Sunteți pe pagina 1din 39

Status:

A : APPROVED B: APPROVED WITH NOTE C: RETURNED FOR CORRECTION D: DISAPPROVED

NOMOR REV. 0 REV. 1 REV. 2 REV. 3 TGL TGL


NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI KONDISI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS LAPANGAN
PSC PIU INTERNAL
SD/NKE/ICT/LYT-001 SITE PLAN ICT, FCSIT 1 & FCSIT 2 (ZONE 2)
1 001/DWG-UM/LYT/IV-2019 8/Apr/19

SD/NKE/MTD/001 METHODE INSTAL BRICK WALL

2 001/DWG-UM/MTD.BW/IV-2019 SD/NKE/MTD/002 METHODE INSTAL BRICK WALL 11/Apr/19 28/May/19 A

004/DWG-UM/FCT.1&2/A-DWS/VII- SD/A-FCT.2/SDW.J/03A SCHEDULE WINDOW J.03A, FCSIT - 1 & 2 ZONE - 2


3 2019/R0 15/Jul/19 1/Aug/19 A

SD/S-FCSIT/D.DPG/01 PLAN BRICK WALL & POWER HOUSE FENCE


DIGANTIK
4 001/DWG-UM/A-FCSIT/VIII-2019/R0 7/Aug/19 15/Aug/19 AN 5/Sep/19 17/Sep/19 REVISI 9/24/2019 11/8/2019 REVISI
SD/S-FCSIT/DT.POT/02 SECTION DETAIL

SD/A-FAR-KES/POWR/01-R0 BRICK WALL POWER HOUSE PLAN


5 006/DWG-UM/FAR-KES/X-2019 R0 SD/A-FAR-KES/POWR/02-R0 SECTION DAN ELEVATION POWER HOUSE 3/Oct/19 REVISI 10/15/2019 11/15/2019 A
Status:
A : APPROVED B: APPROVED WITH NOTE C: RETURNED FOR CORRECTION D: DISAPPROVED

NOMOR REV. 0 REV. 1 REV. 2 REV. 3 TGL TGL


KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS LAPANGAN
PSC PIU INTERNAL
SLC
SD/A-SLC/P.D/01 PAS. DINDING, SLC BUILDING,ZONE 3 DENAH PAS.DINDING LT.1

SD/A-SLC/P.D/01A PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.1 PARTIAL A


1 001/DWG-UM/SLC/A-PD/II/2019/R0 25/02/2019 A 3/26/2019
SD/A-SLC/P.D/01B PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.1 PARTIAL B

SD/A-SLC/P.D/02 PAS. DINDING, SLC BUILDING,ZONE 3 DENAH PAS.DINDING LT.2

SD/A-SLC/P.D/02A PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.2 PARTIAL A


2 002/DWG-UM/SLC/A-PD/II/2019/R0 27/02/2019 A 3/26/2019
SD/A-SLC/P.D/02B PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.2 PARTIAL B

SD/A-SLC/P.D/03 PAS. DINDING, SLC BUILDING,ZONE 3 DENAH PAS.DINDING LT.3


SD/A-SLC/P.D/03A PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.3 PARTIAL A
3 003/DWG-UM/SLC/A-PD/III/2019/R0 02/03/2019 A 3/26/2019
SD/A-SLC/P.D/03B PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.3 PARTIAL B

SD/A-SLC/P.D/04 PAS. DINDING, SLC BUILDING,ZONE 3 DENAH PAS.DINDING LT.4


SD/A-SLC/P.D/04A PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.4 PARTIAL A
4 004/DWG-UM/SLC/A-PD/III/2019/R0 06/03/2019 A 3/26/2019
SD/A-SLC/P.D/04B PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.4 PARTIAL B

SD/NKE/SLC/A07-001 LAYOUT SCHEDULE DOORS & WINDOWS

SD/NKE/SLC/DS-001 DOOR TYPE P1

SD/NKE/SLC/DS-002 DOOR TYPE P2

SD/NKE/SLC/DS-003 DOOR TYPE P3

SD/NKE/SLC/DS-004 DOOR TYPE P4

SD/NKE/SLC/DS-005 DOOR TYPE P5

SD/NKE/SLC/DS-006 DOOR TYPE PJ1

SD/NKE/SLC/DS-007 DOOR TYPE PJ2

SD/NKE/SLC/DS-008 DOOR TYPE PJ3

SD/NKE/SLC/DS-009 DOOR TYPE PJ4


REVISI
SD/NKE/SLC/DS-010 DOOR TYPE PK-1 KATA PAK
001/DWG-UM/SLC/A-PD/IV/2019/R0 04/04/2019 6/Apr/19
WISNU
SD/NKE/SLC/DS-011 DOOR TYPE PS APPROVE

SD/NKE/SLC/A03-001 WINDOW TYPE J1

SD/NKE/SLC/A03-002 WINDOW TYPE J1A

SD/NKE/SLC/A03-003 WINDOW TYPE J2

SD/NKE/SLC/A03-004 WINDOW TYPE J3

SD/NKE/SLC/A03-005 WINDOW TYPE J4

SD/NKE/SLC/A03-006 WINDOW TYPE J5


5
SD/NKE/SLC/A03-007 WINDOW TYPE J6, J7A

SD/NKE/SLC/A03-008 WINDOW TYPE BV

SD/NKE/SLC/A03-009 WINDOW TYPE BV1


5
NOMOR REV. 0 REV. 1 REV. 2 REV. 3 TGL TGL KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL LAPANGAN

SLC

SD/NKE/SLC/A07-001 LAYOUT SCHEDULE DOORS & WINDOWS


SD/NKE/SLC/DS-001 DOOR TYPE P1
SD/NKE/SLC/DS-002 DOOR TYPE P2
SD/NKE/SLC/DS-003 DOOR TYPE P3
SD/NKE/SLC/DS-004 DOOR TYPE P4
SD/NKE/SLC/DS-005 DOOR TYPE P5
SD/NKE/SLC/DS-006 DOOR TYPE PJ1
SD/NKE/SLC/DS-007 DOOR TYPE PJ2
SD/NKE/SLC/DS-008 DOOR TYPE PJ3
SD/NKE/SLC/DS-009 DOOR TYPE PJ4
SD/NKE/SLC/DS-010 DOOR TYPE PK-1 REVISI
001/DWG-UM/SLC/A-PD/IV/2019/R1 5/Apr/19 28/May/19
SD/NKE/SLC/DS-011 DOOR TYPE PS PAK NUR
SD/NKE/SLC/A03-001 WINDOW TYPE J1
SD/NKE/SLC/A03-002 WINDOW TYPE J1A
SD/NKE/SLC/A03-003 WINDOW TYPE J2
SD/NKE/SLC/A03-004 WINDOW TYPE J3
SD/NKE/SLC/A03-005 WINDOW TYPE J4
SD/NKE/SLC/A03-006 WINDOW TYPE J5
SD/NKE/SLC/A03-007 WINDOW TYPE J6, J7A
SD/NKE/SLC/A03-008 WINDOW TYPE BV
SD/NKE/SLC/A03-009 WINDOW TYPE BV1

SD/A-SLC/PL.LT.1/01 POLA FINISH LANTAI


SD/A-SLC/PL.LT.1/02 DENAH POLA LANTAI
SD/A-SLC/PL.LT.1/03 SLC BUILDING , LANTAI 1 ZONE 3
SD/A-SLC/PL.LT.2/01 POLA FINISH LANTAI
SD/A-SLC/PL.LT.2/02 DENAH POLA LANTAI
SD/A-SLC/PL.LT.2/03 SLC BUILDING , LANTAI 2 ZONE 3
4 005/DWG-UM/SLC/A-PL/V/2019/R0 SD/A-SLC/PL.LT.3/01 POLA FINISH LANTAI 15/05/2019 17/May/19 D 18/May/19 28/May/19 A
SD/A-SLC/PL.LT.3/02 DENAH POLA LANTAI
SD/A-SLC/PL.LT.3/03 SLC BUILDING , LANTAI 3 ZONE 3
SD/A-SLC/PL.LT.4/01 POLA FINISH LANTAI
SD/A-SLC/PL.LT.4/02 DENAH POLA LANTAI
SD/A-SLC/PL.LT.4/03 SLC BUILDING , LANTAI 4 ZONE 3

SD/A-SLC/CL.LT.1/01 DENAH CEILING LT.1


SD/A-SLC/CL.LT.1/02 DENAH CEILING LT.1 (PARTIAL A)
SD/A-SLC/CL.LT.1/03 DENAH CEILING LT.1 (PARTIAL B)
SD/A-SLC/CL.LT.2/01 DENAH CEILING LT.2
SD/A-SLC/CL.LT.2/02 DENAH CEILING LT.2 (PARTIAL A)
SD/A-SLC/CL.LT.2/03 DENAH CEILING LT.2 (PARTIAL B)
006/DWG-UM/SLC/A-CL/V/2019/R0 18/05/2019 23/May/19 D 23/May/19 17/Jun/19 A
SD/A-SLC/CL.LT.3/01 DENAH CEILING LT.3
SD/A-SLC/CL.LT.3/02 DENAH CEILING LT.3 (PARTIAL A)
SD/A-SLC/CL.LT.3/03 DENAH CEILING LT.3 (PARTIAL B)
SD/A-SLC/CL.LT.4/01 DENAH CEILING LT.4
SD/A-SLC/CL.LT.4/02 DENAH CEILING LT.4 (PARTIAL A)
SD/A-SLC/CL.LT.4/03 DENAH CEILING LT.4 (PARTIAL B)
5
SD/A-SLC/CL.LT.1/01 CEILING FINISHES LEVEL 1 st FLOOR PLAN

