FOR
CONSULTANCY SERVICES OF
The Project:
0
1 CONTENTS
2 Section 1: Letter of Invitation (LOI) .............................................................................. 4
3.1 DEFINITIONS:.................................................................................................. 5
3.12.3 Financial Proposal (For Quality cum Cost Based Selection) ............. 11
1
4.4 Form-4: FORMAT OF CURRICULUM VITAE (CV) FOR PROPOSED KEY
STAFF.......................................................................................................................... 21
4.6 Form-6: WORK PLAN AND TIME SCHEDULE FOR KEY PERSONNEL23
2
ANNEXURE H: DOCUMENTS TO BE PROVIDED BY THE CLIENT UPON REQUEST
.................................................................................................................................................. 45
3
2 SECTION 1:LETTER OF INVITATION (LOI)
Attention: Mr./Mrs._______________________________________
You are hereby invited to submit a technical and financial proposal for consulting services required
for the assignment “Master Planning for Water Supply and Sanitation Schemes in all villages and
feasibility and Design of sewerage / drainage systems in potential urban areas of merged areas of
Khyber Pakhtunkhwa”.
A brief description of the assignment and its objectives are given in the “Data Sheet” and details are
provided in the attached TORs and appendixes.
1. This Request for Proposal (RFP) is addressed to the competent and qualified Consulting
Firms registered with Pakistan Engineering Council (PEC) in the relevant Category.
2. The Consultant will be selected by the Quality & Cost Based Selection (QCBS)
method and procedures described in this RFP and in accordance with the Khyber
Pukhtunkhwa Procurements Rules (2014).
4. It is mandatory that proposals shall be submitted by using the Standard Forms of this
RFP. Proposals that are not in accordance with the prescribe format may not be
accepted. If any information required in the forms is found missing or written
elsewhere, no credit will be given in the relevant section of the evaluation.
Yours Sincerely,
Executive Engineer
Public Health Engineering Division Northern Tribal Districts Peshawar.
4
3 SECTION 2: INSTRUCTION TO CONSULTANTS
3.1 DEFINITIONS:
a. “Assignment” means the Consultancy Services for Master Planning for Water Supply
and Sanitation Schemes in all villages and feasibility and Design of sewerage /
drainage systems in potential urban areas of merged areas of Khyber Pakhtunkhwa.
b. "Client" means the agency with which the selected Consultant signs the Contract for
the Services. (Public Health Engineering Department Merged Areas of Khyber
Pakhtunkhwa)
c. “Evaluation Committee” means the committee formed by the client for the evaluation
of Technical and Financial proposal of Consultants for this Assignment as per Guide
lines.
d. "Consultant" means any entity including a Joint Venture that will provide the Services
to the Client under the Contract.
e. “Contract” means the contract included in this RFP as section 6, when signed between
the client and the consultant along with all attached Documents.
f. "Data Sheet" means such part of the Instructions to Consultants used to reflect
specific assignment conditions.
g. "Day" means calendar day.
h. "Government" means the government of Khyber Pukhtunkhwa.
i. "Instructions to Consultants" means the document which provides short listed
Consultants with all information needed to prepare their Proposals.
j. “LOI” means the letter of invitation included in this RFP as section 1 sent by the
client to the consultant.
k. "Joint Venture" means a Consultant which comprises two or more Partners each of
whom will be jointly and separately liable to the Client for all the Consultant's
obligations under the Contract.
l. "Personnel" means qualified persons provided by the Consultant and assigned to
perform the Services or any part thereof.
m. "Proposal" means a technical proposal or a financial proposal, or both.
n. “Rules” means the Khyber Pukhtunkhwa Procurement Rules.(KPPRA ).
o. "QCBS" means Quality- and Cost-Based Selection.
p. “RFP” means this Request for Proposal.
