JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
C MASONRY WORKS
11 m2

225 mm Wall Brick work

A-C/1 1.0 1.0 9.300 4.250 39.525


L = 10-.35*2 = 9.3 -

Ded for opening AW/2 1.0 (1.0) 1.000 0.655 (0.655)

Ded Stiffner beam 2.0 (1.0) 4.675 0.225 (2.104)

Det Stiffner columns 2.0 (1.0) 9.000 0.225 (4.050)

Ded stiffner column 1.0 (1.0) 0.225 2.390 (0.538) 32.179

A/1-2 1.0 1.0 0.5 (4.25+5.05) 4.175 19.410

Deduct Stiffner column (4.65- 1.0 (1.0) 0.225 4.425 (0.996)


0.225)
Det for stiffner beam 1.0 (1.0) 4.175 0.225 (0.939) 17.475

A/2-3 1.0 1.0 4.650 5.050 23.483


Deduct for opening (LW/2) 1.0 (1.0) 1.1 2.000 (2.200) 21.283

CF 70.936
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH(m) WIDTH HEIGHT QTY TOTAL QTY REMARKS
m2 70.936

A/2-3
Det stiffner columns 2.0 (1.0) 0.225 2.200 (0.990)

Det stiffnerbeams 1.0 (1.0) 4.65 0.225 (1.046) (1.046)

A/3-4 1.0 1.0 4.650 5.050 23.483

det AW/2 1.0 (1.0) 1.000 1.800 (1.800)

Det stiffner column 1.0 (1.0) 0.225 5.050 (1.136)

Det stiffner column 1.0 (1.0) 0.225 2.650 (0.596)

Det stiffnerbeams 1.0 (1.0) 4.65 0.225 (1.046) 18.904

A/4-5 1.0 1.0 0.5 (4.25+5.05) 4.175 19.410

Deduct Stiffner column (4.65- 1.0 (1.0) 0.225 4.425 (0.996)


0.225)
Det for stiffner beam 1.0 (1.0) 4.175 0.225 (0.939)

Det for EAL/1 1.0 (1.0) 2.753 1.500 (4.130) 13.346


CF 102.139
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
102.139 -

A-C/15 1.0 1.0 9.300 4.250 39.525


L = 10-.35*2 = 9.3 -

Ded Stiffner beam 2.0 (1.0) 4.675 0.225 (2.104)

Det Stiffner columns 2.0 (1.0) 0.225 9.000 (4.050) 33.371

C/2-3 1.0 1.0 3.715 5.050 18.761

Det SD/4 1.0 (1.0) 2.360 2.460 (5.806)

Det SD/6 1.0 (1.0) 0.700 2.150 (1.505)

Ded Stiffner beam 1.0 (1.0) 3.490 0.225 (0.785)

Det Stiffner columns 1.0 (1.0) 0.225 5.050 (1.136) 9.529


Total 145.039
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
112 mm brick wall m2 145.039 -
Gate Act
A-C/1a 2.0 1.0 1.100 4.715 10.373
H= (4.83+4.6)/2
1.0 1.0 3.040 4.715 14.334

1.0 1.00 5.74 4.830 27.724

Ded WD/1 2.0 (1.0) 0.700 2.150 (3.010)

Ded Stiffner beam 1.0 (1.0) 5.740 0.225 (1.292)

Ded Stiffner beam 1.0 (1.0) 3.040 0.225 (0.684)

Det Stiffner columns 4.0 (1.0) 0.225 4.830 (4.347) 43.098

A-C/2 1.0 1.0 6.200 5.050 31.310


L= (6.875 - 0.5 - 0.175) = 6.2

A-C/2a 1.0 1.00 0.700 5.400 3.780

1.0 1.00 2.935 5.400 15.849 50.939

Total 239.076 -
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
m2 239.076 -
A-C/2 cont..

Det door - SD/5 1.0 (1.0) 1.5 2.150 (3.225)

Ded Stiffner beam 1.0 (1.0) 9.160 0.225 (2.061)

Det Stiffner column 1.0 (1.0) 0.225 5.050 (1.136)

Det Stiffner columns 2.0 (1.0) 0.225 5.400 (2.430) (8.852)

A-C/3 1.0 1.0 9.200 5.050 46.460

Det door - SD/7 1.0 (1.0) 0.88 2.150 (1.892)

Ded Stiffner beam 1.0 (1.0) 8.750 0.225 (1.969)

Det Stiffner column 2.0 (1.0) 0.225 5.050 (2.273) 40.327

Total 270.551
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO


BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
270.551
A-C/4 1.0 1.0 10.070 5.400 54.378