006/DWG-UM/SLC/A-CL/V/2019/R1 SD/A-SLC/CL.LT.1/02 CEILING FINISHES LT.1 (PARTIAL A) 18/07/2019 1/Aug/19 A


SD/A-SLC/CL.LT.1/03 CEILING FINISHES LT.1 (PARTIAL B)
5 NOMOR REV. 0 REV. 1 REV. 2 REV. 3 TGL TGL KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL
SLC
SD/A-SLC/CL.LT.2/01 DENAH CEILING LT.2
SD/A-SLC/CL.LT.2/02 DENAH CEILING LT.2 (PARTIAL A)
SD/A-SLC/CL.LT.2/03 DENAH CEILING LT.2 (PARTIAL B)
SD/A-SLC/CL.LT.3/01 DENAH CEILING LT.3
SD/A-SLC/CL.LT.3/02 DENAH CEILING LT.3 (PARTIAL A)
006/DWG-UM/SLC/A-CL/VIII/2019/R2 19/Aug/19 21/Aug/19 REVISI 8/29/2019
SD/A-SLC/CL.LT.3/03 DENAH CEILING LT.3 (PARTIAL B)
SD/A-SLC/CL.LT.4/01 DENAH CEILING LT.4
SD/A-SLC/CL.LT.4/02 DENAH CEILING LT.4 (PARTIAL A)
SD/A-SLC/CL.LT.4/03 DENAH CEILING LT.4 (PARTIAL B)

SD/A-SLC/ACP-01 DETAIL ACP ORNAMEN


6 007/DWG-UM/SLC/A-DTL/V/2019/R0 23/05/2019 17/Jun/19 A 6/29/2019 6/29/2019

SD/NKE/SLC/FSD/01 NORTH ELEVATION


SD/NKE/SLC/FSD/02 WEST ELEVATION
SD/NKE/SLC/FSD/03 SOUTH ELEVATION
7 008/DWG-UM/SLC/FCD/VII/2019/R0 05/07/2019 10/Jul/19 REVISI 18/Jul/19 1/Aug/19 REVISI 13/Aug/19 14-8-19 REVISI 8/29/2019 5-Sep-19 A
SD/NKE/SLC/FSD/04 EAST ELEVATION
SD/NKE/SLC/ACP-01 DETAIL ACP ORNAMENT

SD/A-SLC/TL1/01 DENAH TOILET LADIES & GENTS


SD/A-SLC/TL1/02 DENAH KERAMIK & PLAFOND
SD/A-SLC/TL1/03 POTONGAN 1 - 1 TOILET LADIES & GENTS
SD/A-SLC/TL1/04 POTONGAN 2 - 2 TOILET LADIES & GENTS
SD/A-SLC/TL1/05 POTONGAN 3 - 3 TOILET LADIES & GENTS
8 004/DWG-UM/VII-2019/R0 SD/A-SLC/TL1/06 POTONGAN 4 - 4 TOILET LADIES & GENTS TYPICAL LT.1 - LT.4 05/07/2019 12/Jul/19 REVISI 19/Jul/19 1/Aug/19 A
SD/A-SLC/TL1/07 POTONGAN 5 - 5 TOILET LADIES & GENTS
SD/A-SLC/TL1/08 TYPICAL LT.1 - LT.4
SD/A-SLC/TL1/09 POTONGAN 6 - 6 TOILET LADIES & GENTS
SD/A-SLC/TL1/10 TYPICAL LT.1 - LT.4

SD/A-SLC/TLD/01 DENAH TOILET DIFABLE


SD/A-SLC/TLD/02 POTONGAN 1 - 1 & 2 - 2
9 005/DWG-UM/VII-2019/R0 08/07/2019 12/Jul/19 REVISI 19/Jul/19 1/Aug/19 A
SD/A-SLC/TLD/03 POTONGAN 3 - 3 & 4 - 4

SD/A-SLC/TL2/01 DENAH TOILET MALE


SD/A-SLC/TL2/02 POLA KERAMIK TOILET MALE
SD/A-SLC/TL2/03 POLA RANGKA PLAFOND MALE
SD/A-SLC/TL2/04 POT.1-1 TOILET MALE
005/DWG-UM/VII-2019/R0 10/07/2019 15/Jul/19 REVISI
SD/A-SLC/TL2/05 POT.2-2 TOILET MALE
SD/A-SLC/TL2/06 POT.3-3 TOILET MALE
10 SD/A-SLC/TL2/07 POT.4-4 TOILET MALE

SD/A-SLC/TL2/01 DENAH TOILET MALE


SD/A-SLC/TL2/02 POLA KERAMIK TOILET MALE
005/DWG-UM/VII-2019/R1 SD/A-SLC/TL2/04 POT.1-1 TOILET MALE 19/Jul/19 1/Aug/19 A
SD/A-SLC/TL2/07 POT.4-4 TOILET MALE

SD/A-SLC/TL3/01 DENAH TOILET FEMALE


SD/A-SLC/TL3/02 POLA KERAMIK TOILET FEMALE
SD/A-SLC/TL3/03 POLA RANGKA PLAFOND FEMALE
SD/A-SLC/TL3/04 POT.1-1 TOILET FEMALE
11 006/DWG-UM/VII-2019/R0 16/07/2019 1/Aug/19 A
SD/A-SLC/TL3/05 POT.2-2 TOILET FEMALE
SD/A-SLC/TL3/06 POT.3-3 TOILET FEMALE
SD/A-SLC/TL3/07 POT.4-4 TOILET FEMALE

SD/A-SLC/TL5/01 DENAH TOILET BACK STAGE


SD/A-SLC/TL5/02 DENAH POLA KERAMIK TOILET BACK STAGE
SD/A-SLC/TL5/03 DENAH RANGKA PLAFOND TOILET BACK STAGE
SD/A-SLC/TL5/04 POTONGAN 1-1 TOILET BACK STAGE
12 008/DWG-UM/VII-2019/R0 SD/A-SLC/TL5/05 POTONGAN 2-2 TOILET BACK STAGE 16/07/2019 1/Aug/19 A
SD/A-SLC/TL5/06 POTONGAN 3-3 TOILET BACK STAGE
SD/A-SLC/TL5/07 POTONGAN 4-4 TOILET BACK STAGE
SD/A-SLC/TL5/08 POTONGAN 5-5 TOILET BACK STAGE
NOMOR REV. 0 REV. 1 REV. 2 REV. 3 TGL TGL
12
NO. 008/DWG-UM/VII-2019/R0 SHOP DRAWING 16/07/2019 1/Aug/19 A REMARKS DISTRIBUSI DISTRIBUSI KONDISI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS LAPANGAN
PSC PIU INTERNAL
SLC
SD/A-SLC/TL4/01 DENAH TOILET LAB
SD/A-SLC/TL4/02 POTONGAN 1-1 & 2-2 TOILET LAB
13 007/DWG-UM/VII-2019/R0 15/07/2019 1/Aug/19 A
SD/A-SLC/TL4/03 POTONGAN 3-3 & 4-4 TOILET LAB

SD/A-SLC/PNJ/01 PANTRY & JANITOR LT1 - LT4 : 4 - B


SD/A-SLC/PNJ/02 RANGKA PLAFOND
14 009/DWG-UM/VII-2019/R0 SD/A-SLC/PNJ/03 POTONGAN 1-1 & 2-2 22/07/2019 1/Aug/19 A
SD/A-SLC/PNJ/04 POTONGAN 3-3 & 4-4

SD/A-SLC/RMP.DFB/01 LAYOUT RAMP DEFABEL


SD/A-SLC/RMP.DFB/02 ELEVATION -A, SECTION 02
15 010/DWG-UM/A-SLC/VII/2019/R0 29/07/2019 31/Jul/19 REVISI 3/Aug/19 6/Aug/19 REVISI 8/Aug/19 15/Aug/19 A
SD/A-SLC/RMP.DFB/03 SECTION 01

SD/NKE/SLC/ACP/01 ACP NORTH ELEVATION


SD/NKE/SLC/ACP/02 ACP WEST ELEVATION
SD/NKE/SLC/ACP/03 ACP SOUTH ELEVATION
16 004/DWG-UM/SLC/FCD/VII/2019/R0 30/07/2019 10/Aug/19 A
SD/NKE/SLC/ACP/04 ACP EAST ELEVATION
SD/NKE/SLC/ACP/05 DETAIL RANGKA ACP ORNAMENT

SD/A-SLC/TG1/01 TANGGA AS : A - 6 - 7 LT.1 & LT.2


SD/A-SLC/TG1/02 TANGGA AS : A - 6 - 7 LT.3 & LT.4
17 018/DWG-UM/VIII-2019/R0 SD/A-SLC/TG1/03 POTONGAN 1-1 07/08/2019 15/Aug/19 A
SD/A-SLC/TG1/04 POTONGAN 2-2

SD/NKE/SLC/RPNT/01-R0 DETAIL RANGKA PINTU ENTRANCE


18 005/DWG-UM/SLC/VIII-2019/R0 06/08/2019 16/Aug/19 A

SD/NKE/SLC/FKD/01-R0 FACADE ROOF (AS: 1-3/A)


19 005/DWG-UM/SLC/VIII-2019/R0 07/08/2019 15/Aug/19 A

SD/A-SLC/D.DPG/01 PLAN BRICK WALL & POWER HOUSE FENCE


20 001/DWG-UM/A-SLC/VIII-2019/R0 SD/A-SLC/D.DPG/02 SECTION DETAIL 07/08/2019 15/Aug/19 A 5/Sep/19 18/Sep/19 A

POLA KERAMIK
SD/A-SLC/TG1/05
TANGGA AS : A-6-7 LT.1 DAN LT.2
21 019/DWG-UM/VII-2019/R0 POLA KERAMIK 12/Aug/19 19/Aug/19 A
SD/A-SLC/TG1/06 TANGGA AS: A-6-7 LT.3 DAN LT.4

SD/A-FINISH.LIFT/01 DETAIL TAMPAK FIN.CAT LIFT 1st Floor


22 005/DWG-UM/A-SLC/VIII-2019/R0 SD/A-FINISH.LIFT/02 Detail TAMPAK FIN.CAT LIFT 2nd FLOOR 13/Aug/19 19/Aug/19 A

SD/A-SLC/WD/01 TEMPAT WUDHU LT,2 AS:5


SD/A-SLC/WD/02 POTONGAN 1-1 & 2-2
22 020/DWG-UM/VII-2019/R0 14/Aug/19 19/Aug/19 A
SD/A-SLC/WD/02 POTONGAN3-3 & 4-4

SD/NKE/SLC/A07-001 LAYOUT SCHEDULE DOOR & WINDOW, 1 st FLOOR


SD/NKE/SLC/A07-002 LAYOUT SCHEDULE DOOR & WINDOW, 2 st FLOOR
SD/NKE/SLC/A07-003 LAYOUT SCHEDULE DOOR & WINDOW, 3 st FLOOR
SD/NKE/SLC/A07-004 LAYOUT SCHEDULE DOOR & WINDOW, 4 st FLOOR
SD/NKE/SLC/A07-005 LAYOUT SCHEDULE DOOR & WINDOW, ROOF FLOOR
23 020/DWG-UM/SLC/A-DWS/VIII-2019/R0 14/Aug/19 21/Aug/19 A
LWW/SD/DT/001-SLC SFD w/LOUVRE - NON FIRE RATED - PB1
LWW/SD/DT/002-SLC SFD w/LOUVRE - NON FIRE RATED - PB2
LWW/SD/DT/003-SLC DFD SHAFT - PS
LWW/SD/DT/004-SLC SFD SHAFT- PS