5
q. "Services" means the work to be performed pursuant to the Contract.
r. "Standard Electronic Means" includes facsimile and email transmissions.
s. "Sub-Consultant” means any person or entity with whom the Consultant associates for
performance of any part of the Services and for whom the Consultant is fully
responsible.
t. "Terms of Reference" (TOR) means the document included in the RFP, which
explains the objectives, scope of work, activities, tasks to be performed, respective
responsibilities of the Client and the Consultant, and expected results and deliverables
of the assignment.
3.2 PREAMBLE
Public Health Engineering Department Government of Khyber Pukhtunkhwa is the major
service provider of Water Supply and Sanitation facilities in the Merged areas of Khyber
Pukhtunkhwa. It is responsible for planning, designing, construction, operation and
maintenance of necessary infrastructure for provision of safe drinking water and sanitation
amenities to the general public. The scheme “Master Planning for Water Supply and
Sanitation Schemes in all villages and Feasibility and Design of Sewerage / Drainage
Systems in potential urban areas of merged areas of Khyber Pakhtunkhwa” is reflected
in ADP 2019-20 at Serial No.251/180476. Under this scheme master planning for water
supply and sanitation schemes in all villages and feasibility and design of sewerage / drainage
systems in potential urban areas of merged areas of Khyber Pakhtunkhwa will be framed and
submitted to competent forum for approval. Besides this, conducting general study (condition
assessment) of existing all arrangements for drinking water and sanitation facilities in all
Tribal districts including collection/evaluation of all the available documents, PC-I, maps,
Plans for planning of the Project.
The detail design will cover all relevant parameters with drawings followed by preparation of
PC-I/cost estimate covering technical and financial viability with substantial reduction in
health hazards.
3.3 RATIONALE
Public Health Engineering Department intends to hire Consultancy Services for Master
Planning for Water Supply and Sanitation Schemes in all villages and Feasibility and Design
of Sewerage / Drainage Systems in potential urban areas of merged areas of Khyber
6
Pakhtunkhwa” ADP No.251/180476 (2019-20), which in turn will ensure supply of clean
drinking water and sanitation facilities to the inhabitants of merged areas of Khyber
Pakhtunkhwa. For this purpose sealed Technical & Financial Proposals are invited on Single
Stage Two Envelopes post qualification basis from the interested and prequalified
Consultancy Firms having relevant experience as per attached TORs.
The scope of work for Master Planning of Water Supply will include but not limited to
collection and review of relevant data, PC-1’s, reports, statistics, preparation of district wise
and village wise/scheme wise maps at appropriate scale, assessment of the existing services
and proposal for rehabilitation/augmentation of existing schemes in consultation with Client,
7
identification of major un served villages, preparation of proposals for each village and a
prioritized investment plan based on tentative cost estimates for each district and for the
merged areas. The consultants will also recommend energization option based on evaluation
of alternative energy sources.
In each Tribal district, the consultant shall collect relevant data, PC-1’s, reports, statistics and
maps/drawings from all the sources including PHED. For each district a detailed district map
showing all existing water supply schemes with coverage’s shall be prepared either from
satellite imagery or conducting topographic surveys. The maps shall also show all villages or
areas in villages which are not covered with piped/public water supply schemes as un served
areas. Based on the population of each village, the water requirement shall be assessed based
on a master plan of 20 years horizon. For each village, appropriate water source shall be
identified with study conducted of its quality and quantity. Population of these villages shall
be assessed using available data from census/other reports. If such data is not available, then
population shall be worked out from the satellite imagery or then actual house counting. For
each village in each district, the quantity and quality of existing water sources shall be studied
and potential water sources shall be identified. The current and projected demand of the
population shall be assessed based on PHED practiced/established criteria. For meeting the
demand of the population, adequate sources shall be identified and proposed to be developed.
Required storage shall also be worked out. Tentative cost estimates shall be prepared based
on current MRS and district wise/village wise PC-1 shall be prepared. The villages shall be
prioritized on the basis of pre-determined criteria and investment plan shall be prepared for
most vulnerable/needy communities followed by less affected/needy communities and so on.
