Project: Construction / Rehabilitation of Existing Terminal Building

Job Hazard Analysis


PROJECT / TASK: Pump Crete CONTRACTOR: Vicente T. Lao Construction JOB No.:

SUPERVISOR: Engr. Rey Acabal LOCATION: Gensan City International Airport DATE: 12-12-2019

JOB STEP. HAZARDS CONTROL MEASURES ACTION BY

a.) Work started without permit  Obtain work permit & follow
the instructions defined on
b.) Unskilled operator permit
 Ensure JSA briefing to all
c.) Personnel/Structures hit by
workforce prior to commence
1.) Movement of Heavy Equipment/Heavy Vehicle
activity
Vehicles / Equipment’s
d.) Striking of vehicles with  Deliver tool box talk to all of
structures/overhead live vehicles drivers & operators
lines  Be careful of nearby
structures/lines
e.) Over speeding  Banks men should be available
at site
 Keep away all unauthorized
people during movement of
heavy vehicle/equipment’s
 All Heavy Vehicles /
Equipment’s speed limit is
10Km/hour
 Ensure Close HSE monitoring
/supervision
 Ensure availability of fire
extinguisher at site Flame
arrestor should be installed in
all Vehicles/equipment’s
 Use of appropriate PPE’s

a.) Vehicles/equipment’s  Obtain relevant permit before


striking/hit with commencing of any work
Structure/live lines
 Ensure vehicles/equipment
2.) Working in Live areas
movement only on
b.) Work in live area
designated/defined routes
c.) Unaware about hazards  Be highly careful while
of live areas crossing over the
culverts/drains
d.) Traffic movement on  Avoid sharp turnings of
authorized routes at plan vehicles
site  Banks man should be at site
while movement of vehicles /
e.) Damaged to equipment’s
underground utilities  Ensure use of appropriate
(Drains, Culverts, PPE’s
electrical cable ,pipe
 Ensure close safety
lines etc)
supervision of all work
f.) Movement of people in  Deliver TBT & awareness to all
unauthorized areas of workforce about
area/activity hazards
g.) Fumes of Hydrocarbons  Do not mishandle or operate
in live areas any of live equipment/valve in
the area
h.) Flammable ,toxic gases  Unauthorized movement of
workers to be restricted in live
i.) Fire/explosion areas
 Remove any of combustible
j.) Slip , trip & fall material from site
 Don’t switch off engine once
started to avoid sparking from
battery terminals
 Maintain good housekeeping at
site
 Don not left any vehicle /
equipment / tool un attendant
in running condition
a.) Personnel injury during  Involvement of skilled labour
movement of heavy vehicles  Ensure use of proper PPE’s
 Deliver daily TBT before
3.) Concrete Poring with b.) Manual handling commencing work
Concrete Pump  Ensure use of inspected &
c.) Vehicles collisions colour coded hand tools
 Careful handling of steel &
d.) Slip ,trip & fall other materials
 Ensure proper stocking of all
materials
e.) Inappropriate PPE’s/Tools
during concrete work  Maintain good housekeeping
all the time
 Use of appropriate PPE’s
f.) Skin contact with concrete or
during concrete works (Eye
other chemicals
protection, rubber gloves, gum
shoes)
 Ensure use of inspected tools
for the right job
 Availability of fresh water at
site
 First aid box should be in place
at site

 Ensure proper lighting


a.) Poor visibility at night arrangement for late night
4.) Working at night shift working hours
hours
hours
 Careful movement of vehicles
b.) Vehicles / equipment’s in night hours
hit with people,  Place refection tapes at hard
equipment or structure barriers, structures
 Banks men should worn high
c.) Slip , trip & fall visibility reflection vests
 No working should be allowed
in poor lighting conditions
 Ensure proper housekeeping to
avoid tripping

Prepared by: Remon Ma R. Ealdama Reviewed by: Engr. Rey Acabal Date