SD/A-SLC/P.D/0.1 DETAIL PINTU KAYU P.1


SD/A-SLC/P.D/0.2 DETAIL PINTU KAYU P.2 & P.J.1
SD/A-SLC/P.D/0.3 DETAIL PINTU KAYU P.3, PJ.2, P.J.3 & PJ.4
24 004/DWG-UM/SLC/A-DWS/VIII-2019/R0 SD/A-SLC/P.D/0.4 DETAIL PINTU KAYU P.4 DOUBLE 19/Aug/19 26/Aug/19 A
SD/A-SLC/P.D/0.5 DETAIL PINTU KAYU PT.1
SD/A-SLC/P.D/0.6 DETAIL PINTU KAYU PT.2
NOMOR REV. 0 REV. 1 REV. 2 REV. 3 TGL TGL
KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL
SLC
SD/A-SLC/TG2/01 TANGGA 2 AS : C-2-3 LT1
SD/A-SLC/TG2/02 TANGGA 2 AS : C-2-3 LT2
SD/A-SLC/TG2/03 TANGGA 2 AS : C-2-3 LT3
SD/A-SLC/TG2/04 TANGGA 2 AS : C-2-3 LT4
26 021/DWG-UM/VIII-2019/R0 SD/A-SLC/TG2/05 TANGGA 2 AS : C-2-3 LT ATAP 19/Aug/19 26/Aug/19 A
SD/A-SLC/TG2/06 POTONGAN 1-1
SD/A-SLC/TG2/07 POTONGAN 1-1
SD/A-SLC/TG2/08 POTONGAN 2-2

SD/NKE/SLC/GDN-01 R0 ROOF GARDEN PLAN


SD/NKE/SLC/GDN-02 R0 SECTION 1
27 002/DWG-UM/SLC/VIII-2019/R0 SD/NKE/SLC/GDN-03 R0 ELEVATION A 19/Aug/19 26/Aug/19 A
SD/NKE/SLC/GDN-04 R0 ELEVATION & SECTION

SD/NKE/SLC/WP1-01 WATERPROOFING PLAN 1st


SD/NKE/SLC/WP1-02 WATERPROOFING PLAN 2nd
SD/NKE/SLC/WP1-03 WATERPROOFING PLAN 3th
28 008/DWG-UM/SLC/WP/VIII-2019/R0 29/Aug/19 5/Sep/19 A
SD/NKE/SLC/WP1-04 WATERPROOFING PLAN 4th
SD/NKE/SLC/WPRF-01 WATERPROOFING PLAN ROOF

SD/A-SLC/CER-00 KEYPLAN CERMIN


SD/A-SLC/CER-01 DETAIL CERMIN
29 006/DWG-UM/SLC/WP/VIII-2019/R0 23/Sep/19 7/Oct/19 A
SD/A-SLC/CER-02 DETAIL CERMIN

SD/A-SLC/ACP/01 R0 ACP CANOPY PLAN


30 005/DWG-UM/SLC/VIII-2019/R0 SD/A-SLC/ACP/02-R0 SECTION ACP CANOPY 11/09/2019 8/Oct/19 A

SD/A-SLC/PH/PB/01 LOKASI PINTU BESI POWER HOUSE GEDUNG SLC (ZONE-3)


SD/A-SLC/PH/PB/02 DETAIL PINTU PB2A (2400X2200) NON FIRE RATED (1BH) POWER HOUSE GED
31 066/DWG-UM/SLC/X-2019/R0 22/Oct/19 12/Nov/19 A
SD/A-SLC/PH/PB/03 ACCESSORIES PINTU BESI POWER HOUSE GEDUNG SLC(ZONE-3)

SD/A-SLC/PAV/01 R0 LAYOUT PAVING & ASPALT SCIENCE LEARNING CENTER ZONE 3 DIBAWA NAIK
SD/A-SLC/PAV/02 R0 DETAIL & SETION SCIENCE LEARNING CENTER ZONE 3 TANPA
32 002/DWG-UM/SLC/PAV/X-2019/R0 23/Oct/19 8/Nov/19 REVISI 11/20/2019
SD/A-SLC/PAV/03 R0 DETAIL STAIRS AS : 6 / C TANDA
TERIMA
Status:
A : APPROVED B: APPROVED WITH NOTE C: RETURNED FOR CORRECTION D: DISAPPROVED

NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI


NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL LAPANGAN

ICT
SD/A-ICT/DNH.L1/01 1st FLOOR PLAN

SD/A-ICT/DNH.L1/02 1st FLOOR PLAN - PARTIAL 1


1 001/DWG-UM/ICT/A-PD/III/2019/R0 12/Mar/19 A 3/26/2019
SD/A-ICT/DNH.L1/03 1st FLOOR PLAN - PARTIAL 2

SD/A-ICT/DNH.L2/01 2nd FLOOR PLAN - BRICK WALL

001/DWG-UM/ICT/A-PD/III/2019/R0 SD/A-ICT/DNH.L2/02 2nd FLOOR PLAN - BRICK WALL, PARSIAL 1 16/Mar/19 D

SD/A-ICT/DNH.L2/03 2nd FLOOR PLAN - BRICK WALL, PARSIAL 2

SD/A-ICT/DNH.L2/01 2nd FLOOR PLAN - BRICK WALL


NAMBAH
001/DWG-UM/ICT/A-PD/III/2019 SD/A-ICT/DNH.L2/02 2nd FLOOR PLAN - BRICK WALL, PARSIAL 1 30/Mar/19 6/Apr/19 D
2 PAS.DINDING
SD/A-ICT/DNH.L2/03 2nd FLOOR PLAN - BRICK WALL, PARSIAL 2

SD/A-ICT/DNH.L2/01 2nd FLOOR PLAN - BRICK WALL

SD/A-ICT/DNH.L2/02 2nd FLOOR PLAN - BRICK WALL, PARSIAL 1


001/DWG-UM/ICT/A-PD/III/2019/R3 4/9/2019 10/May/19 A
SD/A-ICT/DNH.L2/03 2nd FLOOR PLAN - BRICK WALL, PARSIAL 2

SD/A-ICT/DNH.L3/01 3rd FLOOR PLAN - BRICK WALL

001/DWG-UM/ICT/A-PD/III-2019/R0 SD/A-ICT/DNH.L3/02 3rd FLOOR PLAN - BRICK WALL, PARSIAL 1 21/Mar/19 6/Apr/19 D

SD/A-ICT/DNH.L3/03 3rd FLOOR PLAN - BRICK WALL, PARSIAL 2


3
SD/A-ICT/DNH.L3/01 3rd FLOOR PLAN - BRICK WALL

SD/A-ICT/DNH.L3/02 3rd FLOOR PLAN - BRICK WALL, PARSIAL 1


001/DWG-UM/ICT/A-PD/III-2019/R1 9/Apr/19 10/May/19 A
SD/A-ICT/DNH.L3/03 3rd FLOOR PLAN - BRICK WALL, PARSIAL 2

SD/A-ICT/DH.DW-1/01 DOOR & WINDOW PLAN 1st FLOOR

SD/A-ICT/DH.DW-2/02 DOOR & WINDOW PLAN 2nd FLOOR

SD/A-ICT/DH.DW-3/03 DOOR & WINDOW PLAN 3rd FLOOR

SD/A-ICT/DH.DW-4/04 DOOR & WINDOW PLAN 4th FLOOR

SD/A-ICT/SC.DW-P/01 SCHEDULE DOOR P.01

SD/A-ICT/SC.DW-P/02 SCHEDULE DOOR P.02

SD/A-ICT/SC.DW-P/03 SCHEDULE DOOR P.03

SD/A-ICT/SC.DW-P/04 SCHEDULE DOOR P.04

SD/A-ICT/SC.DW-P/05 SCHEDULE DOOR P.05


NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL
ICT
SD/A-ICT/SC.DW-P/06 SCHEDULE DOOR P.06