To ensure clean environment through removal and safe disposal of waste water, feasibility
and design for construction of sewerage/drainage system in the potential urban areas of
Merged Areas has also been proposed.
The scope of work for the consultants include, but not limited to collection and review of
sewerage/drainage system relevant data, waste water quality testing, feasible options for
waste water treatment, design of the type and size of Trunk, main, lateral sewers/drains and
treatment plants. Preparation of necessary PC-I/cost estimate, drawings, design, etc for
construction of sewerage/drainage system.
Terms of Reference for the Consultants are attached to the RFP as Section 5.
8
3.9 DOCUMENTS
a. To prepare a proposal, please use the attached Forms.
b. Consultants requiring a clarification of the Documents must notify the Client, in
writing, not later than Ten (10) days before the proposal submission date. Any request
for clarification in writing, shall be sent to the Client’s address indicated in the Data
Sheet. The Client shall respond to such requests and copies of the response shall be
sent to all invited Consultants.
c. At any time before the submission of proposals, the Client may, for any reason,
whether at its own initiative or in response to a clarification requested by an invited
consulting firm, modify the Documents by amendment. The amendment shall be sent
in writing to all invited consulting firms and will be binding on them. The Client may
at its discretion extend the deadline for the submission of proposals.
Technical Proposal
a. In preparing the technical proposal, you are expected to examine all terms and
instructions included in the Documents/TORs etc. Failure to provide all requested
information shall be at your own risk and shall result in rejection of your proposal.
b. During preparation of the technical proposal, you must give particular attention to the
following:
9
No alternative to key professional staff may be proposed, and only one curriculum
vitae (CV) may be submitted for each position.
Study reports must be in the English Language. Working knowledge of the
national language by the firm’s personnel is recommended. The knowledge of the
regional language where the Assignment is located will be considered additional
qualification.
Your technical proposal shall provide the following and any additional
information, using the formats/Forms attached.
3.12 SUBMITTAL
Consultant must submit the original documents which include one copy of the technical
proposal and the financial proposal in separate sealed envelopes, through courier services on
or before 12 September 2019by 13:00 hours, at the following address:
Office of the Executive Engineer Public Health Engineering Division Northern Tribal
Districts at Hayatabad Peshawar.
The Consultants are required to provide income tax return statement of the firm last three
years audit reports.
List of staff along with CV’s on prescribed format as given in this RFP shall be provided for
all the key staff to be deployed on this project. Additional requirements are mentioned in the
evaluation criteria attached to this RFP.
10
PROPOSAL EVALUATION
The evaluation committee shall determine whether the financial proposals are complete and
without computational errors. The lowest financial proposal (Fm) among these shall be given
a financial score (Sf) of 100 points. The financial scores of the proposals shall be computed
as follows:
Proposals, in the quality cum cost based selection shall finally be ranked according to their
combined technical (St) and financial (Sf) scores using the weights (T- the weight given to
the technical proposal, P = the weight given to the financial proposal; and T+P=1) indicated
in the Data Sheet:
S = St x T %+Sƒ x P%
11
3.13 NEGOTIATION
Prior to the expiration of proposal validity, the Client shall notify the successful Consultant
that submitted the highest ranking proposal in writing, by registered letter, or facsimile and
invite it to negotiate the Contract.
Negotiations normally take from two to five days. The aim is to reach agreement on all points
and initial a draft contract by the conclusion of negotiations.
Negotiations shall commence with a discussion of your technical proposal. The proposed
methodology, work plan, staffing and any suggestions you may have made to improve the
TOR. Agreement shall then be reached on the final TOR, the staffing, and the bar charts,
which shall indicate activities, staff, and periods in the field and in the home office, staff
months, logistics and reporting.
Changes agreed upon shall then be reflected in the financial proposal, using proposed unit
rates (no negotiation of the staff month rates).
Having selected Consultants on the basis of, among other things, an evaluation of proposed
key professional staff, the Client expects to negotiate a contract on the basis of the staff
named in the proposal.
