 88.37 0.00 265.22 Cum
bricks, racking the joints and curing the work
for at least 7 days all complete.
3 Stone Masonary Work

Contractor: Prepared By: Checked By: Approved By:


Page 85 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Toilet Summary Sheet
ction of Central Jail (Phase- II) Nuwakot
dur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail T/B D 21 Jail T/B-D-22 Jail T/B-D-23 Jail T/B-D-24 Jail T/B-D-25 Total Quantity Unit

3.1 Stone Masonry in 1:6 cement sand mortar 0.00 0.00 Cum
Dry stone laying in foundation and floor
3.2 including sand filling in joints, leveling, 0.00 0.00 Cum
watering etc. all complete.

4 Plain Cement concrete work


Plain cement Concrete (PCC) in 1:3:6 ratio
for foundations, flooring and walls with
4.1 approved quality of cement and sand and 11.61 11.61 11.61 11.61 11.61 58.05 Cum
crushed stone aggregate including mixing,
laying using mixture & Vibrator, curing etc all
complete in approval
Plain cement of site engineer.
concrete(PCC) for Rcc works
(1:2:4) for slab/lintels with approved quality
of cement sand and crushed stone
4.2 1.42 0.00 1.42 1.42 0.00 4.26 Cum
aggregates including mixing,laying,using
mixture and vibrator, curing etc all complete
in approval of site engineer.
Plain cement Concrete (PCC) for RCC works
(1:1.5:3) for slab/lintels with approved quality
4.3 of cement and sand and crushed stone 80.85 70.58 82.01 80.85 26.12 340.40 Cum
aggregate including mixing, laying using
mixture & Vibrator, curing etc all complete in
approval of site engineer.
Tor steel or TMT reinforcement bar of fe
415/500 grade including straightening,
4.4 cleaning, cutting, binding & fixing in position 12.58 12.37 10.39 10.07 4.57 49.96 Mt
with annealed tying binding wire as per
drawing, design & instruction all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 86 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Toilet Summary Sheet
ction of Central Jail (Phase- II) Nuwakot
dur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail T/B D 21 Jail T/B-D-22 Jail T/B-D-23 Jail T/B-D-24 Jail T/B-D-25 Total Quantity Unit

5 Formwork
Form Work Shuttering, centricn with wooden
form work for all works necessary propping,
5.1 scaffolding, staging,supporting inclusive of 15.67 0.00 15.67 15.67 0.00 47.00 Sqm
wedging and cutting holes for utilization till
the support if full unyeilding net.

Form work , shuttering, centering with 19mm


thick water proof ply board and steel post for
all works necessary propping, scafolding,
5.2 208.22 208.22 208.22 208.22 0.00 832.87 Sqm
staging, supporting inclusive of wedging and
cutting holes for utilization till the support if
fully unyeilding net . Slab

Formwork, shuttering, centering with 19mm


thick waterproof ply for beam with steel pipe
5.3 propping, scaffolding, staging, supporting 449.86 987.57 442.70 442.70 309.41 2632.23 Sqm
inclusive of wedging and cutting holes for
utilization till the support if fully unyielding
net.
Formwork, shuttering, centering with 19mm
thick waterproof ply for column, necessary
5.4 propping, scaffolding, staging, supporting 216.09 216.09 229.32 216.09 216.09 1093.68 Sqm
inclusive of wedging and cutting holes for
utilization till the support if fully unyielding
net.
Roofing Work
6

Contractor: Prepared By: Checked By: Approved By:


Page 87 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Toilet Summary Sheet
ction of Central Jail (Phase- II) Nuwakot
dur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail T/B D 21 Jail T/B-D-22 Jail T/B-D-23 Jail T/B-D-24 Jail T/B-D-25 Total Quantity Unit

0.5mm colour CGI sheet roofing including


fixing in proper shape & size with all
6.1 necessary nails, screws, bolts & nuts 254.61 254.61 Sqm
washers, J & L hooks etc as per drawing &
instruction all complete.
0.50mm colour Ridge on roof including fixing
in proper shape & size with all necessary
6.2 rails, screws, bolts & nuts washers, J & L 17.40 17.40 Rm
hocks etc as per drawing & instruction all
complete.

0.50mm colour sheet for fixing in gable wall


proper shape & size with all necessary rails,
6.3 screws, bolts & nuts washers, J & L hocks 19.81 19.81 Sqm
etc as per drawing & instruction all complete.

7 Door,window & wooden works


Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good
7.3 finish of approved quality including fixing in 0.00 Cum
position with necessary M.S. holdfasts as
per drawing and instructions all complete.
8 Flooring work

Contractor: Prepared By: Checked By: Approved By:


Page 88 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Toilet Summary Sheet
ction of Central Jail (Phase- II) Nuwakot
dur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail T/B D 21 Jail T/B-D-22 Jail T/B-D-23 Jail T/B-D-24 Jail T/B-D-25 Total Quantity Unit

38mm thick (1:2:4) P.C.C. for flooring with


approved quality of O.P. cement & sand and
8.1 crushed stone aggregate including mixing, 78.00 0.00 78.00 78.00 0.00 234.00 Sqm
laying, punning, rubbing in hard surface
curing etc all complete.

Flat dry brick soling on flat in foundation and


8.4 floor including sand filling in joints, leveling, 168.16 90.16 168.16 168.16 90.16 684.80 Sqm
ramming etc. all complete
Sand filling in flooring including supply of
8.5 filling materials, watering, ramming etc. all 7.80 0.00 7.80 7.80 0.00 23.40 Cum
complete
3 mm thick cement sand punning on floor,
skriting, dado etc, including mixing laying
8.7 and rubbing with steel trowel to a hard, 0.00 0.00 0.00
smooth and shining surface and curing all
complete.
9 Plastering Work
12.5mm thick cement sand palster in 1:3
9.1 256.88 256.88 256.88 770.64 Sqm
ratio on ceiling Plaster
12.5mm thick cement sand palster in 1:4
9.2 ratio on External wall plaster 372.82 372.82 372.82 1118.47 Sqm
20 mm thick cement sand palster in 1:4 ratio
9.3 917.33 917.33 917.33 2751.98 Sqm
on internal wall plaster
11.0 Water Proofing Works 0
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment 160.00 160.00 160.00 160.00 160.00 800.00 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 89 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Toilet Summary Sheet
ction of Central Jail (Phase- II) Nuwakot
dur-6, Maharanidihi, Nuwakot

S.N. Description of Work Jail T/B D 21 Jail T/B-D-22 Jail T/B-D-23 Jail T/B-D-24 Jail T/B-D-25 Total Quantity Unit

12 Steel and Iron Works


M.S. Black Pipe roof truss & purpin with I.S.
or B.S. section including jointing, fixing,
12.6 erection and primer painting with all 2347.82 2347.82 4695.64 Kg
necessary M.S. Bed Plates, Shoe angles
anchor bolts all
Total

Contractor: Prepared By: Checked By: Approved By:


Page 90 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

5.00 Sqm 9,000.00

75.00 Cum 37,639.80

50.00 Cum 12,545.00

125.00 Cum 25,555.53

12,000.00 Cum 1,734,168.00

12,000.00 Cum 3,182,682.75

Contractor: Prepared By: Checked By: Approved By:


Page 91 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs
6,500.00 Cum

3,000.00 Cum

8,000.00 Cum 464,386.50

10,000.00 Cum 42,615.90

12,000.00 Cum 4,084,771.20

8,000.00 Mt 399,710.46

Contractor: Prepared By: Checked By: Approved By:


Page 92 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

500.00 Sqm 23,499.00

500.00 Sqm 416,435.00

500.00 Sqm 1,316,115.65

500.00 Sqm 546,840.00

Contractor: Prepared By: Checked By: Approved By:


Page 93 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

1,000.00 Sqm 254,614.20

1,000.00 Rm 17,400.00

1,200.00 Sqm 23,775.84

180,000.00 Cum

Contractor: Prepared By: Checked By: Approved By:


Page 94 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

500.00 Sqm 117,000.00

600.00 Sqm 410,881.50

1,000.00 Cum 23,400.00

150.00

250.00 Sqm 192,660.00

250.00 Sqm 279,618.00

300.00 Sqm 825,595.20

250.00 Sqm 200,000.00

Contractor: Prepared By: Checked By: Approved By:


Page 95 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

125.00 Kg 586,955.06

15,227,864.59

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Page 96 of 593
Babarmahal, Kathmandu
Jail Dinning Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din
S.N. Description of Work 16 17 18 19 20 Total Quantity Unit

C. Civil Work
1 Earthwork and Earthfilling
Site preparation work with cleaning and
disposal of debrises, uprooting roots, solid
1.1 580.00 450.00 450.00 450.00 450.00 2380.00 Sqm
wastes etc. all complete as per instruction.

Earthwork in excavation in hard/boulder mix


soils in foundation including 10m hauling
1.2 distance and 1.5 m. lift all complete. 190.70 190.70 190.70 190.70 190.70 953.48 Cum

Earth filling without supply of filling materials


1.4 all complete. 95.34 94.69 94.47 95.07 94.47 474.04 Cum

Earth filling in 150/150 mm thick layer,


watering, ramming including supply of filling
1.3 materials within 10 m distance all complete. 36.36 36.36 36.36 36.36 60.61 206.05 Cum

2 Brick Masonary work


Good quality local chimney made Brickwork
in 1:4 C/S mortar up to ground floor in perfect
line level finish including wetting the bricks,
2.1 racking the joints and curing the work for at 30.51 29.57 24.36 26.91 35.14 146.49 Cum
least 7 days all complete.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Page 97 of 593
Babarmahal, Kathmandu
Jail Dinning Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din
S.N. Description of Work 16 17 18 19 20 Total Quantity Unit

Good quality local chimney made Brickwork


in 1:4 C/S mortar in Super Structure with
2.2 perfect line level finish including wetting the 59.83 59.84 59.84 59.84 59.83 299.18 Cum
bricks, racking the joints and curing the work
for at least 7 days all complete.

3 Stone Masonary Work

3.1 Stone Masonry in 1:6 cement sand mortar 0.00 Cum

Dry stone laying in foundation and floor


3.2 including sand filling in joints, leveling, 0.00 Cum
watering etc. all complete.
4 Plain Cement concrete work
Plain cement Concrete (PCC) in 1:3:6 ratio
for foundations, flooring and walls with
approved quality of cement and sand and
4.1 crushed stone aggregate including mixing, 31.34 32.12 31.34 28.07 31.34 154.20 Cum
laying using mixture & Vibrator, curing etc all
complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works


(1:2:4) for slab/lintels with approved quality of
cement sand and crushed stone aggregates
4.2 4.47 4.47 4.47 4.47 4.47 22.35 Cum
including mixing,laying,using mixture and
vibrator, curing etc all complete in approval of
site engineer.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Page 98 of 593
Babarmahal, Kathmandu
Jail Dinning Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din
S.N. Description of Work 16 17 18 19 20 Total Quantity Unit

Plain cement Concrete (PCC) for RCC works


(1:1.5:3) for slab/lintels with approved quality
of cement and sand and crushed stone
4.3 aggregate including mixing, laying using 57.24 61.72 61.72 61.72 61.98 304.40 Cum
mixture & Vibrator, curing etc all complete in
approval of site engineer.

Tor steel or TMT reinforcement bar of fe


415/500 grade including straightening,
cleaning, cutting, binding & fixing in position
4.4 10.32 10.32 10.32 10.32 10.36 51.63 Mt
with annealed tying binding wire as per
drawing, design & instruction all complete.

5 Formwork

Form Work Shuttering, centricn with wooden


form work for all works necessary propping,
5.1 scaffolding, staging,supporting inclusive of 40.17 40.17 40.17 40.17 40.17 200.86 Sqm
wedging and cutting holes for utilization till the
support if full unyeilding net.

Form work , shuttering, centering with 19mm


thick water proof ply board and steel post for
all works necessary propping, scafolding,
5.2 0.00 0.00 0.00 0 0 0.00 Sqm
staging, supporting inclusive of wedging and
cutting holes for utilization till the support if
fully unyeilding net . Slab

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Page 99 of 593
Babarmahal, Kathmandu
Jail Dinning Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din
S.N. Description of Work 16 17 18 19 20 Total Quantity Unit

Formwork, shuttering, centering with 19mm


thick waterproof ply for beam with steel pipe
propping, scaffolding, staging, supporting
5.3 inclusive of wedging and cutting holes for 277.95 277.95 277.95 277.95 277.95 1389.75 Sqm
utilization till the support if fully unyielding net.

Formwork, shuttering, centering with 19mm


thick waterproof ply for column, necessary
propping, scaffolding, staging, supporting
5.4 inclusive of wedging and cutting holes for 192.93 192.93 192.93 192.93 192.93 964.63 Sqm
utilization till the support if fully unyielding net.

6 Roofing Work
0.5mm colour CGI sheet roofing including
fixing in proper shape & size with all
6.1 necessary nails, screws, bolts & nuts 395.85 395.85 395.85 395.85 395.85 1979.25 Sqm
washers, J & L hooks etc as per drawing &
instruction all complete.

0.50mm colour Ridge on roof including fixing


in proper shape & size with all necessary rails,
6.2 screws, bolts & nuts washers, J & L hocks etc 26.30 26.30 26.30 26.30 26.30 131.50 Rm
as per drawing & instruction all complete.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Page 100 of 593
Babarmahal, Kathmandu
Jail Dinning Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din
S.N. Description of Work 16 17 18 19 20 Total Quantity Unit

0.50mm colour sheet for fixing in gable wall


proper shape & size with all necessary rails,
6.3 screws, bolts & nuts washers, J & L hocks etc 26.55 26.55 26.55 26.55 26.55 132.76 Sqm
as per drawing & instruction all complete.

7 Door,window & wooden works


Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish
7.3 of approved quality including fixing in position 0.99 0.99 0.99 0.99 0.99 4.95 Cum
with necessary M.S. holdfasts as per drawing
and instructions all complete.
Fixing of glazed shutter in 38x75 mm thick sal
wood frame with 4mm thick plain glass fitted
including all necessary hardware fittings all 15.17 15.17 Sqm
complete.
7.5
8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with
approved quality of O.P. cement & sand and
crushed stone aggregate including mixing,
8.1 laying, punning, rubbing in hard surface curing 271.44 271.44 271.44 271.44 271.44 1357.20 Sqm
etc all complete.

Flat dry brick soling on flat in foundation and


8.4 floor including sand filling in joints, leveling, 400.66 400.66 400.66 400.66 400.66 2003.31 Sqm
ramming etc. all complete

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Page 101 of 593
Babarmahal, Kathmandu
Jail Dinning Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din
S.N. Description of Work 16 17 18 19 20 Total Quantity Unit

Sand filling in flooring including supply of filling


8.5 materials, watering, ramming etc. all complete 24.25 24.25 24.25 24.25 24.25 121.23 Cum

8.7 3 mm thick cement sand punning on floor,


skriting, dado etc, including mixing laying and
rubbing with steel trowel to a hard, smooth
and shining surface and curing all complete. 336.63 336.63 336.63 336.63 336.63 1683.15 Sqm

9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio
9.1 on ceiling Plaster 0.00 0.00 0.00 0.00 0.00 0.00 Sqm

12.5mm thick cement sand palster in 1:4 ratio


9.2 on External wall plaster 364.50 364.50 299.31 364.50 364.50 1757.31 Sqm

20 mm thick cement sand palster in 1:4 ratio


9.3 on internal wall plaster 378.67 378.67 378.67 378.67 378.67 1893.35 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1 chemical for anti termites treatment 373.01 373.01 373.01 373.01 373.01 1865.03 Sqm

12 Steel and Iron Works


M.S. Black Pipe roof truss & purpin with I.S. or
B.S. section including jointing, fixing, erection
12.6 and primer painting with all necessary M.S. 2861.78 2861.78 2861.78 2861.78 2861.78 14308.89 Kg
Bed Plates, Shoe angles anchor bolts all

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Page 102 of 593
Babarmahal, Kathmandu
Jail Dinning Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din Jail Kitchen din
S.N. Description of Work 16 17 18 19 20 Total Quantity Unit

Total

Contractor: Prepared By: Checked By: Approved By:


Page 103 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

5.00 Sqm 11,900.00

75.00 Cum 71,510.64

50.00 Cum 23,702.00

125.00 Cum 25,756.25

12,000.00 Cum 1,757,820.60

Contractor: Prepared By: Checked By: Approved By:


Page 104 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

12,000.00 Cum 3,590,146.80

6,500.00 Cum

3,000.00 Cum

8,000.00 Cum 1,233,609.90

10,000.00 Cum 223,493.62

Contractor: Prepared By: Checked By: Approved By:


Page 105 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

12,000.00 Cum 3,652,744.50

8,000.00 Mt 413,031.64

500.00 Sqm 100,428.75

500.00 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 106 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

500.00 Sqm 694,875.00

500.00 Sqm 482,312.50

1,000.00 Sqm 1,979,250.00

1,000.00 Rm 131,500.00

Contractor: Prepared By: Checked By: Approved By:


Page 107 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

1,200.00 Sqm 159,315.00

180,000.00 Cum 891,000.00

10,000.00 Sqm 151,682.00

500.00 Sqm 678,600.00

600.00 Sqm 1,201,987.50

Contractor: Prepared By: Checked By: Approved By:


Page 108 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

1,000.00 Cum 121,230.00

150.00 Sqm 252,472.50

250.00 Sqm

250.00 Sqm 439,327.50

300.00 Sqm 568,005.75

250.00 Sqm 466,256.25

125.00 Kg 1,788,611.31

Contractor: Prepared By: Checked By: Approved By:


Page 109 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs
21,110,570.01

Contractor: Prepared By: Checked By: Approved By:


Page 110 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Workshop Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot
Jail Jail
S.N. Description of Work Jail workshopB-11 Jailworkshop B-12 Jail workshopB-13 workshopB- workshopB- Total Quantity Unit
14 15

C. Civil Work
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal
1.1 of debrises, uprooting roots, solid wastes etc. all 432.00 432.00 432.00 1,296.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils
1.2 in foundation including 10m hauling distance and 197.48 197.48 197.48 592.44 Cum
1.5 m. lift all complete.
Earth filling in 150/150 mm thick layer, watering,
1.3 ramming including supply of filling materials within 51.62 70.21 58.51 180.34 Cum
10 m distance all complete.
Earth filling without supply of filling materials all
1.4 complete. 98.73 98.73 98.73 296.19 Cum
2 Brick Masonary work
Good quality local chimney made Brickwork in 1:4
C/S mortar up to ground floor in perfect line level
2.1 finish including wetting the bricks, racking the 46.82 35.85 34.04 116.71 Cum
joints and curing the work for at least 7 days all
complete.

Contractor: Prepared By: Checked By: Approved By:


Page 111 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Workshop Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot
Jail Jail
S.N. Description of Work Jail workshopB-11 Jailworkshop B-12 Jail workshopB-13 workshopB- workshopB- Total Quantity Unit
14 15

Good quality local chimney made Brickwork in 1:4


C/S mortar in Super Structure with perfect line
2.2 level finish including wetting the bricks, racking the 46.68 87.64 134.32 Cum
joints and curing the work for at least 7 days all
complete.
3 Stone Masonary Work
3.1 Stone Masonry in 1:6 cement sand mortar - Cum
Dry stone laying in foundation and floor including
3.2 sand filling in joints, leveling, watering etc. all - Cum
complete.

4 Plain Cement concrete work


Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved
quality of cement and sand and crushed stone
4.1 aggregate including mixing, laying using mixture & 9.20 9.20 9.20 27.60 Cum
Vibrator, curing etc all complete in approval of site
engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 112 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Workshop Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot
Jail Jail
S.N. Description of Work Jail workshopB-11 Jailworkshop B-12 Jail workshopB-13 workshopB- workshopB- Total Quantity Unit
14 15

Plain cement concrete(PCC) for Rcc works (1:2:4)


for slab/lintels with approved quality of cement
4.2 sand and crushed stone aggregates including 8.42 0.00 8.42 16.84 Cum
mixing,laying,using mixture and vibrator, curing etc
all complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works


(1:1.5:3) for slab/lintels with approved quality of
cement and sand and crushed stone aggregate
4.3 including mixing, laying using mixture & Vibrator, 116.82 117.03 128.76 362.61 Cum
curing etc all complete in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
binding & fixing in position with annealed tying
4.4 binding wire as per drawing, design & instruction 18.44 22.18 18.96 59.58 Mt
all complete.

5 Formwork

Contractor: Prepared By: Checked By: Approved By:


Page 113 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Workshop Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot
Jail Jail
S.N. Description of Work Jail workshopB-11 Jailworkshop B-12 Jail workshopB-13 workshopB- workshopB- Total Quantity Unit
14 15

Form Work Shuttering, centricn with wooden form


work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and 61.25 61.25 122.49 Sqm
cutting holes for utilization till the support if full
unyeilding net.

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
necessary propping, scafolding, staging,
5.2 336.54 336.54 336.54 1,009.63 Sqm
supporting inclusive of wedging and cutting holes
for utilization till the support if fully unyeilding net .
Slab
Formwork, shuttering, centering with 19mm thick
waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of 786.27 786.27 504.58 2,077.12 Sqm
wedging and cutting holes for utilization till the
support if fully unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of 333.45 335.13 333.45 1,002.03 Sqm
wedging and cutting holes for utilization till the
support if fully unyielding net.

6 Roofing Work

Contractor: Prepared By: Checked By: Approved By:


Page 114 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Workshop Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot
Jail Jail
S.N. Description of Work Jail workshopB-11 Jailworkshop B-12 Jail workshopB-13 workshopB- workshopB- Total Quantity Unit
14 15

0.5mm colour CGI sheet roofing including fixing in


proper shape & size with all necessary nails,
6.1 screws, bolts & nuts washers, J & L hooks etc as - Sqm
per drawing & instruction all complete.

0.50mm colour Ridge on roof including fixing in


proper shape & size with all necessary rails,
6.2 screws, bolts & nuts washers, J & L hocks etc as - Rm
per drawing & instruction all complete.
0.50mm colour sheet for fixing in gable wall proper
shape & size with all necessary rails, screws, bolts
6.3 & nuts washers, J & L hocks etc as per drawing & - Sqm
instruction all complete.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 0.00 0.75 0.75 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.

8 Flooring work

Contractor: Prepared By: Checked By: Approved By:


Page 115 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Workshop Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot
Jail Jail
S.N. Description of Work Jail workshopB-11 Jailworkshop B-12 Jail workshopB-13 workshopB- workshopB- Total Quantity Unit
14 15

38mm thick (1:2:4) P.C.C. for flooring with


approved quality of O.P. cement & sand and
8.1 crushed stone aggregate including mixing, laying, 0.00 - Sqm
punning, rubbing in hard surface curing etc all
complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming 122.65 122.65 122.65 367.96 Sqm
etc. all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete - Cum
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster - Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster - Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster - Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chemical
11.1 for anti termites treatment 373.01 373.01 373.01 1,119.02 Sqm
12 Steel and Iron Works

Contractor: Prepared By: Checked By: Approved By:


Page 116 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Jail Workshop Summary Sheet
Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot
Jail Jail
S.N. Description of Work Jail workshopB-11 Jailworkshop B-12 Jail workshopB-13 workshopB- workshopB- Total Quantity Unit
14 15

M.S. Black Pipe roof truss & purpin with I.S. or


B.S. section including jointing, fixing, erection and
12.6 primer painting with all necessary M.S. Bed 3305.97 3305.97 6,611.94 Kg
Plates, Shoe angles anchor bolts all

Total

Contractor: Prepared By: Checked By: Approved By:


Page 117 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

5.00 Sqm 6,480.00

75.00 Cum 44,432.63

125.00 Cum 22,542.50

50.00 Cum 14,809.50

12,000.00 Cum 1,400,520.00

Contractor: Prepared By: Checked By: Approved By:


Page 118 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

12,000.00 Cum 1,611,799.98

6,500.00 Cum -

3,000.00 Cum -

8,000.00 Cum 220,777.20

Contractor: Prepared By: Checked By: Approved By:


Page 119 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

10,000.00 Cum 168,412.50

12,000.00 Cum 4,351,372.58

8,000.00 Mt 476,649.19

Contractor: Prepared By: Checked By: Approved By:


Page 120 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

500.00 Sqm 61,245.00

500.00 Sqm 504,817.13

500.00 Sqm 1,038,560.40

500.00 Sqm 501,015.00

Contractor: Prepared By: Checked By: Approved By:


Page 121 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

1,000.00 Sqm -

1,000.00 Rm -

1,200.00 Sqm -

180,000.00 Cum 135,270.00

Contractor: Prepared By: Checked By: Approved By:


Page 122 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

500.00 Sqm -

600.00 Sqm 220,777.20

1,000.00 Cum -

250.00 Sqm -

250.00 Sqm -

300.00 Sqm -

250.00 Sqm 279,753.75

Contractor: Prepared By: Checked By: Approved By:


Page 123 of 593

F/Y:- 2075/076

Amount Remarks
Rate Rs. Per
Rs

125.00 Kg 826,492.83

11,885,727.40

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Page 124 of 593 Project Implementation Unit - 4
Babarmahal, Kathmandu

Jail Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

1 Jail 2 Jail 3 Jail 5 Jail 6 Jail 8 Jail 9 Jail Block 10 Jail Block
S.N. Description of Work Dormatory Dormatory Dormitory Dormitory Dormatory Dormatory Dormitory Dormitory

C. Civil Work
1 Earthwork and Earthfilling
Site preparation work with cleaning and
disposal of debrises, uprooting roots,
1.1 solid wastes etc. all complete as per 586.80 586.80 586.80 1286.80 1286.80 586.80 586.80 586.80
instruction.

Earthwork in excavation in hard/boulder


mix soils in foundation including 10m
1.2 hauling distance and 1.5 m. lift all 313.35 313.35 313.35 313.35 313.35 313.35 313.35 313.35
complete.

Earth filling without supply of filling


1.3 materials all complete. 331.67 156.67 331.67 331.67 331.67 331.67 331.67 331.68

Earth filling in 150/150 mm thick layer,


watering, ramming including supply of
1.4 filling materials within 10 m distance all 122.99 122.99 67.71 693.73 67.71 67.71 131.49 131.49
complete.

2 Brick Masonary work


Good quality local chimney made
Brickwork in 1:4 C/S mortar up to ground
floor in perfect line level finish including
2.1 wetting the bricks, racking the joints and 48.98 39.28 41.97 122.10 41.97 38.74 48.16 85.87
curing the work for at least 7 days all
complete.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Page 125 of 593 Project Implementation Unit - 4
Babarmahal, Kathmandu

Jail Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

1 Jail 2 Jail 3 Jail 5 Jail 6 Jail 8 Jail 9 Jail Block 10 Jail Block
S.N. Description of Work Dormatory Dormatory Dormitory Dormitory Dormatory Dormatory Dormitory Dormitory

Good quality local chimney made


Brickwork in 1:4 C/S mortar in Super
Structure with perfect line level finish
2.2 79.72 86.65
including wetting the bricks, racking the
joints and curing the work for at least 7
days all complete.

3 Stone Masonary Work


Stone Masonry in 1:6 cement sand
3.1
mortar
Dry stone laying in foundation and floor
including sand filling in joints, leveling,
3.2
watering etc. all complete.

4 Plain Cement concrete work


Plain cement Concrete (PCC) in 1:3:6
ratio for foundations, flooring and walls
with approved quality of cement and
sand and crushed stone aggregate
4.1 including mixing, laying using mixture & 15.43 15.43 15.43 15.43 55.98 15.43 15.43 15.43
Vibrator, curing etc all complete in
approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Page 126 of 593 Project Implementation Unit - 4
Babarmahal, Kathmandu

Jail Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

1 Jail 2 Jail 3 Jail 5 Jail 6 Jail 8 Jail 9 Jail Block 10 Jail Block
S.N. Description of Work Dormatory Dormatory Dormitory Dormitory Dormatory Dormatory Dormitory Dormitory

Plain cement concrete(PCC) for Rcc


works (1:2:4) for slab/lintels with
approved quality of cement sand and
4.2 crushed stone aggregates including 6.94 0.00 0.00 6.94
mixing,laying,using mixture and vibrator,
curing etc all complete in approval of site
engineer.

Plain cement Concrete (PCC) for RCC


works (1:1.5:3) for slab/lintels with
approved quality of cement and sand
and crushed stone aggregate including
4.3 mixing, laying using mixture & Vibrator, 253.95 111.62 140.68 144.25 252.87 345.10 331.59 241.76
curing etc all complete in approval of site
engineer.

Tor steel or TMT reinforcement bar of fe


415/500 grade including straightening,
cleaning, cutting, binding & fixing in
position with annealed tying binding wire
4.4 33.734 25.19 20.955 17.98 33.734 51.458 46.24 28.83
as per drawing, design & instruction all
complete.

5 Formwork

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Page 127 of 593 Project Implementation Unit - 4
Babarmahal, Kathmandu

Jail Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

1 Jail 2 Jail 3 Jail 5 Jail 6 Jail 8 Jail 9 Jail Block 10 Jail Block
S.N. Description of Work Dormatory Dormatory Dormitory Dormitory Dormatory Dormatory Dormitory Dormitory

Form Work Shuttering, centricn with


wooden form work for all works
necessary propping, scaffolding,
5.1 60.31 0.00 0.00 60.31
staging,supporting inclusive of wedging
and cutting holes for utilization till the
support if full unyeilding net.

Form work , shuttering, centering with


19mm thick water proof ply board and
steel post for all works necessary
5.2 propping, scafolding, staging, supporting 469.05 0.00 0.00 469.05 981.70 981.70 469.05
inclusive of wedging and cutting holes
for utilization till the support if fully
unyeilding net . Slab

Formwork, shuttering, centering with


19mm thick waterproof ply for beam
with steel pipe propping, scaffolding,
staging, supporting inclusive of wedging
5.3 and cutting holes for utilization till the 845.73 328.56 328.56 328.56 845.73 1397.30 1397.30 845.73
support if fully unyielding net.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Page 128 of 593 Project Implementation Unit - 4
Babarmahal, Kathmandu

Jail Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

1 Jail 2 Jail 3 Jail 5 Jail 6 Jail 8 Jail 9 Jail Block 10 Jail Block
S.N. Description of Work Dormatory Dormatory Dormitory Dormitory Dormatory Dormatory Dormitory Dormitory

Formwork, shuttering, centering with


19mm thick waterproof ply for column,
necessary propping, scaffolding,
staging, supporting inclusive of wedging
5.4 and cutting holes for utilization till the 1269.77 753.17 975.90 1223.00 1234.20 1259.40 1259.40 975.90
support if fully unyielding net.

6 Roofing Work
0.5mm colour CGI sheet roofing
including fixing in proper shape & size
with all necessary nails, screws, bolts &
6.1 nuts washers, J & L hooks etc as per
drawing & instruction all complete.

0.50mm colour Ridge on roof including


fixing in proper shape & size with all
6.2 necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing
& instruction all complete.

0.50mm colour sheet for fixing in gable


wall proper shape & size with all
necessary rails, screws, bolts & nuts
6.3 washers, J & L hocks etc as per drawing
& instruction all complete.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Page 129 of 593 Project Implementation Unit - 4
Babarmahal, Kathmandu

Jail Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

1 Jail 2 Jail 3 Jail 5 Jail 6 Jail 8 Jail 9 Jail Block 10 Jail Block
S.N. Description of Work Dormatory Dormatory Dormitory Dormitory Dormatory Dormatory Dormitory Dormitory

7 Door,window & wooden works

Well Seasoned Sal wood chaukhats for


fixed/openable door/windows with good
finish of approved quality including fixing
7.3 1.64 1.64
in position with necessary M.S. holdfasts
as per drawing and instructions all
complete.

8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring
with approved quality of O.P. cement &
sand and crushed stone aggregate
including mixing, laying, punning,
8.1 584.03
rubbing in hard surface curing etc all
complete.

Flat dry brick soling on flat in foundation


and floor including sand filling in joints,
8.4 leveling, ramming etc. all complete 491.58 207.74 202.47 207.74 491.58 202.47 202.47 202.47

Sand filling in flooring including supply of


8.5 filling materials, watering, ramming etc. 28.38 28.38
all complete

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Page 130 of 593 Project Implementation Unit - 4
Babarmahal, Kathmandu

Jail Summary Sheet


Project :- Construction of Central Jail (Phase- II) Nuwakot
Site:-Bidur-6, Maharanidihi, Nuwakot

1 Jail 2 Jail 3 Jail 5 Jail 6 Jail 8 Jail 9 Jail Block 10 Jail Block
S.N. Description of Work Dormatory Dormatory Dormitory Dormitory Dormatory Dormatory Dormitory Dormitory

3 mm thick cement sand punning on


floor, skriting, dado etc, including mixing
8.7 laying and rubbing with steel trowel to a 584.03
hard, smooth and shining surface and
curing all complete.

9 Plastering Work
12.5mm thick cement sand palster in 1:3
9.1 ratio on ceiling Plaster 482.94 482.94

12.5mm thick cement sand palster in 1:4


9.2 ratio on External wall plaster 402.75

20 mm thick cement sand palster in 1:4


9.3 ratio on internal wall plaster 548.53 548.53

11.0 Water Proofing Works


Providing and applying Dustban Premise
11.1 chamical for anti termites treatment 438.85 438.85 438.85 438.85 438.85 438.85 438.85 438.85

12 Steel and Iron Works


M.S. Black Pipe roof truss & purpin with
I.S. or B.S. section including jointing,
fixing, erection and primer painting with
12.6 all necessary M.S. Bed Plates, Shoe
angles anchor bolts all

Total

Contractor: Prepared By: Checked By: Approved By:


onstruction
Page 131 of 593

F/Y:- 2075/076

Amount Remarks
Total Quantity Unit Rate Rs. Per
Rs

6094.40 Sqm 5.00 Sqm 30,472.00

2506.80 Cum 75.00 Cum 188,010.00

2478.37 Cum 50.00 Cum 123,918.25

1405.82 125.00 175,727.50

467.07 Cum 12,000.00 Cum 5,604,816.70

Contractor: Prepared By: Checked By: Approved By:


onstruction
Page 132 of 593

F/Y:- 2075/076

Amount Remarks
Total Quantity Unit Rate Rs. Per
Rs

166.36 Cum 12,000.00 Cum 1,996,362.72

0.00 Cum 6,500.00 Cum -

0.00 Cum 3,000.00 Cum -

163.95 Cum 8,000.00 Cum 1,311,639.00

Contractor: Prepared By: Checked By: Approved By:


onstruction
Page 133 of 593

F/Y:- 2075/076

Amount Remarks
Total Quantity Unit Rate Rs. Per
Rs

13.87 Cum 10,000.00 Cum 138,707.25

1821.84 Cum 12,000.00 Cum 21,862,053.39

258.12 Mt 8,000.00 Mt 2,064,932.86

Contractor: Prepared By: Checked By: Approved By:


onstruction
Page 134 of 593

F/Y:- 2075/076

Amount Remarks
Total Quantity Unit Rate Rs. Per
Rs

120.62 Sqm 500.00 Sqm 60,307.50

3370.55 Sqm 500.00 Sqm 1,685,274.25

6317.47 Sqm 500.00 Sqm 3,158,735.00

Contractor: Prepared By: Checked By: Approved By:


onstruction
Page 135 of 593

F/Y:- 2075/076

Amount Remarks
Total Quantity Unit Rate Rs. Per
Rs

8950.74 Sqm 500.00 Sqm 4,475,370.00

0.00 Sqm 1,000.00 Sqm -

0.00 Rm 1,000.00 Rm -

0.00 Sqm 1,200.00 Sqm -

Contractor: Prepared By: Checked By: Approved By:


onstruction
Page 136 of 593

F/Y:- 2075/076

Amount Remarks
Total Quantity Unit Rate Rs. Per
Rs

3.29 Cum 180,000.00 Cum 591,975.00

584.03 Sqm 500.00 Sqm 292,015.00

2208.52 Sqm 600.00 Sqm 1,325,113.20

56.77 Cum 1,000.00 Cum 56,769.00

Contractor: Prepared By: Checked By: Approved By:


onstruction
Page 137 of 593

F/Y:- 2075/076

Amount Remarks
Total Quantity Unit Rate Rs. Per
Rs

584.03 150.00 87,604.50

965.87 Sqm 250.00 Sqm 241,468.25

402.75 Sqm 250.00 Sqm 100,688.74

1097.06 Sqm 300.00 Sqm 329,118.90

3510.80 Sqm 250.00 Sqm 877,700.00

0.00 Kg 125.00 Kg -

46,778,779.01
Contractor: Prepared By: Checked By: Approved By:
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

Detail measurement sheet of Provisional Sum


Project :- Construction of Phase -II F/Y:- 2075/076
Site:-Bidur-6, Maharanidihi, Nuwakot
Amount Remarks
S.N. Description of Work Quantity Unit Rate Rs.
Rs

1.0 Central Lab Pulchowk for rebar test 1 Job 16,725.66 16,725.66
-
2.0 Multi Lab for sand, agg, brick and cement test 1 Job 17,550.00 17,550.00
VAT amount
- is deducted
3.0 Road devision Nuwakot for cube test 1 Job 313.27 313.27
-
4.0 Adjustment from IPC bill 08 -1 Job 108393 (108,393.00)

Total (73,804.07)
Page 139 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

MB ABSTRACT
Jail Block Dormitory-1 for Central Jail, JAIL UNIT
idur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 586.80 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 313.35 Cum 75.00 Cum
lift all complete.
Earth filling including supply of filling materials all
1.3 331.67 Cum 50.00 Cum
complete.
Earth filling in 150 mm thick layer, watering, ramming
1.4 including supply of filling materials within 6 km 122.99 Cum 125.00 Cum
distance.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 48.98 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.2 finish including wetting the bricks, racking the joints 79.72 Cum 12,000.00 Cum
and curing the work for at least 7 days all complete.

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 15.43 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:2:4)


4.2 for slab/lintels with approved quality of cement and 6.94 Cum 10,000.00 Cum
sand and crushed stone aggregate.

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 253.95 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 140 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

MB ABSTRACT
Jail Block Dormitory-1 for Central Jail, JAIL UNIT
idur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 33.734 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork

Form Work Shuttering, centricn with wooden form


work for all works necessary propping, scaffolding,
5.1 60.31 Sqm 500.00 Sqm
staging,supporting inclusive of wedging and cutting
holes for utilization till the support if full unyeilding net.

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
5.2 necessary propping, scafolding, staging, supporting 469.0505 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab

Contractor: Prepared By: Checked By: Approved By:


Page 141 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

MB ABSTRACT
Jail Block Dormitory-1 for Central Jail, JAIL UNIT
idur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 845.73 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 1269.77 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 1.64 Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
8 Flooring work
Flat dry brick soling on flat in foundation and floor
8.4 including sand filling in joints, leveling, ramming etc. 491.58 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 28.38 Sqm 1,000.00 Sqm
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster 482.94 Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 548.53 Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 438.85 Sqm 250.00 Sqm
Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 142 of 593

ruction

F/Y:- 2075/076

Amount Remarks
Rs

2,934.00

23,501.25

16,583.50

15,373.75

587,760.00

956,590.47

123,402.00

69,353.62

3,047,424.93

Contractor: Prepared By: Checked By: Approved By:


Page 143 of 593

ruction

F/Y:- 2075/076

Amount Remarks
Rs

269,869.74

30,153.75

234,525.25

Contractor: Prepared By: Checked By: Approved By:


Page 144 of 593

ruction

F/Y:- 2075/076

Amount Remarks
Rs

422,865.00

634,884.00

295,987.50

294,949.80

28,384.50
-
120,734.13

164,559.45

109,712.50
7,449,549.14

Contractor: Prepared By: Checked By: Approved By:


Page 145 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Jail Block Dormitory-1 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in hard/boulder mix
1.2
soils
Previous
1.3 Earth filling including supply of filling materials.
Previous
Earth filling in 150 mm thick layer, watering,
1.4 ramming including supply of filling materials
within 6 km distance.
Previous
2 Brick Masonary work
Good quality local chimney made Brickwork in
2.1
1:4 C/S mortar up to ground floor .
Previous
2.2 Good quality local chimney made Brickwork in 1:4 C/S
mortar up to ground floor in perfect line level finish
including wetting the bricks, racking the joints and
curing the work for at least 7 days all complete.

In Ground Floor
Total
4 Plain Cement concrete work
Plain Cement Concrete (PCC) in 1:3:6 ratia for
4.1
foundations, flooring and walls.
Plain cement Concrete (PCC) for RCC works Previous
4.2 (1:2:4) for slab/lintels with approved quality of
cement and sand and crushed stone aggregate. Previous

Plain cement Concrete (PCC) for RCC works


4.3
(1:1.5:3) for column, Beam, Slab & Staircase
Previous
Tor steel or TMT reinforcement bar of Fe
4.4
415/500 grade.
Previous
5 Formwork

Contractor: Prepared By: Checked By: Approved By:


Page 146 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Jail Block Dormitory-1 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m

Form Work Shuttering, centricn with wooden form


work for all works necessary propping,
scaffolding, staging,supporting inclusive of
wedging and cutting holes for utilization till the
support if full unyeilding net.
5.1
Previous
Form work , shuttering, centering with 19mm thick
water proof ply board and steel post for all works
necessary propping, scafolding, staging,
supporting inclusive of wedging and cutting holes
for utilization till the support if fully unyeilding net .
5.2 Slab
Previous
Formwork, shuttering, centering with 19mm
5.3 thick waterproof ply for beam with steel pipe
propping.
Previous
Formwork, shuttering, centering with 19mm
5.4 thick waterproof ply for column, necessary
propping, scaffolding.