SD/A-ICT/SC.DW-P/07 SCHEDULE DOOR P.07

SD/A-ICT/SC.DW-P/08 SCHEDULE DOOR P.08

SD/A-ICT/SC.DW-P/09 SCHEDULE DOOR P.09

SD/A-ICT/SC.DW-PJ/01 SCHEDULE DOOR PJ.01

SD/A-ICT/SC.DW-PJ/02 SCHEDULE DOOR PJ.02


4 001/DWG-UM/ICT/A-DWS/IV/2019/R0 5/Apr/19 28/May/19 A 6/22/2019 6/22/2019
SD/A-ICT/SC.DW-PJ/03 SCHEDULE DOOR PJ.03

SD/A-ICT/SC.DW-PJ/04 SCHEDULE DOOR PJ.04

SD/A-ICT/SC.DW-PJ/05 SCHEDULE DOOR PJ.05

SD/A-ICT/SC.DW-PJ/06 SCHEDULE DOOR PJ.06

SD/A-ICT/SC.DW-PJ/07 SCHEDULE DOOR PJ.07

SD/A-ICT/SC.DW-PJ/08 SCHEDULE DOOR PJ.08

SD/A-ICT/SC.DW-PJ/09 SCHEDULE DOOR PJ.09

SD/A-ICT/SC.DW-PJ/10 SCHEDULE DOOR PJ.10

SD/A-ICT/SC.DW-PJ/11 SCHEDULE DOOR PJ.11

SD/A-ICT/SC.DW-PJ/12 SCHEDULE DOOR PJ.12

SD/A-ICT/SC.DW-PJ/13 SCHEDULE DOOR PJ.13

SD/A-ICT/SC.DW-PJ/14 SCHEDULE DOOR PJ.14

SD/A-ICT/SC.DW-PJ/15 SCHEDULE DOOR PJ.15

SD/A-ICT/SDT.SDW/01 SECTION AND DETAIL

SD/A-ICT/DNH.L4/01 4th FLOOR PLAN - BRICK WALL

SD/A-ICT/DNH.L4/02 4th FLOOR PLAN - BRICK WALL, PARSIAL 1 6/Apr/19 28/May/19 A


5 001/DWG-UM/ICT/A-PD/IV-2019/R0 6/22/2019 6/22/2019
SD/A-ICT/DNH.L4/03 4th FLOOR PLAN - BRICK WALL, PARSIAL 2

SD/A-ICT/TL/01 TOILET LADIES TYPICAL LT.1 - LT.4

SD/A-ICT/TL/02 DENAH KERAMIK DAN RANGKA PLAFOND

SD/A-ICT/TL/03 DENAH SANITAIR TOILET LADIES

6 001/DWG-UM/ICT/A-PD/IV-2019/R0 SD/A-ICT/TL/04 POTONGAN A-A TOILET LADIES 24/Jun/19 11/Jul/19 A

SD/A-ICT/TL/05 POTONGAN B-B TOILET LADIES


NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI
NO.
6 001/DWG-UM/ICT/A-PD/IV-2019/R0 SHOP DRAWING 24/Jun/19 11/Jul/19 A REMARKS DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL
ICT
SD/A-ICT/TL/06 POTONGAN C-C & D-D TOILET LADIES

SD/A-ICT/DNH.L1/01 FASAD DETAIL - 01

SD/A-ICT/DNH.L1/02 FASAD DETAIL - 02

008/DWG-UM/ICT/TFD/VI-2019/R0 SD/A-ICT/DNH.L1/03 FASAD DETAIL - 03 29/Jun/19 1/Jul/19 REVISI

7 SD/A-ICT/DNH.L1/04 FASAD DETAIL - 04

SD/A-ICT/DNH.L1/01 FASAD DETAIL - 01


008/DWG-UM/ICT/TFD/VII-2019/R1 30/Jul/19 10/Aug/19 A

SD/A-ICT/TLG/01 TOILET GENTS TYPICAL LT.1 - LT.3

SD/A-ICT/TLG/02 DENAH RANGKA PLAFOND & SANITAIR

SD/A-ICT/TLG/03 POTONGAN A-A & B-B


8 001/DWG-UM/ICT/A-PD/VI-2019/R0 28/Jun/19 17/Jul/19 A
SD/A-ICT/TLG/04 POTONGAN C-C & D-D

SD/A-ICT/TLG/05 POTONGAN E-E & F-F

SD/A-ICT/ATP-01 RANGKA KASO BAJA RINGAN

SD/A-ICT/ATP-02 MESH + INSULATION + GLASSWOOL


9 007/DWG-UM/ICT/ATP/VI-2019/R0 29/Jun/19 15/Jul/19 A
SD/A-ICT/ATP-03 MESH + INSULATION + GLASSWOOL

SD/A-ICT/TLA/01 DENAH TOILET AS : 7-B TYPICAL LT.1-LT.3

SD/A-ICT/TLA/02 POLA KERAMIK RANGKA PLAFOND AS : 7-B TYPICAL LT.1-LT.3

SD/A-ICT/TLA/03 POTONGAN A-A


10 002/DWG-UM/ICT/VII-2019/R0 1/Jul/19 15/Jul/19 A
SD/A-ICT/TLA/04 POTONGAN B-B

SD/A-ICT/TLA/05 POTONGAN C-C

SD/A-ICT/CL.L.1/01 CEILING FINISHES LAYOUT - 1st FLOOR

SD/A-ICT/CL.L.1/02 CEILING FINISHES LAYOUT - PARSIAL 1


11 003/DWG-UM/ICT/A-PLF/VII-2019/R0 1/Jul/19 15/Jul/19 REVISI 18/Jul/19 1/Aug/19 A
SD/A-ICT/CL.L.1/03 CEILING FINISHES LAYOUT - PARSIAL 2

SD/A-ICT/CL.L.2/01 CEILING FINISHES LAYOUT - 2nd FLOOR

SD/A-ICT/CL.L.2/02 CEILING FINISHES LAYOUT - PARSIAL 1


12 003/DWG-UM/ICT/A-PLF/VII-2019/R0 1/Jul/19 15/Jul/19 REVISI 18/Jul/19
NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL

12 003/DWG-UM/ICT/A-PLF/VII-2019/R0
ICT 1/Jul/19 15/Jul/19 REVISI 18/Jul/19
SD/A-ICT/CL.L.2/03 CEILING FINISHES LAYOUT - PARSIAL 2

SD/A-ICT?SC.DW.J/01 SCHEDULE WINDOW J.01

SD/A-ICT?SC.DW.J/02 SCHEDULE WINDOW J.02

SD/A-ICT?SC.DW.J/03 SCHEDULE WINDOW J.03

SD/A-ICT?SC.DW.J/04 SCHEDULE WINDOW J.04 3/Jul/19 15/Jul/19 A


004/DWG-UM/ICT/A-DWS/VII/2019/R
SD/A-ICT?SC.DW.J/05 SCHEDULE WINDOW J.05

SD/A-ICT?SC.DW.J/06 SCHEDULE WINDOW J.06

SD/A-ICT?SC.DW.J/07 SCHEDULE WINDOW J.07

SD/A-ICT?SC.DW.J/08 SCHEDULE WINDOW J.08

SD/A-ICT/DNH.LRF/01 ROOF FLOOR PLAN - BRICK WALL


13 001/DWG-UM/ICT/A-PD/VII/2019/R0 SD/A-ICT/DNH.LRF/02 ROOF FLOOR PLAN, SECTION BRICK WALL 9/Jul/19 10/Jul/19 REVISI 16/Jul/19 1/Aug/19 A

SD/A-ICT/CL.L3-01 CELLING FINISHES LAYOUT - 3rd FLOOR


SD/A-ICT/CL.L3-02 CELLING FINISHES LAYOUT - PARSIAL 1
14 003/DWG-UM/ICT/A-PLF/VII-2019/R0 8/Jul/19 12/Jul/19 REVISI 7/18/2019 8/1/2019 A
SD/A-ICT/CL.L3-03 CELLING FINISHES LAYOUT - PARSIAL 2

SD/S-ICT/FSD-01 DETAIL FASAD - 4th FLOOR


23 008/DWG-UM/ICT/TFD/VII-2019/R0 SD/S-ICT/FSD-02 DETAIL FASAD - 4th FLOOR 8/Jul/19 18/Jul/19 A

004/DWG-UM/ICT/A-DWS/VII-2019/R0 SD/A-ICT/SC.DW.J/03 SCHEDULE WINDOW J.03 9/Jul/19 12/Jul/19 REVISI


15
SD/A-ICT/SC.DW.J/03A SCHEDULE WINDOW J.03A
004/DWG-UM/ICT/A-DWS/VII-2019/R1 15/Jul/19 7/8/2019 A

SD/A-ICT/FSD-01 DENAH, TAMPAK DAN DETAIL FASAD 01

SD/A-ICT/FSD-02 DENAH, TAMPAK DAN DETAIL FASAD 02


REVISI PAK
16 008/DWG-UM/ICT/A-TFD/VII-2019/R0 19/Jul/19 20/Jul/19
SD/A-ICT/FSD-03 DENAH, TAMPAK DAN DETAIL FASAD 03 WISNU

SD/A-ICT/FSD-04 DENAH, TAMPAK DAN DETAIL FASAD 04

SD/A-ICT/KER/01 POLA KERAMIK LANTAI 1


SD/A-ICT/KER/02 POLA KERAMIK LANTAI 1 PARTIAL 1
17 010/DWG-UM/VII-2019/R0 23/Jul/19 1/Aug/19 A
SD/A-ICT/KER/03 POLA KERAMIK LANTAI 1 PARTIAL 2

SD/A-ICT/PTY/01 Denah Pantry As: 2-D


SD/A-ICT/PTY/02 Potongan A-A Pantry As: 2-D
18 011/DWG-UM/VII-2019/R0 SD/A-ICT/PTY/03 Potongan B-B Pantry As: 2-D 25/Jul/19 1/Aug/19 A
Potongan C-D-D Pantry As: 2-D
SD/A-ICT/PTY/03
SD/A-ICT/PTY2/01 DENAH PANTRY A5 : 2 - D LT.4
SD/A-ICT/PTY2/02 POTONGAN A-A
19 012/DWG-UM/VII-2019/R0 SD/A-ICT/PTY2/03 POTONGAN B-B 26/Jul/19 1/Aug/19 A
SD/A-ICT/PTY2/04 POTONGAN C-C & D-D

SD/A-ICT/DRF.WRP/01 FINISH ROOF FLOOR PLAN


SD/A-ICT/POT.WRP/02 SECTION DETAIL, FINISH ROOF FLOOR
20 001/DWG-UM/ICT/A-WRP/VII-2019/R0 26/Jul/19 13/Aug/19 A
SD/A-ICT/DCP.WRP/01 FINISH PLAN CANOPY & SECTION DETAIL
NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL LAPANGAN

ICT
SD/A-ICT/DNH.ACD/01 PLAN OUTDOOR AC & SECTION DETAIL
21 001/DWG-UM/ICT/S-ACD/VII-2019/R0 27/Jul/19
SD/A-ICT/TRB.POT/01 FLOOR PLAN TRIBUNE & SECTION DETAIL
22 001/DWG-UM/ICT/A-TRB/VII-2019/R0 27/Jul/19 1/Aug/19 A
SD/A-ICT/KER/04 POLA KERAMIK LANTAI 2
SD/A-ICT/KER/05 POLA KERAMIK LANTAI 2 PARTIAL 1
23 013/DWG-UM/VII-2019/R0 SD/A-ICT/KER/06 POLA KERAMIK LANTAI 2 PARTIAL 2 29/Jul/19 1/Aug/19 A
SD/A-ICT/KER/07 POLA KERAMIK LANTAI 2 PARTIAL 3