Prior to contract negotiations, the Client shall require assurances that the staff members will
be actually available. The Client shall not consider substitutions of key staff except in cases
of un-expected delays in the starting date or incapacity of key professional staff for reasons of
health.
The negotiations shall be concluded with a review of the draft form of the contract. The
Client and the Consultants shall finalize the contract to conclude negotiations. If negotiations
fail, the Client shall invite the Consultants that received the second highest score in ranking to
Contract negotiations. The procedure will continue with the third in case the negotiation
process is not successful with the second ranked consultants.
12
The selected Consultant is expected to commence the Assignment on the date and at the
location specified in the Data Sheet.
DATA SHEET
A. Remunerations
Total Man
S.No Position No. Man Months
Months
A. Key Experts
1 Team Leader / PM 1 12 12
2 Water Supply Expert 2 12 24
3 Sanitation/Drainage Expert 2 12 24
4 Field Engineers 14 12 168
5 Urban Planner 1 6 6
6 Hydrologist 1 4 4
7 Structure Design Engineer 1 4 4
8 Waste Water Treatment Specialist 1 6 6
9 Financial Analyst 1 4 4
10 GIS Specialist 1 9 9
A Sub Total A(Key Experts) 261
B. Support Staff
1 Topographic Surveyor 7 8 56
2 Field Surveyors 16 10 160
13
3 Cad Operators 14 8 112
4 Survey Helper/Assistants 14 8 112
5 Office Manager/Accounts/Logistics 1 12 12
B Sub Total B (Non Key) 452
Direct Costs
Note: The above man months input for Key, support staff and Operational costs is minimum
required input to be provided for the assignment in financial bids by the consultants. Lesser
man months input will be corrected up to the required given input and highest unit charge rate
will be applied as correction during financial bid evaluation.
14
BSc Environmental Sciences/Environmental Engineering/Chemistry
8 Waste Water Treatment Specialist
with minimum 10 years of relevant experience
ACCA/ MSc (Economics or Finance) or related field with minimum
9 Financial Analyst
10 years of experience
BSc Geography, GIS, IT with minimum 5 years of relevant
10 GIS Specialist
experience
Note: Only Key Staff will be evaluated. CVs of Key staff should be provided in Technical
Proposals.
15
Experience in similar nature of work
Firm Ten (10 Nos.) Best projects of
Similar Nature i.e. a) Master
25 Planning/Structure planning/Spatial
Planning of Infrastructure b) Feasibility
and Designing of Sanitation/Drainage
Schemes) w.r.t cost of the services
(mentioned in the Work Order) and in hand
or completed in last ten years along with
proof of work order or completion
certificate in support from the relevant
department.
ii) General Experience 10
Firm Ten (10 Nos.) best projects w.r.t cost
of the services (mentioned in the Work
Order) in hand or completed in last five
years along with proof of work order and
completion certificate in support from
relevant department.
16
15. Expected date of commencement of the assignment/consulting services is15 October
2019.
3.15 ENCLOSURES
1. Sample Forms for:-Technical Proposal and Financial Proposal
2. Terms of Reference TORs Annexure A
3. Deliverable and mode of payment Annexure B
4. Qualification and Experience of Consultant’s Key Personnel Annexure C
5. Reporting Requirements Annexure D
6. Key Personnel and Sub consultants Annexure E
7. Breakdown of Contract Price in Foreign Currency Annexure F
8. Breakdown of Contract Price in Local Currency Annexure G
9. Documents to be provided by the client upon request Annexure H
Note: Forms attached to these documents shall be duly filled by and supporting document to
be attached as a proof
Using in the format below, provide information on each reference assignment for which your
firm, either individually as a corporate entity or as one of the major companies within a
consortium, was largely contracted.