Previous

7 Door,window & wooden work


Well seasoned salwood for chaukhats for
7.3
fixed/openable door/windows with good finish.
Previous
8 Flooring work
Flat dry brick soling on flat in foundation and
8.4 floor including sand filling in joints, leveling,
ramming etc. all complete 4 2.25 2.25
Isolated Footing F1
Previous
Sand filling in flooring including supply of filling
8.5
materials, watering, ramming etc. all complete
Previous
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster
Previous
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 147 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Jail Block Dormitory-1 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1
chamical for anti termites treatment
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 148 of 593

F/Y:- 2075/076

Quantity Unit Remarks

586.80 Sqm IPC 8

313.35 Cum IPC 8

331.67 Cum IPC 8

122.99 Cum IPC 8

48.98 Cum IPC 8

79.72 cum IPC 8

15.43 Cum IPC 8

6.94 Cum IPC 8

253.95 Cum IPC 8

33.73 Mt IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 149 of 593

F/Y:- 2075/076

Quantity Unit Remarks

60.31 Sqm IPC 8

469.051 Sqm IPC 8

845.73 Sqm IPC 8

1269.77 IPC 8
Sqm

1.64 Cum IPC 8

20.25
491.58 Sqm IPC 8

28.38 Cum IPC 8

482.94 Sqm IPC 8

548.53 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 150 of 593

F/Y:- 2075/076

Quantity Unit Remarks

438.85 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu

MB ABSTRACT
Project :- Construction of Jail Block Dormitory-2 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 586.80 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 313.35 Cum 75.00 Cum
lift all complete.
Earth filling including supply of filling materials all
1.3 156.67 Cum 50.00 Cum
complete.
Earth filling in 150 mm thick layer, watering, ramming
1.4 including supply of filling materials within 6 km 122.99 Cum 125.00 Cum
distance.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 39.28 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

2.2 Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
finish including wetting the bricks, racking the joints Cum 12,000.00 Cum
and curing the work for at least 7 days all complete.

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 15.43 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:2:4)


4.2 for slab/lintels with approved quality of cement and Cum 10,000.00 Cum
sand and crushed stone aggregate.
Plain cement Concrete (PCC) for RCC works (1:1.5:3)
for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 111.62 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 25.186 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork

Form Work Shuttering, centricn with wooden form


work for all works necessary propping, scaffolding,
Sqm 500.00 Sqm
staging,supporting inclusive of wedging and cutting
holes for utilization till the support if full unyeilding net.
5.1

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
necessary propping, scafolding, staging, supporting Sqm 500.00 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab
5.2
Formwork, shuttering, centering with 19mm thick
waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 328.56 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 753.17 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
Flooring work
8
Flat dry brick soling on flat in foundation and floor
8.4 including sand filling in joints, leveling, ramming etc. 207.74 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete Sqm 1,000.00 Sqm

9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
Sqm 250.00 Sqm
9.1 ceiling Plaster
12.5mm thick cement sand palster in 1:4 ratio on
Sqm 250.00 Sqm
9.2 External wall plaster
20 mm thick cement sand palster in 1:4 ratio on
Sqm 300.00 Sqm
9.3 internal wall plaster
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 438.85 Sqm 250.00 Sqm
Sum of Civil Works
ction

F/Y:- 2075/076

Amount Remarks
Rs

2,934.00

23,501.25

7,833.50

15,373.75

471,336.70

123,402.00

-
1,339,468.98

201,488.40

164,280.00

376,584.00

124,642.80

-
-

109,712.50
2,960,557.88
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Jail Block Dormitory-2 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Building's construction area 1 36.00 16.30
Total
Earthwork in excavation in hard/boulder
1.2
mix soils
Isolated Footing F1 4 2.25 2.25 1.65
Isolated Footing F2 5 2.05 2.05 1.60
Isolated Footing F3 18 1.85 1.85 1.55
Isolated Footing F4 8 1.65 1.65 1.50
Combine Footing CF1 2 2.45 2.15 1.65
Combined Footing CF2 1 2.15 2.05 1.60
Grid A-A 1 9.10 0.70 1.05
Grid B-B 1 8.90 0.70 1.05
Grid C-C 1 8.90 0.70 1.05
Grid D-D 1 8.00 0.70 1.05
Grid E-E 1 8.05 0.70 1.05
Grid F-F 1 4.60 0.70 1.05
Grid G-G 1 5.20 0.70 1.05
Grid H-H 1 5.20 0.70 1.05
Grid I-I 1 5.00 0.70 1.05
Grid J-J 1 5.30 0.70 1.05
Grid K-K 1 4.60 0.70 1.05
Grid L-L 1 5.00 0.70 1.05
Grid 4-4 1 13.56 0.70 1.05
Grid 3-3 1 13.36 0.70 1.05
Grid 2-2 1 14.16 0.70 1.05
Grid 1-1 1 8.70 0.70 1.05
Total
Earth filling including supply of filling
1.3
materials.
50% of Excavation
Previous
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
On Ground Floor 1 34.40 14.40 0.33
Deduction -1 21.00 5.50 0.15
Deduction due to beam -3 34.40 0.30 0.33
-1 13.45 0.30 0.33
-5 12.80 0.30 0.33
-7 7.60 0.30 0.33
Total
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to ground
floor .
Grid A-A 1 12.65 0.23 0.76
Grid B-B 1 12.65 0.23 0.76
Grid C-C 1 12.65 0.23 0.76
Grid D-D 1 12.65 0.23 0.76
Grid E-E 1 12.65 0.23 0.76
Grid F-F 1 7.60 0.23 0.76
Grid G-G 1 7.60 0.23 0.76
Grid H-H 1 7.60 0.23 0.76
Grid I-I 1 7.60 0.23 0.76
Grid J-J 1 7.60 0.23 0.76
Grid K-K 1 7.60 0.23 0.76
Grid L-L 1 7.60 0.23 0.76
Grid 4-4 1 29.00 0.23 0.76
Grid 3-3 1 29.00 0.23 0.76
Grid 2-2 1 29.00 0.23 0.76
Grid 1-1 1 11.20 0.23 0.76

Secondary Beam
Long Beam
1st footing wall 1 5.20 0.45 0.15
2nd footing wall 1 5.20 0.34 0.15
3rd footing wall 1 5.20 0.23 0.27
Short Beam
1st footing wall 2 2.27 0.45 0.15
2nd footing wall 2 2.27 0.34 0.15
3rd footing wall 2 2.27 0.23 0.27
Total
2.2 Good quality local chimney made Brickwork in 1:4
C/S mortar up to ground floor in perfect line level
finish including wetting the bricks, racking the
joints and curing the work for at least 7 days all
complete.

4 Plain Cement concrete work


Plain Cement Concrete (PCC) in 1:3:6 ratia
4.1
for foundations, flooring and walls.
Isolated Footing F1 4 2.25 2.25 0.075
Isolated Footing F2 5 2.05 2.05 0.075
Isolated Footing F3 18 1.85 1.85 0.075
Isolated Footing F4 8 1.65 1.65 0.075
Combine Footing CF1 2 2.45 2.45 0.075
Combined Footing CF2 1 2.15 2.15 0.075
Grid A-A 1 12.65 0.30 0.075
Grid B-B 1 12.65 0.30 0.075
Grid C-C 1 12.65 0.30 0.075
Grid D-D 1 12.65 0.30 0.075
Grid E-E 1 12.65 0.30 0.075
Grid F-F 1 7.60 0.30 0.075
Grid G-G 1 7.60 0.30 0.075
Grid H-H 1 7.60 0.30 0.075
Grid I-I 1 7.60 0.30 0.075
Grid J-J 1 7.60 0.30 0.075
Grid K-K 1 7.60 0.30 0.075
Grid L-L 1 7.60 0.30 0.075
Grid 4-4 1 29.00 0.30 0.075
Grid 3-3 1 29.00 0.30 0.075
Grid 2-2 1 29.00 0.30 0.075
Grid 1-1 1 11.20 0.30 0.075
Previous
Plain cement Concrete (PCC) for RCC works
(1:2:4) for slab/lintels with approved
4.2 quality of cement and sand and crushed
stone aggregate.

Plain cement Concrete (PCC) for RCC works


4.3 (1:1.5:3) for column, Beam, Slab &
Staircase
F1-Footing
Base Square Section 4 2.10 2.10 0.20
Trapezoid Portion 4 4.41 2.10 0.30
Up to Plinth 4 0.45 0.45 1.58
F2-Footing
Base Square Section 5 2.10 2.10 0.20
Trapezoid Portion 5 4.41 1.82 0.25
Up to Plinth 5 0.45 0.45 1.63
F3-Footing
Base Square Section 18 2.10 2.10 0.20
Trapezoid Portion 18 4.41 1.56 0.20
Up to Plinth 18 0.45 0.45 1.68
F4-Footing
Base Square Section 8 2.10 2.10 0.20
Trapezoid Portion 8 4.41 1.56 0.20
Up to Plinth 8 0.45 0.45 1.68
Combine Footing CF1
Base Square Section 2 2.10 2.10 0.20
Trapezoid Portion 2 4.41 1.56 0.20
Up to Plinth 4 0.45 0.45 1.68
Combined Footing CF2 1 2.10 2.10 0.20
1 4.41 1.56 0.20
2 0.45 0.45 1.68
Foundation Beam
Grid A-A 1 12.65 0.30 0.30
Grid B-B 1 12.65 0.30 0.30
Grid C-C 1 12.65 0.30 0.30
Grid D-D 1 12.65 0.30 0.30
Grid E-E 1 12.65 0.30 0.30
Grid F-F 1 7.60 0.30 0.30
Grid G-G 1 7.60 0.30 0.30
Grid H-H 1 7.60 0.30 0.30
Grid I-I 1 7.60 0.30 0.30
Grid J-J 1 7.60 0.30 0.30
Grid K-K 1 7.60 0.30 0.30
Grid L-L 1 7.60 0.30 0.30
Grid 4-4 1 29.00 0.30 0.30
Grid 3-3 1 29.00 0.30 0.30
Grid 2-2 1 29.00 0.30 0.30
Grid 1-1 1 11.20 0.30 0.30
Plinth or Tie Beam
Grid A-A 1 12.65 0.30 0.30
Grid B-B 1 12.65 0.30 0.30
Grid C-C 1 12.65 0.30 0.30
Grid D-D 1 12.65 0.30 0.30
Grid E-E 1 12.65 0.30 0.30
Grid F-F 1 7.60 0.30 0.30
Grid G-G 1 7.60 0.30 0.30
Grid H-H 1 7.60 0.30 0.30
Grid I-I 1 7.60 0.30 0.30
Grid J-J 1 7.60 0.30 0.30
Grid K-K 1 7.60 0.30 0.30
Grid L-L 1 7.60 0.30 0.30
Grid 4-4 1 29.90 0.30 0.30
Grid 3-3 1 29.00 0.30 0.30
Grid 2-2 1 29.00 0.30 0.30
Grid 1-1 1 11.20 0.30 0.30
Secondary Beam
1 5.20 0.23 0.23
2 2.20 0.23 0.23
Total
Tor steel or TMT reinforcement bar of Fe
4.4
415/500 grade.
Footing Bar 12mm dia
Column bar 12mm dia up to Tie beam
Column bar 16mm dia Up to tie Beam
Column bar 20mm dia Up to tie Beam
Column Ties/stirrups 8mm dia
Lower Tie Beam Dia
Lower Tie Beam stirrups 8mmmm Dia
Upper Tie Beam
Upper Tie Beam stirrups 8m Dia
Sec beam long bar 16mm
Total
5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping,
scaffolding, staging,supporting inclusive of
wedging and cutting holes for utilization till the
5.1 support if full unyeilding net.

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
necessary propping, scafolding, staging,
supporting inclusive of wedging and cutting holes
for utilization till the support if fully unyeilding net .
5.2 Slab
Formwork, shuttering, centering with
5.3 19mm thick waterproof ply for beam with
steel pipe propping.
Foundation Beam
Grid A-A 2 12.65 0.30
Grid B-B 2 12.65 0.30
Grid C-C 2 12.65 0.30
Grid D-D 2 12.65 0.30
Grid E-E 2 12.65 0.30
Grid F-F 2 7.60 0.30
Grid G-G 2 7.60 0.30
Grid H-H 2 7.60 0.30
Grid I-I 2 7.60 0.30
Grid J-J 2 7.60 0.30
Grid K-K 2 7.60 0.30
Grid L-L 2 7.60 0.30
Grid 4-4 2 29.00 0.30
Grid 3-3 2 29.00 0.30
Grid 2-2 2 29.00 0.30
Grid 1-1 2 11.20 0.30
Plinth or Tie Beam
Grid A-A 3 12.65 0.30
Grid B-B 3 12.65 0.30
Grid C-C 3 12.65 0.30
Grid D-D 3 12.65 0.30
Grid E-E 3 12.65 0.30
Grid F-F 3 7.60 0.30
Grid G-G 3 7.60 0.30
Grid H-H 3 7.60 0.30
Grid I-I 3 7.60 0.30
Grid J-J 3 7.60 0.30
Grid K-K 3 7.60 0.30
Grid L-L 3 7.60 0.30
Grid 4-4 3 29.00 0.30
Grid 3-3 3 29.00 0.30
Grid 2-2 3 29.00 0.30
Grid 1-1 3 11.20 0.30
secondary beam horizontal 3 5.20 0.23
6 2.20 0.23
Total
Formwork, shuttering, centering with
5.4 19mm thick waterproof ply for column,
necessary propping, scaffolding.
For foundation PCC
Isolated Footing F1 4 8.70 0.075
Isolated Footing F2 5 7.90 0.075
Isolated Footing F3 18 7.10 0.075
Isolated Footing F4 8 6.30 0.075
Combine Footing CF1 2 8.90 0.075
Combined Footing CF2 1 8.10 0.075
For foundation
Isolated Footing F1 4 8.40 0.20
Isolated Footing F2 5 7.60 0.20
Isolated Footing F3 18 6.80 0.20
Isolated Footing F4 8 6.00 0.20
Combine Footing CF1 2 8.60 0.20
Combined Footing CF2 1 7.80 0.20
Column Upto DPC
Isolated Footing F1 4 1.80 1.58
Isolated Footing F2 5 1.80 1.63
Isolated Footing F3 18 1.80 1.68
Isolated Footing F4 8 1.80 1.73
Combine Footing CF1 2 1.80 1.58
Combined Footing CF2 1 1.80 1.63
Total
8 Flooring work
Flat dry brick soling on flat in foundation
8.4 and floor including sand filling in joints,
leveling, ramming etc. all complete
Isolated Footing F1 4 2.25 2.25
Isolated Footing F2 5 2.05 2.05
Isolated Footing F3 18 1.85 1.85
Isolated Footing F4 8 1.65 1.65
Combine Footing CF1 2 2.45 2.15
Combined Footing CF2 1 2.15 2.05
Foundation Beam
Grid A-A 1 12.65 0.30
Grid B-B 1 12.65 0.30
Grid C-C 1 12.65 0.30
Grid D-D 1 12.65 0.30
Grid E-E 1 7.60 0.30
Grid F-F 1 7.60 0.30
Grid G-G 1 7.60 0.30
Grid H-H 1 7.60 0.30
Grid I-I 1 7.60 0.30
Grid J-J 1 7.60 0.30
Grid K-K 1 7.60 0.30
Grid L-L 1 7.60 0.30
Grid 4-4 1 29.00 0.30
Grid 3-3 1 29.00 0.30
Grid 2-2 1 29.00 0.30
Grid 1-1 1 11.20 0.30
For secondary beam
Long Beam 1 4.90 0.60
Short Beam 2 1.94 0.60
Total

11.0 Water Proofing Works


Providing and applying Dustban Premise
11.1 chamical for anti termites treatment
On Footing 1 34.70 15.50
-1 18.00 5.50
Previous
F/Y:- 2075/076

Quantity Unit Remarks

586.80
586.80 Sqm IPC 9

33.41
33.62
95.48
32.67
17.38
7.05
6.68
6.54
6.54
5.88
5.91
3.38
3.82
3.82
3.67
3.89
3.38
3.67
9.96
9.81
10.40
6.39
313.35 Cum IPC 9

156.67
156.67 Cum IPC 9

163.47
-17.33
-10.22
-1.33
-6.34
-5.27
122.99 Cum IPC 9

2.21
2.21
2.21
2.21
2.21
1.33
1.33
1.33
1.33
1.33
1.33
1.33
5.07
5.07
5.07
1.96

0.35
0.27
0.32
0.00
0.31
0.23
0.28
39.28 Cum IPC 9

1.52
1.58
4.62
1.63
0.90
0.35
0.28
0.28
0.28
0.28
0.28
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.65
0.65
0.65
0.25
15.43 Cum IPC 9

3.52
3.90
1.28

4.41
3.89
1.65

15.87
10.75
6.12

7.05
4.77
2.72

1.76
1.19
1.36
0.88
0.59
0.68
1.14
1.14
1.14
1.14
1.14
0.68
0.68
0.68
0.68
0.68
0.68
0.68
2.61
2.61
2.61
1.01

1.14
1.14
1.14
1.14
1.14
0.68
0.68
0.68
0.68
0.68
0.68
0.68
2.69
2.61
2.61
1.01

0.28
0.23
111.62 Cum IPC 9

1661.07
1117.85
8210.89
444.82
5889.91 From BBS
Jail
2740.15 Dormitory
1093.10
2821.80
1151.87
54.60
25.186 Mt IPC 9
7.59
7.59
7.59
7.59
7.59
4.56
4.56
4.56
4.56
4.56
4.56
4.56
17.40
17.40
17.40
6.72
0.00
11.38
11.38
11.38
11.38
11.38
6.84
6.84
6.84
6.84
6.84
6.84
6.84
26.10
26.10
26.10
10.08
3.58
3.03
328.56 Sqm IPC 9

10.44
11.85
38.34
15.12
5.34
2.43

26.88
30.40
97.92
38.40
13.76
6.24

45.50
58.68
217.73
99.65
22.75
11.74
753.17 Sqm IPC 9

20.25
21.01
61.61
21.78
10.54
4.41
0.00
3.80
3.80
3.80
3.80
2.28
2.28
2.28
2.28
2.28
2.28
2.28
2.28
8.70
8.70
8.70
3.36
0.00
2.94
2.33
207.74 Sqm IPC 9

537.85
-99.00
438.85 Sqm IPC 9
Page 171 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Jail Block Dormitory-3 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 586.80 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 313.35 Cum 75.00 Cum
lift all complete.
Earth filling including supply of filling materials all
1.3 331.67 Cum 50.00 Cum
complete.
Earth filling in 150 mm thick layer, watering, ramming
1.4 including supply of filling materials within 6 km 67.71 Cum 125.00 Cum
distance.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 41.97 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 15.43 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 140.68 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 20.955 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork

Contractor: Prepared By: Checked By: Approved By:


Page 172 of 593

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 328.56 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 975.90 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
8 Flooring work
Flat dry brick soling on flat in foundation and floor
8.4 including sand filling in joints, leveling, ramming etc. 202.47 Sqm 600.00 Sqm
all complete
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 438.85 Sqm 250.00

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 173 of 593

ruction

F/Y:- 2075/076

Amount Remarks
Rs

2,934.00

23,501.25

16,583.50

8,463.75

503,640.00

123,402.00

1,688,173.98

167,641.44

Contractor: Prepared By: Checked By: Approved By:


Page 174 of 593

164,280.00

487,950.00

121,482.00

109,712.50

3,417,764.42

Contractor: Prepared By: Checked By: Approved By:


Page 175Government
of 593 of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Jail Block Dormitory-3 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Previous
Earth filling including supply of
1.3
filling materials.
Previous
Earth filling in 150 mm thick layer,
watering, ramming including supply
1.4
of filling materials within 6 km
distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
4 Plain Cement concrete work
Plain Cement Concrete (PCC) in
4.1 1:3:6 ratia for foundations, flooring
and walls.
Previous
Plain cement Concrete (PCC) for
4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase
Previous
Tor steel or TMT reinforcement bar
4.4
of Fe 415/500 grade.
Previous
5 Formwork
Formwork, shuttering, centering
5.3 with 19mm thick waterproof ply for
beam with steel pipe propping.
Previous
Formwork, shuttering, centering
5.4 with 19mm thick waterproof ply for
column, necessary propping, scaffolding.
For foundation PCC
Previous

8 Flooring work
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming
etc. all complete
Previous
Contractor: Prepared By: Checked By: Approved By:
Page 176Government
of 593 of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Jail Block Dormitory-3 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment

Previous

Contractor: Prepared By: Checked By: Approved By:


Page 177 of 593

ction

F/Y:- 2075/076

Quantity Unit Remarks

586.80 Sqm IPC 8

313.35 Cum IPC 8

331.67 Cum IPC 8

67.71 Cum IPC 8

41.97 Cum IPC 8

15.43 Cum IPC 8

140.68 Cum IPC 8

20.96 Mt IPC 8

328.56 Sqm IPC 8

975.90 IPC 8
Sqm

202.47 Sqm IPC 8


Contractor: Prepared By: Checked By: Approved By:
Page 178 of 593

ction

F/Y:- 2075/076

Quantity Unit Remarks

438.85 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Jail Block Dormitory-5 for Central Jail, JAIL UNIT
idur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and
1.1 disposal of debrises, uprooting roots, solid 1286.80 Sqm 5.00 Sqm
wastes etc. all complete as per instruction.

Earthwork in excavation in hard/boulder mix


1.2 soils in foundation including 10m hauling 313.35 Cum 75.00 Cum
distance and 1.5 m. lift all complete.

Earth filling including supply of filling materials


1.3 331.67 Cum 50.00 Cum
all complete.
Earth filling in 150 mm thick layer, watering,
1.4 ramming including supply of filling materials 693.73 Cum 125.00 Cum
within 6 km distance.
2 Brick Masonary work

Good quality local chimney made Brickwork in


1:4 C/S mortar up to ground floor in perfect
2.1 line level finish including wetting the bricks, 122.10 Cum 12,000.00 Cum
racking the joints and curing the work for at
least 7 days all complete.

Good quality local chimney made Brickwork in


1:4 C/S mortar in Super Structure with perfect
2.2 line level finish including wetting the bricks, Cum 12,000.00 Cum
racking the joints and curing the work for at
least 7 days all complete.

4 Plain Cement concrete work


Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved
quality of cement and sand and crushed stone
4.1 15.43 Cum 8,000.00 Cum
aggregate including mixing, laying using
mixture & Vibrator, curing etc all complete in
approval of site engineer.
Plain cement Concrete (PCC) for RCC works
(1:2:4) for slab/lintels with approved quality of
cement and sand and crushed stone
4.2 aggregate including mixing, laying using Cum 10,000.00 Cum
mixture & Vibrator, curing etc all complete in
approval of site engineer.
Plain cement Concrete (PCC) for RCC works
(1:1.5:3) for slab/lintels with approved quality
of cement and sand and crushed stone
4.3 144.25 Cum 12,000.00 Cum
aggregate including mixing, laying using
mixture & Vibrator, curing etc all complete in
approval of site engineer.

Tor steel or TMT reinforcement bar of fe


415/500 grade including straightening,
4.4 cleaning, cutting, binding & fixing in position 17.9782 MT 8,000.00 MT
with annealed tying binding wire as per
drawing, design & instruction all complete.
5 Formwork

Form Work Shuttering, centricn with wooden


form work for all works necessary propping,
5.1 scaffolding, staging,supporting inclusive of Sqm 500.00 Sqm
wedging and cutting holes for utilization till the
support if full unyeilding net.

Form work , shuttering, centering with 19mm


thick water proof ply board and steel post for
all works necessary propping, scafolding,
5.2 0.00 Sqm 500.00 Sqm
staging, supporting inclusive of wedging and
cutting holes for utilization till the support if
fully unyeilding net . Slab

Formwork, shuttering, centering with 19mm


thick waterproof ply for beam with steel pipe
5.3 propping, scaffolding, staging, supporting 328.56 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for
utilization till the support if fully unyielding net.

Formwork, shuttering, centering with 19mm


thick waterproof ply for column, necessary
5.4 propping, scaffolding, staging, supporting 1223.00 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for
utilization till the support if fully unyielding net.

7 Door,window & wooden works


Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish
7.3 of approved quality including fixing in position Cum 180,000.00 Cum
with necessary M.S. holdfasts as per drawing
and instructions all complete.
8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with
approved quality of O.P. cement & sand and
8.1 crushed stone aggregate including mixing, Sqm 500.00 Sqm
laying, punning, rubbing in hard surface curing
etc all complete.

Flat dry brick soling on flat in foundation and


8.4 floor including sand filling in joints, leveling, 207.74 Sqm 600.00 Sqm
ramming etc. all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete Sqm 1,000.00 Sqm

3 mm thick cement sand punning on floor,


skriting, dado etc, including mixing laying and
8.7 rubbing with steel trowel to a hard, smooth and Sqm 150.00 Sqm
shining surface and curing all complete.

9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio
on ceiling Plaster Sqm 250.00 Sqm
9.1
12.5mm thick cement sand palster in 1:4 ratio
on External wall plaster Sqm 250.00 Sqm
9.2
20 mm thick cement sand palster in 1:4 ratio
on internal wall plaster Sqm 300.00 Sqm
9.3
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment 438.85 Sqm 250.00

Sum of Civil Works


F/Y:- 2075/076

Amount Remarks
Rs

6,434.00

23,501.25

16,583.50

86,716.25

1,465,200.00

123,402.00

-
1,731,024.18

143,825.28

164,280.00

611,502.00

124,642.80
-

109,712.50

4,606,823.76
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:
Project :- Construction of Jail Block Dormitory-5 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous ###
Earthwork in excavation in hard/boulder
1.2
mix soils
Previous 313.35
Earth filling including supply of filling
1.3
materials.
Previous 331.67
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
Previous 693.73
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Total 122.10
2.2 Good quality local chimney made Brickwork in
1:4 C/S mortar up to ground floor in perfect line
level finish including wetting the bricks,
racking the joints and curing the work for at
least 7 days all complete.

4 Plain Cement concrete work


Plain Cement Concrete (PCC) in 1:3:6
4.1 ratia for foundations, flooring and
walls. 4 2.25 2.25
Isolated Footing F1 0.075 1.52
Previous 15.43

Plain cement Concrete (PCC) for RCC


works (1:2:4) for slab/lintels with
4.2 approved quality of cement and sand
and crushed stone aggregate.
Plain cement Concrete (PCC) for RCC
4.3 works (1:1.5:3) for column, Beam, Slab
& Staircase
Previous 114.11

Column up to GF 41 0.45 0.45 3.63 30.14


This Bill 30.14

Total 144.25

Tor steel or TMT reinforcement bar of


4.4
Fe 415/500 grade.
Previous 17.98
This Bill 0.000

Total 17.978
5 Formwork

Form work , shuttering, centering with 19mm


thick water proof ply board and steel post for
all works necessary propping, scafolding,
staging, supporting inclusive of wedging and
cutting holes for utilization till the support if
fully unyeilding net . Slab
5.2
Total 0.000
Formwork, shuttering, centering with
5.3 19mm thick waterproof ply for beam
with steel pipe propping.
Foundation Beam
Previous 328.56

This Bill 0.00

Total 328.56

Formwork, shuttering, centering with


5.4 19mm thick waterproof ply for column,
necessary propping, scaffolding.

Previous 964.70
Column Upto Ground Floor Slab 41 1.80 3.50 258.30
This Bill 258.30

Total ###
8 Flooring work
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming etc.
all complete
Previous 207.74
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete

9 Plastering Work
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment

Previous 438.85
F/Y:- 2075/076

Unit Remarks

Sqm IPC 8

Cum IPC 8

Cum IPC 8

Cum IPC 8

Cum IPC 8

Cum IPC 8
Cum IPC 8

Cum IPC 9

Cum

Mt
Mt IPC 9

Mt

Sqm

Sqm

Sqm

Sqm

Sqm

Sqm IPC 9

Sqm

Sqm IPC 8
Sqm IPC 8
Page 191 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Jail Block Dormitory-6 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 1286.80 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 313.35 Cum 75.00 Cum
lift all complete.
Earth filling including supply of filling materials all
1.3 331.67 Cum 50.00 Cum
complete.
Earth filling in 150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 67.71 Cum 125.00 Cum
6 km distance.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 41.97 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in Super Structure with perfect line level
2.2 86.65 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 55.98 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:2:4)


for slab/lintels with approved quality of cement and
4.2 sand and crushed stone aggregate including mixing, 6.94 Cum 10,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 252.87 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 192 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Jail Block Dormitory-6 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 33.7337 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork

Form Work Shuttering, centricn with wooden form


work for all works necessary propping, scaffolding,
5.1 60.31 Sqm 500.00 Sqm
staging,supporting inclusive of wedging and cutting
holes for utilization till the support if full unyeilding net.

Contractor: Prepared By: Checked By: Approved By:


Page 193 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Jail Block Dormitory-6 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
5.2 necessary propping, scafolding, staging, supporting 469.05 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 845.73 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 1234.20 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 1.64 Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
8Flooring work
38mm thick (1:2:4) P.C.C. for flooring with approved
quality of O.P. cement & sand and crushed stone
8.1 aggregate including mixing, laying, punning, rubbing 584.03 Sqm 500.00 Sqm
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 491.58 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 28.38 Sqm 1,000.00 Sqm
3 mm thick cement sand punning on floor, skriting,
dado etc, including mixing laying and rubbing with
8.7 steel trowel to a hard, smooth and shining surface 584.03 Sqm 150.00 Sqm
and curing all complete.
9Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
482.94 Sqm 250.00 Sqm
9.1 ceiling Plaster
12.5mm thick cement sand palster in 1:4 ratio on
402.75 Sqm 250.00 Sqm
9.2 External wall plaster

Contractor: Prepared By: Checked By: Approved By:


Page 194 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Jail Block Dormitory-6 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

20 mm thick cement sand palster in 1:4 ratio on


548.53 Sqm 300.00 Sqm
9.3 internal wall plaster
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 438.85 Sqm 250.00

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 195 of 593

ion

F/Y:- 2075/076

Amount Remarks
Rs

6,434.00

23,501.25

16,583.50

8,463.75

503,640.00

1,039,772.25

447,825.00

69,353.63

3,034,473.03

Contractor: Prepared By: Checked By: Approved By:


Page 196 of 593

ion

F/Y:- 2075/076

Amount Remarks
Rs

269,869.75

30,153.75

Contractor: Prepared By: Checked By: Approved By:


Page 197 of 593

ion

F/Y:- 2075/076

Amount Remarks
Rs

234,525.25

422,865.00

617,100.00

295,987.50

292,015.00

294,949.80

28,384.50

87,604.50

120,734.13

100,688.74

Contractor: Prepared By: Checked By: Approved By:


Page 198 of 593

ion

F/Y:- 2075/076

Amount Remarks
Rs

164,559.45

109,712.50

8,219,196.27

Contractor: Prepared By: Checked By: Approved By:


Page 199 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Jail Block Dormitory-6 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight Kg
S.N. Description of Work No.
m m m /m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Previous
Earth filling including supply of filling
1.3
materials.
Previous
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
2.2 Good quality local chimney made Brickwork in
1:4 C/S mortar up to ground floor in perfect line
level finish including wetting the bricks,
racking the joints and curing the work for at
least 7 days all complete.
Previous
4 Plain Cement concrete work
Plain Cement Concrete (PCC) in 1:3:6
4.1 ratia for foundations, flooring and
walls.
Previous
Plain cement Concrete (PCC) for RCC
works (1:2:4) for slab/lintels with
4.2 approved quality of cement and sand
and crushed stone aggregate.
Previous

Plain cement Concrete (PCC) for RCC


4.3 works (1:1.5:3) for column, Beam, Slab
& Staircase

Previous
Tor steel or TMT reinforcement bar of
4.4
Fe 415/500 grade.
Previous
5 Formwork

Contractor: Prepared By: Checked By: Approved By:


Page 200 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Jail Block Dormitory-6 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight Kg
S.N. Description of Work No.
m m m /m

Form Work Shuttering, centricn with wooden


form work for all works necessary propping,
scaffolding, staging,supporting inclusive of
wedging and cutting holes for utilization till the
support if full unyeilding net.
5.1
Previous

Form work , shuttering, centering with 19mm


thick water proof ply board and steel post for
all works necessary propping, scafolding,
staging, supporting inclusive of wedging and
cutting holes for utilization till the support if
fully unyeilding net . Slab
5.2 1 21.55 10.15
Ground Floor Slab 1
Previous

Formwork, shuttering, centering with


5.3 19mm thick waterproof ply for beam
with steel pipe propping.
Previous

Formwork, shuttering, centering with


5.4 19mm thick waterproof ply for column,
necessary propping, scaffolding.
Previous
7 Door,window & wooden work
Well seasoned salwood for chaukhats
7.3 for fixed/openable door/windows with
good finish.
Previous
8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with
approved quality of O.P. cement & sand and
8.1 crushed stone aggregate including mixing,
laying, punning, rubbing in hard surface curing
etc all complete.

Previous

Flat dry brick soling on flat in


foundation and floor including sand
8.4 filling in joints, leveling, ramming etc.
all complete
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 201 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Jail Block Dormitory-6 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight Kg
S.N. Description of Work No.
m m m /m
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete

Previous
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio
9.1 on ceiling Plaster
Previous
12.5mm thick cement sand palster in 1:4 ratio
9.2 on External wall plaster
Previous
20 mm thick cement sand palster in 1:4 ratio
9.3 on internal wall plaster
Previous
11.0 Water Proofing Works
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 202 of 593

F/Y:- 2075/076

Quantity Unit Remarks

1286.80 Sqm IPC 8

313.35 Cum IPC 8

331.67 Cum IPC 8

67.71 Cum IPC 8

41.97 Cum IPC 8

86.65 cum IPC 8

55.98 Cum IPC 8

6.94 Cum IPC 8

252.87 Cum IPC 8

33.73 Mt IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 203 of 593

F/Y:- 2075/076

Quantity Unit Remarks

60.31 Sqm IPC 8

218.73
469.051 Sqm IPC 8

845.73 Sqm IPC 8

1234.20 Sqm IPC 8

1.64 Cum IPC 8

584.03 Sqm IPC 8

491.58 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 204 of 593

F/Y:- 2075/076

Quantity Unit Remarks

28.38 Cum IPC 8

482.94 Sqm IPC 8

402.75 Sqm IPC 8

548.53 Sqm IPC 8

438.85 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 205 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Jail Block Dormitory-8 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 586.80 Sqm 5.00 Sqm
complete
Earthworkasinper instruction.
excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 313.35 Cum 75.00 Cum
lift all complete.
Earth filling including supply of filling materials all
1.3 331.67 Cum 50.00 Cum
complete.
Earth filling in 150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 67.71 Cum 125.00 Cum
6 km distance.
2 Brick Masonary work
Good quality local chimney made Brickwork in 1:4
C/S mortar up to ground floor in perfect line level
2.1 38.74 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.
4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 15.43 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 345.10 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 51.458066 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
necessary propping, scafolding, staging, supporting 981.6985 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab
5.2

Contractor: Prepared By: Checked By: Approved By:


Page 206 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Jail Block Dormitory-8 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 1397.30 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 1259.40 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
8 Flooring work
Flat dry brick soling on flat in foundation and floor
8.4 including sand filling in joints, leveling, ramming etc. 202.47 Sqm 600.00 Sqm
all complete
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 438.85 Sqm 250.00 Sqm

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 207 of 593

ion

F/Y:- 2075/076

Amount Remarks
Rs

2,934.00

23,501.25

16,583.50

8,463.75

464,880.00

123,402.00

4,141,203.03

411,664.52

490,849.25

Contractor: Prepared By: Checked By: Approved By:


Page 208 of 593

ion

F/Y:- 2075/076

Amount Remarks
Rs

698,650.00

629,700.00

121,482.00

109,712.50

7,243,025.80

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban
Page Development & Building Construction
209 of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Jail Block Dormitory-8 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Earth filling including supply of
1.3
filling materials. 50% of Excavation
Previous
Earth filling in 150 mm thick layer,
watering, ramming including supply
1.4
of filling materials within 6 km
distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
4 Plain Cement
Cementconcrete work(PCC) in
Concrete
4.1 1:3:6 ratia for foundations, flooring
and walls. Previous

Plain cement Concrete (PCC) for


4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase
Previous

Tor steel or TMT reinforcement bar


4.4
of Fe 415/500 grade.
Previous
5 Formwork

Form work , shuttering, centering with


19mm thick water proof ply board and
steel post for all works necessary
propping, scafolding, staging, supporting
inclusive of wedging and cutting holes for
utilization till the support if fully unyeilding
5.2 net . Slab
Previous

Formwork, shuttering, centering


5.3 with 19mm thick waterproof ply for
beam with steel pipe propping.
Previous
Contractor: Prepared By: Checked By: Approved By:
Government of Nepal
Ministry of Urban Development
Department of Urban
Page Development & Building Construction
210 of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Jail Block Dormitory-8 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m

Formwork, shuttering, centering


5.4 with 19mm thick waterproof ply for
column, necessary propping, scaffolding.
Previous
8 Flooring work
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming
etc. all complete
Previous
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment

Previous

Contractor: Prepared By: Checked By: Approved By:


struction Page 211 of 593

F/Y:- 2075/076

Quantity Unit Remarks

586.80 Sqm IPC 8

156.67
331.67 Cum IPC 8

67.71 Cum IPC 8

38.74 Cum IPC 8

15.43 Cum IPC 8

345.10 Cum IPC 8

51.458 MT IPC 8

### Sqm IPC 8

### Sqm IPC 8


Contractor: Prepared By: Checked By: Approved By:
struction Page 212 of 593

F/Y:- 2075/076

Quantity Unit Remarks

### Sqm IPC 8

202.47 Sqm IPC 8

438.85 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of 213
Page Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
ail Block Dormitory-9 for Central Jail, JAIL UNIT
ur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 586.80 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 313.35 Cum 75.00 Cum
lift all complete.
Earth filling including supply of filling materials all
1.3 331.67 Cum 50.00 Cum
complete.
Earth filling in 150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 131.49 Cum 125.00 Cum
6 km distance.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 48.16 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

4 Plain Cement concrete work


Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 15.43 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.
Plain cement Concrete (PCC) for RCC works (1:1.5:3)
for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 331.59 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 46.240807 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
necessary propping, scafolding, staging, supporting 981.6985 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab
5.2

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of 214
Page Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
ail Block Dormitory-9 for Central Jail, JAIL UNIT
ur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 1397.30 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 1259.40 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
8 Flooring work
Flat dry brick soling on flat in foundation and floor
8.4 including sand filling in joints, leveling, ramming etc. 202.47 Sqm 600.00 Sqm
all complete
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 438.85 Sqm 250.00 Sqm
Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


on Page 215 of 593

F/Y:- 2075/076

Amount Remarks
Rs

2,934.00

23,501.25

16,583.50

16,436.25

577,920.00

123,402.00

3,979,122.03

369,926.45

490,849.25

Contractor: Prepared By: Checked By: Approved By:


on Page 216 of 593

F/Y:- 2075/076

Amount Remarks
Rs

698,650.00

629,700.00

121,482.00

109,712.50
7,160,219.23

Contractor: Prepared By: Checked By: Approved By:


Page 217 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:- 2
Project :- Construction of Jail Block Dormitory-9 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous 586.80
Earthwork in excavation in
1.2
hard/boulder mix soils
Previous 313.35
Earth filling including supply of
1.3
filling materials.
Previous 331.67
Earth filling in 150 mm thick layer,
watering, ramming including supply
1.4
of filling materials within 6 km
distance.
Previous 131.49
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Total 48.16
4 Plain Cement concrete work
Plain Cement Concrete (PCC) in
4.1 1:3:6 ratia for foundations, flooring
and walls.
Previous 15.43
Plain cement Concrete (PCC) for
4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase
Previous 127.17

Column up to FF 41 0.45 0.45 3.63 30.14


Ground floor Beam 0.00
Grid 1-1 1 29.00 0.30 0.35 3.05
Grid 2-2 1 29.00 0.30 0.35 3.05
Grid 3-3 1 29.00 0.30 0.35 3.05
Grid 4-4 1 11.20 0.30 0.35 1.18
Grid A-A 1 12.65 0.30 0.35 1.33
Grid B-B 1 12.65 0.30 0.35 1.33
Grid C-C 1 12.65 0.30 0.35 1.33

Contractor: Prepared By: Checked By: Approved By:


Page 218 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:- 2
Project :- Construction of Jail Block Dormitory-9 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
Grid D-D 1 12.65 0.30 0.35 1.33
Grid E-E 1 12.65 0.30 0.35 1.33
Grid F-F 1 7.60 0.30 0.35 0.80
Grid G-G 1 7.60 0.30 0.35 0.80
Grid H-H 1 7.60 0.30 0.35 0.80
Grid I-I 1 7.60 0.30 0.35 0.80
Grid J-J 1 7.60 0.30 0.35 0.80
Grid K-K 1 7.60 0.30 0.35 0.80
Grid L-L 1 7.60 0.30 0.35 0.80
Secondary Beam gf slab horizontal 1 30.50 0.25 0.20 1.53
Secondary Beam gf slab horizontal 1 8.10 0.25 0.20 0.41
Secondary Beam gf slab transevers 1 7.65 0.25 0.20 0.38
Slab Casting 0.00
G F Slab 1 1 21.55 10.15 0.125 27.34
G F Slab 2 1 0.30 3.45 0.125 0.13

1 5.50 14.65 0.125 10.07

1 14.05 10.15 0.125 17.83


Deduction due to staircase -1 4.50 3.75 0.125 -2.11
Staircase first GF 0.00
Staircase first waist slab 1.00 3.77 1.50 0.18 0.99
Landing 1.00 3.75 1.75 0.18 1.15
Stair case second waist slab 1.00 3.77 1.50 0.18 0.99
Riser and Tread 11.00 1.50 0.30 0.17 0.82

First floor Beam 0.00


Grid 1-1 1 29.00 0.30 0.35 3.05
Grid 2-2 1 29.00 0.30 0.35 3.05
Grid 3-3 1 29.00 0.30 0.35 3.05
Grid 4-4 1 11.20 0.30 0.35 1.18
Grid A-A 1 12.65 0.30 0.35 1.33

Contractor: Prepared By: Checked By: Approved By:


Page 219 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:- 2
Project :- Construction of Jail Block Dormitory-9 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
Grid B-B 1 12.65 0.30 0.35 1.33
Grid C-C 1 12.65 0.30 0.35 1.33
Grid D-D 1 12.65 0.30 0.35 1.33
Grid E-E 1 12.65 0.30 0.35 1.33
Grid F-F 1 7.60 0.30 0.35 0.80
Grid G-G 1 7.60 0.30 0.35 0.80
Grid H-H 1 7.60 0.30 0.35 0.80
Grid I-I 1 7.60 0.30 0.35 0.80
Grid J-J 1 7.60 0.30 0.35 0.80
Grid K-K 1 7.60 0.30 0.35 0.80
Grid L-L 1 7.60 0.30 0.35 0.80
Secondary Beam ff slab horizontal 1 30.50 0.25 0.20 1.53
Secondary Beam ff slab horizontal 1 8.10 0.25 0.20 0.41
Secondary Beam ff slab transevers 1 7.65 0.25 0.20 0.38
Slab Casting 0.00
F F Slab 1 1 21.55 10.15 0.125 27.34
F F Slab 2 1 0.30 3.45 0.125 0.13

1 5.50 14.65 0.125 10.07

1 14.05 10.15 0.125 17.83


Deduction due to staircase -1 4.50 3.75 0.125 -2.11
Staircase first FF 0.00
Staircase first waist slab 1.00 3.77 1.50 0.18 0.99
Landing 1.00 3.75 1.75 0.18 1.15
Stair case second waist slab 1.00 3.77 1.50 0.18 0.99
Riser and Tread 11.00 1.50 0.30 0.17 0.82
0.00
Column up to TF 4 0.45 0.45 3.63 2.94
Top floor Beam 0.00
Grid 1-1 1 4.45 0.30 0.35 0.47
Grid 2-2 1 4.45 0.30 0.35 0.47

Contractor: Prepared By: Checked By: Approved By:


Page 220 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:- 2
Project :- Construction of Jail Block Dormitory-9 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
Grid D-D 1 5.95 0.30 0.35 0.62
Grid E-E 1 5.95 0.30 0.35 0.62
0.00
Top floor slab 1.00 5.65 7.15 0.13 5.05
This Bill 204.42

Total 331.59

Tor steel or TMT reinforcement bar


4.4
of Fe 415/500 grade.
Previous 18.003
Ground Floor Beam
16 mm bar 2765.55
12 mm Bar 550.39
8 mm stirrups 1476.13
Ground Floor slab
10 mm Bar 20.93
8 mm Bar 4014.06
Staircase
16 mm Bar 545.47
10 mm Bar 197.41
8 mm Bar 42.15

First Floor Beam


16 mm bar 2765.55
12 mm Bar 550.39
8 mm stirrups 1476.13
First Floor slab
10 mm Bar 20.93
8 mm Bar 4014.06
Staircase
16 mm Bar 545.47
10 mm Bar 197.41
8 mm Bar 42.15

Contractor: Prepared By: Checked By: Approved By:


Page 221 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:- 2
Project :- Construction of Jail Block Dormitory-9 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
Column bar 12mm dia up to Slab FF 545.39
Column bar 16mm dia Up to Slab FF 3922.71
Column Ties/stirrups 8mm dia 3836.27

Top floor beam 293.69


Top floor slab 415.54
This Bill 28.238

Total 46.241
5 Formwork
Form work , shuttering, centering with
19mm thick water proof ply board and
steel post for all works necessary
propping, scafolding, staging, supporting
inclusive of wedging and cutting holes for
utilization till the support if fully unyeilding
5.2 net . Slab 1 21.55 10.15
Ground Floor Slab 1 218.73
Total 981.699

Formwork, shuttering, centering


5.3 with 19mm thick waterproof ply for
beam with steel pipe propping.
Foundation Beam
Grid A-A 2 12.65 0.30 7.59
Grid B-B 2 12.65 0.30 7.59
Grid C-C 2 12.65 0.30 7.59
Grid D-D 2 12.65 0.30 7.59
Grid E-E 2 12.65 0.30 7.59
Grid F-F 2 7.60 0.30 4.56
Grid G-G 2 7.60 0.30 4.56
Grid H-H 2 7.60 0.30 4.56
Grid I-I 2 7.60 0.30 4.56
Grid J-J 2 7.60 0.30 4.56
Grid K-K 2 7.60 0.30 4.56
Grid L-L 2 7.60 0.30 4.56
Grid 4-4 2 29.00 0.30 17.40
Grid 3-3 2 29.00 0.30 17.40
Grid 2-2 2 29.00 0.30 17.40

Contractor: Prepared By: Checked By: Approved By:


Page 222 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:- 2
Project :- Construction of Jail Block Dormitory-9 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
Grid 1-1 2 11.20 0.30 6.72
Plinth or Tie Beam 0.00
Grid A-A 3 12.65 0.30 11.38
Grid B-B 3 12.65 0.30 11.38
Grid C-C 3 12.65 0.30 11.38
Grid D-D 3 12.65 0.30 11.38
Grid E-E 3 12.65 0.30 11.38
Grid F-F 3 7.60 0.30 6.84
Grid G-G 3 7.60 0.30 6.84
Grid H-H 3 7.60 0.30 6.84
Grid I-I 3 7.60 0.30 6.84
Grid J-J 3 7.60 0.30 6.84
Grid K-K 3 7.60 0.30 6.84
Grid L-L 3 7.60 0.30 6.84
Grid 4-4 3 29.00 0.30 26.10
Grid 3-3 3 29.00 0.30 26.10
Grid 2-2 3 29.00 0.30 26.10
Grid 1-1 3 11.20 0.30 10.08
secondary beam horizontal 3 5.20 0.23 3.58
6 2.20 0.23 3.03
Beam for Gfloor Slab 0.00
Grid 1-1 2 29.00 1.00 58.00
Grid 2-2 2 29.00 1.00 58.00
Grid 3-3 2 29.00 1.00 58.00
Grid 4-4 2 11.20 1.00 22.40
Grid A-A 2 12.65 1.00 25.30
Grid B-B 2 12.65 1.00 25.30
Grid C-C 2 12.65 1.00 25.30
Grid D-D 2 12.65 1.00 25.30
Grid E-E 2 12.65 1.00 25.30
Grid F-F 2 7.60 1.00 15.20
Grid G-G 2 7.60 1.00 15.20
Grid H-H 2 7.60 1.00 15.20
Grid I-I 2 7.60 1.00 15.20
Grid J-J 2 7.60 1.00 15.20
Grid K-K 2 7.60 1.00 15.20
Grid L-L 2 7.60 1.00 15.20
Secondary Beam gf slab horizontal 2 30.50 0.95 57.95
Secondary Beam gf slab horizontal 2 8.10 0.95 15.39
Secondary Beam gf slab transevers 2 7.65 0.95 14.53
0.00
Beam for F floor Slab 0.00
Grid 1-1 2 29.00 1.00 58.00

Contractor: Prepared By: Checked By: Approved By:


Page 223 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:- 2
Project :- Construction of Jail Block Dormitory-9 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
Grid 2-2 2 29.00 1.00 58.00
Grid 3-3 2 29.00 1.00 58.00
Grid 4-4 2 11.20 1.00 22.40
Grid A-A 2 12.65 1.00 25.30
Grid B-B 2 12.65 1.00 25.30
Grid C-C 2 12.65 1.00 25.30
Grid D-D 2 12.65 1.00 25.30
Grid E-E 2 12.65 1.00 25.30
Grid F-F 2 7.60 1.00 15.20
Grid G-G 2 7.60 1.00 15.20
Grid H-H 2 7.60 1.00 15.20
Grid I-I 2 7.60 1.00 15.20
Grid J-J 2 7.60 1.00 15.20
Grid K-K 2 7.60 1.00 15.20
Grid L-L 2 7.60 1.00 15.20
Secondary Beam ff slab horizontal 2 30.50 0.95 57.95
Secondary Beam ff slab horizontal 2 8.10 0.95 15.39
Secondary Beam ff slab transevers 2 7.65 0.95 14.53

Beam for Top Floor Slab 0.00


Grid 1-1 2 3.55 1.00 7.10
Grid 2-2 2 3.55 1.00 7.10
Grid 3-3 2 5.05 1.00 10.10
Grid 4-4 2 5.05 1.00 10.10

Total 1397.30

This Bill 1068.74

Previous bill 328.56

Formwork, shuttering, centering


5.4 with 19mm thick waterproof ply for
column, necessary propping, scaffolding.
For foundation PCC
Isolated Footing F1 4 8.70 0.075 10.44
Isolated Footing F2 5 7.90 0.075 11.85
Isolated Footing F3 18 7.10 0.075 38.34
Isolated Footing F4 8 6.30 0.075 15.12

Contractor: Prepared By: Checked By: Approved By:


Page 224 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:- 2
Project :- Construction of Jail Block Dormitory-9 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
Combine Footing CF1 2 8.90 0.075 5.34
Combined Footing CF2 1 8.10 0.075 2.43
For foundation
Isolated Footing F1 4 8.40 0.20 26.88
Isolated Footing F2 5 7.60 0.20 30.40
Isolated Footing F3 18 6.80 0.20 97.92
Isolated Footing F4 8 6.00 0.20 38.40
Combine Footing CF1 2 8.60 0.20 13.76
Combined Footing CF2 1 7.80 0.20 6.24
Column Upto DPC
Isolated Footing F1 4 1.80 1.45 41.76
Isolated Footing F2 5 1.80 1.50 54.00
Isolated Footing F3 18 1.80 1.55 200.88
Isolated Footing F4 8 1.80 1.60 92.16
Combine Footing CF1 2 1.80 1.45 20.88
Combined Footing CF2 1 1.80 1.50 10.80
Column Upto Ground Floor Slab 41 1.80 3.50 258.30
Column Upto First Floor Slab 41 1.80 3.50 258.30
Column Upto Top Floor Slab 4 1.80 3.50 25.20
Total 1259.40

This Bill 242.46

Previous 1016.94

7 Door,window & wooden work


8 Flooring work
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming
etc. all complete
Previous 202.47
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment

Previous 438.85

Contractor: Prepared By: Checked By: Approved By:


Page 225 of 593

F/Y:- 2075/076

Unit Remarks

Sqm IPC 8

Cum IPC 8

Cum IPC 8

Cum IPC 8

Cum IPC 8

Cum IPC 8

Cum IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 226 of 593

F/Y:- 2075/076

Unit Remarks

Contractor: Prepared By: Checked By: Approved By:


Page 227 of 593

F/Y:- 2075/076

Unit Remarks

Contractor: Prepared By: Checked By: Approved By:


Page 228 of 593

F/Y:- 2075/076

Unit Remarks

Cum IPC 9

Cum

Mt IPC 8

From BBS
Jail
Dormitory

Contractor: Prepared By: Checked By: Approved By:


Page 229 of 593
From BBS
Jail
Dormitory

F/Y:- 2075/076

Unit Remarks

Mt IPC 9

Mt

Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 230 of 593

F/Y:- 2075/076

Unit Remarks

Contractor: Prepared By: Checked By: Approved By:


Page 231 of 593

F/Y:- 2075/076

Unit Remarks

Sqm

Sqm IPC 9

Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 232 of 593

F/Y:- 2075/076

Unit Remarks

Sqm

Sqm IPC 9

Sqm IPC 8

Sqm IPC 8

Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
ail Block Dormitory-9 for Central Jail, JAIL UNIT
ur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs.

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all complete as 586.80 Sqm 5.00
per instruction.

Earthwork in excavation in hard/boulder mix soils in


1.2 foundation including 10m hauling distance and 1.5 m. lift 313.35 Cum 75.00
all complete.
Earth filling including supply of filling materials all
1.3 331.68 Cum 50.00
complete.
Earth filling in 150 mm thick layer, watering, ramming
1.4 including supply of filling materials within 6 km distance. 131.49 Cum 125.00
2 Brick Masonary work
Good quality local chimney made Brickwork in 1:4 C/S
mortar up to ground floor in perfect line level finish
2.1 85.87 Cum 12,000.00
including wetting the bricks, racking the joints and curing
the work for at least 7 days all complete.
4 Plain Cement concrete work
Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved quality of
4.1 cement and sand and crushed stone aggregate including 15.43 Cum 8,000.00
mixing, laying using mixture & Vibrator, curing etc all
complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:1.5:3) for


slab/lintels with approved quality of cement and sand and
4.3 crushed stone aggregate including mixing, laying using 241.76 Cum 12,000.00
mixture & Vibrator, curing etc all complete in approval of
site engineer.

Tor steel or TMT reinforcement bar of fe 415/500 grade


including straightening, cleaning, cutting, binding & fixing
4.4 28.830907 MT 8,000.00
in position with annealed tying binding wire as per
drawing, design & instruction all complete.
5 Formwork
Form work , shuttering, centering with 19mm thick water
proof ply board and steel post for all works necessary
5.2 propping, scafolding, staging, supporting inclusive of 469.0505 Sqm 500.00
wedging and cutting holes for utilization till the support if
fully unyeilding net . Slab
Formwork, shuttering, centering with 19mm thick
waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging and 845.73 Sqm 500.00
cutting holes for utilization till the support if fully unyielding
net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging and 975.90 Sqm 500.00
cutting holes for utilization till the support if fully unyielding
net.
8 Flooring work
Flat dry brick soling on flat in foundation and floor
8.4 including sand filling in joints, leveling, ramming etc. all 202.47 Sqm 600.00
complete
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for anti
11.1 termites treatment 438.85 Sqm 250.00
Sum of Civil Works
ction

F/Y:- 2075/076

Amount Remarks
Per
Rs

Sqm 2,934.00

Cum 23,501.25

Cum 16,583.75

Cum 16,436.25

Cum 1,030,440.00

Cum 123,402.00

Cum 2,901,163.23

MT 230,647.26

Sqm 234,525.25
Sqm 422,865.00

Sqm 487,950.00

Sqm 121,482.00

Sqm 109,712.50
Sum of Civil Works 5,721,642.49
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:- 2075
Project :- Construction of Jail Block Dormitory-10 for Central Jail, JAIL UNIT
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight Kg
S.N. Description of Work No. Quantity
m m m /m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous 586.80
Earthwork in excavation in
1.2
hard/boulder mix soils
Previous 313.35
Earth filling including supply of
1.3
filling materials.
50% of Excavation 156.68
Road access due to rain 1 50.00 7.00 0.50 175.00
Total 331.68
Earth filling in 150 mm thick
layer, watering, ramming
1.4 including supply of filling
materials within 6 km
distance.
On Ground Floor 1 34.40 14.40 0.35 173.38
Deduction -1 21.00 5.50 0.15 -17.33
Deduction due to beam -3 34.40 0.30 0.35 -10.84
-1 13.45 0.30 0.35 -1.41
-5 12.80 0.30 0.35 -6.72
-7 7.60 0.30 0.35 -5.59
Total 131.49
2 Brick Masonary work
Good quality local chimney
2.1 made Brickwork in 1:4 C/S
mortar up to ground floor .
Grid A-A 1 12.65 0.23 1.63 4.74
Grid B-B 1 12.65 0.23 1.63 4.74
Grid C-C 1 12.65 0.23 1.63 4.74
Grid D-D 1 12.65 0.23 1.63 4.74
Grid E-E 1 12.65 0.23 1.63 4.74
Grid F-F 1 7.60 0.23 1.63 2.84
Grid G-G 1 7.60 0.23 1.63 2.84
Grid H-H 1 7.60 0.23 1.63 2.84
Grid I-I 1 7.60 0.23 1.63 2.84
Grid J-J 1 7.60 0.23 1.63 2.84
Grid K-K 1 7.60 0.23 1.63 2.84
Grid L-L 1 7.60 0.23 1.63 2.84
Grid 4-4 1 29.00 0.23 1.63 10.87
Grid 3-3 1 29.00 0.23 1.63 10.87
Grid 2-2 1 29.00 0.23 1.63 10.87
Grid 1-1 1 11.20 0.23 1.63 4.19
Secondary Beam 1 10.02 0.23 1.63 3.75
0.00
Secondary Beam 0.00
Long Beam 0.00
1st footing wall 1 5.20 0.45 0.15 0.35
2nd footing wall 1 5.20 0.34 0.15 0.26
3rd footing wall 1 5.20 0.23 0.27 0.32
Short Beam 0.00
1st footing wall 2 2.27 0.45 0.15 0.30
2nd footing wall 2 2.27 0.34 0.15 0.23
3rd footing wall 2 2.27 0.23 0.27 0.28
Total 85.87

4 Plain Cement concrete work


Plain Cement Concrete (PCC) in
4.1 1:3:6 ratia for foundations,
flooring and walls.
Previous 15.43
Plain cement Concrete (PCC)
for RCC works (1:1.5:3) for
4.3
column, Beam, Slab &
Staircase
Previous 94.23
0.00
Plinth or Tie Beam 0.00
Grid A-A 1 12.65 0.30 0.30 1.14
Grid B-B 1 12.65 0.30 0.30 1.14
Grid C-C 1 12.65 0.30 0.30 1.14
Grid D-D 1 12.65 0.30 0.30 1.14
Grid E-E 1 12.65 0.30 0.30 1.14
Grid F-F 1 7.60 0.30 0.30 0.68
Grid G-G 1 7.60 0.30 0.30 0.68
Grid H-H 1 7.60 0.30 0.30 0.68
Grid I-I 1 7.60 0.30 0.30 0.68
Grid J-J 1 7.60 0.30 0.30 0.68
Grid K-K 1 7.60 0.30 0.30 0.68
Grid L-L 1 7.60 0.30 0.30 0.68
Grid 4-4 1 29.90 0.30 0.30 2.69
Grid 3-3 1 29.00 0.30 0.30 2.61
Grid 2-2 1 29.00 0.30 0.30 2.61
Grid 1-1 1 11.20 0.30 0.30 1.01
Secondary Beam 0.00
1 5.20 0.23 0.23 0.28
2 2.20 0.23 0.23 0.23
Column On Ground floor 21 0.45 0.45 3.63 15.44
0.00
Column up to FF 41 0.45 0.45 3.63 30.14
Ground floor Beam 0.00
Grid 1-1 1 29.00 0.30 0.35 3.05
Grid 2-2 1 29.00 0.30 0.35 3.05
Grid 3-3 1 29.00 0.30 0.35 3.05
Grid 4-4 1 11.20 0.30 0.35 1.18
Grid A-A 1 12.65 0.30 0.35 1.33
Grid B-B 1 12.65 0.30 0.35 1.33
Grid C-C 1 12.65 0.30 0.35 1.33
Grid D-D 1 12.65 0.30 0.35 1.33
Grid E-E 1 12.65 0.30 0.35 1.33
Grid F-F 1 7.60 0.30 0.35 0.80
Grid G-G 1 7.60 0.30 0.35 0.80
Grid H-H 1 7.60 0.30 0.35 0.80
Grid I-I 1 7.60 0.30 0.35 0.80
Grid J-J 1 7.60 0.30 0.35 0.80
Grid K-K 1 7.60 0.30 0.35 0.80
Grid L-L 1 7.60 0.30 0.35 0.80
Secondary Beam gf slab horizontal 1 30.50 0.25 0.20 1.53
Secondary Beam gf slab horizontal 1 8.10 0.25 0.20 0.41
Secondary Beam gf slab
1 7.65 0.25 0.20 0.38
transevers
Slab Casting 0.00
G F Slab 1 1 21.55 10.15 0.125 27.34
G F Slab 2 1 0.30 3.45 0.125 0.13
1 5.50 14.65 0.125 10.07
1 14.05 10.15 0.125 17.83
Deduction due to staircase -1 4.50 3.75 0.125 -2.11
Staircase first GF 0.00
Staircase first waist slab 1.00 3.77 1.50 0.18 0.99
Landing 1.00 3.75 1.75 0.18 1.15
Stair case second waist slab 1.00 3.77 1.50 0.18 0.99
Riser and Tread 11.00 1.50 0.30 0.17 0.82
This Bill 147.54

Total 241.76

Tor steel or TMT reinforcement


4.4
bar of Fe 415/500 grade.
Previous 13.950

Upper Tie Beam 16mm Dia 2821.80


Upper Tie Beam stirrups 8m Dia 1151.87
Sec beam long bar 16mm 54.60

Ground Floor Beam


16 mm bar 2765.55
12 mm Bar 550.39
8 mm stirrups 1476.13
Ground Floor slab
10 mm Bar 20.92
8 mm Bar 5254.73
Staircase
16 mm Bar 545.47
10 mm Bar 197.41
8 mm Bar 42.15
This Bill 14.881

Total 28.831

5 Formwork

Form work , shuttering, centering


with 19mm thick water proof ply
board and steel post for all works
necessary propping, scafolding,
staging, supporting inclusive of
wedging and cutting holes for
utilization till the support if fully
unyeilding net . Slab
5.2
Ground Floor Slab 1 1 21.55 10.15 218.73
Ground Floor Slab 2 1 0.30 3.45 1.04
1 5.50 14.65 80.58
1 14.05 10.15 142.61
Sides of slab 2 21.55 0.125 5.39
2 10.15 0.125 2.54
2 10.15 0.125 2.54
2 14.05 0.125 3.51
2 0.30 0.125 0.08
2 5.05 0.125 1.26
1 3.55 0.125 0.44
0.00
Deduction due to staircase -1 4.50 3.75 -16.88
Staircase first GF 0.00
Staircase first waist slab 1.00 3.77 1.50 5.65
sides 1.00 3.77 0.35 1.32
Landing 1.00 3.75 1.75 6.56
sides 2.00 1.75 0.18 0.61
1.00 3.75 0.18 0.66
Stair case second waist slab 1.00 3.77 1.50 5.66
sides 1.00 3.77 0.35 1.32
Riser and Tread 22.00 1.50 0.17 5.45
0.00
Total 469.051

Formwork, shuttering,
centering with 19mm thick
5.3
waterproof ply for beam with
steel pipe propping.
Previous 128.79

Plinth or Tie Beam 0.00


Grid A-A 3 12.65 0.30 11.38
Grid B-B 3 12.65 0.30 11.38
Grid C-C 3 12.65 0.30 11.38
Grid D-D 3 12.65 0.30 11.38
Grid E-E 3 12.65 0.30 11.38
Grid F-F 3 7.60 0.30 6.84
Grid G-G 3 7.60 0.30 6.84
Grid H-H 3 7.60 0.30 6.84
Grid I-I 3 7.60 0.30 6.84
Grid J-J 3 7.60 0.30 6.84
Grid K-K 3 7.60 0.30 6.84
Grid L-L 3 7.60 0.30 6.84
Grid 4-4 3 29.00 0.30 26.10
Grid 3-3 3 29.00 0.30 26.10
Grid 2-2 3 29.00 0.30 26.10
Grid 1-1 3 11.20 0.30 10.08
secondary beam horizontal 3 5.20 0.23 3.58
6 2.20 0.23 3.03
Beam for Gfloor Slab 0.00
Grid 1-1 2 29.00 1.00 58.00
Grid 2-2 2 29.00 1.00 58.00
Grid 3-3 2 29.00 1.00 58.00
Grid 4-4 2 11.20 1.00 22.40
Grid A-A 2 12.65 1.00 25.30
Grid B-B 2 12.65 1.00 25.30
Grid C-C 2 12.65 1.00 25.30
Grid D-D 2 12.65 1.00 25.30
Grid E-E 2 12.65 1.00 25.30
Grid F-F 2 7.60 1.00 15.20
Grid G-G 2 7.60 1.00 15.20
Grid H-H 2 7.60 1.00 15.20
Grid I-I 2 7.60 1.00 15.20
Grid J-J 2 7.60 1.00 15.20
Grid K-K 2 7.60 1.00 15.20
Grid L-L 2 7.60 1.00 15.20
Secondary Beam gf slab horizontal 2 30.50 0.95 57.95
Secondary Beam gf slab horizontal 2 8.10 0.95 15.39
Secondary Beam gf slab
2 7.65 0.95 14.53
transevers
0.00
This Bill 716.94

Total 845.73
Formwork, shuttering,
centering with 19mm thick
5.4
waterproof ply for column,
necessary propping, scaffolding.
Previous 297.12

Column Upto DPC


Isolated Footing F1 4 1.80 1.45 41.76
Isolated Footing F2 5 1.80 1.50 54.00
Isolated Footing F3 18 1.80 1.55 200.88
Isolated Footing F4 8 1.80 1.60 92.16
Combine Footing CF1 2 1.80 1.45 20.88
Combined Footing CF2 1 1.80 1.50 10.80
Column Upto Ground Floor
41 1.80 3.50 258.30
Slab
This Bill 678.78

Total 975.90

8 Flooring work
Flat dry brick soling on flat in
foundation and floor including
8.4 sand filling in joints, leveling,
ramming etc. all complete
Previous 202.47
11.0 Water Proofing Works
Providing and applying Dustban
11.1 Premise chamical for anti termites
treatment
Previous 438.85
F/Y:- 2075/076

Unit Remarks

Sqm IPC 8

Cum IPC 8

Cum IPC 8

Cum IPC 9
Cum IPC 9

Cum IPC 8

Cum IPC 8
Cum IPC 9

Cum

MT IPC 8

From
BBS Jail
Dormitor
y
From
BBS Jail
Dormitor
y

Mt IPC 9

Mt
Sqm

Sqm IPC 8
Sqm IPC 9

Sqm

Sqm IPC 8

Sqm IPC 9

Sqm

Sqm IPC 8

Sqm IPC 8
Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban Development & Building Construction
251 of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 16
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 580.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 190.70 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 95.34 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 36.36 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 30.51 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in superstructure in perfect line level finish
2.2 59.83 12,000.00
including wetting the bricks, racking the joints and
curing the work for at least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. Cum 3,000.00

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 31.34 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 4.47 10,000.00
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban Development & Building Construction
252 of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 16
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 57.24 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 10.316605 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 40.17 Sqm 500.00 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 277.95 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 192.93 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
6 Roofing Work
6.1 0.5mm colour CGI sheet roofing including fixing in
proper shape & size with all necessary nails, screws,
bolts & nuts washers, J & L hooks etc as per drawing 395.85 Sqm 1000.00 Sqm
& instruction all complete.
6.2 0.50mm colour Ridge on roof including fixing in proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 26.30 Rm 1000.00 Rm
instruction all complete.
6.3 0.50mm colour sheet for fixing in gable wall proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 26.55 Sqm 1200.00 Sqm
instruction all complete.
7 Door,window & wooden works

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban Development & Building Construction
253 of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 16
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Well Seasoned Sal wood chaukhats for


fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 0.99 Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
8 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 271.44 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 400.66 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 24.25 Cum 1,000.00 Cum

8.7 3 mm thick cement sand punning on floor, skriting, dado


etc, including mixing laying and rubbing with steel trowel to
a hard, smooth and shining surface and curing all 336.63 Sqm 150.00 Sqm
complete.

9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster Sqm 250.00 Sqm

12.5mm thick cement sand palster in 1:4 ratio on


9.2 External wall plaster 364.50 Sqm 250.00 Sqm

20 mm thick cement sand palster in 1:4 ratio on


9.3 internal wall plaster 378.67 Sqm 300.00 Sqm

11.0 Water Proofing Works


Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 373.01 Sqm 250.00 Sqm

12.0 Steel and Iron Works


M.S. Black Pipe roof truss & purlin with I.S. or B.S.
12.6 section including jointing, fixing, 2861.78 Kg 125.00 Kg

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 254 of 593

F/Y:- 2075/076

Amount Remarks
Rs

2,900.00

14,302.12

4,767.00

4,545.00

366,060.60

717,960.00

250,702.50

44,698.72

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 255 of 593

F/Y:- 2075/076

Amount Remarks
Rs

686,923.50

82,532.84

20,085.75

138,975.00

96,462.50

395,850.00

26,300.00

31,863.00

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 256 of 593

F/Y:- 2075/076

Amount Remarks
Rs

178,200.00

135,720.00

240,397.50

24,246.00

50,494.50

91,125.00

113,601.15

93,251.25

357,722.26

4,169,686.19

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Pageof257
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 16
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight Kg
S.N. Description of Work No.
m m m /m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Isolated Footing F1 16 1.65 1.65 1.650
Isolated Footing F2 5 1.45 1.45 1.600
Trench Along Portion 1-1 & 3-3 2 15 0.75 1.050
Trench Along Portion 2-2 1 16 0.75 1.050
Trench Along A-A,G-G 2 9 0.75 1.050
Trench Along B-B,C-C,D-D,E-E,F-F 5 9.2 0.75 1.050
Secondary Beams 1 22.4 0.45 1.050
2 2.66 0.45 1.050
Earth work for steps 1 24.3 0.23 0.150
2 8 0.60 0.150
Previous
Earth filling including supply of
1.3
filling materials. 50% of Excavation
Previous
Earth filling in 150 mm thick layer,
watering, ramming including supply
1.4
of filling materials within 6 km
distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
Good Quaity Local chimney made
2.2 Brickworks in 1:4 c/s mortar in
super structure
Along grid 3-3 2 5.53 0.250 3.150
Along grid 2'-2' 1 23.770 0.250 3.150
Along grid 1-1 1 21.300 0.250 3.150
Alongid A-A & G-G 2 11.100 0.250 3.150
Along B'-B' & E'-E' 2 3.000 0.250 3.150
Along D-D 1 5.550 0.250 3.150
Deduction
Door (1200x2100) -4 1.20 0.250 2.100
Window1 (1800x1200) -10 1.80 0.250 1.200
Contractor: Prepared By: Checked By: Approved By:
Government of Nepal
Ministry of Urban Development
Department
Pageof258
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 16
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight Kg
S.N. Description of Work No.
m m m /m
Ventilation (1800x750) -4 1.80 0.250 0.750
opeings -2 4 0.250 1.200
Deduction due to
Sill -1 82.52 0.250 0.075
-1 5.550 0.250 0.075
lintel -1 84.32 0.250 0.150
-1 5.550 0.250 0.150
For steps
At Front 1 24.300 0.230 0.750
2 0.600 0.230 0.750
4 0.150 0.230 0.475

At Back 2 4.500 0.230 0.600


4 0.150 0.230 0.375

Total

This Bill

Previous

4 Plain Cement concrete work


Plain cement Concrete (PCC) in
4.1 1:3:6 ratio for foundations, flooring
and walls.
Isolated Footing F1 16 1.65 1.65 0.075
Isolated Footing F2 5 1.45 1.45 0.075
Trench Along Portion 1-1 &3-3 2 14.1 0.45 0.075
Trench Along Portion 2-2 1 15.1 0.45 0.075
Trench Along A-A,G-G 2 8.7 0.45 0.075
Trench Along B-B,C-C,D-D,E-E,F-F 5 8.6 0.45 0.075
Ground Floor 1 24.00 12.00 0.075
Deduction due to beam
-3 24.00 0.30 0.075
-7 11.40 0.30 0.075
For steps
At Front 1 24.30 1.20 0.075
At Back 2 4.50 1.20 0.075

PCC at staircase top


Front 1 24.30 0.60 0.075
Contractor: Prepared By: Checked By: Approved By:
Government of Nepal
Ministry of Urban Development
Department
Pageof259
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 16
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight Kg
S.N. Description of Work No.
m m m /m
4 7.75 0.30 0.075

Back 2 4.50 0.60 0.075


4 4.50 0.30 0.075
Total

This Bill

Previous

Plain Cement Concrete PCC for RCC


4.2
works(1:2:4) slab and lintels
Plain cement Concrete (PCC) for Previous
4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase Previous
Tor steel or TMT reinforcement bar
4.4
of fe 415/500 grade.
Previous
5 Formwork
Formwork, shuttering, centering
with 19mm thick waterproof ply for
5.1
beam with steel pipe propping. Sill
lintel
Previous
Formwork, shuttering, centering
5.3 with 19mm thick waterproof ply for
beam with steel pipe propping.
Previous
Formwork, shuttering, centering with
5.4
19mm thick waterproof ply for column,
Pcc In foundation
Previous
6 Roofing Work

6.1 0.5mm colour CGI sheet roofing including


fixing in proper shape & size with all
necessary nails, screws, bolts & nuts
washers, J & L hooks etc as per drawing
& instruction all complete.

Previous
6.2 0.50mm colour Ridge on roof including
fixing in proper shape & size with all
necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing & 26.30
1
instruction all complete. Ridge Cap Previous

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Pageof260
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 16
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight Kg
S.N. Description of Work No.
m m m /m
6.30.50mm colour sheet for fixing in gable
wall proper shape & size with all Previous
necessary rails, screws, bolts & nuts
7 Door,window & wooden
washers, J & L hocks works
etc as per drawing &
instructionSeasoned
Well all complete. Sal wood
7.3 chaukhats for fixed/openable
door/windows.
Previous
8 Flooring work
38mm thick (1:2:4) P.C.C. for
flooring with approved quality of
8.1 O.P. cement & sand and crushed
stone aggregate . Ground Floor 1 24.00 12.00
Previous
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming
etc. all complete
Isolated Footing F1 16 1.65 1.65
Isolated Footing F2 5 1.45 1.45
Trench Along Portion 1-1 &2-2 2 21.3 0.45
Trench Along Portion 3-3 1 21.8 0.45
Trench Along A-A,G-G 2 11.1 0.45
Trench Along B-B,C-C,D-D,E-E,F-F 5 11.2 0.45
Ground Floor 1 24.00 12.00
Deduction due to beam
-3 24.00 0.30
-7 11.40 0.30
for steps
At front 1 24.30 1.20
At Back 2 4.50 1.20
Total

This Bill

Previous

Sand filling in flooring including


8.5 supply of filling materials, watering,
ramming etc. all complete
Previous

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Pageof261
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 16
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight Kg
S.N. Description of Work No.
m m m /m
3 mm thick cement sand punning
on floor, skriting, dado etc,
including mixing laying and rubbing
8.7 with steel trowel to a hard, smooth
and shining surface and curing all
complete. Ground Floor 1 24.00 12.00
Previous

For Steps at front


1 24.3 0.75
4 7.75 0.3
4 7.75 0.15
2 7.75 0.45
1 9.3 0.75
2 0.6 0.75

At Back
2 4.5 0.6
4 4.5 0.3
4 4.5 0.15
2 4.5 0.44
1 0.6 0.7
1 0.3 0.55
1 0.3 0.4
This Bill

Total

9 Plastering Work
12.5mm thick cement sand palster in
9.1 1:3 ratio on ceiling Plaster
12.5mm thick cement sand palster in
9.2 1:4 ratio on External wall plaster
Previous
For Steps at front
1 24.3 0.75
4 7.75 0.3
4 7.75 0.15
2 7.75 0.45
1 9.3 0.75

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Pageof262
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 16
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight Kg
S.N. Description of Work No.
m m m /m
2 0.6 0.75

At Back
2 4.5 0.6
4 4.5 0.3
4 4.5 0.15
2 4.5 0.44
1 0.6 0.7
1 0.3 0.55
1 0.3 0.4

This Bill

Total

20 mm thick cement sand palster in 1:4


9.3 ratio on internal wall plaster
Previous
11 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment

Previous
12 Steel and Iron Works

12.6 M.S. Black Pipe roof truss & purlin with I.S.
or B.S. section including jointing, fixing,

Previous

Contractor: Prepared By: Checked By: Approved By:


truction Page 263 of 593

F/Y:- 2075/076

Quantity Unit Remarks

580.00 Sqm IPC 8

71.87
16.82
23.63
12.60
14.18
36.23
10.58
2.51
0.84
1.44 IPC 9
190.70 Cum

95.34
95.34 Cum IPC 8

36.36 Cum IPC 8

30.51 Cum IPC 8

8.70
18.72
16.77
17.48
4.73
4.37
0.00
-2.52
-5.40
Contractor: Prepared By: Checked By: Approved By:
truction Page 264 of 593

F/Y:- 2075/076

Quantity Unit Remarks

-1.35
-2.40
0.00
-1.55
-0.10
-3.16
-0.21
0.00
4.19
0.21
0.07
0.00
1.24
0.05
0.00
59.83 Cum

2.28 Cum IPC 9

57.55 Cum

3.27
0.79
0.95
0.51
0.59
1.45
21.60
0.00
-1.62
-1.80
0.00
2.19
0.81
0.00
0.00
1.09
Contractor: Prepared By: Checked By: Approved By:
truction Page 265 of 593

F/Y:- 2075/076

Quantity Unit Remarks

0.70
0.00
0.41
0.41
31.34 Cum

4.76 Cum IPC 9

26.58 Cum

4.47 Cum IPC 8

57.24 Cum IPC 8

10.317 MT IPC 8

40.17 Sqm IPC 8

277.95 Sqm IPC 8

192.93 Sqm IPC 8

395.85 Sqm IPC 8

26.30 Rm
26.30 Rm IPC 8

Contractor: Prepared By: Checked By: Approved By:


truction Page 266 of 593

F/Y:- 2075/076

Quantity Unit Remarks

26.55 Sqm IPC 8

0.99 Cum IPC 8

288.00
271.44 Sqm IPC 8

43.56
10.51
19.17
9.81
9.99
25.20
288.00
0.00
-21.60
-23.94
0.00
29.16
10.80
400.66 Sqm

19.79 Sqm IPC 9

380.87 Sqm

24.25 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


truction Page 267 of 593

F/Y:- 2075/076

Quantity Unit Remarks

288.00
271.44 Sqm IPC 8

0.00
18.23
9.30
4.65
6.98
6.98
0.90
0.00
0.00
5.40
5.40
2.70
3.96
0.42
0.17
0.12
65.19 Sqm IPC 9

336.63 Sqm

299.31 Sqm IPC 8


0.00
18.23
9.30
4.65
6.98
6.98

Contractor: Prepared By: Checked By: Approved By:


truction Page 268 of 593

F/Y:- 2075/076

Quantity Unit Remarks

0.90
0.00
0.00
5.40
5.40
2.70
3.96
0.42
0.17
0.12

65.19 Sqm IPC 9

364.50 Sqm

378.67 Sqm IPC 8

373.01 Cum IPC 8

2861.78 kg IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 269 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 17
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 450.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 190.70 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 94.69 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 36.36 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 29.57 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in superstructure in perfect line level finish
2.2 59.84 12,000.00
including wetting the bricks, racking the joints and
curing the work for at least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. Cum 3,000.00

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 32.12 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 270 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 17
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 4.47 10,000.00
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 61.72 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 10.316605 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 40.17 Sqm 500.00 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 277.95 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 192.93 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

6 Roofing Work

Contractor: Prepared By: Checked By: Approved By:


Page 271 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 17
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

6.1 0.5mm colour CGI sheet roofing including fixing in


proper shape & size with all necessary nails, screws,
bolts & nuts washers, J & L hooks etc as per drawing 395.85 Sqm 1000.00 Sqm
& instruction all complete.

6.2 0.50mm colour Ridge on roof including fixing in proper


shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 26.30 Rm 1000.00 Rm
instruction all complete.

6.3 0.50mm colour sheet for fixing in gable wall proper


shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 26.55 Sqm 1200.00 Sqm
instruction all complete.

