Documente Academic
Documente Profesional
Documente Cultură
3 3 3 3
III Net Volume of soak pit = Soak Pit Volume - Foundation Volume (I-II) 32.96 m 21.98 m 19.78 m 5.87 m
3 3 3 3
IV Volume Occupied by Gravel Considered as 70 % of Net Soak Pit Volume 23.07 m 15.39 m 13.85 m 4.11 m
3 3 3 3
V Net Volume availbale for Oil &Water = Net Volume of soak pit - Volume occupied by Gravel 9.89 m 6.60 m 5.93 m 1.76 m
2 2 2 2
VI Surface Area of Transformer = (axb) + 2(bxc) + 2(axc) 143.92 m 114.70 m 96.24 m 27.63 m
VII Qty of Water for 10 min = 10.2 lit / m2 / min 14.68 KL 11.70 KL 9.82 KL 2.82 KL
VIII Total qty of Oil and Water = Transformer oil qty + Water qty 28.28 KL 19.30 KL 17.22 KL 4.42 KL
3 3 3 3
IX Soak Pit size required Considered as 1/3 of Qty of (Oil + Water) 9.43 m 6.43 m 5.74 m 1.47 m
PIT Dimensions
Length 6.00 m 6.00 m 2.50 m
Width 3.50 m 2.50 m 1.50 m
Depth 1.41 m 1.20 m 1.22 m
Depth of drain pipe 1.50 m 1.40 m 1.25 m
Invert level of oil pit 3.01 m 2.70 m 2.57 m
Depth of of oil pit from FGL 2.71 m 2.40 m 2.27 m
Net Volume avaialble for oil + water = LXWXD 29.64 m3 17.96 m3 4.58 m3
Trafo-soak pit-PLPL