17
Address: No of Staff Months:
Name of Senior Staff (Project Director/Co-coordinator, Team Leader) involved and functions
performed:
18
4.2 FORM-2: APPROACH & METHODOLOGY FOR THE
PROPOSED PROJECT
19
4.3 FORM-3: COMMENTS/SUGGESTIONS OF CONSULTANT ON TOR
20
4.4 FORM-4: FORMAT OF CURRICULUM VITAE (CV) FOR
PROPOSED KEY STAFF
1. Proposed Position: ________________________________________________
2. Name of Firm: ___________________________________________________
3. Name of Staff: ___________________________________________________
4. Date of Birth: _____________________________________________________
5. Academic Qualification: _____________________________________________
6. Other Training
7. Membership in Professional Societies: ______________________________
(Membership of PEC is Mandatory)
8. Experience
[Give an outline of staff member’s experience and training most pertinent to tasks on
assignment. Describe degree of responsibility held by staff member on relevant previous
assignments and give dates and locations. Use up to one page].
9. Employment Record:
Employer
Position held
Nature of assignment/duty
10. Languages:
11. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, these bio-data
correctly describe myself, my qualifications and my experience.
21
4.5 FORM-5: PROPOSED WORK PLAN/ACTIVITY SCHEDULE
A monthly work plan illustrated with a bar chart of activities and graphics of the critical path method (CPM)or Project Evaluation Review
Techniques (PERT) type.
Items of Work/Activities Monthly Programme from date of assignment (in the form of a Bar Chart)
1 2 3 4 5 6 7 8 9 10 11 12
22
4.6 FORM-6: WORK PLAN AND TIME SCHEDULE FOR KEY PERSONNEL
A monthly work plan and time schedule of Key Personnel illustrated with a bar chart of activities and graphics of the critical path method
(CPM)or Project Evaluation Review Techniques (PERT) type.
Signature _________________
(Authorized Representative)
23
4.7 FORM-7 COMPOSITION OF THE TEAM PERSONNEL AND
THE TASKS TO BE ASSIGNED TO EACH TEAM MEMBER
1. Technical/Managerial Staff
2. Support Staff
24
4.8 FORM-8: COMPLETION AND SUBMISSION OF REPORTS
Reports Date
25
5 SECTION 04: FINANCIAL PROPOSAL FORMS
Project:____________________________________Firm:____________________________
Name Position Basic Social Overhead Sub- Fee Rate per Field Rate per
Salary Charges (%age of Total (%age Month Allow. Month
per Cal. (%age of 1+2) (1+2+3) of 4) for (%age of for Field
Month 1) project 1) Work
Office
(1) (2) (3) (4) (5) (6) (7) (8)
Notes:
Item No.1 Basic salary shall include actual gross salary before deduction of taxes. Payroll
sheet for each proposed personnel should be submitted at the time of
negotiations.
Item No.2 Social charges shall include Client’s contribution to social security, paid
vacation, average sick leave and other standard benefits paid by the company to
the employee. Breakdown of proposed percentage charges should be submitted
and supported (see Form 2).
Item No.3 Overhead shall include general administration cost, rent, clerical and junior
professional staff and business getting expenses, etc. Breakdown of proposed
percentage charges for overhead should be submitted and supported (see Form 3).
Item No.5 Fee shall include company profit and share of salary of partners and directors
(if not billed individually for the project) or indicated in overhead costs of the
Company.
Item No.7 Normally payable only in case of field work under hard and arduous conditions.
