BILL OF QUANTITIES

FOR

CONSTRUCTION OF ROADS AND DRAINS


(LOT 1)

NATIONAL HOUSING PROJECT AT COMM. No. 22, TEMA


Contractor: CHINA STATE HUALONG CONSTRUCTION (GHANA) LIMITED
P.O. BOX 10128, ACCRA-NORTH, GHANA

Contract: CONSTRUCTION OF ROADS & DRAINS (LOT 1)


Contract No.:

ITEM DESCRIPTION QTY UNIT RATE

GH₵
BILL NO. 1 - GENERAL ITEMS

CONTRACTUAL REQUIREMENTS

A110 Performance Security sum sum

A120 Insurance of Construction Plant sum sum

A130 Insurance against damages of persons and property

SPECIFIED REQUIREMENTS sum sum

A211 Provide office for Client and staff sum sum

A211.4 Maintain office for Client and staff sum sum

A211.5 Remove temporary office for Engineer and staff upon sum sum
completion of the works

A250 Allow for testing of materials as specified in specifications sum sum

Note: Office for client is approximately 50m2 made up of 3 sum sum


offices

1
NATIONAL HOUSING PROJECT AT COMM. No. 22, TEMA
Contractor: CHINA STATE HUALONG CONSTRUCTION (GHANA) LIMITED
P.O. BOX 10128, ACCRA-NORTH, GHANA

Contract: CONSTRUCTION OF ROADS & DRAINS (LOT 1)

Contract No.:
ITEM DESCRIPTION QTY UNIT RATE

GH₵
BILL NO. 1 - GENERAL ITEMS (cont`d)

A260 Allow for testing of works as specified in sum sum


specifications

A272 Provide and maintain traffic safety signs sum sum


and systems during construction

METHOD RELATED CHARGES

A311.1 Setting up Contractors office and compound sum sum

A311.2 Maintaining Contractors office and compound sum sum

A311.3 Removing Contractors office and compound sum sum

A321.1 Provide temporary Electricity power and pay all sum sum
bills in respect and remove on completion

A321.2 Provide temporary Water to site and pay all bills sum sum
in respect and remove on completion

A371 Contractors Supervision and administration sum sum

2
NATIONAL HOUSING PROJECT AT COMM. No. 22, TEMA
Contractor: CHINA STATE HUALONG CONSTRUCTION (GHANA) LIMITED
P.O. BOX 10128, ACCRA-NORTH, GHANA

Contract: CONSTRUCTION OF ROADS & DRAINS (LOT 1)

Contract No.:

ITEM DESCRIPTION QTY UNIT RATE

GH₵
BILL NO. 1 - GENERAL ITEMS (cont`d)
DAYWORKS

A411 Provisional sum for Dayworks Labour sum sum

A412 Add Adjustment for Profit & overheads ( %)

A413 Provisional Sum for Dayworks Materials sum sum

A414 Add. Adjustment for Profit & overheads ( %) sum sum

A415 Provisional Sum for Dayworks Plant sum sum

A416 Add. Adjustment for Profit & overheads ( %) sum sum


bills in respect and remove on completion

BILL NO.1 -GENERAL ITEMS CARRIED TO SUMMARY

3
NATIONAL HOUSING PROJECT AT COMM. No. 22, TEMA
Contractor: CHINA STATE HUALONG CONSTRUCTION (GHANA) LIMITED
P.O. BOX 10128, ACCRA-NORTH, GHANA

Contract: CONSTRUCTION OF ROADS & DRAINS (LOT 1)

Contract No.:

ITEM DESCRIPTION QTY UNIT RATE

GH₵

BILL NO. 2- DEMOLITION AND SITE CLEARANCE

D100.1 General site clearance of all bush including scrub, 8 Ha


undergrowth and small tres up to 500mm girth and
other obstructions and clear away from proposed
road width
D100.2 Allow the Provisional Sum for the demolition Item
of specified building structures on roadway

D210 Fell trees 0.5 - 1.0 m girth up roots and clear from site 150 Nr

D220 Ditto but 1-2m girth ditto 150 Nr

BILL NO.2 DEMOLITION AND SITE CLEARANCE


CARRIED TO SUMMARY
4
NATIONAL HOUSING PROJECT AT COMM. No. 22, TEMA
Contractor: CHINA STATE HUALONG CONSTRUCTION (GHANA) LIMITED
P.O. BOX 10128, ACCRA-NORTH, GHANA

Contract: CONSTRUCTION OF ROADS & DRAINS (LOT 1)

Contract No.:

ITEM DESCRIPTION QTY UNIT RATE

GH₵

BILL NO. 3- EARTHWORKS

E220 Excavate in cutting to subgrade formation 6,818 m3

Excavate in cutting, material other than topsoil,rock


E240 or artificial hard material,maximum depth 0.25-0.5m m3
and level same to low lying areas.

E250 Excavate for cutting in fused laterite or hard pan and 6,000 m3
dispose.
E532 Disposal of unsuitable excavated materials 150 m3

Selected excavated materials in filling to formation 818 m3


E633 deposited and compacted in layers not exceeding
250mm thick

Supply from approved source imported crushed rock


E635 material (0-40 mm agg.) in filling subgrade to 567 m3
formation deposited and compacted in layers not
exceeding 150mm (inclusive 20 km haulage)

BILL NO.3 - EARTHWORKS CARRIED TO SUMMARY

5
TOTAL
AMOUNT
GH₵
TOTAL
AMOUNT
GH₵

TOTAL
AMOUNT
GH₵
TOTAL
AMOUNT
GH₵
TOTAL
AMOUNT
GH₵