Ded Stiffner beam 1.0 (1.0) 10.070 0.225 (2.266)

Det Stiffner column 2.0 (1.0) 0.225 5.400 (2.430) 49.682

Total 320.233

Sub Station

Foundation brick work m2 1.0 1.0 13.220 0.600


L=13.195 -

Wall two sides 2.0 1.0 3.000 3.250 19.500

Wall front and back 2.0 1.0 4.200 3.250 27.300

Ded LW/2 3.0 (1.0) 0.600 1.000 (1.800)

LW/1 2.0 (1.0) 2.400 1.000 (4.800)

Front door 1.0 (1.0) 2.800 2.800 (7.840)

Ded Stiffner beam 1.0 (1.0) 4.200 0.225 (0.945) 31.415

Total 31.415
Total 351.648
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS

cement rendering
m2
Sub Station part -1 1.0 1.0 3.050 1.700 5.185
Det 2.0 (1.0) 0.517 0.300 (0.310)

1.0 1.0 1.700 0.950 1.615

1.0 1.0 4.200 0.565 2.373 8.863

Total 8.863
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 30-Dec-99 SHEET NO


BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
FRONT BRICK WALL 351.648

C/2-3 and 3-4 m2 2.0 1.0 4.650 5.050 46.965

Deduction for Stiffness column 4.0 (1.0) 0.225 5.050 (4.545)

Deduction for Door SD/1 1.0 (1.0) 2.2 5.050 (11.110)

Deduction for LW/1 1.0 (1.0) 1.2 2.200 (2.640)

Deduction for SD/6 1.0 (1.0) 0.7 2.150 (1.505)

Deduction for SD/4 1.0 (1.0) 2.39 2.350 (5.617) 21.549

C/1-2 & 4-5 1.0 1.0 0.5 (4.25+5.05) 4.175 38.820

Deduction for Door SD/2 1.0 (1.0) 2.2 4.550 (10.010)

Deduction for Door SD/3 1.0 (1.0) 2.2 4.580 (10.076)

Total 373.196
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 30-Dec-99 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
FRONT BRICK WALL 373.196

Deduction for SD/6 2.0 (1.0) 0.7 2.150 (3.010)

Deduction for Stiffness column (1- 2.0 (1.0) 0.225 4.550 (2.048)
2)
Deduction for Stiffness column (4- 2.0 (1.0) 0.225 4.850 (2.183)
5)
Deduction for Duct opening (4-5) 1.0 (1.0) 0.5 0.500 (0.250) (7.490)

Total 365.706
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 30-Dec-99 SHEET NO


BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
Guard House 365.706

m2 4.0 1.0 2.98 3.600 42.912

4.0 0.5 2.980 0.860 5.126

m2 2.0 1.0 1.43 2.600 7.436

m2 1.0 1.0 2.9 2.600 7.540

Deduction for Duct opening (4-5) 1.0 (1.0) 0.9 2.100 (1.890) toatl = 418.242
Comple 84.16%
2.0 (1.0) 0.8 2.100 (3.360)

3.0 (1.0) 1.3 1.200 (4.680)

2.0 (1.0) 0.685 0.400 (0.548)


52.536

Total 418.242
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
C MASONRY WORKS
11 m2

225 mm Wall Palstering

A-C/1 1.0 1.0 10.000 4.600 46.000

A/1-2 1.0 1.0 0.5 (4.6+5.4) 4.175 22.400

A/2-3 1.0 1.0 4.650 5.400 25.110

A/3-4 1.0 1.0 4.650 5.400 25.110

A/4-5 1.0 1.0 0.5 (4.6+5.4) 4.175 22.400

A-C/5 1.0 1.0 10.000 4.600 46.000

C/2-3 1.0 2.0 3.715 5.050 37.522

-
CF 224.542
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH(m) WIDTH HEIGHT QTY TOTAL QTY REMARKS
m2
112 mm brick wall m2

Gate Act
A-C/1a (inner side ) 3.0 1.0 1.100 4.715 15.560
H= (4.83+4.6)/2
Outer side 1.0 1.0 1.210 4.715 5.705

1.0 2.0 3.160 4.715 29.799

Inner side 1.0 1.00 5.63 4.830 27.193

1.0 1.00 5.74 4.830 27.724

A-C/2 1.0 1.0 6.375 5.400 34.425


L= (6.875 - 0.5) = 6.375
1.0 1.0 6.26 5.400 33.804

A-C/2a 1.0 2.00 0.700 5.400 7.560

1.0 1.00 3.07 5.400 16.578

1.0 1.00 2.96 5.400 15.984

CF 214.332
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
214.332
A-C/3 1.0 2.0 9.980 5.400 107.784