7 Door,window & wooden works

Well Seasoned Sal wood chaukhats for


fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 0.99 Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
8 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 271.44 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


including sand filling in joints, leveling, ramming etc.
8.4 all complete 400.66 Sqm 600.00 Sqm

Sand filling in flooring including supply of filling


8.5 materials, watering, ramming etc. all complete 24.25 Cum 1,000.00 Cum

8.7 3 mm thick cement sand punning on floor, skriting,


dado etc, including mixing laying and rubbing with
steel trowel to a hard, smooth and shining surface 336.63 Sqm 150.00 Sqm
and curing all complete.

9 Plastering Work

Contractor: Prepared By: Checked By: Approved By:


Page 272 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 17
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

12.5mm thick cement sand palster in 1:3 ratio on


9.1 ceiling Plaster Sqm 250.00 Sqm

12.5mm thick cement sand palster in 1:4 ratio on


9.2 External wall plaster 364.50 Sqm 250.00 Sqm

20 mm thick cement sand palster in 1:4 ratio on


9.3 internal wall plaster 378.67 Sqm 300.00 Sqm

11.0 Water Proofing Works


Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 373.01 Sqm 250.00 Sqm

12.0 Steel and Iron Works


M.S. Black Pipe roof truss & purlin with I.S. or B.S.
12.6 section including jointing, fixing, 2861.78 Kg 125.00 Kg

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 273 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

2,250.00

14,302.12

4,734.50

4,545.00

354,840.00

718,070.85

256,935.90

Contractor: Prepared By: Checked By: Approved By:


Page 274 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

44,698.72

740,683.50

82,532.84

20,085.75

138,975.00

96,462.50

Contractor: Prepared By: Checked By: Approved By:


Page 275 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

395,850.00

26,300.00

31,863.00

178,200.00

135,720.00

240,397.50

24,246.00

50,494.50

Contractor: Prepared By: Checked By: Approved By:


Page 276 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

91,125.00

113,601.15

93,251.25

357,722.26

-
4,217,887.34

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban
277 of Development
593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 17
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous 450.00
Earthwork in excavation in
1.2
hard/boulder mix soils
Isolated Footing F1 16 1.65 1.65 1.650 71.87
Isolated Footing F2 5 1.45 1.45 1.600 16.82
Trench Along Portion 1-1 & 3-3 2 15 0.75 1.050 23.63
Trench Along Portion 2-2 1 16 0.75 1.050 12.60
Trench Along A-A,G-G 2 9 0.75 1.050 14.18
Trench Along B-B,C-C,D-D,E-E,F-F 5 9.2 0.75 1.050 36.23
Secondary beams 1 22.4 0.45 1.050 10.58
2 2.66 0.45 1.050 2.51
Earth work for steps 1 24.3 0.23 0.150 0.84
2 8 0.60 0.150 1.44
Total 190.70

This Bill 1.31

Previous 189.39
Earth filling including supply of
1.3
filling materials.
Previous 94.69
Earth filling in 150 mm thick layer,
watering, ramming including supply
1.4
of filling materials within 6 km
distance.
Previous 36.36
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous 29.57
Good Quaity Local chimney made
2.2 Brickworks in 1:4 c/s mortar in
super structure
Along grid 3-3 2 5.53 0.250 3.150 8.70
Along grid 2'-2' 1 23.770 0.250 3.150 18.72
Along grid 1-1 1 21.300 0.250 3.150 16.77
Alongid A-A & G-G 2 11.100 0.250 3.150 17.48
Along B'-B' & E'-E' 2 3.000 0.250 3.150 4.73
Along D-D 1 5.550 0.250 3.150 4.37
Deduction 0.00
Door (1200x2100) -4 1.20 0.250 2.100 -2.52
Contractor: Prepared By: Checked By: Approved By:
Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban
278 of Development
593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 17
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
Window1 (1800x1200) -10 1.80 0.250 1.200 -5.40
Ventilation (1800x750) -4 1.80 0.250 0.750 -1.35
opeings -2 4 0.250 1.200 -2.40
Deduction due to 0.00
Sill -1 82.52 0.250 0.075 -1.55
-1 5.550 0.250 0.075 -0.10
lintel -1 84.32 0.250 0.150 -3.16
-1 5.550 0.250 0.150 -0.21
For steps 0.00
At Front 1 24.300 0.230 0.750 4.19
2 0.600 0.230 0.750 0.21
4 0.150 0.230 0.475 0.07
0.00
At Back 2 4.500 0.230 0.600 1.24
4 0.150 0.230 0.375 0.05
Total 59.84

This Bill 2.83


Previous 57.01

4 Plain Cement concrete work


Plain cement Concrete (PCC) in
4.1 1:3:6 ratio for foundations, flooring
and walls.
Isolated Footing F1 16 1.65 1.65 0.075 3.27
Isolated Footing F2 5 1.45 1.45 0.075 0.79
Trench Along Portion 1-1 &3-3 2 14.1 0.45 0.075 0.95
Trench Along Portion 2-2 1 15.1 0.45 0.075 0.51
Trench Along A-A,G-G 2 8.7 0.45 0.075 0.59
Trench Along B-B,C-C,D-D,E-E,F-F 5 8.6 0.45 0.075 1.45
Ground Floor 1 24.00 12.00 0.075 21.60
Deduction due to beam 0.00
-3 24.00 0.30 0.075 -1.62
-7 11.40 0.30 0.075 -1.80
PCC at base of front and back steps 1 24.30 0.23 0.075 0.42
2 4.00 0.60 0.075 0.36
0.00
For steps 0.00
At Front 1 24.30 1.20 0.075 2.19
At Back 2 4.50 1.20 0.075 0.81
0.00
Contractor: Prepared By: Checked By: Approved By:
Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban
279 of Development
593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 17
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
PCC at staircase top 0.00
Front 1 24.30 0.60 0.075 1.09
4 7.75 0.30 0.075 0.70
0.00
Back 2 4.50 0.60 0.075 0.41
4 4.50 0.30 0.075 0.41
Total 32.12

This Bill 5.00

Previous 27.12
Plain Cement Concrete PCC for RCC
4.2
works(1:2:4) slab and lintels
Plain cement Concrete (PCC) for Previous 4.47
4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase Previous 61.72
Tor steel or TMT reinforcement bar
4.4
of fe 415/500 grade.
Previous 10.317
5 Formwork
Formwork, shuttering, centering
with 19mm thick waterproof ply for
5.1
beam with steel pipe propping. Sill
lintel
Previous 40.17
Formwork, shuttering, centering
5.3 with 19mm thick waterproof ply for
beam with steel pipe propping.
Fdtn Beam
Previous 277.95
Formwork, shuttering, centering with
5.4
19mm thick waterproof ply for column,
Previous 192.93

6 Roofing Work
6.1 0.5mm colour CGI sheet roofing including
fixing in proper shape & size with all
necessary nails, screws, bolts & nuts
washers, J & L hooks etc as per drawing
& instruction all complete.

Previous 395.85

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban
280 of Development
593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 17
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
6.2 0.50mm colour Ridge on roof including
fixing in proper shape & size with all
necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete.
Previous 26.30
6.3 0.50mm colour sheet for fixing in gable
wall proper shape & size with all
necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete.
Previous 26.55

7 Door,window & wooden works


Well Seasoned Sal wood
7.3 chaukhats for fixed/openable
door/windows.
Previous 0.99
8 Flooring work
38mm thick (1:2:4) P.C.C. for
flooring with approved quality of
8.1 O.P. cement & sand and crushed
stone aggregate .
Previous 271.44
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming
etc. all complete
Isolated Footing F1 16 1.65 1.65 43.56
Isolated Footing F2 5 1.45 1.45 10.51
Trench Along Portion 1-1 &2-2 2 21.3 0.45 19.17
Trench Along Portion 3-3 1 21.8 0.45 9.81
Trench Along A-A,G-G 2 11.1 0.45 9.99
Trench Along B-B,C-C,D-D,E-E,F-F 5 11.2 0.45 25.20
Ground Floor 1 24.00 12.00 288.00
Deduction due to beam 0.00
-3 24.00 0.30 -21.60
-7 11.40 0.30 -23.94
for steps
At front 1 24.30 1.20 29.16
At Back 2 4.50 1.20 10.80
Total 400.66

This Bill 19.79

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban
281 of Development
593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 17
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m

Previous 380.87

Sand filling in flooring including


8.5 supply of filling materials, watering,
ramming etc. all complete
Previous 24.25
3 mm thick cement sand punning
on floor, skriting, dado etc,
including mixing laying and rubbing
8.7
with steel trowel to a hard, smooth
and shining surface and curing all
complete.
Previous 271.44
For Steps at front
1 24.3 0.75 18.23
4 7.75 0.3 9.30
4 7.75 0.15 4.65
2 7.75 0.45 6.98
1 9.3 0.75 6.98
2 0.6 0.75 0.90
At Back
2 4.5 0.6 5.40
4 4.5 0.3 5.40
4 4.5 0.15 2.70
2 4.5 0.44 3.96
1 0.6 0.7 0.42
1 0.3 0.55 0.17
1 0.3 0.4 0.12
This Bill 65.19

Total 336.63

12.5mm thick cement sand palster in


9.2 1:4 ratio on External wall plaster
Previous 299.31
For Steps at front
1 24.3 0.75 18.23
4 7.75 0.3 9.30
4 7.75 0.15 4.65
2 7.75 0.45 6.98
1 9.3 0.75 6.98
Contractor: Prepared By: Checked By: Approved By:
Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban
282 of Development
593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 17
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
2 0.6 0.75 0.90
0.00
At Back 0.00
2 4.5 0.6 5.40
4 4.5 0.3 5.40
4 4.5 0.15 2.70
2 4.5 0.44 3.96
1 0.6 0.7 0.42
1 0.3 0.55 0.17
1 0.3 0.4 0.12
This Bill 65.19

Total 364.50

20 mm thick cement sand palster in 1:4


9.3 ratio on internal wall plaster

Internal Wall Previous 378.67


11 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment

Previous 373.01
12 Steel and Iron Works

12.6 M.S. Black Pipe roof truss & purlin with I.S.
or B.S. section including jointing, fixing,

Previous 2861.78

Contractor: Prepared By: Checked By: Approved By:


n Page 283 of 593

F/Y:- 2075/076

Unit Remarks

Sqm IPC 8

Cum

Cum IPC 9

Cum IPC 8

Cum IPC 8

Cum IPC 8

Cum IPC 8

Contractor: Prepared By: Checked By: Approved By:


n Page 284 of 593

F/Y:- 2075/076

Unit Remarks

Cum

Cum IPC 9
Cum

Contractor: Prepared By: Checked By: Approved By:


n Page 285 of 593

F/Y:- 2075/076

Unit Remarks

Cum

Cum IPC 9

Cum IPC 8

Cum IPC 8

Cum IPC 8

MT IPC 8

Sqm IPC 8

Sqm IPC 8

Sqm IPC 8

Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


n Page 286 of 593

F/Y:- 2075/076

Unit Remarks

Rm IPC 8

Sqm IPC 8

Cum IPC 8

Sqm

Sqm

Sqm IPC 9

Contractor: Prepared By: Checked By: Approved By:


n Page 287 of 593

F/Y:- 2075/076

Unit Remarks

Sqm IPC 8

Sqm IPC 8

Sqm

Sqm IPC 9

Sqm

Sqm

Contractor: Prepared By: Checked By: Approved By:


n Page 288 of 593

F/Y:- 2075/076

Unit Remarks

Sqm IPC 9

Sqm

Sqm IPC 8

Cum IPC 8

kg IPC 8

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department ofPage
Urban Development
289 of 593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 18
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 450.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 190.70 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 94.47 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 36.36 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 24.36 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in superstructure in perfect line level finish
2.2 59.84 12,000.00
including wetting the bricks, racking the joints and
curing the work for at least 7 days all complete.

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 31.34 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 4.47 10,000.00
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department ofPage
Urban Development
290 of 593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 18
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 61.72 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 10.3166051 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 40.17 Sqm 500.00 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 277.95 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 192.93 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
6 Roofing Work
6.1 0.5mm colour CGI sheet roofing including fixing in
proper shape & size with all necessary nails, screws,
bolts & nuts washers, J & L hooks etc as per drawing 395.85 Sqm 1000.00 Sqm
& instruction all complete.
6.2 0.50mm colour Ridge on roof including fixing in proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 26.30 Rm 1000.00 Rm
instruction all complete.
6.3 0.50mm colour sheet for fixing in gable wall proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 26.55 Sqm 1200.00 Sqm
instruction all complete.
7 Door,window & wooden works

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department ofPage
Urban Development
291 of 593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 18
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Well Seasoned Sal wood chaukhats for


fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 0.99 Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
8 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 271.44 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 400.66 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 24.25 Cum 1,000.00 Cum
8.7 3 mm thick cement sand punning on floor, skriting,
dado etc, including mixing laying and rubbing with
steel trowel to a hard, smooth and shining surface and 336.63 Sqm 150.00 Sqm
curing all complete.
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster 299.31 Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 378.67 Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 373.01 Sqm 250.00 Sqm

12.0 Steel and Iron Works


M.S. Black Pipe roof truss & purlin with I.S. or B.S.
12.6 section including jointing, fixing, 2861.78 kg 125.00 Kg

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


uction Page 292 of 593

F/Y:- 2075/076

Amount Remarks
Rs

2,250.00

14,302.12

4,723.50

4,545.00

292,320.00

718,070.85

250,702.50

44,698.72

Contractor: Prepared By: Checked By: Approved By:


uction Page 293 of 593

F/Y:- 2075/076

Amount Remarks
Rs

740,683.50

82,532.84

20,085.75

138,975.00

96,462.50

395,850.00

26,300.00

31,863.00

Contractor: Prepared By: Checked By: Approved By:


uction Page 294 of 593

F/Y:- 2075/076

Amount Remarks
Rs

178,200.00

135,720.00

240,397.50

24,246.00

50,494.50

-
-

74,827.50

113,601.15
-
93,251.25
-
-
357,722.26
-
-
4,132,825.44

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Page of
295Urban
of 593Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 18
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in hard/boulder
1.2
mix soils
Isolated Footing F1 16 1.65 1.65 1.650
Isolated Footing F2 5 1.45 1.45 1.600
Trench Along Portion 1-1 & 3-3 2 15 0.75 1.050
Trench Along Portion 2-2 1 16 0.75 1.050
Trench Along A-A,G-G 2 9 0.75 1.050
Trench Along B-B,C-C,D-D,E-E,F-F 5 9.2 0.75 1.050
Secondary beam 1 22.4 0.45 1.050
2 2.66 0.45 1.050
Previous

Earth work for steps 1 24.3 0.23 0.150


2 8 0.60 0.150
This bill

Total
Earth filling including supply of filling
1.3
materials.
Previous
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to ground
floor .
Previous
Good Quaity Local chimney made
2.2 Brickworks in 1:4 c/s mortar in super
structure
Previous
For steps
At Front 1 24.300 0.230 0.750
2 0.600 0.230 0.750
4 0.150 0.230 0.475

At Back 2 4.500 0.230 0.600


4 0.150 0.230 0.375

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Page of
296Urban
of 593Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 18
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
This Bill

Total
4 Plain Cement concrete work
Plain cement Concrete (PCC) in 1:3:6 ratio
4.1
for foundations, flooring and walls.
Previous
For steps
At Front 1 24.30 1.20 0.075
At Back 2 4.50 1.20 0.075

PCC at staircase top


Front 1 24.30 0.60 0.075
4 7.75 0.30 0.075

Back 2 4.50 0.60 0.075


4 4.50 0.30 0.075
This Bill

Total

Plain Cement Concrete PCC for RCC


4.2
works(1:2:4) slab and lintels
Plain cement Concrete (PCC) for RCC Previous
4.3 works (1:1.5:3) for column, Beam, Slab &
Staircase F1-Footing
Previous
Tor steel or TMT reinforcement bar of fe
4.4
415/500 grade.
Isolated footing,
Previous
5 Formwork
Formwork, shuttering, centering with
5.1 19mm thick waterproof ply for beam with
steel pipe propping. Sill lintel
Previous
Formwork, shuttering, centering with
5.3 19mm thick waterproof ply for beam with
steel pipe propping.
Previous
Formwork, shuttering, centering with 19mm
5.4
thick waterproof ply for column,
Previous
6 Roofing Work

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Page of
297Urban
of 593Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 18
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
6.1 0.5mm colour CGI sheet roofing including fixing
in proper shape & size with all necessary nails,
screws, bolts & nuts washers, J & L hooks etc as
per drawing & instruction all complete.

Previous
6.2 0.50mm colour Ridge on roof including fixing in
proper shape & size with all necessary rails,
screws, bolts & nuts washers, J & L hocks etc as
per drawing & instruction all complete.

Previous
6.3 0.50mm colour sheet for fixing in gable wall
proper shape & size with all necessary rails,
screws, bolts & nuts washers, J & L hocks etc as
per drawing & instruction all complete.
In Gable wall 12.35 2.15
1
Previous
Well Seasoned Sal wood chaukhats for
7.3
fixed/openable door/windows.
Previous
8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with
8.1 approved quality of O.P. cement & sand
and crushed stone aggregate .
Previous
Flat dry brick soling on flat in foundation
8.4 and floor including sand filling in joints,
leveling, ramming etc. all complete
Previous
for steps
At front 1 24.30 1.20
At Back 2 4.50 1.20
This Bill

Total

Sand filling in flooring including supply of


8.5 filling materials, watering, ramming etc.
all complete
3 mm thick cement sand punning on Previous
floor, skriting, dado etc, including mixing
laying and rubbing with steel trowel to a
8.7 hard, smooth and shining surface and
curing all complete.
Previous

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Page of
298Urban
of 593Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 18
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
For Steps at front
1 24.3 0.75
4 7.75 0.3
4 7.75 0.15
2 7.75 0.45
1 9.3 0.75
2 0.6 0.75

At Back
2 4.5 0.6
4 4.5 0.3
4 4.5 0.15
2 4.5 0.44
1 0.6 0.7
1 0.3 0.55
1 0.3 0.4
This Bill

Total

9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio
9.1 on ceiling Plaster

12.5mm thick cement sand palster in 1:4 ratio


9.2
on External wall plaster
Previous

For Steps at front


1 24.3 0.75
4 7.75 0.3
4 7.75 0.15
2 7.75 0.45
1 9.3 0.75
2 0.6 0.75

At Back
2 4.5 0.6
4 4.5 0.3
4 4.5 0.15
2 4.5 0.44
1 0.6 0.7

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Page of
299Urban
of 593Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 18
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
1 0.3 0.55
1 0.3 0.4
This Bill

Total

20 mm thick cement sand palster in 1:4 ratio


9.3 on internal wall plaster

Previous
11 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment

Previous
12 Steel and Iron Works

12.6 M.S. Black Pipe roof truss & purlin with I.S. or B.S.
section including jointing, fixing,
Previous

Contractor: Prepared By: Checked By: Approved By:


ruction Page 300 of 593

F/Y:- 2075/076

Quantity Unit Remarks

450.00 Sqm IPC 8

71.87
16.82
23.63
12.60
14.18
36.23
10.58
2.51
188.42 Cum IPC 8

0.84
1.44
2.28 Cum IPC 8

190.70 Cum

94.47 Cum IPC 8

36.36 Cum IPC 8

24.36 Cum IPC 8

54.08 Cum IPC 8


0.00
4.19
0.21
0.07
0.00
1.24
0.05

Contractor: Prepared By: Checked By: Approved By:


ruction Page 301 of 593

F/Y:- 2075/076

Quantity Unit Remarks

5.76 Cum IPC 9

59.84 Cum

25.74 Cum
0.00
2.19
0.81
0.00
0.00
1.09
0.70
0.00
0.41
0.41
5.60 Cum IPC 9

31.34 Cum

4.47 Cum IPC 8

61.72 Cum IPC 8

10.317 MT IPC 8

40.17 Sqm IPC 8

277.95 Sqm IPC 8

192.93 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


ruction Page 302 of 593

F/Y:- 2075/076

Quantity Unit Remarks

395.85 Sqm IPC 8

26.30 Rm IPC 8

26.55 Sqm
26.55 Sqm IPC 8

0.99 Cum IPC 8

271.44 Sqm IPC 8

360.70 Sqm

29.16
10.80
39.96 Sqm IPC 9

400.66 Sqm

24.25 Sqm IPC 8

271.44 Sqm

Contractor: Prepared By: Checked By: Approved By:


ruction Page 303 of 593

F/Y:- 2075/076

Quantity Unit Remarks

18.23
9.30
4.65
6.98
6.98
0.90

0.00
5.40
5.40
2.70
3.96
0.42
0.17
0.12
65.19 Sqm IPC 9

336.63 Sqm

299.31 Sqm

0.00
18.23
9.30
4.65
6.98
6.98
0.90
0.00
0.00
5.40
5.40
2.70
3.96
0.42

Contractor: Prepared By: Checked By: Approved By:


ruction Page 304 of 593

F/Y:- 2075/076

Quantity Unit Remarks

0.17
0.12
65.19 Sqm IPC 9

364.50 Sqm

378.67 Sqm IPC 8

373.01 Cum IPC 8

2861.78 kg IPC 8

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban Development & Building Construction
305 of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 19
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 450.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 190.70 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 95.07 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 36.36 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 26.91 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in superstructure in perfect line level finish
2.2 59.84 12,000.00
including wetting the bricks, racking the joints and
curing the work for at least 7 days all complete.

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 28.07 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 4.47 10,000.00
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 61.72 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban Development & Building Construction
306 of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 19
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 10.316605 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 40.17 Sqm 500.00 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel

Formwork, shuttering, centering with 19mm thick


5.3 277.95 Sqm 500.00 Sqm
waterproof ply for beam with steel pipe propping.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 192.93 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

6 Roofing Work
6.1 0.5mm colour CGI sheet roofing including fixing in
proper shape & size with all necessary nails, screws,
bolts & nuts washers, J & L hooks etc as per drawing 395.85 Sqm 1,000.00 Sqm
& instruction all complete.
6.2 0.50mm colour Ridge on roof including fixing in proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 26.30 Rm 1,000.00 Rm
instruction all complete.
6.3 0.50mm colour sheet for fixing in gable wall proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 26.55 Sqm 1,200.00 Sqm
instruction all complete.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 0.99 Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
8 Flooring work

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban Development & Building Construction
307 of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 19
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 271.44 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 400.66 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 24.25 Cum 1,000.00 Cum
3 mm thick cement sand punning on floor, skriting,
dado etc, including mixing laying and rubbing with
8.7 steel trowel to a hard, smooth and shining surface 336.63 Sqm 150.00 Sqm
and curing all complete.
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster 364.50 Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 378.67 Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 373.01 Sqm 250.00 Sqm
12 Steel and Iron Works
M.S. Black Pipe roof truss & purpin with I.S. or B.S.
section including jointing, fixing, erection and primer
12.6 painting with all necessary M.S. Bed Plates, Shoe 2861.78 kg 125.00 kg
angles anchor bolts leas sheeting or cement grouting
as per drw

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 308 of 593

F/Y:- 2075/076

Amount Remarks
Rs

2,250.00

14,302.13

4,753.50

4,545.00

322,920.00

718,070.85

224,566.50

44,698.73

740,683.50

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 309 of 593

F/Y:- 2075/076

Amount Remarks
Rs

82,532.84

20,085.75

138,975.00

96,462.50

395,850.00

26,300.00

31,863.00

178,200.00

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 310 of 593

F/Y:- 2075/076

Amount Remarks
Rs

135,720.00

240,397.50

24,246.00

50,494.50

91,125.00

113,601.15

93,251.25

357,722.26

4,153,616.96

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Pageof311
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 19
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Isolated Footing F1 16 1.65 1.65 1.650
Isolated Footing F2 5 1.45 1.45 1.600
Trench Along Portion 1-1 & 3-3 2 15 0.75 1.050
Trench Along Portion 2-2 1 16 0.75 1.050
Trench Along A-A,G-G 2 9 0.75 1.050
Trench Along B-B,C-C,D-D,E-E,F-F 5 9.2 0.75 1.050
Secondary beam 1 22.4 0.45 1.050
2 2.66 0.45 1.050

Earth work for steps 1 24.3 0.23 0.150


2 8 0.60 0.150
Total

This Bill

Previous

Earth filling including supply of


1.3
filling materials.
Previous
Earth filling in 150 mm thick layer,
watering, ramming including supply
1.4
of filling materials within 6 km
distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
Good Quaity Local chimney made
2.2 Brickworks in 1:4 c/s mortar in
super structure
Along grid 3-3 2 5.53 0.250 3.150
Along grid 2'-2' 1 23.770 0.250 3.150

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Pageof312
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 19
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Along grid 1-1 1 21.300 0.250 3.150
Alongid A-A & G-G 2 11.100 0.250 3.150
Along B'-B' & E'-E' 2 3.000 0.250 3.150
Along D-D 1 5.550 0.250 3.150
Deduction
Door (1200x2100) -4 1.20 0.250 2.100
Window1 (1800x1200) -10 1.80 0.250 1.200
Ventilation (1800x750) -4 1.80 0.250 0.750
opeings -2 4 0.250 1.200
Deduction due to
Sill -1 82.52 0.250 0.075
-1 5.550 0.250 0.075
lintel -1 84.32 0.250 0.150
-1 5.550 0.250 0.150
For steps
At Front 1 24.300 0.230 0.750
2 0.600 0.230 0.750
4 0.150 0.230 0.475

At Back 2 4.500 0.230 0.600


4 0.150 0.230 0.375
Total

This Bill

Previous
4 Plain Cement concrete work
Plain cement Concrete (PCC) in
4.1 1:3:6 ratio for foundations, flooring
and walls.
Isolated Footing F2 5 1.45 1.45 0.075
Trench Along Portion 1-1 &3-3 2 14.1 0.45 0.075
Trench Along Portion 2-2 1 15.1 0.45 0.075
Trench Along A-A,G-G 2 8.7 0.45 0.075
Trench Along B-B,C-C,D-D,E-E,F-F 5 8.6 0.45 0.075
Ground Floor 1 24.00 12.00 0.075
Deduction due to beam
-3 24.00 0.30 0.075
-7 11.40 0.30 0.075
For steps

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Pageof313
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 19
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
At Front 1 24.30 1.20 0.075
At Back 2 4.50 1.20 0.075

PCC at staircase top


Front 1 24.30 0.60 0.075
4 7.75 0.30 0.075

Back 2 4.50 0.60 0.075


4 4.50 0.30 0.075

Total

This Bill

Previous

Plain Cement Concrete PCC for RCC


4.2
works(1:2:4) slab and lintels
Plain cement Concrete (PCC) for Previous
4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase Previous
Tor steel or TMT reinforcement bar
4.4
of fe 415/500 grade.
Previous
5 Formwork
Formwork, shuttering, centering
with 19mm thick waterproof ply for
5.1
beam with steel pipe propping. Sill
lintel
Previous
Formwork, shuttering, centering
5.3 with 19mm thick waterproof ply for
beam with steel pipe propping.
Previous
Formwork, shuttering, centering with
5.4
19mm thick waterproof ply for column,
Previous
6 Roofing Work

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Pageof314
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 19
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
6.1 0.5mm colour CGI sheet roofing including
fixing in proper shape & size with all
necessary nails, screws, bolts & nuts
washers, J & L hooks etc as per drawing
& instruction all complete.
Previous
6.2 0.50mm colour Ridge on roof including
fixing in proper shape & size with all
necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete.
Previous
6.3 0.50mm colour sheet for fixing in gable
wall proper shape & size with all
necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete. In Gable wall 12.35 2.15
1
Previous
7 Door,window & wooden works
Well Seasoned Sal wood
7.3 chaukhats for fixed/openable
door/windows. Door (1200x2100) 5.40 0.075 0.100
4
Previous

Fixing of glazed shutter in 38x75 mm thick sal


wood frame with 4mm thick plain glass fitted
including all necessary hardware fittings all
complete.
7.5
8 Flooring work
38mm thick (1:2:4) P.C.C. for
flooring with approved quality of
8.1 O.P. cement & sand and crushed
stone aggregate .
Previous
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming
etc. all complete
Isolated Footing F1 16 1.65 1.65
Isolated Footing F2 5 1.45 1.45
Trench Along Portion 1-1 &2-2 2 21.3 0.45
Trench Along Portion 3-3 1 21.8 0.45
Trench Along A-A,G-G 2 11.1 0.45
Trench Along B-B,C-C,D-D,E-E,F-F 5 11.2 0.45
Ground Floor 1 24.00 12.00

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Pageof315
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 19
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Deduction due to beam
-3 24.00 0.30
-7 11.40 0.30

for steps
At front 1 24.30 1.20
At Back 2 4.50 1.20
Total

This Bill

Previous

Sand filling in flooring including


8.5 supply of filling materials, watering,
ramming etc. all complete
3 mm thick cement sand punning Previous
on floor, skriting, dado etc,
including mixing laying and rubbing
8.7 with steel trowel to a hard, smooth
and shining surface and curing all
complete.
-2 24.00 0.23
-2 12.00 0.23

For Steps at front


1 24.3 0.75
4 7.75 0.3
4 7.75 0.15
2 7.75 0.45
1 9.3 0.75
2 0.6 0.75

At Back
2 4.5 0.6
4 4.5 0.3
4 4.5 0.15
2 4.5 0.44
1 0.6 0.7
1 0.3 0.55

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Pageof316
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 19
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
1 0.3 0.4
Total

This Bill

Previous

9 Plastering Work
12.5mm thick cement sand palster in
9.1 1:3 ratio on ceiling Plaster

12.5mm thick cement sand palster in


9.2
1:4 ratio on External wall plaster
Copping 26 0.1 3.500
Column 4 1.8 3.500
Deduction
Type D1 -4 1.2 2.100
Sides 4 5.4 0.230
Open space -2 4 1.200
sides 2 10.4 0.230
Type W1 -10 1.8 1.200
sides 10 7.8 0.230
VentillatorV1 -4 0.75 1.200
sides 4 3.15 0.230
Previous
For Steps at front
1 24.3 0.75
4 7.75 0.3
4 7.75 0.15
2 7.75 0.45
1 9.3 0.75
2 0.6 0.75

At Back
2 4.5 0.6
4 4.5 0.3
4 4.5 0.15

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Department
Pageof317
Urban Development & Building Construction
of 593
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 19
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
2 4.5 0.44
1 0.6 0.7
1 0.3 0.55
1 0.3 0.4
This Bill

Total

20 mm thick cement sand palster in 1:4


9.3
ratio on internal wall plaster
Previous
11 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment

Previous
12 Steel and Iron Works

12.6 M.S. Black Pipe roof truss & purlin with I.S.
or B.S. section including jointing, fixing,
Previous

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 318 of 593

F/Y:- 2075/076

Quantity Unit Remarks

450.00 Sqm IPC 8

71.87
16.82
23.63
12.60
14.18
36.23
10.58
2.51
0.00
0.84
1.44
190.70 Cum

0.56 Cum IPC 9

190.14 Cum IPC 8

95.07 Cum IPC 8

36.36 Cum IPC 8

26.91 Cum IPC 8

8.70
18.72

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 319 of 593

F/Y:- 2075/076

Quantity Unit Remarks

16.77
17.48
4.73
4.37
0.00
-2.52
-5.40
-1.35
-2.40
0.00
-1.55
-0.10
-3.16
-0.21

4.19
0.21
0.07
0.00
1.24
0.05
59.84 Cum

2.47 Cum IPC 9

57.37 Cum

0.79
0.95
0.51
0.59
1.45
21.60
0.00
-1.62
-1.80

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 320 of 593

F/Y:- 2075/076

Quantity Unit Remarks

2.19
0.81

0.00
1.09
0.70
0.00
0.41
0.41

28.07 Cum

0.68 Cum IPC 9

27.39 Cum

4.47 Cum IPC 8

61.72 Cum IPC 8

10.317 MT IPC 8

40.17 Sqm IPC 8

277.95 Sqm IPC 8

192.93 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 321 of 593

F/Y:- 2075/076

Quantity Unit Remarks

395.85 Sqm IPC 8

26.30 Rm IPC 8

26.55 Sqm
26.55 Sqm IPC 8

0.16
0.99 Cum IPC 8

271.44 Sqm IPC 8

43.56
10.51
19.17
9.81
9.99
25.20
288.00

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 322 of 593

F/Y:- 2075/076

Quantity Unit Remarks

0.00
-21.60
-23.94

0.00
29.16
10.80
400.66 Sqm

19.79 Sqm IPC 9

380.87 Sqm IPC 8

24.25 Sqm IPC 8

-11.04
-5.52
0.00
0.00
18.23
9.30
4.65
6.98
6.98
0.90
0.00
0.00
5.40
5.40
2.70
3.96
0.42
0.17

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 323 of 593

F/Y:- 2075/076

Quantity Unit Remarks

0.12
336.63 Sqm

65.19 Sqm IPC 9

271.44 Sqm

9.10
25.20
0.00
-10.08
4.97
-9.60
4.78
-21.60
17.94
-3.60
2.90
299.31 Sqm IPC 8

18.23
9.30
4.65
6.98
6.98
0.90

0.00

0.00
5.40
5.40
2.70

Contractor: Prepared By: Checked By: Approved By:


onstruction Page 324 of 593

F/Y:- 2075/076

Quantity Unit Remarks

3.96
0.42
0.17
0.12
65.19 Sqm IPC 9

364.50 Sqm

378.67 Sqm IPC 8

373.01 Cum IPC 8

2861.78 kg IPC 8

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban
325 of Development
593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 20
:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 450.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 190.70 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 94.47 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 60.61 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work
Good quality local chimney made Brickwork in 1:4
C/S mortar up to ground floor in perfect line level
2.1 35.14 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in superstructure in perfect line level finish
2.2 59.83 12,000.00
including wetting the bricks, racking the joints and
curing the work for at least 7 days all complete.
3 Stone Masonary Work
Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete.

4 Plain Cement concrete work


Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 31.34 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.
Plain cement concrete(PCC) for Rcc works (1:2:4) for
slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 4.47 Cum 10,000.00 Cum
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban
326 of Development
593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 20
:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 61.98 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 10.362535 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 40.17 Sqm 500.00 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel
Formwork, shuttering, centering with 19mm thick
waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 277.95 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
Formwork, shuttering, centering with 19mm thick
waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 192.93 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 0.99 Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
Fixing of glazed shutter in 38x75 mm thick sal wood
frame with 4mm thick plain glass fitted including all
7.5 necessary hardware fittings all complete. 15.17 Sqm 10,000.00 Sqm

6 Roofing Work
0.5mm colour CGI sheet roofing including fixing in
proper shape & size with all necessary nails, screws,
6.1 bolts & nuts washers, J & L hooks etc as per drawing 395.85 Sqm 1000.00 Sqm
& instruction all complete.

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
DepartmentPage
of Urban
327 of Development
593 & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 20
:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

0.50mm colour Ridge on roof including fixing in proper


shape & size with all necessary rails, screws, bolts &
6.2 nuts washers, J & L hocks etc as per drawing & 26.30 Rm 1000.00 Rm
instruction all complete.
0.50mm colour sheet for fixing in gable wall proper
shape & size with all necessary rails, screws, bolts &
6.3 nuts washers, J & L hocks etc as per drawing & 26.55 Sqm 1200.00 Sqm
instruction all complete.
8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with approved
quality of O.P. cement & sand and crushed stone
8.1 271.44 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.
Flat dry brick soling on flat in foundation and floor
8.4 including sand filling in joints, leveling, ramming etc. 400.66 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 24.25 Cum 1,000.00 Cum

3 mm thick cement sand punning on floor, skriting,


8.7 dado etc, including mixing laying and rubbing with 336.63 Sqm 150.00 Sqm
steel trowel to a hard, smooth and shining surface
and curing all complete.
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster 0.00 Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster 364.50 Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 378.67 Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 373.01 Sqm 250.00 Sqm
12 Steel and Iron Works
Supplying and fixing of different sizes M.S. angles
12.2 with primer painitng with all necessary M.S. bed kg 125.00 kg
plates, Shoe angles, Anchor Bolts sheeting
M.S. Black Pipe roof truss & purlin with I.S. or B.S.
12.6 section including jointing, fixing, 2861.78 Kg 125.00 Kg

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


struction Page 328 of 593

F/Y:- 2075/076

Amount Remarks
Rs

2,250.00

14,302.12

4,723.50

7,576.25

421,680.00

717,974.25

250,702.50

44,698.72

Contractor: Prepared By: Checked By: Approved By:


struction Page 329 of 593

F/Y:- 2075/076

Amount Remarks
Rs

743,770.50

82,900.28

20,085.75

138,975.00

96,462.50

178,200.00

151,682.00

395,850.00

Contractor: Prepared By: Checked By: Approved By:


struction Page 330 of 593

F/Y:- 2075/076

Amount Remarks
Rs

26,300.00

31,863.00

135,720.00

240,397.50

24,246.00

50,494.50

91,125.00

113,601.15

93,251.25
-

357,722.26
-
4,436,554.03

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Page 331 of 593
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 20
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Isolated Footing F1 16 1.65 1.65 1.650
Isolated Footing F2 5 1.45 1.45 1.600
Trench Along Portion 1-1 & 3-3 2 15 0.75 1.050
Trench Along Portion 2-2 1 16 0.75 1.050
Trench Along A-A,G-G 2 9 0.75 1.050
Trench Along B-B,C-C,D-D,E-E,F-F 5 9.2 0.75 1.050
Secondary beam 1 22.4 0.45 1.050
2 2.66 0.45 1.050

Earth work for steps 1 24.3 0.23 0.150


2 8 0.60 0.150
Total

This Bill

Previous
Earth filling including supply of
1.3
filling materials.
Earth filling in 150 mm thick layer, Previous
watering, ramming including supply
1.4
of filling materials within 6 km
distance. Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
Good Quaity Local chimney made
2.2 Brickworks in 1:4 c/s mortar in
super structure
Previous
For steps
At Front 1 24.300 0.230 0.750
2 0.600 0.230 0.750
4 0.150 0.230 0.475

At Back 2 4.500 0.230 0.600


4 0.150 0.230 0.375
This Bill

Total
4 Plain Cement concrete work

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Page 332 of 593
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 20
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Plain cement Concrete (PCC) in
4.1 1:3:6 ratio for foundations, flooring
and walls.
Previous
For steps
At Front 1 24.30 1.20 0.075
At Back 2 4.50 1.20 0.075

PCC at staircase top


Front 1 24.30 0.60 0.075
4 7.75 0.30 0.075

Back 2 4.50 0.60 0.075


4 4.50 0.30 0.075
This Bill

Total
Plain Cement Concrete PCC for RCC
4.2
works(1:2:4) slab and lintels
Previous
Plain cement Concrete (PCC) for
4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase
Previous
Tor steel or TMT reinforcement bar
4.4
of fe 415/500 grade.
Previous
5 Formwork
Formwork, shuttering, centering
with 19mm thick waterproof ply for
5.1
beam with steel pipe propping. Sill
lintel
Previous
Formwork, shuttering, centering
5.3 with 19mm thick waterproof ply for
beam with steel pipe propping.
Previous
Formwork, shuttering, centering with
5.4
19mm thick waterproof ply for column,
Previous
6 Roofing Work
6.1 0.5mm colour CGI sheet roofing including
fixing in proper shape & size with all
necessary nails, screws, bolts & nuts
washers, J & L hooks etc as per drawing
& instruction all complete.
Previous

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Page 333 of 593
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 20
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
6.2 0.50mm colour Ridge on roof including
fixing in proper shape & size with all
necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete.
Previous
6.3 0.50mm colour sheet for fixing in gable
wall proper shape & size with all
necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete.
Previous
7 Door,window & wooden works
Well Seasoned Sal wood
7.3 chaukhats for fixed/openable
door/windows.
Previous

Fixing of glazed shutter in 38x75 mm


thick sal wood frame with 4mm thick
plain glass fitted including all
necessary hardware fittings all
complete.
7.5
Previous
8 Flooring work
38mm thick (1:2:4) P.C.C. for
flooring with approved quality of
8.1 O.P. cement & sand and crushed
stone aggregate .
Previous
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming
etc. all complete
Previous
for steps
At front 1 24.30 1.20
At Back 2 4.50 1.20
This Bill

Total
Sand filling in flooring including
8.5 supply of filling materials, watering,
ramming etc. all complete
Previous

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Page 334 of 593
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 20
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. 3 mm thick cement
Description of sand
Work punning No.
m m m Kg / m
on floor, skriting, dado etc,
including mixing laying and rubbing
8.7 with steel trowel to a hard, smooth
and shining surface and curing all
complete.
Previous
For Steps at front
1 24.3 0.75
4 7.75 0.3
4 7.75 0.15
2 7.75 0.45
1 9.3 0.75
2 0.6 0.75

At Back
2 4.5 0.6
4 4.5 0.3
4 4.5 0.15
2 4.5 0.44
1 0.6 0.7
1 0.3 0.55
1 0.3 0.4
This Bill

Total
9 Plastering Work
12.5mm thick cement sand palster in
9.1 1:3 ratio on ceiling Plaster

12.5mm thick cement sand palster in


9.2 1:4 ratio on External wall plaster
Previous

For Steps at front


1 24.3 0.75
4 7.75 0.3
4 7.75 0.15
2 7.75 0.45
1 9.3 0.75
2 0.6 0.75

At Back
2 4.5 0.6
4 4.5 0.3

Contractor: Prepared By: Checked By: Approved By:


Government of Nepal
Ministry of Urban Development
Page 335 of 593
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Kitchen Dining 20
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
4 4.5 0.15
2 4.5 0.44
1 0.6 0.7
1 0.3 0.55
1 0.3 0.4
This Bill

Total
20 mm thick cement sand palster in 1:4
9.3 ratio on internal wall plaster

Previous
11 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment

Total
12 Steel and Iron Works

12.6 M.S. Black Pipe roof truss & purlin with I.S.
or B.S. section including jointing, fixing,

Rafter (Dia 90mm 4.0 mm thick) 7 13.12 91.84 6.24


Vertical Strut (Dia 65mm 4.0 mm thick) 7 9.25 64.75 5.03
Inclined Strut (Dia 65mm 4.0 mm thick) 7 12.40 86.80 5.03
Base Beam (Dia 90mm 4.0 mm thick) 7 12.00 84.00 ` 6.24
Purlin (Dia 50 mm 4.0 mm thick) 12 26.10 313.20 3.20
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 336 of 593
nstruction

F/Y:- 2075/076

Quantity Unit Remarks

450.00 Sqm IPC 8

71.87
16.82
23.63
12.60
14.18
36.23
10.58
2.51
0.00
0.84
1.44
190.70 Cum

1.76 Cum IPC 9

188.94 Cum IPC 8

94.47 Cum IPC 8

60.61 Cum IPC 8

35.14 Cum IPC 8

54.08 Cum IPC 8


0.00
4.19
0.21
0.07
0.00
1.24
0.05
5.75 Cum IPC 9

59.83

Contractor: Prepared By: Checked By: Approved By:


Page 337 of 593
nstruction

F/Y:- 2075/076

Quantity Unit Remarks

25.74 Cum
0.00
2.19
0.81
0.00
0.00
1.09
0.70
0.00
0.41
0.41
5.60 Cum IPC 9

31.34 Cum

4.47 Cum IPC 8

61.98 Cum IPC 8

10.363 MT IPC 8

40.17 Sqm IPC 8

277.95 Sqm IPC 8

192.93 Sqm IPC 8

395.85 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 338 of 593
nstruction

F/Y:- 2075/076

Quantity Unit Remarks

26.30 Rm IPC 8

26.55 Sqm IPC 8

0.99 Cum IPC 8

15.17 Sqm IPC 8

271.44 Sqm IPC 8

360.70 Sqm
0.00
29.16
10.80
39.96 Sqm IPC 9

400.66 Sqm

24.25 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 339 of 593
nstruction

F/Y:- 2075/076

Quantity Unit Remarks

271.44 Sqm
0.00
18.23
9.30
4.65
6.98
6.98
0.90
0.00
0.00
5.40
5.40
2.70
3.96
0.42
0.17
0.12
65.19 Sqm IPC 9

336.63 Sqm

299.31 Sqm

18.23
9.30
4.65
6.98
6.98
0.90
0.00
0.00
5.40
5.40

Contractor: Prepared By: Checked By: Approved By:


Page 340 of 593
nstruction

F/Y:- 2075/076

Quantity Unit Remarks

2.70
3.96
0.42
0.17
0.12
65.19 Sqm IPC 9

364.50 Sqm

378.67 Sqm IPC 8

373.01 Cum IPC 8

573.08
325.69
436.60
524.16
1002.24
2861.78 kg IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 341 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail workshop 11
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1.0 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 432.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 197.48 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 98.73 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 51.62 Cum 125.00 Cum
m distance all complete.
2.0 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 46.82 Cum 12000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in superstructure in perfect line level finish
2.2 46.68 Cum 12000.00 Cum
including wetting the bricks, racking the joints and
curing the work for at least 7 days all complete.

