Equipment Data Project: HLJOC RBI Asset: TGT FIELD DEVELOPMENT Unit: KO DRUM H01-55-V-002

PRESSURE VESSEL
Identification Function Productivity impact P&ID PSV
r No impact Tag Set pressure (bar)
r 1/3 limited impact
H01-55-V-002 FLARE KO DRUM TGT-H01-55SK005-C01-0001
r 2/3 significant impact N/A N/A
r immediate shutdown
Design
Construction Code Manufacturer Nb. Volume equipment (m3) Volume system (m3) Design Life Start up date
Temperature (°C) Pressure (barg)
r Latest edition
ASME VIII DIV.1 2015 r Modified U-032 6.19 7.428 2017 Min -29/ Max 120 10
r No Code

Sub equipments

SHELL HEAD-LEFT HEAD-RIGHT POLLUTANT


Identification H01-55-V-002 H01-55-V-002 H01-55-V-002 Nature of pollutant r HC gas or non polluting products

Function KO DRUM KO DRUM KO DRUM r Amine / Glycol

Material Carbon steel Carbon steel Carbon steel r Oil water

Material spec. SA 516 Gr.70N SA 516 Gr.70N SA 516 Gr.70N r Liquid Hydrocarbon

Nozzle nb 8 2 N/A Marine pollution r < 0,2 m3

Conformity to NACE ? YES YES YES r 0,2 - 20 m3

Construction type ? Welded Welded Welded r 20 - 200 m3

Welded equipment ? yes yes yes r 200 - 2000 m3

PWHT? N/A N/A N/A r > 2000 m3

Construction thickness (mm) 12.7 10.8 10.8 Rehabilitation factor r Natural re-absorption

Design thickness (mm) 12.7 10.8 10.8 r Easy

Retirement thickness (mm) 12.7 10.8 10.8 r Difficult

Corrosion allowance (mm) 3 3 3 r Very difficult but possible

Operating temperature (°C) 55 To 80 55 To 80 55 To 80 r Very difficult / irreversible

Operating pressure (barg) ATM To 2.5 ATM To 2.5 ATM To 2.5

Lining Date of coating Condition

Interior Painting

Exterior PAINTING
COMMENT
Thermal insulation YES

r 100% Visual inspection without removal of internals GOOD

Internal visual inspection r 100% Visual inspection with dismantling of internal elements

r Hot works required for a 100% Visual inspection

Observations:

H01-55-V-002 Page 1/1