SD/A-ICT/KER/08 POLA KERAMIK LANTAI 3


SD/A-ICT/KER/09 POLA KERAMIK LANTAI 3 PARTIAL 1
24 014/DWG-UM/VII-2019/R0 30/Jul/19 6/Jul/19 REVISI 12/Aug/19 8/19/2019 A
SD/A-ICT/KER/10 POLA KERAMIK LANTAI 3 PARTIAL 2

SD/A-ICT/KER/11 POLA KERAMIK LANTAI 4


SD/A-ICT/KER/12 POLA KERAMIK LANTAI 4 PARTIAL 1
25 015/DWG-UM/VII-2019/R0 3/Aug/19 10/Aug/19 A
SD/A-ICT/KER/13 POLA KERAMIK LANTAI 4 PARTIAL 2

SD/A-DETAIL.GRC-01 DETAIL ORNAMEN GRC


APPROVE JADI SATU
26 008/DWG-UM/ICT/A-GRC/VIII-2019/R0 SD/A-DETAIL.GRC-02 DETAIL 1 & 2 ORNAMEN GRC 2/Aug/19 6/Aug/19 REVISI 8/13/2019 8/20/2019 ORNAMEN GRC DAYAK

SD/A-ICT/WDH/01 TEMPAT WUDHU AS : 2 E LT.1 & LT.2


27 017/DWG-UM/VIII-2019/R0 SD/A-ICT/WDH/02 POTONGAN TEMPAT WUDHU AS : 2 - LT.1 & LT.2 3/Aug/19 10/Aug/19 A

SD/A-FNSH LIFT/01 DETAIL KERAMIK LIFT PASSANGER 1st FLOOR


28 002/DWG-UM/ICT/A-KRM/VII-2019/R0 SD/A-FNSH LIFT/02 DETAIL KERAMIK LIFT PASSANGER 2nd FLOOR 5/Aug/19 6/Aug/19 REVISI 8/8/2019 8/15/2019 A

SD/A-ICT/DNH.L4/01 CEILING FINISHES LAYOUT - 4th FLOOR


SD/A-ICT/DNH.L4/02 CEILING FINISHES LAYOUT - PARTIAL 1
29 003/DWG-UM/ICT/A-PLF/VII-2019/R0 13/Aug/19 19/Aug/19 A
SD/A-ICT/DNH.L4/03 CEILING FINISHES LAYOUT - PARTIAL 2

SD/A-ICT/SC.DW.P.3/1 SCHEDULE DOOR P.03


29 004/DWG-UM/ICT/A-DWS/VIII-2019/R0 SD/A-ICT/SC.DW.P.3/2 SCHEDULE DOOR P.05 13/Aug/19 19/Aug/19 A

SD/A-DETAIL.ORG/01-R0 DETAIL GRC ORNAMENT DAYAK


29 005/DWG-UM/ICT/VIII-2019/R0 16/Aug/19 26/Aug/19 A

SD/A-ICT/TG1/01 TANGGA ENTRANCE AS : 1-1C


SD/A-ICT/TG1/02 BLOWUP TANGGA ENTRANCE AS : 1-1C
30 022/DWG-UM/VIII-2019/R0 SD/A-ICT/TG1/03 POTONGAN 1-1 19/Aug/19 26/Aug/19 A
SD/A-ICT/TG1/04 TAMPAK 2

SD/A-ICT/P.D/01 DETAIL PINTU KAYU P.01


SD/A-ICT/P.D/02 DETAIL PINTU KAYU P.02
SD/A-ICT/P.D/03 DETAIL PINTU KAYU P.06 DOUBLE
SD/A-ICT/P.D/04 DETAIL PINTU KAYU PJ.02, PJ.03, PJ.06, PJ.09
31 004/DWG-UM/ICT/A-DWS/VIII-2019/R0 19/Aug/19 26/Aug/19 A
SD/A-ICT/P.D/05 DETAIL PINTU KAYU PJ.09, PJ.13
SD/A-ICT/P.D/06 DETAIL PINTU KAYU PJ.07, PJ.06, PJ.04, P.07
SD/A-ICT/P.D/07 DETAIL PINTU KAYU PJ.05, PJ.04

SD/A-ICT/TG2/01 TANGGA 2 AS : 1-2-B


SD/A-ICT/TG2/02 TANGGA 2 AS : 1-2-B
32 023/DWG-UM/VIII-2019/R0 SD/A-ICT/TG2/03 POTONGAN 1-1 23/Aug/19 26/Aug/19 A
SD/A-ICT/TG2/04 POTONGAN 2-2

SD/A-ICT/TG3/01 TANGGA 3 AS : 1-2-D


SD/A-ICT/TG3/02 TANGGA 3 AS : 1-2-D
SD/A-ICT/TG3/03 TANGGA 3 AS : 1-2-D
33 024/DWG-UM/VIII-2019/R0 26/Aug/19 5/Sep/19 A
NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL
ICT
33 024/DWG-UM/VIII-2019/R0 SD/A-ICT/TG3/04 POTONGAN 1-1 26/Aug/19 5/Sep/19 A
SD/A-ICT/TG3/05 POTONGAN 1-1
SD/A-ICT/TG3/06 POTONGAN 2-2

SD/S-ICT/D.DPG/01 PLAN BRICK WALL & POWER HOUSE FENCE


34 001/DWG-UM/A-ICT/VIII-2019/R0 SD/S-ICT/DT.POT/02 SECTION DETAIL 30/Aug/19 31/Aug/19 REVISI 5/Sep/19 18/Sep/19 A

SD/A-ICT/DH-DW-1/01 LAYOUT SCHEDULE DOOR AND WINDOWS 1st floor


SD/A-ICT/DH-DW-2/02 LAYOUT SCHEDULE DOOR AND WINDOWS 2nd floor
SD/A-ICT/DH-DW-3/03 LAYOUT SCHEDULE DOOR AND WINDOWS 3nd floor
35 001/DWG-UM/ICT/A-DW/X-2019/R0 LMW/SD/DT/001 SFD SHAFT P-03 3/Oct/19 15/Nov/19 A
LMW/SD/DT/002 DFD SHAFT P-05
LMW/SD/DT/003 SSD wLOUVRE P-06

SD/A-ICT/DH/01/ R0 DOG HOUSE


36 004/DWG-UM/ICT/DGH/X-2019/R0 8/Oct/19 15/Nov/19 A

SD/A-ICT/DNH.RF/01 4rd FLOOR PLAN, RAISED FLOOR REVISI PAK


36 001/DWG-UM/ICT/ARSF/XI-2019/R0 18/Nov/19 19/Nov/19 WISNU 20/Nov/19
SD/A-ICT/DNH.RF/02 SECTION A-A DAN SECTION B-B
Status:
A : APPROVED B: APPROVED WITH NOTE C: RETURNED FOR CORRECTION D: DISAPPROVED

NOMOR REV. 0 REV. 1 REV. 2 TGL TGL


NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI KONDISI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL LAPANGAN

ILAB
SD/S-ILB/BW/01-R0 BRICK WALL PLAN LEVEL 1

SD/S-ILB/BW/02-R0 BRICK WALL PLAN LEVEL 1 (PARTIAL 1)

SD/S-ILB/BW/03-R0 BRICK WALL PLAN LEVEL 1 (PARTIAL 2)

SD/S-ILB/BW/04-R0 SECTION LEVEL 1

SD/S-ILB/BW/05-R0 BRICK WALL TOILET PLAN LEVEL 1

SD/S-ILB/BW/06-R0 SECTION LEVEL 1

1 001/DWG-UM/ILB/IV-2019/R0 SD/S-ILB/PJ/01-R0 DETAIL DOOR & WINDOW 16/Apr/19 28/May/19 A

SD/S-ILB/PJ/02-R0 DETAIL DOOR & WINDOW

SD/S-ILB/PJ/03-R0 DETAIL DOOR & WINDOW

SD/S-ILB/PJ/04-R0 DETAIL DOOR & WINDOW

SD/S-ILB/PJ/05-R0 FLOOR HARDENER LEVEL 1

SD/S-ILB/PJ/6-R0 DETAIL DOOR & WINDOW

SD/A-ILB/BW2/01-R0 BRICK WALL PLAN LEVEL 2

SD/A-ILB/BW2/02-R0 BRICK WALL PLAN LEVEL 2 (PARTIAL 1)

SD/A-ILB/BW2/03-R0 BRICK WALL PLAN LEVEL 2 (PARTIAL 2)


2 001/DWG-UM/ILB/V-2019/R0 11/May/19 28/May/19 A
SD/A-ILB/BW2/04-R0 BRICK WALL TOILET PLAN LEVEL 2

SD/A-ILB/BW2/05-R0 SECTION LEVEL 2

SD/A-ILB/KP/01-R0 COLUMN PRACTICE DOOR WINDOW

SD/A-ILB/KP/02-R0 COLUMN PRACTICE DOOR WINDOW


3 001/DWG-UM/ILB/IV-2019/R0 29/Apr/19 28/May/19 A
SD/A-ILB/KP/03-R0 COLUMN PRACTICE DOOR WINDOW

SD/A-ILB/BW3/01 BRICK WALL PLAN LEVEL 3

SD/A-ILB/BW3/02 BRICK WALL PLAN LEVEL 3 PARTIAL 1

SD/A-ILB/BW3/03 BRICK WALL PLAN LEVEL 3 PARTIAL 2


001/DWG-UM/ILB/VII-2019/R0 1/Jul/19 15/Jul/19 A
SD/A-ILB/BW3/04 BRICK WALL TOILET PLAN LEVEL 3

4 SD/A-ILB/BW3/05 SECTION LEVEL 3


NOMOR REV. 0 REV. 1 REV. 2 TGL TGL
NO. 001/DWG-UM/ILB/VII-2019/R0
SHOP DRAWING 1/Jul/19 15/Jul/19 A
REMARKS DISTRIBUSI DISTRIBUSI KONDISI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL LAPANGAN
4
ILAB