3.0 Stone Masonary Work


Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. Cum 3000.00

4.0 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 9.20 Cum 8000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 342 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail workshop 11
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 8.42 Cum 10000.00 Cum
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 116.82 Cum 12000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 18.4417 MT 8000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 343 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail workshop 11
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

5.0 Formwork

Form Work Shuttering, centricn with wooden form


work for all works necessary propping, scaffolding,
61.25 Sqm 500.00 Sqm
staging,supporting inclusive of wedging and cutting
holes for utilization till the support if full unyeilding net.
5.1

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
necessary propping, scafolding, staging, supporting 336.54 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab
5.2
Formwork, shuttering, centering with 19mm thick
waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 786.27 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 333.45 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
7.0 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with Cum 180000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
8.0 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 122.65 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete Cum 1000.00 Cum
9.0 Plastering Work

Contractor: Prepared By: Checked By: Approved By:


Page 344 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail workshop 11
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

12.5mm thick cement sand palster in 1:3 ratio on


9.1 ceiling Plaster Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 373.01 Sqm 250.00 Sqm
12.0 Steel and Iron Works
M.S. Black Pipe roof truss & purlin with I.S. or B.S. section
12.6 including jointing, fixing, 3305.97 Kg 125.00 Kg

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 345 of 593

truction

F/Y:- 2075/076

Amount Remarks
Rs

2,160.00

14,810.87

4,936.50

6,452.50

561,840.00

560,114.40

73,592.40

Contractor: Prepared By: Checked By: Approved By:


Page 346 of 593

truction

F/Y:- 2075/076

Amount Remarks
Rs

84,206.25

1,401,849.04

147,533.72

Contractor: Prepared By: Checked By: Approved By:


Page 347 of 593

truction

F/Y:- 2075/076

Amount Remarks
Rs
-

30,622.50

168,272.38

393,135.60

166,725.00

73,592.40

-
-

Contractor: Prepared By: Checked By: Approved By:


Page 348 of 593

truction

F/Y:- 2075/076

Amount Remarks
Rs

-
-
93,251.25

413,246.42

4,196,341.22

Contractor: Prepared By: Checked By: Approved By:


Page 349 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Workshop 11


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Previous
Earth filling including supply of filling
1.3
materials.
Previous
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous

Good Quaity Local chimney made


2.2 Brickworks in 1:4 c/s mortar in super
structure Ground floor wall
Total
Plain cement Concrete (PCC) in 1:3:6
4.1 ratio for foundations, flooring and
walls.
Previous
Plain Cement Concrete PCC for RCC
4.2
works(1:2:4) slab and lintels
Previous
Plain cement Concrete (PCC) for RCC
4.3 works (1:1.5:3) for column, Beam,
Slab & Staircase
Previous
Tor steel or TMT reinforcement bar of
4.4
fe 415/500 grade.
Previous
5 Formwork
Form Work Shuttering, centricn with wooden
form work for all works necessary propping,
scaffolding, staging,supporting inclusive of
5.1 wedging and cutting holes for utilization till
the support if full unyeilding net.
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 350 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Workshop 11


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Form work , shuttering, centering with
19mm thick water proof ply board and
steel post for all works necessary
propping, scafolding, staging, supporting
inclusive of wedging and cutting holes for
utilization till the support if fully
5.2
unyeilding net . Slab
Previous
Formwork, shuttering, centering with
5.3 19mm thick waterproof ply for beam
with steel pipe propping.
Previous
Formwork, shuttering, centering with
5.4 19mm thick waterproof ply for
column. Pcc In foundation
Previous
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming etc.
all complete
Previous
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1
chemical for anti termites treatment
Previous

12 Steel and Iron Works


M.S. Black Pipe roof truss & purlin with I.S. or
B.S. section including jointing, fixing,
12.6

Rafter (Dia 65mm 4.0 mm thick) 6 8.335 50.01 5.55


6 6.405 38.43 5.55
Vertical Strut (Dia 40mm 4.0 mm thick) 6 2.291 13.746 4.12
12 1.663 19.956 4.12
12 1.195 14.34 4.12
12 0.732 8.784 4.12
12 0.274 3.288 4.12
Inclined Strut (Dia 40mm 4.0 mm thick) 12 2.724 32.688 4.12
12 1.897 22.764 4.12
12 1.522 18.264 4.12
12 1.188 14.256 4.12

Contractor: Prepared By: Checked By: Approved By:


Page 351 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Workshop 11


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Base Beam (Dia 65mm 4.0 mm thick) 6 12.55 75.3 ` 5.55
Purlin (Dia 65 mm 4.0 mm thick) 14 23 322 5.55
Total

Contractor: Prepared By: Checked By: Approved By:


Page 352 of 593

onstruction

F/Y:- 2075/076

Quantity Unit Remarks

432.00 Sqm IPC 8

197.48 Cum IPC 8

98.73 Cum IPC 8

51.62 Cum IPC 8

46.82 Cum IPC 8

46.68 Cum IPC 8

9.20 Cum IPC 8

8.42 Cum IPC 8

116.82 Cum IPC 8

18.442 MT IPC 8

61.245 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 353 of 593

onstruction

F/Y:- 2075/076

Quantity Unit Remarks

336.54 sqm IPC 8

786.27 Sqm IPC 8

333.45 Sqm IPC 8

122.65 Sqm IPC 8

373.01 sqm IPC 8

277.5555
213.2865
56.63352
82.21872
59.0808
36.19008
13.54656
134.67456
93.78768
75.24768
58.73472
0

Contractor: Prepared By: Checked By: Approved By:


Page 354 of 593

onstruction

F/Y:- 2075/076

Quantity Unit Remarks

417.915
1787.1
3,305.97 kg IPC 9

Contractor: Prepared By: Checked By: Approved By:


Page 355 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
on of Central Jail (Phase- II) Nuwakot, Jail workshop 12
ite:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling

Site preparation work with cleaning and


1.1 disposal of debrises, uprooting roots, solid 432.00 Sqm 5.00 Sqm
wastes etc. all complete as per instruction.

Earthwork in excavation in hard/boulder mix


1.2 soils in foundation including 10m hauling 197.48 Cum 75.00 Cum
distance and 1.5 m. lift all complete.

Earth filling in 150/150 mm thick layer,


1.3 watering, ramming including supply of filling 70.21 Cum 125.00 Cum
materials within 10 m distance all complete.

Earth filling without supply of filling materials


1.4 all complete. 98.73 Cum 50.00 Cum

2 Brick Masonary work

Good quality local chimney made Brickwork


in 1:4 C/S mortar up to ground floor in perfect
2.1 line level finish including wetting the bricks, 35.85 Cum 12,000.00 Cum
racking the joints and curing the work for at
least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and floor
3.2 including sand filling in joints, leveling, Cum 3,000.00
watering etc. all complete.
4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio


for foundations, flooring and walls with
approved quality of cement and sand and
4.1 9.20 Cum 8,000.00 Cum
crushed stone aggregate including mixing,
laying using mixture & Vibrator, curing etc all
complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 356 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
on of Central Jail (Phase- II) Nuwakot, Jail workshop 12
ite:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) for RCC works


(1:1.5:3) for slab/lintels with approved quality
of cement and sand and crushed stone
4.3 117.03 Cum 12,000.00 Cum
aggregate including mixing, laying using
mixture & Vibrator, curing etc all complete in
approval of site engineer.

Tor steel or TMT reinforcement bar of fe


415/500 grade including straightening,
4.4 cleaning, cutting, binding & fixing in position 22.179 MT 8,000.00 MT
with annealed tying binding wire as per
drawing, design & instruction all complete.

5 Formwork

Form work , shuttering, centering with 19mm


thick water proof ply board and steel post for
all works necessary propping, scafolding,
336.54 Sqm 500.00 Sqm
staging, supporting inclusive of wedging and
cutting holes for utilization till the support if
fully unyeilding net . Slab
5.2
Formwork, shuttering, centering with 19mm
thick waterproof ply for beam with steel pipe
propping, scaffolding, staging, supporting
5.3 786.27 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for
utilization till the support if fully unyielding
net.

Formwork, shuttering, centering with 19mm


thick waterproof ply for column, necessary
propping, scaffolding, staging, supporting
5.4 335.13 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for
utilization till the support if fully unyielding
net.
7 Door,window & wooden works

Contractor: Prepared By: Checked By: Approved By:


Page 357 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
on of Central Jail (Phase- II) Nuwakot, Jail workshop 12
ite:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Well Seasoned Sal wood chaukhats for


fixed/openable door/windows with good finish
7.1 of approved quality including fixing in position Cum 180,000.00 Cum
with necessary M.S. holdfasts as per drawing
and instructions all complete.

8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with
approved quality of O.P. cement & sand and
8.1 crushed stone aggregate including mixing, Sqm 500.00 Sqm
laying, punning, rubbing in hard surface
curing etc all complete.
Flat dry brick soling on flat in foundation and
8.4 floor including sand filling in joints, leveling, 122.65 Sqm 600.00 Sqm
ramming etc. all complete
Sand filling in flooring including supply of
8.5 filling materials, watering, ramming etc. all Cum 1,000.00 Cum
complete
9 Plastering Work
12.5mm thick cement sand palster in 1:3
9.1 ratio on ceiling Plaster Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4
9.2 ratio on External wall plaster Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio
9.3 on internal wall plaster Sqm 300.00 Sqm
Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 358 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

2,160.00

14,810.88

8,776.25

4,936.50

430,200.00

73,592.40

Contractor: Prepared By: Checked By: Approved By:


Page 359 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

1,404,360.00

177,432.00

168,272.38

393,135.60

167,565.00

Contractor: Prepared By: Checked By: Approved By:


Page 360 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

73,592.40

-
2,918,833.40

Contractor: Prepared By: Checked By: Approved By:


Page 361 ofGovernment
593 of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detail Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Workshop 12


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
Previous
Earthwork in excavation in hard/boulder
1.2
mix soils
Previous
Earth filling including supply of filling
1.3
materials.
Previous
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to ground
floor .
Previous
Good Quaity Local chimney made
2.2 Brickworks in 1:4 c/s mortar in super
structure
Ground floor wall
Grid A-A,E-E,F-F 3 9.30 0.23 1.78
Grid 1-1 1 19.75 0.23 1.75
Total
4 Plain Cement concrete work
Plain cement Concrete (PCC) in 1:3:6
4.1
ratio for foundations, flooring and walls.
Previous
Plain cement Concrete (PCC) for RCC
4.3 works (1:1.5:3) for column, Beam, Slab &
Staircase
Previous

Tor steel or TMT reinforcement bar of fe


4.4
415/500 grade.
Previous
5.0 Formwork

Form work , shuttering, centering with 19mm


thick water proof ply board and steel post for
all works necessary propping, scafolding,
5.2
staging, supporting inclusive of wedging and
cutting holes for utilization till the support if
fully unyeilding net . Slab

Previous
Formwork, shuttering, centering with
19mm thick waterproof ply for beam
5.3 with steel pipe propping.
Previous
Contractor: Prepared By: Checked By: Approved By:
Page 362 ofGovernment
593 of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detail Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Workshop 12


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m

Formwork, shuttering, centering with


5.4
19mm thick waterproof ply for column.

Previous

Flat dry brick soling on flat in foundation


8.4 and floor including sand filling in joints,
leveling, ramming etc. all complete

Previous
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1 chemical for anti termites treatment

Previous

Contractor: Prepared By: Checked By: Approved By:


Page 363 of 593

F/Y:- 2075/076

Quantity Unit Remarks

432.00 Sqm

197.48 Cum

98.73 Cum

70.21 Cum

35.85 Cum

11.40
7.95
19.35 Cum

9.20 Cum

117.03 Cum

22.18 Mt

336.54 Sqm

786.27 Sqm
Contractor: Prepared By: Checked By: Approved By:
Page 364 of 593

F/Y:- 2075/076

Quantity Unit Remarks

335.13 Sqm

122.65 Sqm

373.01 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 365 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail workshop 13
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 432.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 197.48 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 98.73 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 58.51 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 34.04 Cum 12000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in superstructure in perfect line level finish
2.2 87.64 12000.00
including wetting the bricks, racking the joints and
curing the work for at least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. Cum 3000.00

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 9.20 Cum 8000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 366 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail workshop 13
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 8.42 Cum 10000.00 Cum
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 128.76 Cum 12000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 18.9604 MT 8000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 367 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail workshop 13
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

5 Formwork

Form Work Shuttering, centricn with wooden form


work for all works necessary propping, scaffolding,
61.25 Sqm 500.00 Sqm
staging,supporting inclusive of wedging and cutting
holes for utilization till the support if full unyeilding net.
5.1

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
necessary propping, scafolding, staging, supporting 336.54 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab
5.2
Formwork, shuttering, centering with 19mm thick
waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 504.58 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 333.45 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 0.75 Cum 180000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with approved
quality of O.P. cement & sand and crushed stone
8.1 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.
Flat dry brick soling on flat in foundation and floor
8.4 including sand filling in joints, leveling, ramming etc. 122.65 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete Cum 1000.00 Cum
9 Plastering Work

Contractor: Prepared By: Checked By: Approved By:


Page 368 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail workshop 13
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

12.5mm thick cement sand palster in 1:3 ratio on


9.1 ceiling Plaster Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 373.01 Sqm 250.00 Sqm
12.0 Steel and Iron Works
M.S. Black Pipe roof truss & purlin with I.S. or B.S. section
12.6 including jointing, fixing, 3305.97 Kg 125.00 Kg
Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 369 of 593

struction

F/Y:- 2075/076

Amount Remarks
Rs

2,160.00

14,810.88

4,936.50

7,313.75

408,480.00

1,051,685.58

73,592.40

Contractor: Prepared By: Checked By: Approved By:


Page 370 of 593

struction

F/Y:- 2075/076

Amount Remarks
Rs

84,206.25

1,545,163.54

151,683.47

Contractor: Prepared By: Checked By: Approved By:


Page 371 of 593

struction

F/Y:- 2075/076

Amount Remarks
Rs

30,622.50

168,272.38

252,289.20

166,725.00

135,270.00

73,592.40

Contractor: Prepared By: Checked By: Approved By:


Page 372 of 593

struction

F/Y:- 2075/076

Amount Remarks
Rs

93,251.25

413,246.42
4,677,301.51

Contractor: Prepared By: Checked By: Approved By:


Page 373 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Workshop 13


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Isolated Footing F1 3 1.85 1.85 1.65
Isolated Footing F2 21 1.65 1.65 1.60
Trench Along Portion 1-1 & 2-2 2 13.60 0.75 1.05
Trench Along Portion 3-3, 4-4 2 14.00 0.75 1.05
Trench Along A-A,F-F 2 7.60 0.75 1.05
Trench Along B-B,C-C,D-D,E-E 5 7.40 0.75 1.05
Secondary Beam 2 4.27 0.50 1.05
Previous
Earth filling including supply of filling
1.3
materials.
Previous
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous

Good Quaity Local chimney made


2.2 Brickworks in 1:4 c/s mortar in super
structure
Total
4 Plain Cement concrete work
Plain cement Concrete (PCC) in 1:3:6
4.1 ratio for foundations, flooring and
walls.
Previous Bill
Plain Cement Concrete PCC for RCC
4.2
works(1:2:4) slab and lintels
Previous Bill
Plain cement Concrete (PCC) for RCC
4.3 works (1:1.5:3) for column, Beam,
Slab & Staircase
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 374 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Workshop 13


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Tor steel or TMT reinforcement bar of
4.4
fe 415/500 grade.
Previous
5 Formwork

Form Work Shuttering, centricn with wooden


form work for all works necessary propping,
scaffolding, staging,supporting inclusive of
wedging and cutting holes for utilization till
the support if full unyeilding net.
5.1
Previous
Form work , shuttering, centering with
19mm thick water proof ply board and
steel post for all works necessary
propping, scafolding, staging, supporting
inclusive of wedging and cutting holes
for utilization till the support if fully
5.2
unyeilding net . Slab
Previous
Formwork, shuttering, centering with
5.3 19mm thick waterproof ply for beam
with steel pipe propping.
Previous

Formwork, shuttering, centering with


5.4 19mm thick waterproof ply for
column.
Previous
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
7.3
fixed/openable door/windows.
Previous
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming etc.
all complete
Previous
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1
chemical for anti termites treatment
Previous
12 Steel and Iron Works
M.S. Black Pipe roof truss & purlin with I.S. or
B.S. section including jointing, fixing,
12.6

Contractor: Prepared By: Checked By: Approved By:


Page 375 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Workshop 13


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m

Rafter (Dia 65mm 4.0 mm thick) 6 8.335 50.01 5.55


6 6.405 38.43 5.55
Vertical Strut (Dia 40mm 4.0 mm thick) 6 2.291 13.746 4.12
12 1.663 19.956 4.12
12 1.195 14.34 4.12
12 0.732 8.784 4.12
12 0.274 3.288 4.12
Inclined Strut (Dia 40mm 4.0 mm thick) 12 2.724 32.688 4.12
12 1.897 22.764 4.12
12 1.522 18.264 4.12
12 1.188 14.256 4.12

Base Beam (Dia 65mm 4.0 mm thick) 6 12.55 75.3 ` 5.55


Purlin (Dia 65 mm 4.0 mm thick) 14 23 322 5.55
Total

Contractor: Prepared By: Checked By: Approved By:


Page 376 of 593

struction

F/Y:- 2075/076

Quantity Unit Remarks

432.00 Sqm IPC 8

16.94
91.48
21.42
22.05
11.97
29.14
4.48
197.48 Cum IPC 8

98.73 Cum IPC 8

58.51 Cum IPC 8

34.04 Cum IPC 8

87.64 Cum IPC 8

9.20 Cum IPC 8

8.42 Cum IPC 8

128.76 Cum IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 377 of 593

struction

F/Y:- 2075/076

Quantity Unit Remarks

18.960 MT IPC 8

61.25 Sqm IPC 8

336.54 sqm IPC 8

504.58 Sqm IPC 8

333.45 Sqm IPC 8

0.75 Cum IPC 8

122.65 Sqm IPC 8

373.01 sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 378 of 593

struction

F/Y:- 2075/076

Quantity Unit Remarks

277.5555
213.2865
56.63352
82.21872
59.0808
36.19008
13.54656
134.67456
93.78768
75.24768
58.73472
0
0
417.915
1787.1
3,305.97 kg IPC 9

Contractor: Prepared By: Checked By: Approved By:


Page 379 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
ion of Central Jail (Phase- II) Nuwakot, Jail Toilet D 21
ite:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and
disposal of debrises, uprooting roots,
1.1 260.00 Sqm 5.00 Sqm
solid wastes etc. all complete as per
instruction.
Earthwork in excavation in hard/boulder
mix soils in foundation including 10m
1.2 100.38 Cum 75.00 Cum
hauling distance and 1.5 m. lift all
complete.
Earth filling without supply of filling
1.3 materials all complete. 50.18 Cum 50.00 Cum
Earth filling in 150 mm thick layer,
watering, ramming including supply of
1.4 filling materials within 6 km distance. 21.45 Cum 125.00 Cum

2 Brick Masonary work


Good quality local chimney made
Brickwork in 1:4 C/S mortar up to
ground floor in perfect line level finish
2.1 25.74 Cum 12,000.00 Cum
including wetting the bricks, racking the
joints and curing the work for at least 7
days all complete.

Good quality local chimney made


Brickwork in 1:4 C/S mortar in
superstructure in perfect line level finish
2.2 88.49 Cum 12,000.00 Cum
including wetting the bricks, racking the
joints and curing the work for at least 7
days all complete.
3 Stone Masonary Work
Dry stone laying in foundation and floor
3.2 including sand filling in joints, leveling, Cum 3,000.00
watering etc. all complete.
4 Plain Cement concrete work

Contractor: Prepared By: Checked By: Approved By:


Page 380 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
ion of Central Jail (Phase- II) Nuwakot, Jail Toilet D 21
ite:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) in 1:3:6


ratio for foundations, flooring and walls
with approved quality of cement and
4.1 sand and crushed stone aggregate 11.61 Cum 8,000.00 Cum
including mixing, laying using mixture &
Vibrator, curing etc all complete in
approval of site engineer.

Plain cement concrete(PCC) for Rcc


works (1:2:4) for slab/lintels with
approved quality of cement sand and
4.2 crushed stone aggregates including 1.42 Cum 10,000.00 Cum
mixing,laying,using mixture and
vibrator, curing etc all complete in
approval of site engineer.

Plain cement Concrete (PCC) for RCC


works (1:1.5:3) for slab/lintels with
approved quality of cement and sand
4.3 and crushed stone aggregate including 80.85 Cum 12,000.00 Cum
mixing, laying using mixture & Vibrator,
curing etc all complete in approval of
site engineer.

Tor steel or TMT reinforcement bar of fe


415/500 grade including straightening,
cleaning, cutting, binding & fixing in
4.4 12.5751 MT 8,000.00 MT
position with annealed tying binding
wire as per drawing, design &
instruction all complete.

5 Formwork

Form Work Shuttering, centricn with


wooden form work for all works
necessary propping, scaffolding,
5.1 15.67 Sqm 500.00 Sqm
staging,supporting inclusive of wedging
and cutting holes for utilization till the
support if full unyeilding net.

Contractor: Prepared By: Checked By: Approved By:


Page 381 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
ion of Central Jail (Phase- II) Nuwakot, Jail Toilet D 21
ite:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Form work , shuttering, centering with


19mm thick water proof ply board and
steel post for all works necessary
5.2 propping, scafolding, staging, 208.22 Sqm 500.00 Sqm
supporting inclusive of wedging and
cutting holes for utilization till the
support if fully unyeilding net . Slab

Formwork, shuttering, centering with


19mm thick waterproof ply for beam
with steel pipe propping, scaffolding,
5.3 449.86 Sqm 500.00 Sqm
staging, supporting inclusive of wedging
and cutting holes for utilization till the
support if fully unyielding net.

Formwork, shuttering, centering with


19mm thick waterproof ply for column,
necessary propping, scaffolding,
5.4 216.09 Sqm 500.00 Sqm
staging, supporting inclusive of wedging
and cutting holes for utilization till the
support if fully unyielding net.

6 Roofing Work
0.5mm colour CGI sheet roofing
including fixing in proper shape & size
with all necessary nails, screws, bolts &
6.1 nuts washers, J & L hooks etc as per 0.00 Sqm 1000.00 Sqm
drawing & instruction all complete.

0.50mm colour Ridge on roof including


fixing in proper shape & size with all
necessary rails, screws, bolts & nuts
6.2 washers, J & L hocks etc as per 0.00 Rm 1000.00 Rm
drawing & instruction all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 382 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
ion of Central Jail (Phase- II) Nuwakot, Jail Toilet D 21
ite:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

0.50mm colour sheet for fixing in gable


wall proper shape & size with all
necessary rails, screws, bolts & nuts
6.3 washers, J & L hocks etc as per 0.00 Sqm 1200.00 Sqm
drawing & instruction all complete.

7 Door,window & wooden works

Well Seasoned Sal wood chaukhats for


fixed/openable door/windows with good
finish of approved quality including
7.3 0.00 Cum 180,000.00 Cum
fixing in position with necessary M.S.
holdfasts as per drawing and
instructions all complete.

8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring
with approved quality of O.P. cement &
sand and crushed stone aggregate
8.1 78.00 Sqm 500.00 Sqm
including mixing, laying, punning,
rubbing in hard surface curing etc all
complete.
Flat dry brick soling on flat in foundation
and floor including sand filling in joints,
8.4 leveling, ramming etc. all complete 168.16 Sqm 600.00 Sqm

Sand filling in flooring including supply


8.5 of filling materials, watering, ramming 7.80 Cum 1,000.00 Cum
etc. all complete
3 mm thick cement sand punning on
floor, skriting, dado etc, including mixing
laying and rubbing with steel trowel to a
8.7 hard, smooth and shining surface and 0.00 Sqm 150.00 Sqm
curing all complete.

9 Plastering Work
12.5mm thick cement sand palster in
9.1 1:3 ratio on ceiling Plaster 256.88 Sqm 250.00 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 383 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
ion of Central Jail (Phase- II) Nuwakot, Jail Toilet D 21
ite:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

12.5mm thick cement sand palster in


9.2 1:4 ratio on External wall plaster 372.82 Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4
9.3 ratio on internal wall plaster 917.33 Sqm 300.00 Sqm
11 Water Proofing Works
Providing and applying Dustban
11.1 Premise chemical for anti termites 160.00 Sqm 250.00
treatment
12 Steel and Iron Works
M.S. Black Pipe roof truss & purlin with
12.6 I.S. or B.S. section including jointing, 2347.82 Kg 125.00
fixing,

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 384 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

1,300.00

7,528.20

2,509.00

2,680.65

308,877.00

1,061,894.25

Contractor: Prepared By: Checked By: Approved By:


Page 385 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

92,877.30

14,205.30

970,172.92

100,601.06

7,833.00

Contractor: Prepared By: Checked By: Approved By:


Page 386 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

104,108.75

224,928.95

108,045.00

Contractor: Prepared By: Checked By: Approved By:


Page 387 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

39,000.00

100,896.30

7,800.00

64,220.00

Contractor: Prepared By: Checked By: Approved By:


Page 388 of 593

uction

F/Y:- 2075/076

Amount Remarks
Rs

93,206.00

275,198.40

40,000.00

293,477.53

3,921,359.61

Contractor: Prepared By: Checked By: Approved By:


Page 389 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detail Measurement Sheet

of Central Jail (Phase- II) Nuwakot, Jail Toilet D 21


dur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Previous
Earth filling without supply of filling
1.3
materials all complete.
Previous
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
Good quality local chimney made
Brickwork in 1:4 C/S mortar up to
ground floor in perfect line level finish
2.2 including wetting the bricks, racking the
joints and curing the work for at least 7
days all complete.

Previous
4 Plain Cement concrete work
Plain cement Concrete (PCC) in 1:3:6
4.1 ratio for foundations, flooring and
walls.
Previous
Plain Cement Concrete PCC for RCC
4.2
works(1:2:4) slab and lintels
Plain cement Concrete (PCC) for RCC Previous
4.3 works (1:1.5:3) for column, Beam,
Slab & Staircase Previous
Tor steel or TMT reinforcement bar of
4.4
fe 415/500 grade.
Previous
5 Formwork
Formwork, shuttering, centering with
5.1 19mm thick waterproof ply for with
steel pipe propping.
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 390 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detail Measurement Sheet

of Central Jail (Phase- II) Nuwakot, Jail Toilet D 21


dur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Formwork, shuttering, centering with
5.2 19mm thick waterproof ply for Slab
with steel pipe propping.
Previous

Formwork, shuttering, centering with


19mm thick waterproof ply for beam
with steel pipe propping, scaffolding,
5.3
staging, supporting inclusive of
wedging and cutting holes for utilization
till the support if fully unyielding net.
Previous

Formwork, shuttering, centering with


19mm thick waterproof ply for column,
necessary propping, scaffolding,
5.4
staging, supporting inclusive of
wedging and cutting holes for utilization
till the support if fully unyielding net.

Previous

6 Roofing Work
0.5mm colour CGI sheet roofing including
fixing in proper shape & size with all
6.1 necessary nails, screws, bolts & nuts
washers, J & L hooks etc as per drawing &
instruction all complete.
Previous
0.50mm colour Ridge on roof including
fixing in proper shape & size with all
6.2 necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete.

Previous
6.3 0.50mm colour sheet for fixing in gable wall
proper shape & size with all necessary rails,
screws, bolts & nuts washers, J & L hocks
etc as per drawing & instruction all
complete.
Previous
8 Flooring work

Contractor: Prepared By: Checked By: Approved By:


Page 391 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detail Measurement Sheet

of Central Jail (Phase- II) Nuwakot, Jail Toilet D 21


dur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
38mm thick (1:2:4) P.C.C. for flooring
8.1 with approved quality of O.P. cement
& sand and crushed stone
aggregate .
Previous
Flat dry brick soling on flat in
8.4
foundation and floor including sand
filling in joints, leveling, ramming
etc. all complete
Previous
Sand filling in flooring including
8.5 supply of filling materials, watering,
ramming etc. all complete
Previous
3 mm thick cement sand punning on floor,
skriting, dado etc, including mixing laying
8.7 and rubbing with steel trowel to a hard,
smooth and shining surface and curing all
complete.
9 Plastering Work
12.5mm thick cement sand palster in 1:3
9.1
ratio on ceiling Plaster
Previous
12.5mm thick cement sand plaster in 1:4
9.2 ratio on External wall plaster
Previous
20 mm thick cement sand palster in 1:4
9.3
ratio on internal wall plaster
Previous
11 Water Proofing Works
11.1 Providing and applying Dustban Premise
chemical for anti termites treatment
Previous
12 Steel and Iron Works
12.6 M.S. Black Pipe roof truss & purlin with I.S.
or B.S. section including jointing, fixing,

Rafter (Dia 80mm 4.0 mm thick) 5 5.693 28.465 6.24


5 6.439 32.195 6.24
Vertical Strut (Dia 50mm 4.0 mm thick) 5 8.89 44.45 5.03
Inclined Strut (Dia 50mm 4.0 mm thick) 5 10.673 53.365 5.03
Base Beam (Dia 80mm 4.0 mm thick) 5 10.527 52.635 ` 6.24
Purlin (Dia 65 mm 4.0 mm thick) 12 17.25 207 5.55
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 392 of 593

tion

F/Y:- 2075/076

Quantity Unit Remarks

260.00 Sqm

100.38 Cum

50.18 Cum

21.45 Cum

25.74 Cum

88.49 Cum

11.61 Cum

1.42 Cum

80.85 Cum

12.58 mt

15.67 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 393 of 593

tion

F/Y:- 2075/076

Quantity Unit Remarks

208.22 Sqm

449.86 Sqm

216.09 Sqm

254.61 Sqm

17.40 Rm

19.81 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 394 of 593

tion

F/Y:- 2075/076

Quantity Unit Remarks

78.00 Sqm

168.16 Sqm

7.80 Cum

256.88 SQm

372.82 Sqm

917.33 SQm

160.00 SQm

177.6216
200.8968
223.5835
268.42595
328.4424
1148.85
2,347.82 kg

Contractor: Prepared By: Checked By: Approved By:


Page 395 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 22
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 260.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 100.38 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 50.18 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 21.45 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 25.74 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in Super Structure with perfect line level
2.2 0.00 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. 0.00 Cum 3,000.00 Cum

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 11.61 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 396 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 22
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 0.00 Cum 10,000.00
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 70.58 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 12.37 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 397 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 22
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting Sqm 500.00 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
5.2 necessary propping, scafolding, staging, supporting 208.22 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 987.57 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 216.09 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.1 approved quality including fixing in position with Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
8 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 90.16 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete Cum 1,000.00 Cum

Contractor: Prepared By: Checked By: Approved By:


Page 398 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 22
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

3 mm thick cement sand punning on floor, skriting,


dado etc, including mixing laying and rubbing with
8.7 steel trowel to a hard, smooth and shining surface Sqm 150.00 Cqm
and curing all complete.
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 160.00 Sqm 250.00 Sqm
Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 399 of 593

struction

F/Y:- 2075/076

Amount Remarks
Rs

1,300.00

7,528.20

2,509.00

2,680.65

308,877.00

92,877.30

Contractor: Prepared By: Checked By: Approved By:


Page 400 of 593

struction

F/Y:- 2075/076

Amount Remarks
Rs

846,960.00

98,938.08

Contractor: Prepared By: Checked By: Approved By:


Page 401 of 593

struction

F/Y:- 2075/076

Amount Remarks
Rs

104,108.75

493,783.85

108,045.00

54,096.30

Contractor: Prepared By: Checked By: Approved By:


Page 402 of 593

struction

F/Y:- 2075/076

Amount Remarks
Rs

40,000.00
2,161,704.13

Contractor: Prepared By: Checked By: Approved By:


Page 403 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detail Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 22


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils 3 1.85 1.85 1.65
Isolated Footing F1
Previous
Earth filling without supply of filling
1.3
materials all complete.
Previous
Earth filling in 150 mm thick layer,
watering, ramming including
1.4 supply of filling materials within 6
km distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
4 Plain Cement concrete work
Plain cement Concrete (PCC) in
4.1 1:3:6 ratio for foundations,
flooring and walls.
Previous
Plain cement Concrete (PCC) for
4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase
F1-Footing
Base Square Section 3 1.70 1.70 0.20
Trapezoid Portion 3 2.89 1.32 0.20
Up to Plinth 3 0.35 0.35 1.55
F2-Footing
Base Square Section 12 1.50 1.50 0.20
Trapezoid Portion 12 2.25 1.10 0.15
Up to Plinth 12 0.35 0.35 1.60
Foundation Beam
Grid 3-3 1.00 14.20 0.23 0.30
Grid 2-2 1.00 14.20 0.23 0.30
Grid 1-1 1.00 14.20 0.23 0.30
Grid A-A 1.00 9.30 0.23 0.30

Contractor: Prepared By: Checked By: Approved By:


Page 404 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detail Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 22


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Grid B-B 1.00 9.30 0.23 0.30
Grid C-C 1.00 9.30 0.23 0.30
Grid D-D 1.00 9.30 0.23 0.30
Grid E-E 1.00 9.30 0.23 0.30

Plinth or Tie Beam


Grid 3-3 1.00 14.20 0.23 0.30
Grid 2-2 1.00 14.20 0.23 0.30
Grid 1-1 1.00 14.20 0.23 0.30
Grid A-A 1.00 9.30 0.23 0.30
Grid B-B 1.00 9.30 0.23 0.30
Grid C-C 1.00 9.30 0.23 0.30
Grid D-D 1.00 9.30 0.23 0.30
Grid E-E 1.00 9.30 0.23 0.30
Secondary beam section-Bet Grid
B-B & C-C
2 4.37 0.23 0.300
6 1.35 0.23 0.300
Secondary beam section-Bet Grid
D-D & E-E
2 4.04 0.23 0.300
6 1.35 0.23 0.300
Long Secondary Beam
1 15.37 0.23 0.230
small secondary beam
2 0.89 0.23 0.230

Column up to Ground Floor Slab 15 0.35 0.35 3.505


Ground Floor slab Beam
Grid 3-3 1.00 14.20 0.23 0.30
Grid 2-2 1.00 14.20 0.23 0.30
Grid 1-1 1.00 14.20 0.23 0.30
Grid A-A 1.00 9.30 0.23 0.30
Grid B-B 1.00 9.30 0.23 0.30
Grid C-C 1.00 9.30 0.23 0.30
Grid D-D 1.00 9.30 0.23 0.30
Grid E-E 1.00 9.30 0.23 0.30
Secondary Beam 1.00 14.68 0.23 0.23
Ground Floor Slab 1 17.15 11.55 0.13
1 3.45 0.40 0.13
1 3.45 0.40 0.13

Contractor: Prepared By: Checked By: Approved By:


Page 405 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detail Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 22


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Total

This Bill

Previous
Tor steel or TMT reinforcement bar
4.4
of fe 415/500 grade.
Previous

Colunm reinforcement details


16 mm Bar
12 mm Bar
8 mm Bar

In GF slab

GF beam
16 mm Bar
12 mm Bar
8 mm Bar
This Bill

Total

5 Formwork
Formwork, shuttering, centering
5.2 with 19mm thick waterproof ply for
Slab with steel pipe propping.

Ground Floor Slab 1 17.15 11.55


1 3.45 0.40
1 3.45 0.40
Sides 2 17.15 0.13
2 11.55 0.13
2 0.40 0.13
2 0.40 0.13
Total

Contractor: Prepared By: Checked By: Approved By:


Page 406 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detail Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 22


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m

Formwork, shuttering, centering with


19mm thick waterproof ply for beam
with steel pipe propping, scaffolding,
5.3 staging, supporting inclusive of
wedging and cutting holes for
utilization till the support if fully
unyielding net.
Previous

Ground Floor slab Beam


Grid 3-3 2.00 14.20 0.30
Grid 2-2 2.00 14.20 0.30
Grid 1-1 2.00 14.20 0.30
Grid A-A 2.00 9.30 0.30
Grid B-B 2.00 9.30 0.30
Grid C-C 2.00 9.30 0.30
Grid D-D 2.00 9.30 0.30
Grid E-E 2.00 9.30 0.30
Secondary Beam 2.00 14.68 0.20

This Bill

Total

Formwork, shuttering, centering with


19mm thick waterproof ply for column,
necessary propping, scaffolding,
5.4 staging, supporting inclusive of
wedging and cutting holes for
utilization till the support if fully
unyielding net.
Previous
8 Flooring work

Contractor: Prepared By: Checked By: Approved By:


Page 407 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detail Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 22


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Flat dry brick soling on flat in
foundation and floor including sand
8.4
filling in joints, leveling, ramming
etc. all complete
Previous
11.1 Water Proofing Works
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 408 of 593

Construction
4

F/Y:- 2075/076

Quantity Unit Remarks

260.00 Sqm IPC 8

16.94
100.38 Cum IPC 8

50.18 Cum IPC 8

21.45 Cum IPC 8

25.74 Cum IPC 8

11.61 Cum IPC 8

1.73
2.29
0.56
0.00
5.40
4.46
2.35
0.00
0.97
0.97
0.97
0.64

Contractor: Prepared By: Checked By: Approved By:


Page 409 of 593

Construction
4

F/Y:- 2075/076

Quantity Unit Remarks

0.64
0.64
0.64
0.64
0.00
0.00
0.97
0.97
0.97
0.64
0.64
0.64
0.64
0.64
0.00
0.60
0.55
0.00
0.55
0.55
0.00
0.81
0.00
0.09
0.00
6.44
0.00
0.97
0.97
0.97
0.64
0.64
0.64
0.64
0.64
0.77
24.76
0.17
0.17

Contractor: Prepared By: Checked By: Approved By:


Page 410 of 593

Construction
4

F/Y:- 2075/076

Quantity Unit Remarks

70.58

34.34 IPC 9

36.24 Cum IPC 8

6.66 Mt

677.92
365.33
469.33
From BBS
2607.00
Toilet

899.70
211.26
477.96
5.71 Mt IPC 9

12.37 Mt

198.08
1.38
1.38
4.29
2.89
0.10
0.10
208.22 Sqm IPC 9

Contractor: Prepared By: Checked By: Approved By:


Page 411 of 593

Construction
4

F/Y:- 2075/076

Quantity Unit Remarks

309.41 Sqm

8.52
8.52
8.52
5.58
5.58
5.58
5.58
5.58
5.87

678.16 Sqm IPC 9

987.57 Sqm

216.09 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 412 of 593

Construction
4

F/Y:- 2075/076

Quantity Unit Remarks

90.16 Sqm IPC 8

160.00 Sqm IPC 8

Contractor: Prepared By: Checked By: Approved By:


Page 413 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 23
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 260.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 100.38 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 50.18 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 111.52 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 39.77 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in Super Structure with perfect line level
2.2 88.37 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. Cum 3,000.00 Cum

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 11.61 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 414 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 23
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 1.42 Cum 10,000.00 Cum
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 82.01 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 10.387 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 15.67 Sqm 500.00 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
5.2 necessary propping, scafolding, staging, supporting 208.22 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 442.70 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Contractor: Prepared By: Checked By: Approved By:


Page 415 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 23
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 229.32 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
6 Roofing Work
6.1 0.5mm colour CGI sheet roofing including fixing in
proper shape & size with all necessary nails, screws,
bolts & nuts washers, J & L hooks etc as per drawing Sqm 1000.00 Sqm
& instruction all complete.
6.2 0.50mm colour Ridge on roof including fixing in proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & Rm 1000.00 Rm
instruction all complete.
6.3 0.50mm colour sheet for fixing in gable wall proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & Sqm 1200.00 Sqm
instruction all complete.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.1 approved quality including fixing in position with Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
8 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 78.00 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 168.16 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 7.80 Cum 1,000.00 Cum
3 mm thick cement sand punning on floor, skriting,
dado etc, including mixing laying and rubbing with
8.7 steel trowel to a hard, smooth and shining surface Sqm 150.00 Sqm
and curing all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 416 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 23
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster 256.88 Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster 372.82 Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 917.33 Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 160.00 Sqm 250.00 Sqm
12 Steel and Iron Works
Supplying and fixing of different sizes M.S. angles
12.2 with primer painitng with all necessary M.S. bed kg 125.00 kg
plates, Shoe angles, Anchor Bolts sheeting
M.S. Black Pipe roof truss & purlin with I.S. or B.S.
12.6 section including jointing, fixing, Kg 125.00 Kg

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 417 of 593

nstruction

F/Y:- 2075/076

Amount Remarks
Rs

1,300.00

7,528.20

2,509.00

13,939.38

477,276.00

1,060,394.25

92,877.30

Contractor: Prepared By: Checked By: Approved By:


Page 418 of 593

nstruction

F/Y:- 2075/076

Amount Remarks
Rs

14,205.30

984,064.42

83,092.10

7,833.00

104,108.75

221,348.45

Contractor: Prepared By: Checked By: Approved By:


Page 419 of 593

nstruction

F/Y:- 2075/076

Amount Remarks
Rs

114,660.00

39,000.00

100,896.30

7,800.00

Contractor: Prepared By: Checked By: Approved By:


Page 420 of 593

nstruction

F/Y:- 2075/076

Amount Remarks
Rs

64,220.00

93,206.00

275,198.40

40,000.00
-

3,805,456.85

Contractor: Prepared By: Checked By: Approved By:


Page 421 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 23


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
previous bill
Earthwork in excavation in
1.2
hard/boulder mix soils
Isolated Footing F1 3 1.85 1.85 1.65
Isolated Footing F2 12 1.65 1.65 1.60
Trench Portion 1-1 1 8.40 0.53 1.05
Trench Portion 2-2 1 7.80 0.53 1.05
Trench Portion 3-3 1 8.40 0.53 1.05
Trench along A-A 1 6.40 0.53 1.05
Trench along B-B 1 6.20 0.53 1.05
Trench along C-C 1 6.20 0.53 1.05
Trench along D-D 1 6.20 0.53 1.05
Trench along E-E 1 6.40 0.53 1.05
previous bill
Earth filling without supply of filling materials
1.3
all complete.
Previous
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
Good quality local chimney made
Brickwork in 1:4 C/S mortar up to ground
floor in perfect line level finish including
2.2 wetting the bricks, racking the joints and
curing the work for at least 7 days all
complete.