Full Name:__________________________
Signature:___________________________
26
5.2 FORM 2: BREAKDOWN OF SOCIAL CHARGES
27
5.3 FORM 3: BREAKDOWN OF OVERHEAD COSTS
28
5.4 FORM 4
Page 1 of 2
Sub-Total:
29
FORM 4
Page 2 of 2
II Non-Technical Staff
Sub-Total (B)
Total (A + B)
30
5.5 FORM 5: DIRECT (NON-SALARY) COSTS
Unit
Total Rate
No. Nomenclature Quatntity Months Months (Rs) Total (Rs)
31
5.6 FORM 6
GSTon Services
3. Grand Total with GST
Dated ___/___/______
32
ANNEXURES
33
ANNEXURE-A: TERM OF REFERENCE (TORS)
1. MASTER PLANNING FOR WATER SUPPLY AND SANITATION SCHEMES IN
ALL VILLAGES AND FEASIBILITY AND DESIGN OF SEWERAGE/DRAINAGE
SYSTEMS IN POTENTIAL URBAN AREAS OF MERGED AREA OF KHYBER
PAKHTUNKHWA {ADP NO. 251/180476 (2019-20)}
A. PRELIMINARY STUDIES:
1. To collect all relevant data i/c Water Source description, discharge, Population
Water Demand Pumping machinery, Storage and Pipe lineetc: data of all drinking
water supply schemes completed by PHE Department upto June, 2019 with
breakup whether (Gravity/ Pumping and Electric or Solar based).
2. To assess all the shortcomings in the existing Drinking Water facilities of PHE
Department and prepare proposal of rehabilitation and augmentation of existing
drinking water systems.
3. To collect data of Functional and Non-functional schemes with reason of non-
functionality to identify scope of work to make it functional or otherwise.
4. To work out operational/recurring cost, source of funding whether bears by Govt:
or VDO and make comparison of No. of beneficiaries benefited from Govt: and
VDO based schemes.
5. To work out Construction/operational cost comparison for solar VS electric based
schemes.
6. To make comparison of functional/non-functional in Govt: and VDO based
schemes in terms of DWSS: components damaged/ mal functional and estimate
costs require for restoration.
7. To conduct general study of existing arrangements for WSS& Sanitation facility in
Tribal Districts.
8. To mark locations of existing and proposed WSS& Sanitation schemes on Google
Map along with GPS Co-ordinates for each scheme.
9. To indicate Projects objectives and scope of work of all completed and proposed
schemes/Projects.
10. To prepare rough estimate cost of all Projects i/c Rehabilitation Schemes & New
proposed schemes for each Districts &Sub Divisions.
34
11. To figure out the recurring/operational cost (i.e. repair and maintenance, monthly
electricity bills and operational staff salaries) of completed WSS, propose WSS
and Sanitation schemes.
12. To identify the social, political and environmental constraints.
13. To identify project relevancy to the identified needs.
14. To identify project effectiveness in delivering desired/planned results.
15. To identify lesson learned in terms of execution, operation and management and to
share recommendations for further improvement.
B. MASTER PLANNING FOR DRINKING WATER SUPPLY SCHEMES IN
MERGED AREA
35
10. Develop criteria for prioritization of water supply schemes on need basis.
11. Assess the feasibility of using solar energy as source of Energization for existing as
well as new Drinking Water Supply schemes, status of land availability (free/with
cost).
12. Prepare a prioritized list of schemes in each district based on the approved design
criteria.
13. Preparation of feasibility of drinking water supply schemes on spring and
surface/sub surface water both Gravity or Pumping base.
14. Prepare tentative cost estimate based on typical design including water source,
Pumping Machineries, supply/pumping main, distribution and necessary
treatment, if any.
15. Prepare a District &Sub Division wise Master Plan/Investment Plan and phasing
based on availability of financial sources.
C. MASTER PLANNING FOR SANITATION (WASTEWATER DISPOSAL AND
TREATMENT) IN MERGED AREAS.
36
12. Development of sample strategy regarding awareness campaign and BCC
(Behavior change communication) Sanitation or ODF based on CLTS
(Community lead total Sanitation).
13. Determine capital cost, recurrent cost estimate of various components of the
project using current schedule of rates.
2. FOR FEASIBILITY STUDY & DESIGN OF SEWERAGE/DRAINAGE SYSTEM
IN POTENTIAL URBAN AREAS OF MERGED TRIBAL DISTRICTS KHYBER
PAKHTUNKHWA.
1. PRELIMINARY STUDIES:
1. Conducting General study of existing arrangements for sanitation facility in Tribal
district Headquarters and surroundings.
2. Collection/evaluation of all the available documents, PC-I, maps, Plans for
planning of the project.