SD/A-ILB/BW3/03 BRICK WALL PLAN LEVEL 3 PARTIAL 2

001/DWG-UM/ILB/VIII-2019/R1 SD/A-ILB/BW3/05 SECTION LEVEL 3 23/Aug/19 5/Sep/19 A

SD/A-ILB/BW4/01 BRICK WALL PLAN LEVEL 4

SD/A-ILB/BW4/02 BRICK WALL PLAN LEVEL 4 PARTIAL 1

5 001/DWG-UM/ILB/VII-2019/R0 SD/A-ILB/BW4/03 BRICK WALL PLAN LEVEL 4 PARTIAL 2 1/Jul/19 15/Jul/19 A

SD/A-ILB/BW4/04 BRICK WALL TOILET PLAN LEVEL 4

SD/A-ILB/BW4/05 SECTION LEVEL 4

SD/A-ILB/BW4/01 BRICK WALL PLAN LEVEL 4

SD/A-ILB/BW4/02 BRICK WALL PLAN LEVEL 4 PARTIAL 1


5 001/DWG-UM/ILB/VIII-2019/R1 23/Aug/19 5/Sep/19 A
SD/A-ILB/BW4/03 BRICK WALL PLAN LEVEL 4 PARTIAL 2

SD/A-ILB/BW4/05 SECTION LEVEL 4

SD/A-ILB/BW5/01 BRICK WALL PLAN LEVEL 5

SD/A-ILB/BW5/02 BRICK WALL PLAN LEVEL 5 PARTIAL 1

SD/A-ILB/BW5/03 BRICK WALL PLAN LEVEL 5 PARTIAL 2


001/DWG-UM/ILB/VII-2019/R0 1/Jul/19 15/Jul/19 A
SD/A-ILB/BW5/04 BRICK WALL TOILET PLAN LEVEL 5

SD/A-ILB/BW5/05 SECTION LEVEL 5


6

SD/A-ILB/BW5/02 BRICK WALL PLAN LEVEL 5 PARTIAL 1

SD/A-ILB/BW5/03 BRICK WALL PLAN LEVEL 5 PARTIAL 2


001/DWG-UM/ILB/VIII-2019/R1 23/Aug/19 5/Sep/19 A
SD/A-ILB/BW5/05 SECTION LEVEL 5

SD/A-ILB/BW6/01 BRICK WALL PLAN LEVEL 6

SD/A-ILB/BW6/02 BRICK WALL PLAN LEVEL 6 PARTIAL 1

SD/A-ILB/BW6/03 BRICK WALL PLAN LEVEL 6 PARTIAL 2


7 001/DWG-UM/ILB/VII-2019/R0 1/Jul/19 15/Jul/19 A
SD/A-ILB/BW6/04 BRICK WALL TOILET PLAN LEVEL 6

SD/A-ILB/BW6/05 SECTION LEVEL 6

SD/A-ILB/BWRF/01 BRICK WALL PLAN ROOF PLAN

A
8 001/DWG-UM/ILB/VII-2019/R0 1/Jul/19 15/Jul/19 DIGANTIK 16/Nov/19
AN
NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL
ILAB
SD/A-ILB/BWRF/02 BRICK WALL PLAN ROOF PLAN PARTIAL 1 A
8 001/DWG-UM/ILB/VII-2019/R0 1/Jul/19 15/Jul/19 DIGANTIK 16/Nov/19
AN
SD/A-ILB/BWRF/03 BRICK WALL ROOF PLAN PARTIAL 2

SD/A-ILB/PJ/07-R0 DOOR TYPE PS


9 001/DWG-UM/ILB/VII-2019/R0 31/Jul/19 10/Aug/19 A
Status:
A : APPROVED B: APPROVED WITH NOTE C: RETURNED FOR CORRECTION D: DISAPPROVED

NOMOR REV. 0 REV. 1 REV. 2 REV. 3 TGL TGL KONDISI


NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL
PHARMACY
SD/A-FMC/BWAB/01-R0 BRICK WALL PLAN 1A

SD/A-FMC/BW1A/02-R0 BRICK WALL PLAN 1A (PARTIAL 1)

SD/A-FMC/BW1A/03-R0 BRICK WALL PLAN 1A (PARTIAL 2)

SD/A-FMC/BW1A/04-R0 SECTION
1 004/DWG-UM/FAR/VIII-2019/R0 6/Aug/19 15/Aug/19 REVISI 2/Sep/19 27/Sep/19 revisi 3-Oct-19 11/14/2019 A
SD/A-FMC/BW1A/05-R0 DETAIL BRICK WALL TOILET 1A

SD/A-FMC/BW1A/06-R0 DETAIL BRICK WALL TOILET 1A

SD/A-FMC/BW1A/07-R0 SECTION BRICK WALL TOILET 1A

004/DWG-UM/FAR/VIII-2019/R0 SD/A-FMC/BW1B/01-R0 BRICK WALL PLAN 1B

SD/A-FMC/BW1B/02-R0 BRICK WALL PLAN 1B (PARTIAL 1)

SD/A-FMC/BW1B/03-R0 BRICK WALL PLAN 1B (PARTIAL 2)

SD/A-FMC/BW1B/04-R0 SECTION
2 6/Aug/19 15/Aug/19 REVISI 2/Sep/19 27/Sep/19 revisi 3-Oct-19 11/14/2019 A
004/DWG-UM/FAR/X-2019/R2 SD/A-FMC/BW1B/05-R0 SECTION

SD/A-FMC/BW1B/06-R0 DETAIL BRICK WALL TOILET 1B

SD/A-FMC/BW1B/07-R0 SECTION BRICK WALL TOILET 1B

SD/A-FMC/BW2/01-R0 BRICK WALL PLAN 2

SD/A-FMC/BW2/02-R0 BRICK WALL PLAN 2 (PARTIAL 1)

SD/A-FMC/BW2/03-R0 BRICK WALL PLAN 2 (PARTIAL 2)

3 004/DWG-UM/FAR/VIII-2019/R0 SD/A-FMC/BW2/04-R0 SECTION LEVEL 2 6/Aug/19 7/Aug/19 REVISI 2/Sep/19 3/Sep/19 revisi 9/19/2019 9/27/2019 revisi 10/23/2019 11/14/2019 A

SD/A-FMC/BW2/05-R0 DETAIL BRICK WALL TOILET 2,3 & 4

SD/A-FMC/BW2/06-R0 DETAIL BRICK WALL TOILET 2,3 & 4

004/DWG-UM/FAR/VIII-2019/R0 SD/A-FMC/PIN/01-R0 DOOR TYPE 2/Sep/19 27/Sep/19

SD/A-FMC/PIN/02-R0 DOOR TYPE 3/Oct/19 19/Oct/19

SD/A-FMC/PIN/03-R0 DOOR TYPE


4 6/Aug/19 12/Aug/19 REVISI revisi 10/23/2019 11/14/2019 A
004/DWG-UM/FAR/X-2019/R1 SD/A-FMC/PIN/04-R0 DOOR TYPE

SD/A-FMC/PIN/05-R0 DOOR TYPE

004/DWG-UM/FAR/VIII-2019/R0 SD/A-FMC/DW/01-RO DOOR & WINDOW TYPE

SD/A-FMC/DW/02-R0 DOOR & WINDOW TYPE

SD/A-FMC/DW/03-R0 DOOR & WINDOW TYPE

SD/A-FMC/DW/04-R0 DOOR & WINDOW TYPE bukan


REVISI
10/19/2019 revisi
tapi
5 6/Aug/19 12/Aug/19 2/Sep/19 27/Sep/19 revisi 3-Oct-19
SD/A-FMC/DW/05-R0 DOOR & WINDOW TYPE LAYOUT ada yg
004/DWG-UM/FAR/X-2019/R1 ditambah
SD/A-FMC/DW/06-R0 DOOR & WINDOW TYPE

SD/A-FMC/DW/07-R0 DOOR & WINDOW TYPE

SD/A-FMC/DW/08-R0 DOOR & WINDOW TYPE

004/DWG-UM/FAR/VIII-2019/R0 SD/A-FMC/BW3/01-R0 BRICK WALL PLAN 3

6 8/Aug/19 15/Aug/19 REVISI 2/Sep/19 27/Sep/19 REVISI 3-Oct-19 11/14/2019 A


SD/A-FMC/BW3/02-R0 BRICK WALL PLAN 3 (PARTIAL 1)
6 8/Aug/19 15/Aug/19 REVISI 2/Sep/19 27/Sep/19 REVISI 3-Oct-19 11/14/2019 A
SD/A-FMC/BW3/03-R0 BRICK WALL PLAN 3 (PARTIAL 2)
004/DWG-UM/FAR/X-2019/R2
SD/A-FMC/BW3/04-R0 SECTION LEVEL 3

004/DWG-UM/FAR/VIII-2019/R0 SD/A-FMC/BW4/01-R0 BRICK WALL PLAN 4

SD/A-FMC/BW4/02-R0 BRICK WALL PLAN 4 (PARTIAL 1)


7 6/Aug/19 15/Aug/19 REVISI 2/Sep/19 27/Sep/19 revisi 3-Oct-19 11/14/2019 A
SD/A-FMC/BW4/03-R0 BRICK WALL PLAN 4 (PARTIAL 2)
004/DWG-UM/FAR/X-2019/R0
SD/A-FMC/BW4/04-R0 SECTION LEVEL 4

SD/A-FMC/DW1B/01-R0 DOORS & WINDOWS PLAN LEVEL 1B

SD/A-FMC/DW1A/01-R0 DOORS & WINDOWS PLAN LEVEL 1A

SD/A-FMC/DW2/01-R0 DOORS & WINDOWS PLAN LEVEL 2

8 004/DWG-UM/FAR/X-2019/R0 SD/A-FMC/DW3/01-R0 DOORS & WINDOWS PLAN LEVEL 3 2/Sep/19 27/Sep/19 revisi 3/Oct/19 14/Nov/19 A

SD/A-FMC/DW4/01-R0 DOORS & WINDOWS PLAN LEVEL 4

SD/A-FMC/DWRF/01-R0 DOORS & WINDOWS PLAN LEVEL ROOF

SD/A-FMC/CW/01-R0 DETAIL JA,JB,JC

SD/A-FMC/CW/02-R0 DETAIL JD,JE,JF


bukan
SD/A-FMC/CW/03-R0 DETAIL JG,JH,JI REVISI
9 004/DWG-UM/FAR/X-2019/R0 3/Oct/19 19/Oct/19 hanya 23/Oct/19 11/14/2019 A
SD/A-FMC/CW/04-R0 DETAIL JJ,JK,JL,JM melengka
pi
SD/A-FMC/CW/05-R0 DETAIL JN,JO,JP
Status:
A : APPROVED B: APPROVED WITH NOTE C: RETURNED FOR CORRECTION D: DISAPPROVED

NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI


NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL LAPANGAN

KESMAS
SD/A-KES/BW1/01-R0 BRICK WALL PLAN LEVEL 1A BUILDING KESMAS ZONE - 1

SD/A-KES/BW1/02-R0 BRICK WALL PLAN LEVEL 1A (PARTIAL 1) BUILDING KESMAS ZONE - 1

SD/A-KES/BW1/03-R0 BRICK WALL PLAN LEVEL 1A (PARTIAL 2) BUILDING KESMAS ZONE - 1

SD/A-KES/BW1/04-R0 SECTION LEVEL 1A BUILDING KESMAS ZONE - 1


A
1 004/DWG-UM/KES/X-2019/R0 SD/A-KES/BW1/05-R0 SECTION LEVEL 1A BUILDING KESMAS ZONE - 1 9/Oct/19 14/Nov/19 DIGANTIK 11/Nov/19
AN
SD/A-KES/BW1/06-R0 DETAIL TOILET LEVEL 1A BUILDING KESMAS ZONE - 1

SD/A-KES/BW1/07-R0 SECTION TOILET LEVEL 1A BUILDING KESMAS ZONE - 1

SD/A-KES/BW1/08-R0 SECTION TOILET LEVEL 1A BUILDING KESMAS ZONE - 1

SD/A-KES/BW1/01-R0 BRICK WALL PLAN LEVEL 1B BUILDING KESMAS ZONE - 1

SD/A-KES/BW1/02-R0 BRICK WALL PLAN LEVEL 1B (PARTIAL 1) BUILDING KESMAS ZONE - 1

SD/A-KES/BW1/03-R0 BRICK WALL PLAN LEVEL 1B (PARTIAL 2) BUILDING KESMAS ZONE - 1

SD/A-KES/BW1/04-R0 SECTION LEVEL 1B BUILDING KESMAS ZONE - 1 A


2 004/DWG-UM/KES/X-2019/R0 9/Oct/19 14/Nov/19 DIGANTIK 11/11/2019
SD/A-KES/BW1/05-R0 DETAIL TOILET LEVEL 1B BUILDING KESMAS ZONE - 1 AN

SD/A-KES/BW1/06-R0 SECTION TOILET LEVEL 1B BUILDING KESMAS ZONE - 1

SD/A-KES/BW1/07-R0 DETAIL TOILET RESTROOM 1B BUILDING KESMAS ZONE - 1

SD/A-KES/BW2/01-R0 BRICK WALL PLAN LEVEL 2

SD/A-KES/BW2/02-R0 BRICK WALL PLAN LEVEL 2 (PARTIAL 1)

SD/A-KES/BW2/03-R0 BRICK WALL PLAN LEVEL 2 (PARTIAL 2)

3 004/DWG-UM/KES/X-2019/R0 SD/A-KES/BW2/04-R0 SECTION LEVEL 4 9/Oct/19 8/Nov/19 REVISI 11/11/2019

SD/A-KES/BW2/05-R0 DETAIL TOILET TYPICAL

SD/A-KES/BW2/06-R0 DETAIL TOILET TYPICAL

SD/A-KES/BW3/01-R0 BRICK WALL PLAN LEVEL 3 BUILDING KESMAS ZONE - 1

SD/A-KES/BW3/02-R0 BRICK WALL PLAN LEVEL 3 (PARTIAL 1) BUILDING KESMAS ZONE - 1

4 004/DWG-UM/KES/X-2019/R0 SD/A-KES/BW3/03-R0 BRICK WALL PLAN LEVEL 3 (PARTIAL 2) BUILDING KESMAS ZONE - 1 9/Oct/19 8/Nov/19 REVISI 11/11/2019 11/18/2019 REVISI 11/21/2019

SD/A-KES/BW3/04-R0 SECTION LEVEL 3 BUILDING KESMAS ZONE - 1


4 004/DWG-UM/KES/X-2019/R0 9/Oct/19 8/Nov/19 REVISI 11/11/2019 11/18/2019 REVISI 11/21/2019

SD/A-KES/BW4/01-R0 BRICK WALL PLAN LEVEL 4 BUILDING KESMAS ZONE - 1

SD/A-KES/BW4/02-R0 BRICK WALL PLAN LEVEL 4 (PARTIAL 1) BUILDING KESMAS ZONE - 1

SD/A-KES/BW4/03-R0 BRICK WALL PLAN LEVEL 4 (PARTIAL 2) BUILDING KESMAS ZONE - 1


5 004/DWG-UM/KES/X-2019/R0 9/Oct/19 8/Nov/19 REVISI 11/11/2019
SD/A-KES/BW4/04-R0 SECTION LEVEL 4 BUILDING KESMAS ZONE - 1

SD/A-KES/BW4/05-R0 SECTION LEVEL 4 BUILDING KESMAS ZONE - 1

SD/A-KES/PJ/01-R0 DOOR & WINDOWS TYPE BUILDING KESMAS ZONE - 1

SD/A-KES/PJ/02-R0 DOOR & WINDOWS TYPE BUILDING KESMAS ZONE - 1


6 004/DWG-UM/KES/X-2019/R0 9/Oct/19 8/Nov/19 REVISI 16/Nov/19
SD/A-KES/PJ/03-R0 DOOR & WINDOWS TYPE BUILDING KESMAS ZONE - 1

SD/A-KES/JEN/01-R0 WINDOWS TYPE BUILDING KESMAS ZONE - 1

SD/A-KES/JEN/02-R0 WINDOWS TYPE BUILDING KESMAS ZONE - 1

7 004/DWG-UM/KES/X-2019/R0 SD/A-KES/JEN/03-R0 WINDOWS TYPE BUILDING KESMAS ZONE - 1 9/Oct/19 8/Nov/19 REVISI 16-Nov-19

SD/A-KES/JEN/04-R0 WINDOWS TYPE BUILDING KESMAS ZONE - 1

SD/A-KES/DOOR/01-R0 DOOR TYPE BUILDING KESMAS ZONE - 1

SD/A-KES/DOOR/02-R0 DOOR TYPE BUILDING KESMAS ZONE - 2


8 004/DWG-UM/KES/X-2019/R0 9/Oct/19 8/Nov/19 REVISI 16-Nov-19
SD/A-KES/DOOR/03-R0 DOOR TYPE BUILDING KESMAS ZONE - 3

SD/A-KES/WIN/01-R0 DOOR & WINDOWS PLAN LEVEL 1B BUILDING KESMAS ZONE - 1

SD/A-KES/WIN/02-R0 DOOR & WINDOWS PLAN LEVEL 1A BUILDING KESMAS ZONE - 1

SD/A-KES/WIN/03-R0 DOOR & WINDOWS PLAN LEVEL 2 BUILDING KESMAS ZONE - 1


A
9 004/DWG-UM/KES/X-2019/R0 SD/A-KES/WIN/04-R0 DOOR & WINDOWS PLAN LEVEL 3 BUILDING KESMAS ZONE - 1 9/Oct/19 14/Nov/19 digantikan 16/Nov/19

SD/A-KES/WIN/05-R0 DOOR & WINDOWS PLAN LEVEL 4 BUILDING KESMAS ZONE - 1

SD/A-KES/WIN/06-R0 DOOR & WINDOWS PLAN ROOF BUILDING KESMAS ZONE - 1

SD/A-KES/BW1/01-R0 DETAIL JA, JB, JD BUILDING KESMAS ZONE -1

SD/A-KES/BW1/02-R0 DETAIL JE, JF, JG BUILDING KESMAS ZONE -1

10 004/DWG-UM/KES/X-2019/R0 SD/A-KES/BW1/03-R0 DETAIL JH, JI, JJ BUILDING KESMAS ZONE -1 9/Oct/19 8/Nov/19 REVISI 16/Nov/19

SD/A-KES/BW1/04-R0 DETAIL JK, JL, JM, JN BUILDING KESMAS ZONE -1


Status:
A : APPROVED B: APPROVED WITH NOTE C: RETURNED FOR CORRECTION D: DISAPPROVED

NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI


NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS LAPANGAN
PSC PIU INTERNAL
FCSIT 1
SD/A-FCT.1/DNH.L1/01 1st FLOOR PLAN BRICK WALL

SD/A-FCT.1/DNH.L1/02 1st FLOOR PLAN BRICK WALL PARSIAL 1

SD/A-FCT.1/DNH.L1/03 1st FLOOR PLAN BRICK WALL PARSIAL 2

1 001/DWG-UM/FCT.1/A-PD/V/2019/R0 SD/A-FCT.1/DNH.L2/01 2nd FLOOR PLAN BRICK WALL 23/May/19 19/Jun/19 A 6/22/2019 6/22/2019