Previous
4 Plain Cement concrete work
Plain cement Concrete (PCC) in 1:3:6
4.1 ratio for foundations, flooring and
walls.
Previous
Plain Cement Concrete PCC for RCC
4.2
works(1:2:4) slab and lintels
Contractor: Prepared By: Checked By: Approved By:
Page 422 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 23


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Previous
Plain cement Concrete (PCC) for RCC
4.3 works (1:1.5:3) for column, Beam, Slab
& Staircase
Previous
Tor steel or TMT reinforcement bar of
4.4
fe 415/500 grade.
Previous

5 Formwork
Formwork, shuttering, centering with
5.1 19mm thick waterproof ply for with
steel pipe propping.
Previous
Formwork, shuttering, centering with
5.2 19mm thick waterproof ply for Slab
with steel pipe propping.
Previous
5.3
Formwork, shuttering, centering with
19mm thick waterproof ply for beam with
steel pipe propping, scaffolding, staging,
supporting inclusive of wedging and
cutting holes for utilization till the support
if fully unyielding net.
Previous

Formwork, shuttering, centering with


19mm thick waterproof ply for column,
necessary propping, scaffolding, staging,
supporting inclusive of wedging and
cutting holes for utilization till the support
if fully unyielding net.
5.4
Previous
8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring
8.1 with approved quality of O.P. cement &
sand and crushed stone aggregate .
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 423 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 23


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming etc.
all complete
Previous

Sand filling in flooring including supply


8.5 of filling materials, watering, ramming
etc. all complete
Previous
8.7 3 mm thick cement sand punning on floor,
skriting, dado etc, including mixing laying and
rubbing with steel trowel to a hard, smooth
and shining surface and curing all complete.

Previous
9 Plastering Work
12.5mm thick cement sand palster in 1:3
9.1
ratio on ceiling Plaster
Previous
12.5mm thick cement sand plaster in 1:4
9.2 ratio on External wall plaster
Previous
20 mm thick cement sand palster in 1:4 ratio
9.3
on internal wall plaster
Previous
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1 chemical for anti termites treatment
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 424 of 593

onstruction

F/Y:- 2075/076

Quantity Unit Remarks

260.00 Sqm

16.94
52.27
4.67
4.34
4.67
3.56
3.45
3.45
3.45
3.56
100.38 Cum

50.18 Cum

111.52 Cum

39.77 Cum

88.37 Cum

11.61 Cum

Contractor: Prepared By: Checked By: Approved By:


Page 425 of 593

onstruction

F/Y:- 2075/076

Quantity Unit Remarks

1.42 Cum

82.01 Cum

10,386.51 Kg
10.39 MT

15.67 Sqm

208.22 Sqm

442.70 Sqm

229.32 Sqm

78.00 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 426 of 593

onstruction

F/Y:- 2075/076

Quantity Unit Remarks

168.16 sqm

7.80 Cum

0.00 sqm

256.88 Sqm

372.82 Sqm

917.33 Sqm

160.00 sqm

Contractor: Prepared By: Checked By: Approved By:


Page 427 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 24
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 760.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 100.38 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 50.18 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 21.45 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 26.41 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in Super Structure with perfect line level
2.2 88.37 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. 0.00 Cum 3,000.00 Cum

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 11.61 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 1.42 Cum 10,000.00
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 428 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 24
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 80.85 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 10.070 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 15.67 Sqm 500.00 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
5.2 necessary propping, scafolding, staging, supporting 208.22 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 442.70 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 216.09 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
6 Roofing Work
6.1 0.5mm colour CGI sheet roofing including fixing in
proper shape & size with all necessary nails, screws,
bolts & nuts washers, J & L hooks etc as per drawing 0.00 Sqm 1000.00 Sqm
& instruction all complete.
6.2 0.50mm colour Ridge on roof including fixing in proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 0.00 Rm 1000.00 Rm
instruction all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 429 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 24
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

6.3 0.50mm colour sheet for fixing in gable wall proper


shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 0.00 Sqm 1200.00 Sqm
instruction all complete.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.1 approved quality including fixing in position with 0.00 Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
8 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 78.00 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 168.16 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 7.80 Cum 1,000.00 Cum
3 mm thick cement sand punning on floor, skriting,
dado etc, including mixing laying and rubbing with
8.7 steel trowel to a hard, smooth and shining surface 0.00 Sqm 150.00 Sqm
and curing all complete.

9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster 256.88 Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster 372.82 Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 917.33 Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 160.00 Sqm 250.00 Sqm
12 Steel and Iron Works
M.S. Black Pipe roof truss & purlin with I.S. or B.S.
12.6 section including jointing, fixing, 2347.82 Sqm 125.00 Sqm

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 430 of 593

truction

F/Y:- 2075/076

Amount Remarks
Rs

3,800.00

7,528.20

2,509.00

2,680.65

316,896.00

1,060,394.25

92,877.30

14,205.30

Contractor: Prepared By: Checked By: Approved By:


Page 431 of 593

truction

F/Y:- 2075/076

Amount Remarks
Rs

970,172.91

80,556.42

7,833.00

104,108.75

221,348.45

108,045.00

Contractor: Prepared By: Checked By: Approved By:


Page 432 of 593

truction

F/Y:- 2075/076

Amount Remarks
Rs

39,000.00

100,896.30

7,800.00

64,220.00

93,206.00

275,198.40

40,000.00

293,477.53

3,906,753.46

Contractor: Prepared By: Checked By: Approved By:


Page 433 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 24


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Isolated Footing F1 3 1.85 1.85 1.65
Isolated Footing F2 12 1.65 1.65 1.60
Trench Portion 1-1 1 8.40 0.53 1.05
Trench Portion 2-2 1 7.80 0.53 1.05
Trench Portion 3-3 1 8.40 0.53 1.05
Trench along A-A 1 6.40 0.53 1.05
Trench along B-B 1 6.20 0.53 1.05
Trench along C-C 1 6.20 0.53 1.05
Trench along D-D 1 6.20 0.53 1.05
Trench along E-E 1 6.40 0.53 1.05
Previous
Earth filling without supply of filling
1.3
materials all complete.
Previous
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
Previous

2 Brick Masonary work

Good quality local chimney made


2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
Good quality local chimney made
Brickwork in 1:4 C/S mortar up to
ground floor in perfect line level finish
2.2 including wetting the bricks, racking
the joints and curing the work for at
least 7 days all complete.

Previous
4 Plain Cement concrete work

Contractor: Prepared By: Checked By: Approved By:


Page 434 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 24


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Plain cement Concrete (PCC) in
4.1 1:3:6 ratio for foundations, flooring
and walls.
Previous
Plain Cement Concrete PCC for RCC
4.2
works(1:2:4) slab and lintels
Previous
Plain cement Concrete (PCC) for
4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase
Previous

Tor steel or TMT reinforcement bar


4.4
of fe 415/500 grade.
Previous

5 Formwork
Formwork, shuttering, centering
5.1 with 19mm thick waterproof ply for
with steel pipe propping.
Formwork, shuttering, centering Previous
5.2 with 19mm thick waterproof ply for
Slab with steel pipe propping. Previous
5.3 Formwork, shuttering, centering with
19mm thick waterproof ply for beam
with steel pipe propping, scaffolding,
staging, supporting inclusive of
wedging and cutting holes for
utilization till the support if fully
unyielding net.
Formwork, shuttering, centering with
Previous
19mm thick waterproof ply for column,
necessary propping, scaffolding,
staging, supporting inclusive of
5.4 wedging and cutting holes for
utilization till the support if fully
Previous
unyielding net.
7 Wooden Works
8 Flooring work
38mm thick (1:2:4) P.C.C. for
flooring with approved quality of
8.1 O.P. cement & sand and crushed
stone aggregate .
Previous
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming
etc. all complete

Contractor: Prepared By: Checked By: Approved By:


Page 435 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 24


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Previous
Sand filling in flooring including
8.5 supply of filling materials, watering,
ramming etc. all complete
Previous
8.7 3 mm thick cement sand punning on floor,
skriting, dado etc, including mixing laying
and rubbing with steel trowel to a hard,
smooth and shining surface and curing all
complete.
Previous
9 Plastering Work
12.5mm thick cement sand palster in 1:3
9.1
ratio on ceiling Plaster
Previous
12.5mm thick cement sand plaster in 1:4
9.2
ratio on External wall plaster
Previous
20 mm thick cement sand palster in 1:4
9.3 ratio on internal wall plaster
Previous
11.0 Water Proofing Works
Providing and applying Dustban Premise
11.1 chemical for anti termites treatment

Previous
12 Steel and Iron Works
M.S. Black Pipe roof truss & purlin with I.S.
or B.S. section including jointing, fixing,
12.6

Rafter (Dia 80mm 4.0 mm thick) 5 5.693 28.465 6.24


5 6.439 32.195 6.24
Vertical Strut (Dia 50mm 4.0 mm thick) 5 8.89 44.45 5.03
Inclined Strut (Dia 50mm 4.0 mm thick) 5 10.673 53.365 5.03
Base Beam (Dia 80mm 4.0 mm thick) 5 10.527 52.635 ` 6.24
Purlin (Dia 65 mm 4.0 mm thick) 12 17.25 207 5.55
Total

Contractor: Prepared By: Checked By: Approved By:


Page 436 of 593

Construction

F/Y:- 2075/076

Quantity Unit Remarks

760.00 Sqm

16.94
52.27
4.67
4.34
4.67
3.56
3.45
3.45
3.45
3.56
100.38 Cum

50.18 Cum

21.45 Cum

26.41 Cum

88.37 Cum

Contractor: Prepared By: Checked By: Approved By:


Page 437 of 593

Construction

F/Y:- 2075/076

Quantity Unit Remarks

11.61 Cum

1.42 Cum

80.85 Cum

10,069.55 Kg
10.07 MT

15.67 Sqm

208.22 Sqm

442.70 Sqm

216.09 Sqm

78.00 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 438 of 593

Construction

F/Y:- 2075/076

Quantity Unit Remarks

168.16 sqm

7.80 Cum

0.00 sqm

256.88 Sqm

372.82 Sqm

917.33 Sqm

160.00 sqm

177.6216
200.8968
223.5835
268.42595
328.4424
1148.85
2,347.82 kg

Contractor: Prepared By: Checked By: Approved By:


Page 439 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Toilet D 25
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning
and disposal of debrises, uprooting
1.1 260.00 Sqm 5.00 Sqm
roots, solid wastes etc. all complete
as per instruction.

Earthwork in excavation in
hard/boulder mix soils in foundation
1.2 100.36 Cum 75.00 Cum
including 10m hauling distance and
1.5 m. lift all complete.

Earth filling in 150/150 mm thick


layer, watering, ramming including
1.3 28.59 Cum 125.00 Cum
supply of filling materials within 10 m
distance all complete.
Earth filling without supply of filling
1.4 50.18 Cum 50.00 Cum
materials all complete.
2 Brick Masonary work

Good quality local chimney made


Brickwork in 1:4 C/S mortar up to
ground floor in perfect line level
2.1 26.85 Cum 12,000.00 Cum
finish including wetting the bricks,
racking the joints and curing the
work for at least 7 days all complete.

Good quality local chimney made


Brickwork in 1:4 C/S mortar in
superstructure in perfect line level
2.2 Cum 12,000.00 Cum
finish including wetting the bricks,
racking the joints and curing the
work for at least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and
floor including sand filling in joints,
3.2 leveling, watering etc. all complete. Cum 3,000.00

4 Plain Cement concrete work

Contractor: Prepared By: Checked By: Approved By:


Page 440 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Toilet D 25
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) in


1:3:6 ratio for foundations, flooring
and walls with approved quality of
cement and sand and crushed stone
4.1 11.61 Cum 8,000.00 Cum
aggregate including mixing, laying
using mixture & Vibrator, curing etc
all complete in approval of site
engineer.

Plain cement concrete(PCC) for Rcc


works (1:2:4) for slab/lintels with
approved quality of cement sand
4.2 and crushed stone aggregates Cum 10,000.00 Cum
including mixing,laying,using mixture
and vibrator, curing etc all complete
in approval of site engineer.

Plain cement Concrete (PCC) for


RCC works (1:1.5:3) for slab/lintels
with approved quality of cement and
sand and crushed stone aggregate
4.3 26.12 Cum 12,000.00 Cum
including mixing, laying using
mixture & Vibrator, curing etc all
complete in approval of site
engineer.

Tor steel or TMT reinforcement bar


of fe 415/500 grade including
straightening, cleaning, cutting,
4.4 binding & fixing in position with 4.5654 MT 8,000.00 MT
annealed tying binding wire as per
drawing, design & instruction all
complete.
5 Formwork
Form Work Shuttering, centricn with
wooden form work for all works
necessary propping, scaffolding,
staging,supporting inclusive of Sqm 500.00 Sqm
wedging and cutting holes for
utilization till the support if full
unyeilding net.
5.1

Contractor: Prepared By: Checked By: Approved By:


Page 441 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Toilet D 25
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Form work , shuttering, centering


with 19mm thick water proof ply
board and steel post for all works
necessary propping, scafolding,
Sqm 500.00 Sqm
staging, supporting inclusive of
wedging and cutting holes for
utilization till the support if fully
unyeilding net . Slab
5.2
Formwork, shuttering, centering with
19mm thick waterproof ply for beam
with steel pipe propping, scaffolding,
5.3 staging, supporting inclusive of 309.41 Sqm 500.00 Sqm
wedging and cutting holes for
utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with


19mm thick waterproof ply for
column, necessary propping,
5.4 scaffolding, staging, supporting 216.09 Sqm 500.00 Sqm
inclusive of wedging and cutting
holes for utilization till the support if
fully unyielding net.
7 Door,window & wooden works

Well Seasoned Sal wood chaukhats


for fixed/openable door/windows with
good finish of approved quality
7.1 including fixing in position with Cum 180,000.00 Cum
necessary M.S. holdfasts as per
drawing and instructions all
complete.

8 Flooring work
38mm thick (1:2:4) P.C.C. for
flooring with approved quality of O.P.
cement & sand and crushed stone
8.1 Sqm 500.00 Sqm
aggregate including mixing, laying,
punning, rubbing in hard surface
curing etc all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 442 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, Jail Toilet D 25
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Flat dry brick soling on flat in


foundation and floor including sand
8.4 filling in joints, leveling, ramming etc. 90.16 Sqm 600.00 Sqm
all complete
Sand filling in flooring including
supply of filling materials, watering,
8.5 ramming etc. all complete Cum 1,000.00 Cum

9 Plastering Work
12.5mm thick cement sand palster in
9.1 1:3 ratio on ceiling Plaster Sqm 250.00 Sqm

12.5mm thick cement sand palster in


9.2 1:4 ratio on External wall plaster Sqm 250.00 Sqm

20 mm thick cement sand palster in


9.3 1:4 ratio on internal wall plaster Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban
11.1 Premise chamical for anti termites Sqm 250.00 Sqm
treatment

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 443 of 593

F/Y:- 2075/076

Amount Remarks
Rs

1,300.00

7,527.00

3,574.20

2,509.00

322,242.00

Contractor: Prepared By: Checked By: Approved By:


Page 444 of 593

F/Y:- 2075/076

Amount Remarks
Rs

92,877.30

313,400.95

36,522.80

Contractor: Prepared By: Checked By: Approved By:


Page 445 of 593

F/Y:- 2075/076

Amount Remarks
Rs

154,705.95

108,045.00

Contractor: Prepared By: Checked By: Approved By:


Page 446 of 593

F/Y:- 2075/076

Amount Remarks
Rs

54,096.30

-
1,096,800.50

Contractor: Prepared By: Checked By: Approved By:


Page 447 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 25


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Isolated Footing F1 3 1.85 1.85 1.65
Isolated Footing F2 12 1.65 1.65 1.60
Trench Portion 1-1 1 8.40 0.53 1.05
Trench Portion 2-2 1 7.80 0.53 1.05
Trench Portion 3-3 1 8.40 0.53 1.05
Trench along A-A 1 6.40 0.53 1.05
Trench along B-B 1 6.20 0.53 1.05
Trench along C-C 1 6.20 0.53 1.05
Trench along D-D 1 6.20 0.53 1.05
Trench along E-E 1 6.40 0.53 1.05
Previous
Earth filling without supply of filling materials
1.3
all complete.
50% of Excavation
Previous
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
4 Plain Cement concrete work
Plain cement Concrete (PCC) in 1:3:6
4.1 ratio for foundations, flooring and
walls.
Previous
Plain cement Concrete (PCC) for RCC
4.3 works (1:1.5:3) for column, Beam,
Slab & Staircase
Previous
Tor steel or TMT reinforcement bar of
4.4
fe 415/500 grade.
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 448 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, Toilet Block 25


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m

5 Formwork
Formwork, shuttering, centering with
5.3
19mm thick waterproof ply for beam with
steel pipe propping, scaffolding, staging,
supporting inclusive of wedging and
cutting holes for utilization till the
support if fully unyielding net.
Previous

Formwork, shuttering, centering with


19mm thick waterproof ply for column,
necessary propping, scaffolding, staging,
supporting inclusive of wedging and
cutting holes for utilization till the
5.4 support if fully unyielding net.
Previous
7 Wooden Works

8 Flooring work
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming etc.
all complete
Previous

11.0 Water Proofing Works


Providing and applying Dustban Premise
11.1
chemical for anti termites treatment
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 449 of 593

tion

F/Y:- 2075/076

Quantity Unit Remarks

260.00 Sqm

16.94
52.27
4.67
4.34
4.67
3.56
3.45
3.45
3.45
3.56
100.36 Cum

50.18
50.18 Cum

28.59 Cum

26.85 Cum

11.61 Cum

26.12 Cum

4,565.35 Kg

Contractor: Prepared By: Checked By: Approved By:


Page 450 of 593

tion

F/Y:- 2075/076

Quantity Unit Remarks

4.57 MT

309.41 Sqm

216.09 Sqm

90.16 sqm

160.00 sqm

Contractor: Prepared By: Checked By: Approved By:


Page 451 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Abstract of Cost
Project :- Construction of Security Wall for Central Jail
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 302.40 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 340.20 Cum 75.00 Cum
lift all complete.
3 Stone Masonary work
3.1 Stone Masonry in 1:6 cement sand mortar 952.56 Cum 6,500.00 Cum

3.2 Rubble filling Work 45.36 Cum 3,000.00 Cum


4 Plain Cement concrete work

Plain cement Concrete (PCC) for RCC works (1:2:4)


for slab/lintels with approved quality of cement and
4.2 sand and crushed stone aggregate including mixing, 22.68 Cum 10,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 204.12 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 11.800 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork

Form Work Shuttering, centricn with wooden form


work for all works necessary propping, scaffolding,
5.1 544.32 Sqm 500.00 Sqm
staging,supporting inclusive of wedging and cutting
holes for utilization till the support if full unyeilding net.

9 Plaster Work
Flush ruled pointing 1:2 in stone /Rubble masonry wall as
9.4 per drawing all complete. 1209.60 Sqm 100.00 Sqm
Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 452 of 593

nstruction

Amount Remarks
Rs

1,512.00

25,515.00

6,191,640.00

136,080.00

226,800.00

2,449,440.00

94,399.54

272,160.00

120,960.00
9,518,506.54

Contractor: Prepared By: Checked By: Approved By:


Page 453 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detailed Estimate
F/Y:- 2074
Project :- Construction of Security Wall for Central Jail
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Wall Construction Area 1 336.00 0.90 302.40
Total 302.40

This Bill 18.90

Previous 283.50
Earthwork in excavation in hard/boulder
1.2
mix soils
Wall 1 336.00 0.90 1.13 340.20
Total 340.20

This Bill -107.10

Previous 447.30
3 Stone/Rubble Masonary work

3.1 Stone Masonry in 1:6 cement sand mortar

First footing Up to G.L 1 336.00 0.90 0.90 272.16


Second footing (above G.L) 1 336.00 0.75 0.90 226.8
Third footing (above G.L) 1 336.00 0.75 0.90 226.8
Forth footing (above G.L) 1 336.00 0.75 0.90 226.8
Total 952.56

This Bill 45.36

Previous 907.2
3.2 Rubble filling Work
wall 1 336.00 0.90 0.15 45.36
Total 45.36

This Bill -1.89

Previous 47.25
4 Plain Cement concrete work

Contractor: Prepared By: Checked By: Approved By:


Page 454 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detailed Estimate
F/Y:- 2074
Project :- Construction of Security Wall for Central Jail
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
Plain cement Concrete (PCC) for RCC
4.2
works (1:2:4) for Sill/Lintel
For Footing 1 336.00 0.90 0.08 22.68
Total 22.68

This Bill -0.94

Previous 23.62
Plain cement Concrete (PCC) for RCC
4.3
works (1:1.5:3) for column
Plinth tie (band) 1 336.00 0.90 0.15 45.36
intermediate tie (band) 2 nos 1 336.00 0.75 0.15 37.8
1 336.00 0.75 0.15 37.8
1 336.00 0.75 0.15 37.8
1 336.00 0.90 0.15 45.36
Total 204.12

This Bill 126.17

Previous 77.95

Tor steel or TMT reinforcement bar of fe


4.4
415/500 grade.
Long bar 12mm 3rd sill 10 336.00 @ 0.889 2987.04
Long bar 12mm 4th sill 10 336.00 @ 0.889 2987.04
8mm tie bar in plinth tie band 2241 2101 1.98 @ 0.395 1643.19
8mm tie bar in 2nd sill 2241 2101 1.68 @ 0.395 1394.22
8mm tie bar in 3rd sill 2241 2101 1.68 @ 0.395 1394.22
8mm tie bar in 4th sill 2241 2101 1.68 @ 0.395 1394.22
Total 11.800

This Bill 3.162

Previous 8.638

5 Formwork
5.1 Wooden Form Work
Plinth tie 2 336.00 0.15 100.8

Contractor: Prepared By: Checked By: Approved By:


Page 455 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Detailed Estimate
F/Y:- 2074
Project :- Construction of Security Wall for Central Jail
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
intermediate tie 2 nos 2 336.00 0.15 100.8
2 336 0.15 100.8
2 336 0.20 134.4
2 336 0.16 107.52
Total 544.32

This Bill 308.07

Previous 236.25

9 Plaster Work
Flush ruled pointing 1:2 in stone /Rubble
9.4 masonry wall as per drawing all
complete.
On stone masonry wall 2 336.00 1.80 1209.60

Contractor: Prepared By: Checked By: Approved By:


Page 456 of 593

on

F/Y:- 2074/075

Unit Remarks

56 nos. of
Sqm
section,
each
Sqm section of
length 6
meter
Sqm

Cum

Cum

Cum

Wall behing
A6, D22,
A4,
B13,A10,A9
, & A7

Cum

Cum

Cum

Cum

Cum

Cum

Contractor: Prepared By: Checked By: Approved By:


Page 457 of 593

on

F/Y:- 2074/075

Unit Remarks

Cum

Cum

Cum

Cum

Cum

Cum

Mt

Mt

Mt

Contractor: Prepared By: Checked By: Approved By:


Page 458 of 593

on

F/Y:- 2074/075

Unit Remarks

Sqm

Sqm

Sqm

Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 459 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Barrack Dorm
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 2196.91 Sqm 5 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 225.95 Cum 75 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 112.97 Cum 50 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 28.07 Cum 125 Cum
m distance all complete.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 31.18 Cum 12000 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in Super Structure with perfect line level
2.2 138.42 Cum 12000 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. 14.20 Cum 3000 Cum

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 31.76 Cum 8000 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 9.73 Cum 10000
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 460 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Barrack Dorm
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 235.69 Cum 12000 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 35.254243 MT 8000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 461 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Barrack Dorm
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 77.86 Sqm 500 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
5.2 necessary propping, scafolding, staging, supporting 533.51 Sqm 500 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 988.59 Sqm 500 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 765.05 Sqm 500 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 2.50 Cum 180000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.

Fixing of glazed shutter in 38x75 mm thick sal wood


7.5 frame with 4mm thick plain glass fitted including all 59.67 Sqm 10000.00 Sqm
necessary hardware fittings all complete.

8 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 395.63 Sqm 500 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 282.33 Sqm 600.00 Sqm
all complete

Contractor: Prepared By: Checked By: Approved By:


Page 462 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB Abstract
Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Barrack Dorm
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Sand filling in flooring including supply of filling


8.5 materials, watering, ramming etc. all complete 19.62 Cum 1000.00 Cum
3 mm thick cement sand punning on floor, skriting,
dado etc, including mixing laying and rubbing with
8.7 steel trowel to a hard, smooth and shining surface 0.00 Sqm 150.00 Sqm
and curing all complete.
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster 509.34 Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster 992.76 Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 885.54 Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 236.91 Sqm 250.00 Sqm
Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 463 of 593

struction

Amount Remarks
Rs

10,984.55

16,946.25

5,648.50

3,508.75

374,217.33

1,660,993.65

42,600.00

254,093.00

97,321.87

Contractor: Prepared By: Checked By: Approved By:


Page 464 of 593

struction

Amount Remarks
Rs

2,828,295.06

282,033.94

Contractor: Prepared By: Checked By: Approved By:


Page 465 of 593

struction

Amount Remarks
Rs

38,928.75

266,753.25

494,295.20

382,523.00

450,692.10

596,700.00

197,814.00

169,399.08

Contractor: Prepared By: Checked By: Approved By:


Page 466 of 593

struction

Amount Remarks
Rs

19,618.50

127,335.87

248,190.00

265,662.00

59,227.50
8,893,782.15

Contractor: Prepared By: Checked By: Approved By:


Page 467 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Barrack Dorm
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Previous
Earth filling including supply of
1.3
filling materials.
Previous
Earth filling in 150 mm thick layer,
watering, ramming including supply
1.4
of filling materials within 6 km
distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
Good quality local chimney made
Brickwork in 1:4 C/S mortar in super
structure in perfect line level finish
2.2 including wetting the bricks,
racking the joints and curing the
work for at least 7 days all
complete.
Previous
3 Stone Masonary Work
Flat dry boulder soling on flat in
3.2 foundation and floor including sand
filling in joints.
Previous
4 Plain Cement concrete work
Plain cement Concrete (PCC) in
4.1 1:3:6 ratio for foundations, flooring
and walls.
Previous
Plain Cement Concrete PCC for RCC
4.2
works(1:2:4) slab and lintels
Previous
Plain cement Concrete (PCC) for
4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase
Previous
Tor steel or TMT reinforcement bar
4.4
of fe 415/500 grade.
Previous
5 Formwork
Contractor: Prepared By: Checked By: Approved By:
Page 468 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Barrack Dorm
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Formwork, shuttering, centering
5.1 with 19mm thick waterproof ply for
sill & lintel with steel pipe propping.
Previous
Formwork, shuttering, centering
5.2 with 19mm thick waterproof ply for
slab with steel pipe propping.
GF Slab
Previous
Formwork, shuttering, centering
5.3 with 19mm thick waterproof ply for
beam with steel pipe propping.
Previous

Formwork, shuttering, centering


5.4 with 19mm thick waterproof ply for
column, necessary propping, scaffolding.

Previous

7 Wooden Works

Well Seasoned Sal wood chaukhats for


fixed/openable door/windows with
good finish of approved quality
7.1
including fixing in position with
necessary M.S. holdfasts as per
drawing and instructions all complete.

Previous
Fixing of glazed shutter in 38x75 mm
thick sal wood frame with 4mm thick
plain glass fitted including all
necessary hardware fittings all
7.5 complete.
Previous
8 Flooring work
38mm thick (1:2:4) P.C.C. for
flooring with approved quality of
8.1 O.P. cement & sand and crushed
stone aggregate .
Previous
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming
etc. all complete
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 469 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Barrack Dorm
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Sand filling in flooring including
8.5 supply of filling materials, watering,
ramming etc. all complete
3 mm thick cement sand punning on
floor, skriting, dado etc, including
mixing laying and rubbing with steel
8.7 trowel to a hard, smooth and shining
surface and curing all complete.

Previous
9 Plastering Work
12.5mm thick cement sand palster in
9.1 1:3 ratio on ceiling Plaster

Previous
12.5mm thick cement sand palster in
9.2 1:4 ratio on External wall plaster

Previous
20 mm thick cement sand palster in 1:4
9.3 ratio on internal wall plaster
Previous
11.0 Water Proofing Works
Providing and applying Dustban
11.1 Premise chamical for anti termites
treatment
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 470 of 593

struction

F/Y:- 2074/075

Quantity Unit Remarks

2196.91 Sqm

225.95 Cum

112.97 Cum

28.07 Cum

31.18 Cum

138.42 Cum

14.20 Cum

31.76 Cum

9.73 Cum

235.69 Cum

35.254 MT

Contractor: Prepared By: Checked By: Approved By:


Page 471 of 593

struction

F/Y:- 2074/075

Quantity Unit Remarks

77.86 Sqm

533.51 Sqm

988.59 Sqm

765.05 Sqm

2.50 Cum

59.67 Sqm

395.63 Sqm

282.33 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 472 of 593

struction

F/Y:- 2074/075

Quantity Unit Remarks

0.00 Sqm

509.34 Sqm

992.76 Sqm

885.54 Sqm

236.91 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 473 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Dining
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 2536.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 199.08 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 99.54 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 40.43 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 46.84 Cum 12,000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in superstructure in perfect line level finish
2.2 50.24 12,000.00 Cum
including wetting the bricks, racking the joints and
curing the work for at least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. 10.38 Cum 3,000.00 Cum

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 29.53 Cum 8,000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 8.62 10,000.00 Cum
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 474 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Dining
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 87.61 Cum 12,000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 14.365864 MT 8,000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 37.49 Sqm 500.00 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel
Formwork, shuttering, centering with 19mm thick
waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 355.67 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
Formwork, shuttering, centering with 19mm thick
waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 179.90 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
6 Roofing Work
6.1 0.5mm colour CGI sheet roofing including fixing in
proper shape & size with all necessary nails, screws,
bolts & nuts washers, J & L hooks etc as per drawing 423.55 Sqm 1,000.00 Sqm
& instruction all complete.
6.2 0.50mm colour Ridge on roof including fixing in proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 30.75 Rm 1,000.00 Rm
instruction all complete.
6.3 0.50mm colour sheet for fixing in gable wall proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 22.11 Sqm 1,200.00 Sqm
instruction all complete.
7 Door,window & wooden works

Contractor: Prepared By: Checked By: Approved By:


Page 475 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Dining
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Well Seasoned Sal wood chaukhats for


fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 1.88 Cum 180,000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
Fixing of glazed shutter in 38x75 mm thick sal wood
frame with 4mm thick plain glass fitted including all
necessary hardware fittings all complete. Sqm 10,000.00 Sqm
7.5
8 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 576.00 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 628.08 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 86.40 Cum 1,000.00 Cum
3 mm thick cement sand punning on floor, skriting,
dado etc, including mixing laying and rubbing with
8.7 steel trowel to a hard, smooth and shining surface 576.00 Sqm 150.00 Sqm
and curing all complete.
Plastering Work
9
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster 0.00 Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster 278.87 Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 452.51 Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 309.87 Sqm 250.00 Sqm
12 Steel and Iron Works
M.S. Black Pipe roof truss & purlin with I.S. or B.S.
12.6 section including jointing, fixing, 3252.22 kg 125.00 kg

Total

Contractor: Prepared By: Checked By: Approved By:


Page 476 of 593

struction

Amount Remarks
Rs

12,680.00

14,931.00

4,977.00

5,053.75

562,080.00

602,880.00

31,125.38

236,274.00

86,215.50

Contractor: Prepared By: Checked By: Approved By:


Page 477 of 593

struction

Amount Remarks
Rs

1,051,356.80

114,926.91

18,742.50

177,835.00

89,950.00

423,550.50

30,750.00

26,536.92

Contractor: Prepared By: Checked By: Approved By:


Page 478 of 593

struction

Amount Remarks
Rs

338,377.50

288,000.00

376,848.00

86,400.00

86,400.00

69,717.00

135,754.20

77,467.18

406,527.94

5,355,357.08

Contractor: Prepared By: Checked By: Approved By:


Page 479 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Dining


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous
Earthwork in excavation in
1.2
hard/boulder mix soils
Isolated Footing F1 20 1.65 1.65 1.65
Isolated Footing F2 7 1.45 1.45 1.60
Trench Along Portion 1-1&3-3 2 16.80 0.70 1.65
Grid 2-2 1 18.20 0.70 1.65
Grid A-A & G-G 2 8.00 0.70 1.18
Grid B-B to F-F 5 8.20 0.70 1.18
Previous
Earth filling including supply of
1.3
filling materials.
Previous
Earth filling in 150 mm thick layer,
watering, ramming including supply
1.4
of filling materials within 6 km
distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous
Good Quaity Local chimney made
2.2 Brickworks in 1:4 c/s mortar in
super structure
Previous
3 Stone Masonary Work
Flat dry boulder soling on flat in
3.2 foundation and floor including sand
filling in joints.
Previous
4 Plain Cement concrete work
Plain cement Concrete (PCC) in
4.1 1:3:6 ratio for foundations, flooring
and walls.
Previous
Plain Cement Concrete PCC for RCC
4.2
works(1:2:4) slab and lintels
Previous
Plain cement Concrete (PCC) for
4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase

Contractor: Prepared By: Checked By: Approved By:


Page 480 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Dining


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Previous
Tor steel or TMT reinforcement bar
4.4
of fe 415/500 grade.
Previous
5 Formwork
Formwork,wooden shuttering,
centering with 19mm thick
5.1
waterproof ply for beam with steel
pipe propping.
Linel 2 85.75 0.150
Previous
Formwork, shuttering, centering
5.3 with 19mm thick waterproof ply for
beam with steel pipe propping.
Previous
Formwork, shuttering, centering with
5.4
19mm thick waterproof ply for column,
Previous

6 Roofing Work
6.1 0.5mm colour CGI sheet roofing including
fixing in proper shape & size with all
necessary nails, screws, bolts & nuts
washers, J & L hooks etc as per drawing &
instruction all complete.
In Roof 2 30.75 6.89
6.2 0.50mm colour Ridge on roof including
fixing in proper shape & size with all
necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete.
Ridge cap 1 30.75

Contractor: Prepared By: Checked By: Approved By:


Page 481 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Dining


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
6.3 0.50mm colour sheet for fixing in gable
wall proper shape & size with all necessary
rails, screws, bolts & nuts washers, J & L
hocks etc as per drawing & instruction all
complete.