3. Conducting study for last 10 years rain fall and run off in the project area and
surroundings for comprehensive master planning,
4. Measure flow of wastewater (domestic + run off), and other parameter required for
the design of sewerage system. Assessment of open defecation, conducting sewage
tests BOD/COD etc.
5. Devise a comprehensive plan in terms of sewerage and drainage along with
existing conditions of sewage flow, surface run off and assessment of open
defecation.
6. Prepare map of the catchment area through digitizing including levels.
7. Identify suitable location for the waste water disposal.
8. Assessment of social and environmental impacts of the project.
9. Proposed best, feasible, economical, environment friendly facilities for
sewerage/drainage.
10. Prepare design criteria for various components of project.
11. Preparation of long section and X-section of sewers & Drains including
trunk/lateral branches in sewer/drainage system.
12. Determine capital cost, recurrent cost estimate of various components of the
project using current schedule of rates.
13. Preparation of construction Schedule and Cash flows.
37
14. Preparation of Draft Feasibility Report.
15. Preparation of Final Feasibility Report for individual District.
16. Prepare Initial Environmental Examination (IEE)/Environmental Impact
Assessment (EIA) Report.
2. DETAIL DESIGN
1. Carry out additional topographic survey for the detailed design at suitable scales
for the project as per directions of the Engineer /Client.
2. Carry out detailed design of the sewage/drainage System (Separate or combined).
3. Carry out feasibility and detailed design of low cost sanitation facilities like Pour
flush/pit latrine /Septic tank and soakage pits.
4. Preparation of Feasibility level PC-I Performa for individual project in required
number of copies.
5. Prepare and submit draft design report with drawings
6. Prepare and submit Final Design Report
7. Prepare PC-1 along with detailed cost estimate in required No. of copies.
8. Prepare Staff and Equipment list along with their cost and operation requirements.
9. Prepare a comprehensive O&M mechanism including manual to ensure
sustainable operation of the sewerage system.
10. Design/ feasibility of treatment plant of any type deem fit for the area.
11. Prepare a landscape plantation plan based on the flow direction to impound
spreading of foul smells.
COMPLETION TIME
Completion time will be 12 months for Feasibility and Detail Design stage each after
award of consultancy contract.
38
ANNEXURE-B:DELIVERABLES AND MODE OF PAYMENT
Mode of Payment: The lump sum Payments will be made as per following delieverables/schedule
Delieverywith
Activity in Months
S.No Deliverables/Activity Tasks Payment %
Days after contract
signing
(i) Final Master Plan for Water Supply & Sanitation (ii)
6 Submission of Cost Estimation & PC-1's 60 12 10%
forSanitaion/Drainge Schemes
39
ANNEXUREC:QUALIFICATION AND EXPERIENCE OF
CONSULTANT’S KEY PERSONNEL
Consultants will assign adequately qualified key personnel to carry out the implementation of
the Project as described in TOR, man-month inputs for which are indicated above. The key
personnel should possess the qualifications and experience as indicated against each position
as described above.
40
ANNEXURE D: REPORTING REQUIREMENTS
Report should be provided in accordance with Annexure B with 5 Copies Each
Monthly reports and other reports as applicable are to include schedules of contract
payments and variation orders, graphical representations of progress against program, based
on the approved contract schedules, charts of physical progress on major items, relevant
photographs and details of impediments to the works and proposals for overcoming these.
Response to M & E, audit and other forum seeking information’s
41
ANNEXURE E: KEY PERSONNEL AND SUB
CONSULTANTS
List under:
42
ANNEXURE F: BREAKDOWN OF CONTRACT PRICE IN
FOREIGN CURRENCY
43
ANNEXURE G: BREAKDOWN OF CONTRACT PRICE IN
LOCAL CURRENCY
Breakdown of Contract Price in Local Currency
44
ANNEXURE H: DOCUMENTS TO BE PROVIDED BY
THE CLIENT UPON REQUEST
Thanks
45