A-C/4 1.0 2.0 10.070 5.400 108.756 216.540 430.87

Sub station

Foundation m2 1.0 1.0 13.700 0.600

Wall two sides 2.0 1.0 3.000 3.375 20.250

Wall two sides 2.0 1.0 3.450 3.375 23.288

Wall front and back 2.0 1.0 4.200 3.375 28.350

2.0 1.0 4.650 3.375 31.388 103.28

Total 534.147
BOQ NO
BOQ NO

BOQ NO
BOQ NO
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 29/07/2019 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH HEIGHT WIDTH QTY TOTAL QTY REMARKS
C MASONRY WORKS
11 m2

Formwork

A-C/1
Stiffner beam 2.0 2.0 4.675 0.225 4.208

Stiffner columns 2.0 2.0 4.250 0.225 3.825

stiffner column 1.0 2.0 2.390 0.225 1.076

A/1-2
Stiffner column (4.65-0.225) 1.0 2.0 4.425 0.225 1.991

stiffner beam 1.0 2.0 4.175 0.225 1.879

A/2-3
stiffner columns 2.0 3.0 2.2 0.225 2.970

stiffnerbeams 1.0 2.0 4.65 0.225 2.093

Add for bottom 1.0 1.0 1.20 0.225 0.270

stiffnerbeams 1.0 2.0 4.65 0.100 0.930


Add for bottom 1.0 3.0 0.760 0.225 0.513

Total 19.754
29/07/2019 SHEET NO

BOQ NO TOTAL QTY REMARKS


19.754
A/3-4
stiffner column 1.0 2.0 5.05 0.225 2.273

stiffner column 1.0 2.0 2.65 0.225 1.193


-
stiffnerbeams 1.0 2.0 4.65 0.225 2.093

Add beam bottom 1.0 1.0 1.00 0.225 0.225

A/4-5

Stiffner column (4.65-0.225) 1.0 2.0 4.425 0.225 1.991

stiffner beam 1.0 2.0 4.175 0.225 1.879

Add beam bottom 1.0 1.0 2.753 0.225 0.619

A-C/15

Stiffner beam 2.0 2.0 4.675 0.225 4.208

Stiffner columns 2.0 2.0 4.25 0.225 3.825 18.304


CF 38.058
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 29/07/2019 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
38.058
C/2-3

Stiffner beam 1.0 2.0 3.490 0.225 1.571

Add bottom 1.0 1.0 2.815 0.225 0.633

Stiffner columns 2.0 4.0 2.460 0.225 4.428

1.0 2.0 2.650 0.225 1.193

1.0 3.0 2.650 0.225 1.789

A-C/1a
Stiffner beam 1.0 2.0 5.740 0.225 2.583

Stiffner beam 1.0 2.0 3.040 0.225 1.368

Add beam bottom 2.0 1.0 0.700 0.110 0.154 13.718

Total 51.776
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
51.776
Stiffner columns 4.0 2.0 4.830 0.225 8.694

Stiffner columns 4.0 1.0 2.200 0.110 0.968

A-C/2 cont..

Stiffner beam 1.0 2.0 9.160 0.225 4.122

Stiffner column 1.0 2.0 5.050 0.225 2.273

Stiffner columns 3.0 2.0 5.400 0.225 7.290

Stiffner columns 2.0 1.0 5.400 0.110 1.188

A-C/3

Stiffner beam 1.0 2.0 9.200 0.225 4.140

Add beam bottom 1.0 1.0 0.880 0.110 0.097

Stiffner column 2.0 2.0 5.050 0.225 4.545 33.316

Total 85.092
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
m2 85.092
Add column 1.0 1.000 2.150 0.110 0.237

A-C/4

Stiffner beam 2.0 2.0 10.070 0.225 9.063

Stiffner column 2.0 2.0 5.400 0.225 4.860

Total 85.092
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO


BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS
85.092
SUB STATION
Stiffner beam 1.0 2.0 4.2 0.225 1.890

Add for beam bottom 1.0 1 2.8 0.225 0.630 2.520

Total 87.612
JFE EC PROJECT MPS

MEASUREMENT SHEETS DATE 26-Jul-19 SHEET NO

BOQ NO DESCRIPTION UNIT NO NO LENGTH WIDTH HEIGHT QTY TOTAL QTY REMARKS

Total -

S-ar putea să vă placă și