Gable wall 1 11.30 1.957


7 Door,window & wooden work
Well seasoned salwood for
7.3 chaukhats for fixed/openable
door/windows with good finish.
Previous
8 Flooring work
38mm thick (1:2:4) P.C.C. for
flooring with approved quality of
8.1 O.P. cement & sand and crushed
stone aggregate .
Ground Floor 1 32.00 18.00
Previous
Flat dry brick soling on flat in
foundation and floor including sand
8.4 filling in joints, leveling, ramming
etc. all complete
Previous
Sand filling in flooring including
8.5 supply of filling materials, watering,
ramming etc. all complete Ground Floor 1 32.00 18.00
0.15
Previous
3 mm thick cement sand punning on floor,
skriting, dado etc, including mixing laying
8.7 and rubbing with steel trowel to a hard,
smooth and shining surface and curing all
complete.
Previous
9 Plastering Work
12.5mm thick cement sand palster in 1:3
9.1 ratio on ceiling Plaster 1 0.00 0.00 0.00
Previous
12.5mm thick cement sand plaster in 1:4
9.2 ratio on External wall plaster Ground Floor
Previous
20 mm thick cement sand palster in 1:4
9.3
ratio on internal wall plaster
Previous
11.0 Water Proofing Works

Contractor: Prepared By: Checked By: Approved By:


Page 482 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, APF Dining


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment
Previous
12 Steel and Iron Works
M.S. Black Pipe roof truss & purlin with
12.6 I.S. or B.S. section including jointing,
fixing,
Rafter (Dia 65 mm 4.0 mm thick) 18 6.78 122.08 5.75
Vertical Strut (Dia 32 mm 4.0 mm thick) 9 9.25 83.23 2.48
Inclined Strut (Dia 25 mm 4.0 mm thick) 18 6.44 115.83 1.94
Base Beam (Dia 65 mm 4.0 mm thick) 9 11.30 101.70 ` 5.75
Purlin (Dia 50 mm 4.0 mm thick) 14 30.70 429.80 3.57
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 483 of 593

uction

F/Y:- 2074/075

Quantity Unit Remarks

2536.00 Sqm

89.84
23.55
38.81

13.16
33.72
199.08 Cum

99.54 Cum

40.43 Cum

46.84 Cum

50.24 Cum

10.38 Cum

29.53 Cum

8.62 Cum

Contractor: Prepared By: Checked By: Approved By:


Page 484 of 593

uction

F/Y:- 2074/075

Quantity Unit Remarks

87.61 Cum

14.366 MT

25.73
37.485 Sqm

355.67 Sqm

179.90 Sqm

423.55 Sqm

30.75 Rm

Contractor: Prepared By: Checked By: Approved By:


Page 485 of 593

uction

F/Y:- 2074/075

Quantity Unit Remarks

22.11 Sqm

1.88 Cum

576.00
576.00 Sqm

628.08 Sqm

86.40
86.40 Cum

576.00 Sqm

0.00
0.00 Sqm

278.87 Sqm

452.51 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 486 of 593

uction

F/Y:- 2074/075

Quantity Unit Remarks

309.87 Sqm

701.94
206.42
224.71
584.78
1534.39
### kg

Contractor: Prepared By: Checked By: Approved By:


Page 487 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Dining
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 400.00 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 177.86 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 88.93 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 40.43 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work
Good quality local chimney made Brickwork in 1:4
C/S mortar up to ground floor in perfect line level
2.1 36.69 Cum 12000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in superstructure in perfect line level finish
2.2 61.27 Cum 12000.00 Cum
including wetting the bricks, racking the joints and
curing the work for at least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. 8.30 Cum 3000.00 Cum

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 21.03 Cum 8000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 6.63 Cum 10000.00 Cum
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 488 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Dining
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 64.61 Cum 12000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 10.695908 MT 8000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 28.82 Sqm 500.00 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 313.06 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
Formwork, shuttering, centering with 19mm thick
waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 241.75 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
6 Roofing Work
6.1 0.5mm colour CGI sheet roofing including fixing in
proper shape & size with all necessary nails, screws,
bolts & nuts washers, J & L hooks etc as per drawing 283.00 Sqm 1000.00 Sqm
& instruction all complete.
6.2 0.50mm colour Ridge on roof including fixing in proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 23.80 Rm 1000.00 Rm
instruction all complete.
6.3 0.50mm colour sheet for fixing in gable wall proper
shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & 20.18 Sqm 1200.00 Sqm
instruction all complete.
7 Door,window & wooden works

Contractor: Prepared By: Checked By: Approved By:


Page 489 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Dining
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Well Seasoned Sal wood chaukhats for


fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 1.08 Cum 180000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.
Fixing of glazed shutter in 38x75 mm thick sal wood
frame with 4mm thick plain glass fitted including all
necessary hardware fittings all complete. 19.20 Sqm 10,000.00 Sqm
7.5
8 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 400.00 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 434.62 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 40.00 Cum 1000.00 Cum
3 mm thick cement sand punning on floor, skriting,
dado etc, including mixing laying and rubbing with
8.7 steel trowel to a hard, smooth and shining surface 400.00 Sqm 150.00 Sqm
and curing all complete.
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster 0.00 Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster 171.26 Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 343.53 Sqm 300.00 Sqm
11 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 186.81 Sqm 250.00 Sqm
12 Steel and Iron Works
M.S. Black Pipe roof truss & purpin with I.S. or B.S.
section including jointing, fixing, erection and primer
12.6 painting with all necessary M.S. Bed Plates, Shoe 2599.01 kg 125.00 kg
angles anchor bolts leas sheeting or cement grouting
as per drw

Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 490 of 593

struction

Amount Remarks
Rs

2,000.00

13,339.50

4,446.50

5,053.75

440,280.00

735,240.00

24,890.63

168,277.50

66,291.75

Contractor: Prepared By: Checked By: Approved By:


Page 491 of 593

struction

Amount Remarks
Rs

775,325.70

85,567.26

14,411.25

156,528.75

120,876.00

283,001.04

23,800.00

24,217.80

Contractor: Prepared By: Checked By: Approved By:


Page 492 of 593

struction

Amount Remarks
Rs

194,231.25

192,000.00

200,000.00

260,772.00

40,000.00

60,000.00

42,814.50

103,059.00

46,703.13

324,876.13

4,408,003.43

Contractor: Prepared By: Checked By: Approved By:


Page 493 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:
Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Dining
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work
Previous 400.00
Earthwork in excavation in
1.2
hard/boulder mix soils
Isolated Footing F1 20 1.65 1.65 1.65 89.84
Isolated Footing F2 7 1.45 1.45 1.60 23.55
Trench Along Portion 1-1&3-3 2 12.60 0.70 1.65 29.11

Grid 2-2 1 13.60 0.70 1.65


Grid A-A & G-G 2 6.00 0.70 1.18 9.87
Grid B-B to F-F 5 6.20 0.70 1.18 25.50
Previous 177.86
Earth filling including supply of
1.3
filling materials.
Previous 88.93
Earth filling in 150 mm thick layer,
watering, ramming including supply
1.4
of filling materials within 6 km
distance.
Previous 40.43
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to
ground floor .
Previous 36.69
Good Quaity Local chimney made
2.2 Brickworks in 1:4 c/s mortar in
super structure
Previous 61.27
3 Stone Masonary Work
Rubble masonry in 1:6 C/S mortar in
perfect line level finish including,
3.1 racking the joints and curing the
work for at least 7 days all
complete.
Flat dry boulder soling on flat in
3.2 foundation and floor including sand
filling in joints.
Previous 8.30
4 Plain Cement concrete work
Plain cement Concrete (PCC) in
4.1 1:3:6 ratio for foundations, flooring
and walls.
Previous 21.03

Contractor: Prepared By: Checked By: Approved By:


Page 494 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:
Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Dining
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
Plain Cement Concrete PCC for RCC
4.2
works(1:2:4) slab and lintels
Previous 6.63
Plain cement Concrete (PCC) for
4.3 RCC works (1:1.5:3) for column,
Beam, Slab & Staircase
Previous 64.61
Tor steel or TMT reinforcement bar
4.4
of fe 415/500 grade.
Previous 10.696
5 Formwork
Formwork, shuttering, centering
5.1 with 19mm thick waterproof ply for
beam with steel pipe propping.
Previous 28.823
Formwork, shuttering, centering
5.3 with 19mm thick waterproof ply for
beam with steel pipe propping.
Previous 313.06
Formwork, shuttering, centering with
5.4
19mm thick waterproof ply for column,
Previous 241.75
6 Roofing Work
6.1 0.5mm colour CGI sheet roofing including
fixing in proper shape & size with all
necessary nails, screws, bolts & nuts
washers, J & L hooks etc as per drawing &
instruction all complete.
Previous 283.00
6.2 0.50mm colour Ridge on roof including
fixing in proper shape & size with all
necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete.
Ridge cap 1 23.80 23.80

6.3 0.50mm colour sheet for fixing in gable


wall proper shape & size with all necessary
rails, screws, bolts & nuts washers, J & L
hocks etc as per drawing & instruction all
complete.
Previous 15.33
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats
7.3
for fixed/openable door/windows.
Previous 1.08

Contractor: Prepared By: Checked By: Approved By:


Page 495 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:
Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Dining
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
Fixing of glazed shutter in 38x75 mm thick
sal wood frame with 4mm thick plain glass
fitted including all necessary hardware
fittings all complete.
7.5
Previous 19.20
Fixing of glazed shutter in 38x75 mm thick
sal wood frame with 4mm thick plain glass
fitted including all necessary hardware
fittings all complete.
7.5
8 Flooring work
38mm thick (1:2:4) P.C.C. for
flooring with approved quality of
8.1
O.P. cement & sand and crushed
stone aggregate .
Previous 400.00
Flat dry brick soling on flat in
foundation and floor including sand
8.4
filling in joints, leveling, ramming
etc. all complete
Previous 434.62
Sand filling in flooring including
8.5 supply of filling materials, watering,
ramming etc. all complete
Previous 40.00
3 mm thick cement sand punning on floor,
skriting, dado etc, including mixing laying
8.7 and rubbing with steel trowel to a hard,
smooth and shining surface and curing all
complete.
Ground floor 1 25.00 16.00 400.00
Previous 400.00
9 Plastering Work
Previous 0.00
12.5mm thick cement sand plaster in 1:4 ratio
9.2
on External wall plaster
Previous 171.26
9.3 20 mm thick cement sand palster in 1:4
ratio on internal wall plaster
Previous 343.53
11 Water Proofing Works
Providing and applying Dustban Premise
11.1 chamical for anti termites treatment

Previous 186.81
12 Steel and Iron Works

Contractor: Prepared By: Checked By: Approved By:


Page 496 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
F/Y:
Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Dining
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No. Quantity
m m m Kg / m
M.S. Black Pipe roof truss & purlin with I.S. or
12.6 B.S. section including jointing, fixing,

Rafter (Dia 65 mm 4.0 mm thick) 7 13.12 91.84 5.75 528.08


Vertical Strut (Dia 40 mm 4.0 mm thick) 7 9.25 64.75 3.10 200.73
Inclined Strut (Dia 40 mm 4.0 mm thick) 7 12.40 86.80 3.10 269.08
Base Beam (Dia 65 mm 4.0 mm thick) 7 12.00 84.00 ` 5.75 483.00
Purlin (Dia 50 mm 4.0 mm thick) 12 26.10 313.20 3.57 1118.12
Previous ###

Contractor: Prepared By: Checked By: Approved By:


Page 497 of 593

F/Y:- 2075/076

Unit Remarks

Sqm

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Contractor: Prepared By: Checked By: Approved By:


Page 498 of 593

F/Y:- 2075/076

Unit Remarks

Cum

Cum

MT

Sqm

Sqm

Sqm

Sqm

Rm

Sqm

Cum

Contractor: Prepared By: Checked By: Approved By:


Page 499 of 593

F/Y:- 2075/076

Unit Remarks

Sqm

Sqm

Sqm

Cum

Sqm

Sqm

Sqm

Sqm

Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 500 of 593

F/Y:- 2075/076

Unit Remarks

kg

Contractor: Prepared By: Checked By: Approved By:


Page 501 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Barrack Dormitory
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 2196.91 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 225.95 Cum 75.00 Cum
lift all complete.
Earth filling without supply of filling materials all
1.3 112.97 Cum 50.00 Cum
complete.
Earth filling in 150/150 mm thick layer, watering,
1.4 ramming including supply of filling materials within 10 28.07 Cum 125.00 Cum
m distance all complete.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 31.10 Cum 12000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in Super Structure with perfect line level
2.2 123.89 Cum 12000.00 Cum
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

3 Stone Masonary Work


Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. 14.20 Cum 3000.00 Cum

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 31.76 Cum 8000.00 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 10.04 Cum 10000.00
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 502 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Barrack Dormitory
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 235.69 Cum 12000.00 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 35.254243 MT 8000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork
Form Work Shuttering, centricn with wooden form
work for all works necessary propping, scaffolding,
5.1 staging,supporting inclusive of wedging and cutting 80.2875 Sqm 500.00 Sqm
holes for utilization till the support if full unyeilding net.
Sill n lintel

Form work , shuttering, centering with 19mm thick


water proof ply board and steel post for all works
5.2 necessary propping, scafolding, staging, supporting 533.5065 Sqm 500.00 Sqm
inclusive of wedging and cutting holes for utilization till
the support if fully unyeilding net . Slab

Formwork, shuttering, centering with 19mm thick


waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 988.59 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 765.05 Sqm 500.00 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
7 Door,window & wooden works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with good finish of
7.3 approved quality including fixing in position with 2.50 Cum 180000.00 Cum
necessary M.S. holdfasts as per drawing and
instructions all complete.

Contractor: Prepared By: Checked By: Approved By:


Page 503 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Barrack Dormitory
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Fixing of glazed shutter in 38x75 mm thick sal wood


frame with 4mm thick plain glass fitted including all
necessary hardware fittings all complete. 59.67 Sqm 10000.00 Sqm
7.5
8 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 395.63 Sqm 500.00 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 282.33 Sqm 600.00 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 19.62 Cum 1000.00 Cum
3 mm thick cement sand punning on floor, skriting,
dado etc, including mixing laying and rubbing with
8.7 steel trowel to a hard, smooth and shining surface 395.63 Sqm 150.00 Sqm
and curing all complete.
9 Plastering Work
12.5mm thick cement sand palster in 1:3 ratio on
9.1 ceiling Plaster 509.34 Sqm 250.00 Sqm
12.5mm thick cement sand palster in 1:4 ratio on
9.2 External wall plaster 992.76 Sqm 250.00 Sqm
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 885.54 Sqm 300.00 Sqm
11.0 Water Proofing Works
Providing and applying Dustban Premise chamical for
11.1 anti termites treatment 236.91 Sqm 250.00 Sqm
Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 504 of 593

struction

Amount Remarks
Rs

10,984.55

16,946.25

5,648.50

3,508.75

373,256.73

1,486,622.25

42,600.00

254,093.00

100,359.37

Contractor: Prepared By: Checked By: Approved By:


Page 505 of 593

struction

Amount Remarks
Rs

2,828,295.06

282,033.94

40,143.75

266,753.25

494,295.20

382,523.00

450,692.10

Contractor: Prepared By: Checked By: Approved By:


Page 506 of 593

struction

Amount Remarks
Rs

596,700.00

197,814.00

169,399.08

19,618.50

59,344.20

127,335.87

248,190.00

265,662.00

59,227.50
8,782,046.85

Contractor: Prepared By: Checked By: Approved By:


Page 507 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Barrack Dormitory


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
1.1 Site preparation work 1 29.80 7.95
Building's construction area
Previous
Earthwork in excavation in hard/boulder
1.2
mix soils
Isolated Footing F1 2 2.15 2.15 1.65
Isolated Footing F2 7 1.95 1.95 1.65
Isolated Footing F3 7 1.75 1.75 1.60
Isolated Footing F4 8 1.65 1.65 1.55
Combine Footing CF1 2 2.65 2.65 1.70
Combined Footing CF2 1 2.05 1.65 1.65
Grid A-A 1 4.35 0.70 1.05
Grid B-B 1 4.05 0.70 1.05
Grid C-C 1 4.15 0.70 1.05
Grid D-D 1 3.75 0.70 1.05
Grid E-E 1 3.45 0.70 1.05
Grid F-F 1 3.45 0.70 1.05
Grid G-G 1 4.15 0.70 1.05
Grid H-H 1 4.15 0.70 1.05
Grid I-I 1 4.15 0.70 1.05
Grid J-J 1 4.35 0.70 1.05

Grid 1-1 1 14.81 0.70 1.05


Grid 2-2 1 14.21 0.70 1.05
Grid 3-3 1 16.91 0.70 1.05
Trench Along Partition Horizontal T/B 2 1.00 0.70 1.05
1 3.13 0.70 1.05
Trench Along Partition Transeverse T/B 1 3.30 0.70 1.05
Previous
Earth filling including supply of filling
1.3
materials.
Previous
Earth filling in 150 mm thick layer,
1.4 watering, ramming including supply of
filling materials within 6 km distance.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to ground
floor .
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 508 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Barrack Dormitory


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Good quality local chimney made
Brickwork in 1:4 C/S mortar in super
structure in perfect line level finish
2.2
including wetting the bricks, racking the
joints and curing the work for at least 7
days all complete.
Previous
3 Stone Masonary Work
Flat dry boulder soling on flat in foundation
3.2
and floor including sand filling in joints.
Previous
4 Plain Cement concrete work
Plain cement Concrete (PCC) in 1:3:6 ratio
4.1
for foundations, flooring and walls.
Previous
Plain Cement Concrete PCC for RCC
4.2
works(1:2:4) slab and lintels
Previous
Plain cement Concrete (PCC) for RCC
4.3 works (1:1.5:3) for column, Beam, Slab &
Staircase
Previous
Tor steel or TMT reinforcement bar of fe
4.4
415/500 grade.
Previous
5 Formwork
Formwork, shuttering, centering with
5.1 19mm thick waterproof ply for sill & lintel
with steel pipe propping.
Previous
Formwork, shuttering, centering with
5.2 19mm thick waterproof ply for slab with
steel pipe propping.
Previous
Formwork, shuttering, centering with
5.3 19mm thick waterproof ply for beam with
steel pipe propping.

previous bill

Formwork, shuttering, centering with


5.4 19mm thick waterproof ply for column,
necessary propping, scaffolding.
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 509 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Barrack Dormitory


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
7 Wooden Works
Well Seasoned Sal wood chaukhats for
fixed/openable door/windows with
good finish of approved quality
7.1
including fixing in position with
necessary M.S. holdfasts as per
drawing and instructions all complete.
Previous
Fixing of glazed shutter in 38x75 mm
thick sal wood frame with 4mm thick
plain glass fitted including all
necessary hardware fittings all
7.5 complete.
Previous
8 Flooring work
38mm thick (1:2:4) P.C.C. for flooring with
8.1 approved quality of O.P. cement & sand
and crushed stone aggregate .
Previous
Flat dry brick soling on flat in foundation
8.4 and floor including sand filling in joints,
leveling, ramming etc. all complete
Previous
Sand filling in flooring including supply of
8.5 filling materials, watering, ramming etc. all
complete
Previous
3 mm thick cement sand punning on floor,
skriting, dado etc, including mixing laying
8.7 and rubbing with steel trowel to a hard,
smooth and shining surface and curing all
complete.
Previous
9 Plastering Work
12.5mm thick cement sand palster in
9.1
1:3 ratio on ceiling Plaster
Previous
12.5mm thick cement sand palster in 1:4
9.2
ratio on External wall plaster
Previous
20 mm thick cement sand palster in 1:4
9.3 ratio on internal wall plaster
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 510 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet

Project :- Construction of Central Jail (Phase- II) Nuwakot, NP Barrack Dormitory


Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
11.0 Water Proofing Works
Providing and applying Dustban
11.1 Premise chemical for anti termites
treatment
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 511 of 593

truction

F/Y:- 2075/076

Quantity Unit Remarks

236.91
2196.91 Sqm

15.25
43.91
34.30
33.75
23.87
5.58
3.19
2.97
3.05
2.75
2.53
2.53
3.05
3.05
3.05
3.19

10.88
10.44
12.42
1.47
2.30
2.42
225.95 Cum

112.97 Cum

28.07 Cum

31.10 Cum

Contractor: Prepared By: Checked By: Approved By:


Page 512 of 593

truction

F/Y:- 2075/076

Quantity Unit Remarks

123.89 Cum

14.20 Cum

31.76 Cum

10.04 Cum

235.69 Cum

35.254 MT

80.29 Sqm

533.51 Sqm

673.05 Sqm

765.05 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 513 of 593

truction

F/Y:- 2075/076

Quantity Unit Remarks

2.50 Cum

59.67 Sqm

395.63 Sqm

282.33 Sqm

19.62 Cum

395.63 Sqm

509.34 Sqm

992.76 Sqm

885.54 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 514 of 593

truction

F/Y:- 2075/076

Quantity Unit Remarks

236.91 Cum

Contractor: Prepared By: Checked By: Approved By:


Page 515 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Water Tank for Central Jail
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

A. CIVIL WORKS
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal of
1.1 debrises, uprooting roots, solid wastes etc. all 57.06 Sqm 5.00 Sqm
complete as per instruction.
Earthwork in excavation in hard/boulder mix soils in
1.2 foundation including 10m hauling distance and 1.5 m. 156.91 Cum 75.00 Cum
lift all complete.
Earth filling including supply of filling materials all
1.3 6.15 Cum 50.00 Cum
complete.
Earth filling in 150 mm thick layer, watering, ramming
1.4 including supply of filling materials within 6 km 0.00 Cum 125.00 Cum
distance.
2 Brick Masonary work

Good quality local chimney made Brickwork in 1:4


C/S mortar up to ground floor in perfect line level
2.1 0.00 Cum 12000 Sqm
finish including wetting the bricks, racking the joints
and curing the work for at least 7 days all complete.

Good quality local chimney made Brickwork in 1:4


C/S mortar in superstructure in perfect line level finish
2.2 0.00 Cum 12000 Cum
including wetting the bricks, racking the joints and
curing the work for at least 7 days all complete.

3 Stone Masonry
Dry stone laying in foundation and floor including sand
3.2 filling in joints, leveling, watering etc. all complete. 0.00 Cum 3000 Cum

4 Plain Cement concrete work

Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls with approved quality
4.1 of cement and sand and crushed stone aggregate 3.67 Cum 8000 Cum
including mixing, laying using mixture & Vibrator,
curing etc all complete in approval of site engineer.

Plain cement concrete(PCC) for Rcc works (1:2:4) for


slab/lintels with approved quality of cement sand and
4.2 crushed stone aggregates including 0.00 Cum 10000 Cum
mixing,laying,using mixture and vibrator, curing etc all
complete in approval of site engineer.

Contractor: Prepared By: Checked By: Approved By:


Page 516 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Water Tank for Central Jail
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

Plain cement Concrete (PCC) for RCC works (1:1.5:3)


for slab/lintels with approved quality of cement and
4.3 sand and crushed stone aggregate including mixing, 36.62 Cum 12000 Cum
laying using mixture & Vibrator, curing etc all complete
in approval of site engineer.

Tor steel or TMT reinforcement bar of fe 415/500


grade including straightening, cleaning, cutting,
4.4 3.192 MT 8000.00 MT
binding & fixing in position with annealed tying binding
wire as per drawing, design & instruction all complete.

5 Formwork
Formwork, shuttering, centering with 19mm thick
waterproof ply for beam with steel pipe propping,
5.3 scaffolding, staging, supporting inclusive of wedging 218.12 Sqm 500 Sqm
and cutting holes for utilization till the support if fully
unyielding net.

Formwork, shuttering, centering with 19mm thick


waterproof ply for column, necessary propping,
5.4 scaffolding, staging, supporting inclusive of wedging 0.00 Sqm 500 Sqm
and cutting holes for utilization till the support if fully
unyielding net.
7 Door, window & wooden work
Fixing of Well seasoned salwood for
7.1 beam/joist/column all necessary hardware fittings all 0.00 Cum 180000 Cum
comlete.
8 Flooring work

38mm thick (1:2:4) P.C.C. for flooring with approved


quality of O.P. cement & sand and crushed stone
8.1 16.50 Sqm 500 Sqm
aggregate including mixing, laying, punning, rubbing
in hard surface curing etc all complete.

Flat dry brick soling on flat in foundation and floor


8.4 including sand filling in joints, leveling, ramming etc. 57.06 Sqm 600 Sqm
all complete
Sand filling in flooring including supply of filling
8.5 materials, watering, ramming etc. all complete 11.41 Cum 1000 Cum
3mm thick cement sand punning on floor, skirting,
dado etc, including mixing laying and rubbing with
8.7 steel trowel to hard, smooth and shining surface and 159.20 Sqm 150 Sqm
curing all

Contractor: Prepared By: Checked By: Approved By:


Page 517 of 593

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
MB ABSTRACT
Project :- Construction of Water Tank for Central Jail
Site:-Bidur-6, Maharanidihi, Nuwakot

S.N. Description of Work Quantity Unit Rate Rs. Per

9 Plastering Work
12.5mm thick cement sand plaster in 1:4 ratio on
9.2 External wall plaster 40.56 Cum 250 Cum
20 mm thick cement sand palster in 1:4 ratio on
9.3 internal wall plaster 99.74 Cum 300 Cum
11 Water Proofing Works
Providing and applying Dustban Premise chemicals
0.00 Sqm 250 Sqm
11.1 for Anti termite Treatment
Elastocrete cementitious elastomeric water proofing
coating 2 components capacity per kg sqft 2 coat 74.42 Sqm 400 Sqm
11.2 including supply and all complete
Sum of Civil Works

Contractor: Prepared By: Checked By: Approved By:


Page 518 of 593

Construction

Amount Remarks
Rs

285.30

11,768.25

307.50

29,360.00

Contractor: Prepared By: Checked By: Approved By:


Page 519 of 593

Construction

Amount Remarks
Rs

439,440.00

25,536.69

109,060.00

8,250.00

34,236.00

11,410.00

23,879.46

Contractor: Prepared By: Checked By: Approved By:


Page 520 of 593

Construction

Amount Remarks
Rs

10,140.00

29,920.88

29,768.00

763,362.09

Contractor: Prepared By: Checked By: Approved By:


Page 521 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
Project :- Construction of Water Tank for Central Jail
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
A. CIVIL WORKS:-
1 Earthwork and Earthfilling
Site preparation work with cleaning and disposal
1.1 of debrises, uprooting roots, solid wastes etc. all
complete as per instruction. For 30 CUM Tank 4.60 3.60
1
Previous
Earthwork in excavation in hard/boulder mix
1.2 soils in foundation including 10m hauling
distance and 1.5 m. lift all complete.
Previous
Earth filling including supply of filling materials
1.3
all complete.
Previous
2 Brick Masonary work
Good quality local chimney made
2.1 Brickwork in 1:4 C/S mortar up to ground
floor .
Previous
Good quality local chimney made
2.2 Brickwork in 1:4 C/S mortar up to ground
floor .
Previous
3 Stone Masonry

Contractor: Prepared By: Checked By: Approved By:


Page 522 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
Project :- Construction of Water Tank for Central Jail
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
Dry stone laying in foundation and floor including
3.1 sand filling in joints, leveling, watering etc. all
complete.
Previous
4 Plain Cement Concrette Works
Plain Cement Concrete (PCC) in 1:3:6
4.1
ratio for foundations, flooring and walls.
Previous
Plain cement Concrete (PCC) for RCC
works (1:2:4) for slab/lintels with
4.2 approved quality of cement and sand and
crushed stone aggregate.
Plain cement Concrete (PCC) for RCC
works (1:1.5:2) for slab/lintels with
4.3
approved quality of cement and sand and
crushed stone aggregate.
Previous
Tor steel or TMT reinforcement bar of Fe
4.4
415/500 grade.
Previous
5 Formwork
Formwork, shuttering, centering with
5.1 19mm thick waterproof ply for beam
with steel pipe propping.
Previous
Formwork, shuttering, centering with
5.2 19mm thick waterproof ply for Column
with steel pipe propping.

7 Door/ Window and Wooden Works

7.1 Door/ Window

8 Flooring work

Contractor: Prepared By: Checked By: Approved By:


Page 523 of 593
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Project Implementation Unit - 4
Babarmahal, Kathmandu
Measurement Sheet
Project :- Construction of Water Tank for Central Jail
Site:-Bidur-6, Maharanidihi, Nuwakot
Length Breadth Height Weight
S.N. Description of Work No.
m m m Kg / m
38mm thick (1:2:4) P.C.C. for flooring
8.1 with approved quality of O.P. cement &
sand and crushed stone aggregate .
Previous
Flat dry brick soling on flat in foundation
8.4 and floor including sand filling in joints,
leveling, ramming etc. all complete
For 30 CUM Tank 4.60 3.60
1
Previous
Sand filling in flooring including supply of
8.5 filling materials, watering, ramming etc.
all complete
Previous
3mm thick cement sand punning work
8.7 with all complete
Previous
9 Plastering Work
12.5mm thick cement sand plaster in 1:4 ratio
9.2 on External wall plaster
Previous
20 mm thick cement sand palster in 1:4 ratio on
9.3
internal wall plaster
Previous
11 Water Proofing Works
Elastocrete cementitious elastomeric water
proofing coating 2 components capacity per kg
sqft 2 coat including supply and all complete
11.2
Previous

Contractor: Prepared By: Checked By: Approved By:


Page 524 of 593

struction

uction

F/Y:- 2075/076

Quantity Unit Remarks

16.56
57.06 Cum

156.91 Cum

6.15 Cum

0.00 Cum

0.00 Cum

Contractor: Prepared By: Checked By: Approved By:


Page 525 of 593

struction

uction

F/Y:- 2075/076

Quantity Unit Remarks

0.00 Cum

3.67 Cum

36.62 Cum

3.192 MT

218.12 Sqm

Contractor: Prepared By: Checked By: Approved By:


Page 526 of 593

struction

uction

F/Y:- 2075/076

Quantity Unit Remarks

16.50 Sqm

16.56
57.06 Sqm

11.41 Cum

159.20 Sqm

40.56 Sqm

99.74 Sqm

74.42 Sqm

Contractor: Prepared By: Checked By: Approved By:


Go
Ministry
Department Of Urban De

Bar Bending M
Isolated footing

Grid Description Actual Shape

Isolated footing in F1 12mm Bottom bar 150 150


Isolated footing in F2 12mm Bottom Bar 150 150
2000
Isolated footing in F3 12mm Bottom Bar 1800
150 150
Isolated footing in F4 12mm Bottom Bar 150 150
1600
12mm Bottom Bar in X 150 1400 150
Isolated footing in CF1 direction
2200
12mm Bottom Bar in Y 150 150
Isolated footing in CF1 direction
1900
12mm Bottom Bar in X
150 150
Isolated footing in CF2 direction
12mm Bottom Bar in Y 1900
Isolated footing in CF2 direction 150
150
1800

Column Rebar

Column Rebar for C1 (16 NoS) Floor Level

C1
3630.00
1st Floor slab

GF Slab 3630.00

Colum C1 DPC 450.00

dia + 8-16
Bottom Lvl. of foundation up
4-12dia to plinth -1500.0
C2
3630.00
1st Floor slab

GF Slab 3630.00

Colum C2
DPC 450.00

Bottom Lvl. of foundation up


dia 12-16 to plinth -1500.0

C3
3630.00
1st Floor slab

GF Slab 3630.00

Column C3
DPC 450.00

Bottom Lvl. of foundation up


dia + 8-16 to plinth -1500.0
4-20dia

C4
3630.00
1st Floor slab

GF Slab 3630.00

Colum C4 DPC 450.00

Bottom Lvl. of foundation up


dia + 8-16 to plinth
4-20dia
-1500.0

C5
3630.00
1st Floor slab
GF Slab 3630.00

Colum C5 DPC 450.00

Bottom Lvl. of foundation up


dia + 4-16 to plinth
8-12dia
-1500.0

Column Stirrups

Grid Floor S. L. (Ft.)

Stirrups at C1 Column up to GF

Foundation to Plinth (450x450)


DPC(1500+450) 1950
cover 40mm 90 deg ring

Foundation to Plinth (450x450)


DPC(1500+450) 1950
cover 40mm small stirrups

Foundation to Plinth (450x450)


DPC(1500+450) 1950
cover 40mm small stirrups

Up to GF Slab
GF Support Bottom
Stirrups(H/4) 3630

GF Support Bottom (450x450)


cover 40mm small stirrups

GF Support Bottom (450x450)


cover 40mm small stirrups

GF Mid Span stirrups 3630


GF Mid Span small stirrups
GF Mid Span small stirrups

GF Support Top Stirrups (H/4)


3630
GF Support Top small Stirrups
(H/4)
GF Support Top small Stirrups
(H/4)
Up to 1st floor Beam
GF Support Bottom
Stirrups(H/4) 3630

GF Support Bottom (450x450)


cover 40mm small stirrups

GF Support Bottom (450x450)


cover 40mm small stirrups

GF Mid Span stirrups 3630


GF Mid Span small stirrups
GF Mid Span small stirrups

GF Support Top Stirrups (H/4)


3630
GF Support Top small Stirrups
(H/4)
GF Support Top small Stirrups
(H/4)

Lower Tie Beam


Grid Description Dia of bar
Lower Tie Beam
Grid 1-1 Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16

Grid 2-2 & 3-3 Top Bar 16


Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16

Grid 4-4 Top Bar 16


Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Grid A-A,B-B,C-C & D-D,E-E Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16

Grid F-F, G-G, H-H, I-I, J-J, K-K, Top Bar


L-L 16
Bottom Bar 16

Foundation Tie Beam

Grid L Shape of bar

Stirrups at Horizontal Foundation Beam (300x300), 25mm Clear cover

From Grid A-A to L_L


Horizontal section Support at
5050
end
Horizontal section Support at
5050
mid
Horizontal section Support at
5050
end

Horizontal section Support at


2550
end
Horizontal section Support at
2550
mid
Horizontal section Support at
2550
end

From Grid 1-1 to 4-4


Horizontal section Support at
3550
end
Horizontal section Support at
3550
mid
Horizontal section Support at
3550
end

Horizontal section Support at


2550
end
Horizontal section Support at
2550
mid
Horizontal section Support at
2550
end
Horizontal section Support at
5050
end
Horizontal section Support at
5050
mid
Horizontal section Support at
5050
end

Tie Beam
Grid Description Dia of bar
Tie Beam
Grid 1-1 Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16

Grid 2-2 & 3-3 Top Bar 16


Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16

Grid 4-4 Top Bar 16


Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16

Grid A-A,B-B,C-C & D-D,E-E Top Bar 16


Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16

Grid F-F, G-G, H-H, I-I, J-J, K-K, Top Bar


L-L 16
Bottom Bar 16
Long Beam Top Bar 12
Bottom Bar 12

Short beam Top Bar 12


Bottom Bar 12

Tie Beam Strirrups

Grid L Shape of bar

Stirrups at Horizontal Foundation Beam (300x300), 25mm Clear cover

From Grid A-A to L_L


Horizontal section Support at
5050
end
Horizontal section Support at
5050
mid
Horizontal section Support at
5050
end

Horizontal section Support at


2550
end
Horizontal section Support at
2550
mid
Horizontal section Support at
2550
end

From Grid 1-1 to 4-4


Horizontal section Support at
3550
end
Horizontal section Support at
3550
mid
Horizontal section Support at
3550
end

Horizontal section Support at


2550
end
Horizontal section Support at
2550
mid
Horizontal section Support at
2550
end

Horizontal section Support at


5050
end
Horizontal section Support at
5050
mid
Horizontal section Support at
5050
end
Secondary Beam
Long Beam
Horizontal section Support at
5200
end
Horizontal section Support at
5200
mid
Horizontal section Support at
5200
end

Short Beam
Horizontal section Support at
2275
end
Horizontal section Support at
2275
mid
Horizontal section Support at
2275
end

Ground Floor Slab


Grid Description Dia of bar

In Slab 1(slab with staircase Main Bar( in X direction)


void) 8
8
8
8
8
8
8
8
Binders(in y-direction)
8
8
8
8
8
8
Ex-top bars(in X-direction) 8
8
8
8
8
8
8
8
8
8
8
8
8
top binders (in Ydirection) 8
8
8
8
8
8
8
8
8
8
In slab 2 Main Bar( in X direction) 8
8
Binders(in y-direction)
8
Ex-top bars(in X-direction) 8
8
8
8
8
8
8
8
top binders (in Ydirection) 8
8
8
8
8

diagonal bars 10

GF Beam
Grid Description Dia of bar
GF Beam
Grid 1-1 Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Extra bars
at support top ex-bar 16
16
at support bottom ex-bar 12
12
16
Grid 2-2 (A-A to E-E) Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Extra bars
at support top ex-bar 12
12
16
12
Grid 2-2 (F-F to L-L) Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Extra bars
at support top ex-bar 16
12
Ex-top bars 12
16
hunge bars 16
Grid 3-3 (A-A to E-E) Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Extra bars
at support top ex-bar 16
12
16
12
Grid 3-3 (F-F to L-L) Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Extra bars
at support top ex-bar 16
12
12
Ex-top bars 12
16
12
hunge bars 16
Grid 4-4 (A-A to E-E) Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Extra bars
at support top ex-bar 16
12
16
12
Grid 4-4 (F-F to L-L) Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Extra bars
at support top ex-bar 16
12
12
Ex-top bars 12
16
12
hunge bars 16
Grid A-A Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Bottom Bar 12
Bottom Bar/End 12
Ex-top bars
at support end 16
16
16
hunge bars 16
Grid B-B Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Bottom Bar 12
Bottom Bar/End 12
Ex-top bars
at support end 12
12
12
hunge bars 16
Grid C-C Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Bottom Bar 12
Bottom Bar/End 12
Ex-top bars
at support end 12
12
16
16
12
16
hunge bars 16
Grid D-D Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Ex-top bars
at support end 16
16
16
Ex-bottom bars 12
hunge bars 16
Grid E-E Top Bar 16
Top Bar/End 16
Bottom Bar 16
Bottom Bar/End 16
Ex-top bars
at support end 16
16
16
Ex-bottom bars 12
hunge bars 16
Grid F-F Top Bar 16
bottom bar 16
Ex-top bars
at support end 16
16
12
16
12
hunge bars 16
Grid G-G Top Bar 16
bottom bar 16
Ex-top bars
at support end 16
16
12
16
12
hunge bars 16
Grid H-H Top Bar 16
bottom bar 16
Ex-top bars
at support end 16
16
12
16
12
hunge bars 16
Grid I-I Top Bar 16
bottom bar 16
Ex-top bars
at support end 16
16
12
16
12
hunge bars 16
Grid J-J Top Bar 16
bottom bar 16
Ex-top bars
at support end 12
16
16
Ex-bottom bars 12
hunge bars 16
Grid K-K Top Bar 16
bottom bar 16
Ex-top bars
at support end 12
16
16
Ex-bottom bars 12
hunge bars 16
Grid L-L Top Bar 16
bottom bar 16
Ex-top bars
at support end 16
16
12
16
12
hunge bars 16
Secondary beams
betn 3-3 & 4-4(betn A-A to E-E) Top Bar 12
Top Bar/End 12
Bottom Bar 12
Bottom Bar/End 12
betn 1-1 & 2-2(betn A-A to D-D) Top Bar 12
Bottom Bar 12
betn 3-3 & 4-4(betn F-F to L-L) Top Bar 12
Top Bar/End 12
Bottom Bar 12
Bottom Bar/End 12
betn K-K &L-L ,transverse Top Bar
sections 12
bottom bar 12

Ground Floor beam stirrups

Grid Floor Shape

Stirrups at Horizontal first floor beam, 25mm Clear cover


for slab1
Horizontal section Foundation
beam stirrups ( Grid of4-4, 3- 75
3 ,2-2, 1-1 )
T/L=3550+2550+2550+2550
with mid span @150mm and
250
support @100mmc/c
Transeverse Section A-A, B-
B,C-C,D-D,E-E, Clear Span
75
T/L=5050+2550+5050
for slab2
Horizontal section Foundation 185
250
beam stirrups ( Grid of4-4, 3- 75
3 ,2-2 )
T/L=5050+2550+2550+2550+25
50+2550 with mid span
250
@150mm and support
@100mmc/c
Transeverse Section F-F,G-
G,H-H,I-I,J-J,K-K,L-LClear
75
Span T/L=2550+5050
Stirrups at Horizontal First Floor Secondary Beam (250x350mm), 25mm Clear cover
185
250
betn 1-1 & 2-2(betn A-A to D-D)
Betn K-K & L-L,transverse sections 75
betn 3-3 & 4-4(betn F-F to L-L) 75
75
200
betn 3-3 & 4-4(betn A-A to E-E)
200
75
200

200
staircase

Grid Description
Dia of bar

flight 1 Main Bar( in X direction) 16


Ex-bar 16
16
16
16
Binders 10
10
flight 2 Main Bar( in X direction) 16
Ex-bar 16
16
16
16
Binders 10
10
Chair bars 8
8
Government Of Nepal
Ministry Of Urban Development
ment Of Urban Development & Building Construction
Division Office
Nuwakot
Bar Bending Measurement Jail Dormitory

No of Bar No of Bar Total in Both Dir No of FootingsLength

14.33 15 30 4 2.300
13.00 13 26 5 2.100
11.6666666667 12 24 18 1.900
10.33 11 22 8 1.700

15.6666666667 16 16 2 2.500

13.6666666667 14 14 2 2.200

13.6666666667 14 14 1 2.200

13.00 13 13 1 2.100
Total 12mm Bar r

Shape Dia of bar Length No

6165 6405

16 10.780 8

3765 3765
12 10.480 4
550 610
4-12dia
0 8-16dia
6405

16 10.780 9

3765

610
12-16dia

6645 6405

16 10.780 8

3765 3765
20 11.260 4

850 610
4-20dia
0
8-16dia

6645 6405

16 10.780 8

3765 3765
20 11.260 4
850 610
4-20dia
0 8-16dia
6165 6405

16 10.780 4

3765 3765
12 10.480 8
550 610
4-12dia
0 8-16dia

Dia of bar
Floor Ht.(ft.) Shape Length

8 1.63

8 1.14

8 1.14

0 8 1.63

8 1.14

3500 8 1.14
3500 8 1.63
8 1.14
8 1.14

3500 8 1.63

8 1.14

8 1.14
0 8 1.63

8 1.14

3500 8 1.14
3500 8 1.63
8 1.14
8 1.14

3500 8 1.63

8 1.14

8 1.14

Actual Shape Length No. No. of Grids


Total length in M

11000 11.660 3 1 34.98


3360 4.020 3 1 12.06
660
11.660 3 1 34.98
660
660 11000 4.020 3 1 12.06
660 0.00
3360 11.660 3 2 69.96
11000
4260 4.920 3 2 29.52
660
11.660 3 2 69.96
660
660 11000 4.920 3 2 29.52
660
11.660 3 2 69.96
11000
4260 11.520 3 2 69.12
10860
660
11.660 3 2 69.96
660
660 11000 11.520 3 2 69.12
660 0.00
10860 11.660 3 1 34.98
11000
3360 4.020 3 1 12.06
660
11.660 3 1 34.98
660
660 11000 4.020 3 1 12.06
660
11.660 3 1 34.98
11000
3360 11.520 3 1 34.56
10860
660
11.660 3 1 34.98
660
660 11000 11.520 3 1 34.56
660
660
0.00
10860 11.660 3 5 174.90
11000
4360 5.020 3 5 75.30
660
11.660
660
3 5 174.90
660 11000 5.020 3 5 75.30
660 0.00
4360
8900
10.220 3 7 214.62
660
660 10.220 3 7 214.62
660 8900 660

Dia of bar
Shape of bar Length No

8 1.15 17.83
75
250
8 1.15 17.83
75
250 250
250
8 1.15 17.83
75
250

8 1.15 9.50
75 250
250
8 1.15 9.50
75
250 250
250
8 1.15 9.50
75
250

250
8 1.15 12.83
75
250
8 1.15 12.83
75
250 250
250
8 1.15 12.83
75
250

8 1.15 9.50
75 250
250
8 1.15 9.50
75
250 250
250
8 1.15 9.50
75
250
8 1.15 17.83
75 250
250
8 1.15 17.83
75
250 250
250
8 1.15 17.83
75
250

250

Actual Shape Length No. No. of Grids


Total length in M

11000 11.660 3 1 34.98


3360 4.020 3 1 12.06
660
11.660 3 1 34.98
660
660 11000 4.020 3 1 12.06
660 0.00
3360 11.660 3 2 69.96
11000
4260 4.920 3 2 29.52
660
11.660 3 2 69.96
660
660 11000 4.920 3 2 29.52
660
11000 11.660 3 2 69.96
4260 11.520 3 2 69.12
10860
660
11.660 3 2 69.96
660
660 11000 11.520 3 2 69.12
660 0.00
10860 11.660 3 1 34.98
11000
3360 4.020 3 1 12.06
660
11.660 3 1 34.98
660
660 11000 4.020 3 1 12.06
660
11.660 3 1 34.98
11000
3360 11.520 3 1 34.56
10860
660
11.660 3 1 34.98
660
660 11000 11.520 3 1 34.56
660 0.00
10860 11.660 3 5 174.90
11000
4360 5.020 3 5 75.30
660
11.660 3 5 174.90
660
660 11000 5.020 3 5 75.30
660 0.00
4360
8900
10.220 3 7 214.62
660
660 10.220 3 7 214.62
660 8900 660
5750 7.070 3 1 21.21
7.070
660
3 1 21.21
660
660 5750 660

2800 4.120 3 2 24.72


4.120
660
3 2 24.72
660
660 2800 660

Dia of bar
Shape of bar Length No

8 1.15 17.83
75
250
8 1.15 17.83
75
250 250
8 1.15 17.83
75
250

250 8 1.15 9.50


75
75 250
250
8 1.15 9.50
75
250
250 250
8 1.15 9.50
75
250 250

250
8 1.15 12.83
75
250
8 1.15 12.83
75
250
250 250
8 1.15 12.83
75
250

8 1.15 9.50
75 250
250
250
8 1.15 9.50
75
250 250
8 1.15 9.50
75
250

8 1.15 17.83
75 250
7 250
250
8 1.15 17.83
75
250
250
8 1.15 17.83
75
250
75
250

8 0.87 18.33
75
7 180
250
8 0.87 18.33
75
180
250
8 0.87 18.33
75
180

8 0.87 8.58
75
7 180
250
8 0.87 8.58
75
180
250
8 0.87 8.58
75
180

Wt.(Kg /
Actual Shape Length No. Total length in M
mt.)

