CONSTRUCTION GROUP
PROJECT : Expansion of Bhilai Power Project 2x250MW, Unit 1 & 2 REF NO:
PREPARED CHECKED APPROVED
TITLE: Relay Setting for Phase Fault Relays SG RM
51 on Incomer feeder
CT Ratio = 1000 /1 A
Considering Grading Margin of 200 mSec from the fuse operating time of 50ms
Required Operating Time (tq) = 0.25 Sec
TMS = 0.25/2.288
0.109
Say 0.1
51 N on Incomer Feeder
CT Ratio = 1000/1 A
CT Ratio = 1000 /1 A
Since the PSM is more than 20, hence calculated opretaing time at PSM 20
Considering Grading Margin of 200 mSec from the fuse operating time of 50ms
Required Operating Time (tq) = 0.25 Sec
TMS = 0.25/2.267
0.11
Say 0.1