75 7890
7.965 42 334.53 0.40
6610 6.685
75 42 280.77 0.40
75 8290 8.365 23 192.40 0.40
6610 6.685
75 23 153.76 0.40
10.170 35 355.95 0.40
75 10020 75
8.565 7 59.96 0.40
75 8490
6610 6.685
75 7 46.80 0.40
1.170 31 36.27 0.40
75 1020 75

3.570 3 10.71 0.40


75 3420 75
9.565 68 650.42 0.40
75 9490
6.685 68 454.58 0.40
6610 9.670
75 27 261.09 0.40
75 9520 75
1.170 24 28.08 0.40
75 1020 75
5.620 8 44.96 0.40
75 5470 75
7890 7.965 12 95.58 0.40
75 6610 6.685 12 80.22 0.40
75 7890 7.96575
13 103.55 0.40
6610 6.685 13 86.91 0.40
7890 7.965 5 39.83 0.40
75
6610 6.685 5 33.43 0.40
75
75 6610
8290 8.365
75 18 150.57 0.40
6610 6.685 18 120.33 0.40
75
10.170 5 50.85 0.40
75
75 10020 75
10.170 5 50.85 0.40
75 10020 75
8.565 7 59.96 0.40
8490
6610 6.685 7 46.80 0.40
75
1.170 31 36.27 0.40
1020 75
3.570 3 10.71 0.40
3420
75 9.565
75 13 124.35 0.40
9490
75 6.68575 13 86.91 0.40
75 6610 9.565 28 267.82 0.40
9490
6.685
75
28 187.18 0.40
75 6610 9.565 9 86.09 0.40
9490
6.685
75
9 60.17 0.40
75 6610 9.670 19 183.73 0.40
9520
5.620
75
8 44.96 0.40
5470 75
75 1.170 24 28.08 0.40
1020
7575 10500 10.575 75 68 719.10 0.40
75 11500 11.57575
75 68 787.10 0.40

10.270 145 1489.15 0.40


75 10120 75
10500 10.575 12 126.90 0.40
11500 11.575 12 138.90 0.40
75 10.575 13 137.48 0.40
10500 75
11500 11.575 13 150.48 0.40
75
10500 10.575 14 148.05 0.40
75
11500 11.575 14 162.05 0.40
75
10500 10.575 13 137.48 0.40
75
75 11500 11.575 13 150.48 0.40
10.270 9 92.43 0.40
10120 75
10.270 56 575.12 0.40
10120 75
75 10.270 14 143.78 0.40
10120 75
75 10.270 13 133.51 0.40
75 10120 75
10.270 12 123.24 0.40
75 10120 75 total 8mm bar
75 75
2.825 12 33.90 0.62
2825

Actual Shape Length No. No. of Grids


Total length in M

11000 11.535 2 1 23.07


11000
3360 3.895 2 1 7.79
535
11.535
535
3 1 34.61
535 11000 3.895 3 1 11.69
535
0.00
3360 1.710 3 1 5.13
1175 1.960 3 1 5.88
1425
535
295 1175 1.470 2 1 2.94
535
1.950 3 2 11.70
1950 2.200 3 1 6.60
11000 2200 11.425 2 1 22.85
4360 4.895 2 1 9.79
425
11.425
535
3 1 34.28
425 11000 4.895 3 1 14.69
535 0.00
4360 1.710 3 1 5.13
2175 1.720 3 1 5.16
1425
425 1.950 1 2 3.90
295
1950 2.200 3 1 6.60
11000 2200 11.535 2 1 23.07
10860 11.395 2 1 22.79
535
11.535 3 1 34.61
535
535 11000 11.395 3 1 34.19
535 0.00
10860 2.335 1 1 2.34
1800 1.470 1 1 1.47
1175 535
1.950 1 4 7.80
295 1950 2.575 1 1 2.58
2575 3.840 2 1 7.68
3840 11.425 2 1 22.85
11000
4360 4.895 2 1 9.79
425
11.425 3 1 34.28
535
425 11000 4.895 3 1 14.69
535 0.00
4360 1.710 1 1 1.71
2175 1.720 3 1 5.16
1425
425 1.950 1 2 3.90
295
1950 2.200 3 1 6.60
11000 2200 11.535 2 1 23.07
10860 11.395 2 1 22.79
535
11.535 3 1 34.61
535
535 11000 11.395 3 1 34.19
535 0.00
10860 2.335 3 1 7.01
1800 2.095 1 1 2.10
1800 535
1.470 1 1 1.47
1175 295
1175 295
1.950 1 4 7.80
295 1950 2.575 3 1 7.73
2575 2.575 1 1 2.58
2575 3.840 2 1 7.68
3840 11.535 2 1 23.07
11000
3360 3.895 2 1 7.79
535
11.535
535
3 1 34.61
535 11000 3.895 3 1 11.69
535 0.00
3360 1.710 1 1 1.71
1175 1.720 3 1 5.16
1425
535 1.950 1 2 3.90
295
1950 2.200 3 1 6.60
11000 2200 11.535 2 1 23.07
10860 11.395 2 1 22.79
535
11.535 3 1 34.61
535
535 11000 11.395 3 1 34.19
535 0.00
10860 2.335 3 1 7.01
1800 2.095 1 1 2.10
1800 535
1.470 1 1 1.47
1175 295
1.950 1 4 7.80
295 1950 2.575 3 1 7.73
2575 2.575 1 1 2.58
2575 3.840 2 1 7.68
3840 11.535 2 1 23.07
11000
4360 4.895 2 1 9.79
535
11.535 2 1 23.07
535
535 11000 4.895 2 1 9.79
535
11.295 1 1 11.30
295 4360
11000 4.415 1 1 4.42
295
4120 2.335 3 1 7.01
1800 2.335 3 1 7.01
1800 535
2.575 3 2 15.45
535 2575 3.840 2 2 15.36
3840 11.535 2 1 23.07
11000
4360 4.895 2 1 9.79
535
11.535 2 1 23.07
535
535 11000 4.895 2 1 9.79
535
11.295 1 1 11.30
295 4360
11000 4.415 1 1 4.42
295 0.00
4120 2.095 3 1 6.29
1800 2.095 3 1 6.29
1800 295
1800 295
2.575 3 2 15.45
295 2575 3.840 2 2 15.36
3840 11.535 2 1 23.07
11000
4360 4.895 2 1 9.79
535
11.535
535
2 1 23.07
535 11000 4.895 2 1 9.79
535
11.295 1 1 11.30
295 4360
11000 4.415 1 1 4.42
295
4120 2.095 2 1 4.19
1800 2.095 2 1 4.19
1800 295
2.335 1 1 2.34
295 1800 2.335 1 1 2.34
535 1800 2.575 2 2 10.30
2575 535 2.575 1 2 5.15
2575 3.840 2 2 15.36
3840 11.535 2 1 23.07
11000
4360 4.895 2 1 9.79
535
11.535 3 1 34.61
535
535 11000 4.895 3 1 14.69
535
4360 2.335 4 1 9.34
1800 2.335 4 1 9.34
535 1800 2.575 4 2 20.60
2575 535 4.125 2 1 8.25
4125 3.840 2 2 15.36
3840 11.535 2 1 23.07
11000
4360 4.895 2 1 9.79
535
11.535 3 1 34.61
535
535 11000 4.895 3 1 14.69
535
0.00
4360 2.335 4 1 9.34
1800 2.335 4 1 9.34
535 1800 2.575 4 2 20.60
2575 535 4.125 2 1 8.25
4125 3.840 2 2 15.36
3840 9.970 2 1 19.94
8900
9.970 3 1 29.91
535 535
8900 0.00
535 535
1.710 1 1 1.71
1175 2.335 1 1 2.34
535 1800 2.095 2 1 4.19
1800 2.575535 1 1 2.58
2575 2.575295 2 1 5.15
2575 3.840 2 1 7.68
3840
3840 9.970 2 1 19.94
8900
9.970 3 1 29.91
535 535
8900 0.00
535 535
1.710 1 1 1.71
1175 2.335 1 1 2.34
1800 2.095 2 1 4.19
535
1800 2.575535 1 1 2.58
2575 2.575295 2 1 5.15
2575 3.840 2 1 7.68
3840 9.970 2 1 19.94
8900
9.970 3 1 29.91
535 535
8900 0.00
535 535
1.710 1 1 1.71
1175 2.335 1 1 2.34
535 1800 2.095 2 1 4.19
1800 2.575535 1 1 2.58
2575 2.575295 2 1 5.15
2575 3.840 2 1 7.68
3840 9.970 2 1 19.94
8900
9.970 3 1 29.91
535 535
8900 0.00
535 535
1.710 1 1 1.71
1175 2.335 1 1 2.34
1800 2.095 2 1 4.19
535
1800 2.575535 1 1 2.58
2575 2.575295 2 1 5.15
2575 3.840 2 1 7.68
3840 9.970 2 1 19.94
8900
9.970 3 1 29.91
535 535
8900 0.00
535 535
1.710 3 1 5.13
1175 2.335 4 1 9.34
295 1800 2.575 4 1 10.30
2575 4.125535 2 1 8.25
4125 3.840 2 1 7.68
3840 9.970 2 1 19.94
8900
9.970 3 1 29.91
535 535
8900 0.00
535 535
1.710 3 1 5.13
1175 2.335 4 1 9.34
1800 2.575 4 1 10.30
295
2575 4.125535 2 1 8.25
4125 3.840 2 1 7.68
3840 9.970 2 1 19.94
8900
9.970 3 1 29.91
535 535
535 535
8900
535 535
1.710 1 1 1.71
1175 2.335 1 1 2.34
535 1800 2.095 2 1 4.19
1800 2.575535 1 1 2.58
2575 2.575295 2 1 5.15
2575 3.840 2 1 7.68
3840 0.00
11000 11.470 3 1 34.41
2970 3.440 3 1 10.32
470
11.470
470
3 1 34.41
3.440 3 1 10.32
470 11000
2970 10.190 470 3 1 30.57
9250
10.190 3 1 30.57
470 11.470 470 3 1 34.41
11000
470 9250 10.940 470 3 1 32.82
10470
470
11.470 3 1 34.41
470
10.940 3 1 32.82
470 11000
8750
10470 470
9.690 3 1 29.07
470 9.690 470 3 1 29.07
8750 0.00
470 470

e Dia of bar Length No whole no

425

8 1.5 111.56 112.00

425
255 8 1.5 124.44 125.00

425

8 1.5 176.22 177.00


425
255 8 1.5 75.56 76.00

8 1.15 81.00 82.00


8 1.15 77.00 78.00
300
8 1.15 184.22 185.00
300
300
8 1.15 116.89 118.00
300

Total
Actual Shape length in
Length No. M Wt.(Kg / mt.)

6.400 11 70.40 1.58


2.050 11 22.55 1.58
1.920 11 21.12 1.58
2.725 11 29.98 1.58
1.920 11 21.12 1.58
1.600 47 75.20 0.62
3.850 22 84.70 0.62
7.075 11 77.83 1.58
2.725 11 29.98 1.58
1.920 11 21.12 1.58
2.725 11 29.98 1.58
1.920 11 21.12 1.58
1.600 47 75.20 0.62
3.850 22 84.70 0.62
0.85 88 74.8 0.40
1.45 22 31.9 0.40

total
10mm dia bar
16mm dia bar
8mm dia bar
Wt.(Kg) / Total quantity (Kg) Remarks
Total length mt.
276 0.889 245.33 F1
273 0.889 242.67 F2
820.8 0.889 729.60 F3
299.2 0.889 265.96 F4

CF1
80 0.889 71.11
CF1
61.6 0.889 54.76
CF2
30.8 0.889 27.38
CF2
27.3 0.889 24.27
Total 12mm Bar r 1661.07

Total
No Of Col Length in Wt.(Kg) / m Total quantity (Kg)
M

26 2242.240 1.580 3543.29

26 1089.920 0.889 968.81


26 2522.520 1.580 3986.20

2 172.480 1.580 272.56

2 90.080 2.469 222.41

2 172.480 1.580 272.56

2 90.080 2.469 222.41


2 86.240 1.580 136.28

2 167.680 0.889 149.04

12 mm dia sub total 1117.85


16 mm dia sub total 8210.89
20 mm dia sub total 444.82

Column Total Total Wt.(Kg) / m Total


No Whole No Length in quantity Remarks
M (Kg)

20.5 21 41 1403.43 0.395 554.44

20.5 21 41 981.54 0.395 387.77

20.5 21 41 981.54 0.395 387.77


0 0.000 0.00

10.1 11 41 735.13 0.395 290.42

10.1 11 41 514.14 0.395 203.12

10.1 11 41 514.14 0.395 203.12


13.1 14 41 935.62 0.395 369.63
13.1 14 41 654.36 0.395 258.51
13.1 14 41 654.36 0.395 258.51

10.1 11 41 735.13 0.395 290.42

10.1 11 41 514.14 0.395 203.12

10.1 11 41 514.14 0.395 203.12


0 0.000 0.00
0 0.000 0.00

10.1 11 41 735.13 0.395 290.42

10.1 11 41 514.14 0.395 203.12

10.1 11 41 514.14 0.395 203.12


13.1 14 41 935.62 0.395 369.63
13.1 14 41 654.36 0.395 258.51
13.1 14 41 654.36 0.395 258.51

10.1 11 41 735.13 0.395 290.42

10.1 11 41 514.14 0.395 203.12

10.1 11 41 514.14 0.395 203.12


Total 5889.91 Kg

For 10 dia For 16 dia For 20 dia


Wt.(Kg / mt.) Total quantity (Kg)
For 8 dia rebar
rebar
For 12 dia rebar
rebar rebar Remarks

1.58 55.28 0 0 0 #REF! 0


1.58 19.06
1.58 55.28
1.58 19.06
0.00 0.00
1.58 110.55
1.58 46.65
1.58 110.55
1.58 46.65
1.58 110.55
1.58 109.23
1.58 110.55
1.58 109.23
0.00 0.00
1.58 55.28
1.58 19.06
1.58 55.28
1.58 19.06
1.58 55.28
1.58 54.61
1.58 55.28
1.58 54.61
0.00 0.00
1.58 276.39
1.58 118.99
1.58 276.39
1.58 118.99
0.00 0.00

1.58 339.15
1.58 339.15
Total 2740.15 Kg

Wt.(Kg) / Total
whole no Total Grid Total Length in M m quantity (Kg) Remarks

18.00 17 351.9 0.395 139.02

18.00 17 351.9 0.395 139.02

18.00 17 351.9 0.395 139.02


0.00

10.00 12 138 0.395 54.52

10.00 12 138 0.395 54.52

10.00 12 138 0.395 54.52


0.00
0.00

13.00 4 59.8 0.395 23.62

13.00 4 59.8 0.395 23.62

13.00 4 59.8 0.395 23.62


0.00

10.00 27 310.5 0.395 122.67

10.00 27 310.5 0.395 122.67

10.00 27 310.5 0.395 122.67


0.00
18.00 3 62.1 0.395 24.53

18.00 3 62.1 0.395 24.53

18.00 3 62.1 0.395 24.53


Total 1093.10 Kg

For 10 dia For 16 dia For 20 dia


Wt.(Kg / mt.) Total quantity (Kg)
For 8 dia rebar
rebar
For 12 dia rebar
rebar rebar Remarks

1.58 55.28 0 0 0 #REF! 0


1.58 19.06
1.58 55.28
1.58 19.06
0.00 0.00
1.58 110.55
1.58 46.65
1.58 110.55
1.58 46.65
1.58 110.55
1.58 109.23
1.58 110.55
1.58 109.23
0.00 0.00
1.58 55.28
1.58 19.06
1.58 55.28
1.58 19.06
1.58 55.28
1.58 54.61
1.58 55.28
1.58 54.61
0.00 0.00
1.58 276.39
1.58 118.99
1.58 276.39
1.58 118.99
0.00 0.00

1.58 339.15
1.58 339.15
0.00
0.89 18.85
0.89 18.85
0.00
0.89 21.97
0.89 21.97
Total 2821.80 Kg

Wt.(Kg) / Total
whole no Total Grid Total Length in M m quantity (Kg) Remarks

18.00 17 351.9 0.395 139.02

18.00 17 351.9 0.395 139.02

18.00 17 351.9 0.395 139.02


0 0.000 0.00

10.00 12 138 0.395 54.52

10.00 12 138 0.395 54.52

10.00 12 138 0.395 54.52


0 0.000 0.00
0 0.000 0.00

13.00 4 59.8 0.395 23.62

13.00 4 59.8 0.395 23.62

13.00 4 59.8 0.395 23.62


0 0.000 0.00

10.00 27 310.5 0.395 122.67

10.00 27 310.5 0.395 122.67

10.00 27 310.5 0.395 122.67


0 0.000 0.00

18.00 3 62.1 0.395 24.53

18.00 3 62.1 0.395 24.53

18.00 3 62.1 0.395 24.53


19 1 16.53 0.395 6.53

19 1 16.53 0.395 6.53

19 1 16.53 0.395 6.53


0 0.000 0.00
0 0.000 0.00

19 2 33.06 0.395 13.06

19 2 33.06 0.395 13.06

19 2 33.06 0.395 13.06


Total 1151.87 kg

For 8 dia For 12 dia For 20 dia


Total quantity (Kg) rebar
For 10 dia rebar
rebar
For 16 dia rebar
rebar Remarks

132.16 0 0 0 0
110.92
76.01
60.74
140.62
23.69
18.49
14.33

4.23 (along extended slab)


256.96
179.59
103.15
11.09
17.76 along top(grid E-E)
37.76
31.69
40.91
34.33
15.73
13.20
59.48
47.54
20.09
20.09
23.69
18.49
14.33
4.23
49.12
34.33
105.81
73.95
34.01
23.77
72.58
17.76
11.09
284.09
310.95

588.31
50.13
54.87
54.31
59.45
58.49
64.02
54.31
59.45
36.52
227.21
56.80
52.74
48.69
4014.06 Kg
20.93 kg

For 10 dia For 16 dia For 20 dia


Wt.(Kg / mt.) Total quantity (Kg)
For 8 dia rebar
rebar
For 12 dia rebar
rebar rebar Remarks

1.58 36.46 0 0 0 #REF! 0


1.58 12.31
1.58 54.68
1.58 18.47
0.00 0.00
1.58 8.11
1.58 9.29
0.89 2.61
0.89 10.40
1.58 10.43
1.58 36.11
1.58 15.47
1.58 54.16
1.58 23.21
0.00 0.00
0.89 4.56
0.89 4.59
1.58 6.16
0.89 5.87
1.58 36.46
1.58 36.01
1.58 54.68
1.58 54.02
0.00 0.00
1.58 3.69
0.89 1.31
0.89 6.93
1.58 4.07
1.58 12.14
1.58 36.11
1.58 15.47
1.58 54.16
1.58 23.21
0.00 0.00
1.58 2.70
0.89 4.59
1.58 6.16
0.89 5.87
1.58 36.46
1.58 36.01
1.58 54.68
1.58 54.02
0.00 0.00
1.58 11.07
0.89 1.86
0.89 1.31
0.89 6.93
1.58 12.21
0.89 2.29
1.58 12.14
1.58 36.46
1.58 12.31
1.58 54.68
1.58 18.47
0.00 0.00
1.58 2.70
0.89 4.59
1.58 6.16
0.89 5.87
1.58 36.46
1.58 36.01
1.58 54.68
1.58 54.02
0.00 0.00
1.58 11.07
0.89 1.86
0.89 1.31
0.89 6.93
1.58 12.21
0.89 2.29
1.58 12.14
1.58 36.46
1.58 15.47
1.58 36.46
1.58 15.47
0.89 10.04
0.89 3.92

1.58 11.07
1.58 11.07
1.58 24.41
1.58 24.27
1.58 36.46
1.58 15.47
1.58 36.46
1.58 15.47
0.89 10.04
0.89 3.92
0.00 0.00
0.89 5.59
0.89 5.59
0.89 13.73
1.58 24.27
1.58 36.46
1.58 15.47
1.58 36.46
1.58 15.47
0.89 10.04
0.89 3.92

0.89 3.72
0.89 3.72
1.58 3.69
1.58 3.69
0.89 9.16
1.58 8.14
1.58 24.27
1.58 36.46
1.58 15.47
1.58 54.68
1.58 23.21

1.58 14.76
1.58 14.76
1.58 32.55
0.89 7.33
1.58 24.27
1.58 36.46
1.58 15.47
1.58 54.68
1.58 23.21
0.00 0.00
1.58 14.76
1.58 14.76
1.58 32.55
0.89 7.33
1.58 24.27
1.58 31.51
1.58 47.27
0.00 0.00
1.58 2.70
1.58 3.69
0.89 3.72
1.58 4.07
0.89 4.58
1.58 12.14
1.58 31.51
1.58 47.27
0.00 0.00
1.58 2.70
1.58 3.69
0.89 3.72
1.58 4.07
0.89 4.58
1.58 12.14
1.58 31.51
1.58 47.27
0.00 0.00
1.58 2.70
1.58 3.69
0.89 3.72
1.58 4.07
0.89 4.58
1.58 12.14
1.58 31.51
1.58 47.27
0.00 0.00
1.58 2.70
1.58 3.69
0.89 3.72
1.58 4.07
0.89 4.58
1.58 12.14
1.58 31.51
1.58 47.27
0.00 0.00
0.89 4.56
1.58 14.76
1.58 16.28
0.89 7.33
1.58 12.14
1.58 31.51
1.58 47.27
0.00 0.00
0.89 4.56
1.58 14.76
1.58 16.28
0.89 7.33
1.58 12.14
1.58 31.51
1.58 47.27
1.58 2.70
1.58 3.69
0.89 3.72
1.58 4.07
0.89 4.58
1.58 12.14
0.00 0.00
0.89 30.59
0.89 9.17
0.89 30.59
0.89 9.17
0.89 27.17
0.89 27.17
0.89 30.59
0.89 29.17
0.89 30.59
0.89 29.17

0.89 25.84
0.89 25.84
0.00 0.00
total 12 mm bars 550.39 Kg
total 16mm bars 2765.55 kg

Total Grid Total Length in M Wt.(Kg) / m Total quantity (Kg)Remarks

4 672 0.40 265.48

5 937.5 0.40 370.37

3 796.5 0.40 314.67


7 798 0.40 315.26

1 94.3 0.40 37.25


1 89.7 0.40 35.44
1 212.75 0.40 84.05

1 135.7 0.40 53.61


Sub Total 8mm bar 1476.13 Kg

For 8 dia For 12 dia For 20 dia


rebar
For 10 dia rebar
rebar
For 16 dia rebar
rebar Remarks
Total quantity (Kg)

111.25
35.63
33.37
47.37
33.37
46.42
52.28
122.98 Err:504 Err:504 Err:504 Err:504
47.37
33.37
47.37
33.37
46.42
52.28
29.55
12.60

785.03 Kg
197.41 Kg
545.47 Kg
42.15 Kg
tended slab)
Government Of Nepal
Ministry Of Urban Development
Department Of Urban Development & Building Con
Building Construction
Division Office
Nuwakot

Bar Bending Measurement Toilet D24

Isolated footing Bottom Bar

Grid Dia in mm Nos Actual Shape No of Bar

Isolated footing in F1 12 3 100 100 11.67


1600
Isolated footing in F2 12 12 100 100 10.3333333333
1400

Column Rebar for C1 (16 NoS)

Grid Floor Level Shape

1st Floor slab 3500.00


GF Slab 3630.00 4350 4590
DPC 450.00
Column Size
"dia
1'-0"x1'-0
+ 4- 4-16 3700 3700
20 dia
Bottom Lvl. of 7370
foundation 0
up to plinth ,-1500 550 610
0
4-12dia 4-16dia

Column Stirrups
Grid Floor S. L. (Ft.) Floor Ht.(ft.) Shape

Stirrups at C1 Column up to GF
Foundation to Plinth
DPC(1500+4
(450x450) cover 40mm 1950 0
50) 75
90 deg ring
Foundation to Plinth
DPC(1500+4 200
(450x450) cover 40mm 1950 0 275
50)
Angle stirrups
75
Up to GF Slab
GF Support Bottom
Stirrups(H/4) 3630 0
75
GF Support Bottom
angle Stirrups (H/4) 3630 3630 200

GF Mid Span stirrups 275


75
3630 3630
75
GF Mid Span angle
stirrups 3630 3630 200
GF Support Top 275
75
Stirrups (H/4) 3630 3630
75
GF Support Top angle
Stirrups(H/4) 3630 3630 265
200
375
275
75

Lower Tie Beam


Dia of
Grid Description Actual Shape Length
bar
Lower Tie Beam
9800
Top Bar
Grid 1-1,2-2,3-3 16 660 10.460
7110
Top Bar/End
16 660 7.770

Bottom Bar 660 7110


16 7.770

Bottom Bar/En 660


16 10.460
9800
10300
Top Bar
Grid A-A to G-G 16 660 660 11.620

Top Bar End 660 10300 660


16 11.620

Lower Tie Beam Stirrups


Grid Floor Shape Dia of bar

Stirrups at Horizontal Foundation Beam (230x300), 25mm Clear cover


Horizontal section
Foundation beam 75
stirrups ( Grid of 3-3 , 255
2-2, 1-1 )
T/L=3150+3150+3950+ 1
3950 with mid span 8
@150mm and support 5
@100mmc/c 8
Transeverse Section
A-A, B-B,C-C,D-D,E-E,
75
Clear Span 255
T/L=4250+5050 8
1
8
5

Upper Tie Beam


Dia of
Grid Description Actual Shape Length
bar

9800
Top Bar
Grid 1-1,2-2,3-3 16 660 10.460
7110
Top Bar/End
16 660 7.770

Bottom Bar 660 7110


16 7.770

Bottom Bar/En 660


16 9800 10.460
10300
Top Bar
Grid A-A to G-G 16 660 660 11.620

Top Bar End 660 10300 660


16 11.620

Secondary Beam
9800
Top Bar
Horizontal Section 12 310 10.110
7110
Top Bar/End
12 310 7.420

Bottom Bar 310 7110


12 7.420

Bottom Bar/En 310


12 9800 10.110

1775
Top Bar
Transeverse Section 12 310 2.395

Bottom Bar
310 1775
12 2.395
4950
Top Bar
12 310 5.570

Bottom Bar
310 4950
12 5.570
4750
Top Bar
12 310 5.370

Bottom Bar
310 4750
12 5.370
1125
Top Bar
12 310 1.745

Bottom Bar
310 1125
12 1.745
Upper Tie beam Stirrups

Grid Floor Shape Dia of bar

Stirrups at Horizontal Foundation Beam (230x300), 25mm Clear cover


Horizontal section
Foundation beam 75
stirrups ( Grid of 3-3 , 255
2-2, 1-1 )
T/L=3150+3150+3950+ 1
3950 with mid span 8
@150mm and support 5
@100mmc/c 8
Transeverse Section
A-A, B-B,C-C,D-D,E-E,
75
Clear Span 255
T/L=4250+5050 8
Secondary Beam ties 1
(230x230) 8
H-Section 5
(T/L=3150*4=12600)@c 75
/c 100mm 185 8
H-Section
(T/L=1345*12=16140@ 1
75
c/c 100mm) 8 185 8
5
T-section (T/L=4250, 1
@100mm C/C 75
8 185
8
5
T-section (T/L=4150, 1
@100mm C/C 75
8 185 8
5
T-section (T/L=1125, 1
@100mm C/C 75
8 185 8
5
1
8
5

Ground Floor Beam


Dia of
Grid Description Actual Shape Length
bar

Top Bar 9800


Grid 1-1,2-2,3-3 16 10.460
660
Top Bar/End 7110
16 7.770
660
660
Bottom Bar
16 660 7110 7.770
Bottom Bar/En
16 660 10.460
9800
Bottom Bar
12 420 7110 7.530
Bottom Bar/En
12 420 10.220
9800
Ex-top 1175
16 1.835
660
16 2300 2.300

2300
16 2.300

16 2300 2.300

16 660 1.765

Top Bar 10300


Grid A-A 16 11.620
660 660
Top Bar End
16 660 10300 660 11.620
Top Bar End
12 420 10300 420 11.140
Ex-top 1450
12 1.870
420
12 2850 2.850
1650
16 660 2.310
Hunge bar
16 3.840

Top Bar 10300


Grid B-B & E-E 16 11.620
660 660
Top Bar End
16 660 10300 660 11.620
Ex-top 1450
12 1.870
420
12 2850 2.850

16 2850 2.850
1650
12 420 2.070
Hunge bar
16 3.840
Top Bar 10300
Grid C-C & D-D 16 11.620
660 660
Top Bar End
16 660 10300 660 11.620
Top Bar End
12 420 10300 420 11.140
Ex-top 1450
12 1.870
420
16 2850 2.850
1650
12 420 2.070
Hunge bar
16 3.840

Secondary Beam

Top Bar 9800


Horizontal Section 12 10.110
310
Top Bar/End 7110
12 7.420
310
Bottom Bar
12 310 7110 7.420
Bottom Bar/En
12 310 10.110
9800

Ground Floor Stirrups

Grid Floor Shape Dia of bar

Stirrups at Horizontal Beam (230x475), 25mm Clear cover


Horizontal section
Foundation beam 75
stirrups ( Grid of 3-3 , 375
2-2, 1-1 )
T/L=3150+3150+3950+
180
3950 with mid span
85
@150mm and support
@100mmc/c 8
Transeverse Section
A-A, B-B,C-C,D-D,E-E,
75
Clear Span 375
T/L=4250+5050 8
Secondary Beam ties 180

H-Section
(T/L=3150*4=12600)@c
75
/c 100mm 185 8

1
8
5
Ground Floor Slab
Dia of
Grid Description Actual Shape Length
bar

75 11500
Main Bar
In Slan 8 11.575
6610 75

8 6.685
7010 75

8 7.085

75 11500 75
8 11.650

75 11900 75
8 12.050

2000
Ex-Top 75
8 2.075
2400
75
8 2.475

2580
8 2.580
2580
8 2.580

2580
8 2.580
2250
75
8 2.325
12030
Binders 75 75
8 12.180
3400
75 75
8 3.550

1775
Ex-Top 75
8 1.850

1880
8 1.880

2455
8 2.455
2230
75
8 2.305
17630
Binders 75 75
8 17.780
3400
75 75
8 3.550
nt Of Nepal
an Development
ment & Building Construction
onstruction
n Office
wakot

urement Toilet D24

Total
No of Bar Total in No of Length Total length
Wt.(Kg) / mt.
quantity Remarks
Both Dir Footings (Kg)

12 24 3 1.800 129.6 0.889 115.20


0.000 0.00
11 22 12 1.600 422.4 0.889 375.46

Total in Kg 490.66
12 Dia Rebar 490.66 Kg

Total
Dia of bar Length No No Of Col Length inWt.(Kg)Total
/ m quantity (Kg)
M

16 7.150 4 15 429.000 1.580 677.92

12 6.850 4 15 411.000 0.889 365.33

16mm Dia Bar 677.92


12mm Dia Bar 365.33

Dia of bar Column Total Wt.(Kg) / Total


Shape Length No Whole No Total Length in m quantity Remarks
M (Kg)
275 8 1.25 20.5 21 15 393.75 0.395 155.56

275 200
8 0.950 20.5 21 15 299.25 0.395 118.22
75

8 1.25 10.1 11 15 206.25 0.395 81.48


275
200 8 0.950 10.1 11 15 156.75 0.395 61.93
275
75
8 1.25 13.1 14 15 262.5 0.395 103.70
275
200 8 0.950 13.1 14 15 199.5 0.395 78.81
275
75
8 1.25 10.1 11 15 206.25 0.395 81.48
275
375
265
200 8 0.950 10.1 11 15 156.75 0.395 61.93
375
275
75
Total 469.33 Kg

Wt.(Kg / For 8 dia For 10 dia For 12 dia For 16 dia For 20 dia
No.Total length in M Total quantity (Kg)
rebar rebar rebar rebar rebar Remarks
mt.)

9 94.14 1.58 148.76 0 0 0 #REF! 0

9 69.93 1.58 110.50

9 69.93 1.58 110.50

9 94.14 1.58 148.76

15 174.30 1.58 275.43

15 174.30 1.58 275.43

16mm Dia Sub total 1069.38 0.00 0.00 0.00 #REF! 0.00
Length No whole no Total Grid
Total Length inWt.(Kg)
M Total/ m quantity (Kg)
Remarks

1.03 138.22 139.00 3 429.51 0.395 169.68

1.03 88.67 89.00 5 458.35 0.395 181.08


Sub Total 8mm bar 350.76

Wt.(Kg / For 8 dia For 10 dia For 12 dia For 16 dia For 20 dia
No.Total length in M Total quantity (Kg)
rebar rebar rebar rebar rebar Remarks
mt.)

9 94.14 1.58 148.76 0 0 0 #REF! 0

9 69.93 1.58 110.50

9 69.93 1.58 110.50

9 94.14 1.58 148.76

15 174.30 1.58 275.43

15 174.30 1.58 275.43

0.00 0.00

0.00 0.00
3 30.33 0.89 26.96

3 22.26 0.89 19.78

3 22.26 0.89 19.78

3 30.33 0.89 26.96

0.00

0.00

36 86.22 0.89 76.64

36 86.22 0.89 76.64

6 33.42 0.89 29.70

6 33.42 0.89 29.70

6 32.22 0.89 28.64

6 32.22 0.89 28.64

6 10.47 0.89 9.30

6 10.47 0.89 9.30

12mm Dia Bar 382.04

16mm Dia Bar 1069.38


Length No whole no Total Grid
Total Length inWt.(Kg)
M Total/ m quantity (Kg)
Remarks

1.03 138.22 139.00 3 429.51 0.395 169.68

1.03 88.67 89.00 5 458.35 0.395 181.08

0.000

0.89 86.00 86.00 1 76.54 0.395 30.24

0.89 109.60 110.00 1 97.9 0.395 38.68

0.89 30.33 31.00 1 27.59 0.395 10.90

0.89 29.67 30.00 1 26.7 0.395 10.55

0.89 9.50 10.00 1 8.9 0.395 3.52


Sub Total 8mm bar 444.64

Wt.(Kg / For 8 dia For 10 dia For 12 dia For 16 dia For 20 dia
No. No. of Grids
Total length in M Total quantity (Kg)
rebar rebar rebar rebar rebar
mt.)

2 3 62.76 1.58 99.17 0 0 0 #REF! 0

2 3 46.62 1.58 73.67


2 3 46.62 1.58 73.67

2 3 62.76 1.58 99.17

1 3 22.59 0.89 20.08

1 3 30.66 0.89 27.25

1 3 5.51 1.58 8.69

1 3 6.90 1.58 10.90

1 3 6.90 1.58 10.90

1 3 6.90 1.58 10.90

1 3 5.30 1.58 8.36

0.00 0.00 0.00

2 1 23.24 1.58 36.72

2 1 23.24 1.58 36.72

1 1 11.14 0.89 9.90

1 1 1.87 0.89 1.66

3 1 8.55 0.89 7.60

1 1 2.31 1.58 3.65

2 1 7.68 1.58 12.13

0.00 0.00 0.00

2 2 46.48 1.58 73.44

3 2 69.72 1.58 110.17

1 2 3.74 0.89 3.32

2 2 11.40 0.89 10.13

1 2 5.70 1.58 9.00

1 2 4.14 0.89 3.68

2 2 15.36 1.58 24.27


0.00 0.00 0.00

2 2 46.48 1.58 73.44

2 2 46.48 1.58 73.44

1 2 22.28 0.89 19.80

1 2 3.74 0.89 3.32

3 2 17.10 1.58 27.02

3 2 12.42 0.89 11.04

2 2 15.36 1.58 24.27

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

3 1 30.33 0.89 26.96

3 1 22.26 0.89 19.78

3 1 22.26 0.89 19.78

3 1 30.33 0.89 26.96

0.00
12mm Dia Bar 211.26
16mm Dia Bar 899.70

Length No whole no Total Grid


Total Length inWt.(Kg)
M Total/ m quantity (Kg)
Remarks
1.26 138.22 139.00 3 525.42 0.395 207.57

1.26 88.67 89.00 5 560.7 0.395 221.51

0 0.000 0.00

0.89 138.22 139.00 1 123.71 0.395 48.87


Sub Total 8mm bar 477.96

Wt.(Kg / For 8 dia For 10 dia For 12 dia For 16 dia For 20 dia
No.Total length in M Total quantity (Kg)
rebar rebar rebar rebar rebar Remarks
mt.)

87 1007.03 0.40 397.83 #REF! 0 0 0 0

63 421.16 0.40 166.38

24 170.04 0.40 67.17

101 1176.65 0.40 464.84

23 277.15 0.40 109.49

0.00 0.00 0.00

43 89.23 0.40 35.24

24 59.40 0.40 23.46

67 172.86 0.40 68.29


67 172.86 0.40 68.29

67 172.86 0.40 68.29

67 155.78 0.40 61.54

72 876.96 0.40 346.45

6 21.30 0.40 8.41

43 79.55 0.40 31.42

67 125.96 0.40 49.76

67 164.49 0.40 64.98

67 154.44 0.40 61.01

72 1280.16 0.40 505.74

6 21.30 0.40 8.41


Sub Total 8mm bar 2607.00 Kg
Remarks