SD/A-FCT.1/DNH.L2/02 2nd FLOOR PLAN BRICK WALL PARSIAL 1

SD/A-FCT.1/DNH.L2/03 2nd FLOOR PLAN BRICK WALL PARSIAL 2

SD/A-FCT.2/SDW.P/01 SCHEDULE DOOR P.02

SD/A-FCT.2/SDW.P/02 SCHEDULE DOOR P.03

SD/A-FCT.2/SDW.P/03 SCHEDULE DOOR P.04

SD/A-FCT.2/SDW.P/04 SCHEDULE DOOR P.05

SD/A-FCT.2/SDW.P/05 SCHEDULE DOOR P.06

SD/A-FCT.2/SDW.P/06 SCHEDULE DOOR P.07

SD/A-FCT.2/SDW.P/07 SCHEDULE DOOR P.08

SD/A-FCT.2/SDW.P/08 SCHEDULE DOOR P.09

SD/A-FCT.2/SDW.PJ/01 SCHEDULE DOOR PJ.01

SD/A-FCT.2/SDW.PJ/02 SCHEDULE DOOR PJ.01A

SD/A-FCT.2/SDW.PJ/03 SCHEDULE DOOR PJ.02

SD/A-FCT.2/SDW.PJ/04 SCHEDULE DOOR PJ.03

SD/A-FCT.2/SDW.PJ/05 SCHEDULE DOOR PJ.04


2 001/DWG-UM/FCT.1&2/A-PD/V/2019/R0 23/May/19 19/Jun/19 A 6/22/2019 6/22/2019
SD/A-FCT.2/SDW.PJ/06 SCHEDULE DOOR PJ.05

SD/A-FCT.2/SDW.PJ/07 SCHEDULE DOOR PJ.06

SD/A-FCT.2/SDW.PJ/08 SCHEDULE DOOR PJ.07

SD/A-FCT.2/SDW.PJ/09 SCHEDULE DOOR PJ.08

SD/A-FCT.2/SDW.PJ/10 SCHEDULE DOOR PJ.09

SD/A-FCT.2/SDW.PJ/11 SCHEDULE DOOR PJ.10

SD/A-FCT.2/SDW.PJ/12 SCHEDULE DOOR PJ.11

SD/A-FCT.2/SDW.PJ/13 SCHEDULE DOOR PJ.12

SD/A-FCT.2/SDW.PJ/14 SCHEDULE DOOR PJ.13

SD/A-FCT.2/SDW.PJ/15 SCHEDULE DOOR PJ.14

SD/A-FCT.2/SDW.PJ/16 SCHEDULE DOOR PJ.15

SD/A-FCT.2/SDW.PJ/17 SCHEDULE DOOR PJ.16


NOMOR REV. 0 REV. 1 REV. 2 TGL TGL
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI KONDISI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL LAPANGAN

FCSIT 1
SD/A-FCT.2/SDW.DT/01 SECTION DETAIL

SD/A-FCT.1/DNH.L3/01 3rd FLOOR PLAN BRICK WALL

SD/A-FCT.1/DNH.L3/02 3rd FLOOR PLAN BRICK WALL PARSIAL 1

SD/A-FCT.1/DNH.L3/03 3rd FLOOR PLAN BRICK WALL PARSIAL 2

3 001/DWG-UM/FCT.1/A-PD/VI/2019/R0 SD/A-FCT.1/DNH.L4/01 4th FLOOR PLAN BRICK WALL 21/Jun/19 11/Jul/19 A

SD/A-FCT.1/DNH.L4/02 4th FLOOR PLAN BRICK WALL PARSIAL 1

SD/A-FCT.1/DNH.L4/03 4th FLOOR PLAN BRICK WALL PARSIAL 2

SD/A-FCT1/KR2/01 POLA KERAMIK LANTAI 2

SD/A-FCT1/KR2/02 POLA KERAMIK LANTAI 2 PARTIAL 1


5 037/DWG-UM/IX-2019/R0 27/Sep/19 23/Oct/19 A
SD/A-FCT1/KR2/03 POLA KERAMIK LANTAI 2 PARTIAL 2

SD/FCT1/WC1/01 DENAH PUBLIC TOILET AS : 1-A-B LT.1-4

SD/FCT1/WC1/02 POLA KERAMIK & RANGKA PLAFOND PUBLIC TOILET

SD/FCT1/WC1/03 POTONGAN A - A PLAFOND PUBLIC TOILET

SD/FCT1/WC1/04 POTONGAN A - A PLAFOND PUBLIC TOILET

SD/FCT1/WC1/05 POTONGAN B - B PLAFOND PUBLIC TOILET

6 038/DWG-UM/FCT1/IX-2019/R0 SD/FCT1/WC1/06 POTONGAN B - B PLAFOND PUBLIC TOILET 1/Oct/19 8/Nov/19 REVISI 11/14/2019

SD/FCT1/WC1/07 POTONGAN C - C PLAFOND PUBLIC TOILET

SD/FCT1/WC1/08 POTONGAN D - D PLAFOND PUBLIC TOILET

SD/FCT1/WC1/09 POTONGAN E - E PLAFOND PUBLIC TOILET

SD/FCT1/WC1/10 POTONGAN F - F PLAFOND PUBLIC TOILET

SD/A-FCT1/WD/01 TEMPAT WUDHU AS : 2-A LANTAI 1

SD/A-FCT1/WD/02 POTONGAN A-A & B-B


7 039/DWG-UM/FCT1/IX-2019/R0 30/Sep/19 8/Nov/19 REVISI 14/Nov/19
SD/A-FCT1/WD/03 POTONGAN C-C

SD/A-FCT1/PTR/01 PANTRY AS : 1-C-D LANTAI 2-4

7 040/DWG-UM/FCT1/X-2019/R0 SD/A-FCT1/PTR/02 POTONGAN PANTRY AS : 1-C-D LANTAI 2-4 1/Oct/19 14/Nov/19 A

SD/A-FCT/KR3/01 POLA KERAMIK LANTAI 3

SD/A-FCT/KR3/02 POLA KERAMIK LANTAI 3 PARTIAL 1


8 041/DWG-UM/FCT1/X-2019/R0 1/Oct/19 14/Nov/19 A
SD/A-FCT/KR3/03 POLA KERAMIK LANTAI 3 PARTIAL 2
NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS LAPANGAN
PSC PIU INTERNAL
FCSIT 1
SD/A-FCT1/PTR/01 PANTRY AS : 1-C LANTAI 1

9 042/DWG-UM/FCT1/X-2019/R0 SD/A-FCT1/WD/02 POTONGAN PANTRY AS : 1-C LANTAI 1 1/Oct/19 14/Nov/19 A

SD/A-FCT1/TG1/01 TANGGA 1 AS:2 - D LANTAI 1 & 2

SD/A-FCT1/TG1/02 TANGGA 1 AS:2 - D LANTAI 3& 4

10 044/DWG-UM/FCT1/X-2019/R0 SD/A-FCT1/TG1/03 POTONGAN 1-1 TANGGA 1 AS: 2-D 3/Oct/19 14/Nov/19 A

SD/A-FCT1/TG1/04 POTONGAN 2-2 TANGGA 1 AS: 2-D

SD/A-FCT1/TG2/01 TANGGA 2 AS:6 - A LANTAI 1 & 2

SD/A-FCT1/TG2/02 TANGGA 2 AS:6 - A LANTAI 3 & 4

11 045/DWG-UM/FCT1/X-2019/R0 SD/A-FCT1/TG2/03 POTONGAN 1-1 TANGGA 2 AS : 6-A 5/Oct/19 14/Nov/19 A

SD/A-FCT1/TG2/04 POTONGAN 2-2 TANGGA 2 AS : 6-A

SD/A-FCT1/KR4/01 POLA KERAMIK LANTAI 4

SD/A-FCT1/KR4/02 POLA KERAMIK LANTAI 4 PARTIAL 1


12 046/DWG-UM/FCT1/X-2019/R0 5/Oct/19 14/Nov/19 A
SD/A-FCT1/KR4/03 POLA KERAMIK LANTAI 4 PARTIAL 2

SD/A-FCT1/KR5/01 POLA KERAMIK LANTAI 5

SD/A-FCT1/KR5/02 POLA KERAMIK LANTAI 5 PARTIAL 1


13 047/DWG-UM/FCT1/X-2019/R0 5/Oct/19 8/Nov/19 REVISI 11/Nov/19
SD/A-FCT1/KR5/03 POLA KERAMIK LANTAI 5 PARTIAL 2

SD/A-FCT1/JAN/01 JANITOR AS : 2-A LANTAI 2-4

14 048/DWG-UM/FCT1/X-2019/R0 SD/A-FCT1/JAN/02 POTONGAN JANITOR AS : 2-A LANTAI 2-5 5/Oct/19 11/Nov/19

SD/A-FCT1/WC2/01 DENAH TOILET AS:3-D LANTAI 2

15 049/DWG-UM/FCT1/X-2019/R0 SD/A-FCT1/WC2/02 POTONGAN DENAH TOILET AS:3-D LANTAI 3 7/Oct/19 14/Nov/19 A

SD/A-FCT1/CH1/01 KOMPOSIT CEILING LANTAI 1

SD/A-FCT1/CH1/02 KOMPOSIT CEILING LANTAI 1 PARTIAL 1


16 054/DWG-UM/FCT1/X-2019/R0 15/Oct/19 14/Nov/19 A
SD/A-FCT1/CH1/03 KOMPOSIT CEILING LANTAI 1 PARTIAL 2

SD/A-FCT1/CH2/01 KOMPOSIT CEILING LANTAI 2

SD/A-FCT1/CH2/02 KOMPOSIT CEILING LANTAI 2 PARTIAL 1

17 055/DWG-UM/FCT1/X-2019/R0 SD/A-FCT1/CH2/03 KOMPOSIT CEILING LANTAI 2 PARTIAL 2 15/Oct/19 14/Nov/19 A

SD/A-FCT1/CH2/04 KOMPOSIT CEILING LANTAI 2 PARTIAL 3

SD/A-FCT1/CH1/01 KOMPOSIT CEILING LANTAI 3

18 056/DWG-UM/FCT1/X-2019/R0 15/Oct/19 18/Nov/19 REVISI 22/Nov/19


NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL
FCSIT 1
SD/A-FCT1/CH1/02 KOMPOSIT CEILING LANTAI 3 PARTIAL 1
18 056/DWG-UM/FCT1/X-2019/R0 15/Oct/19 18/Nov/19 REVISI 22/Nov/19
SD/A-FCT1/CH1/03 KOMPOSIT CEILING LANTAI 3 PARTIAL 2

SD/A-FCT1/CH4/01 KOMPOSIT CEILING LANTAI 4

SD/A-FCT1/CH4/02 KOMPOSIT CEILING LANTAI 4 PARTIAL 1


19 057/DWG-UM/FCT1/X-2019/R0 15/Oct/19 18/Nov/19 REVISI 22/Nov/19
SD/A-FCT1/CH4/03 KOMPOSIT CEILING LANTAI 4 PARTIAL 2

SD/A-FCT1/PB/01 LOKASI PINTU BESI LANTAI 1

SD/A-FCT1/PB/02 LOKASI PINTU BESI LANTAI 2

SD/A-FCT1/PB/03 LOKASI PINTU BESI LANTAI 3


GAK JADI
SD/A-FCT1/PB/04 LOKASI PINTU BESI LANTAI 4 DIPAKE
20 058/DWG-UM/FCT1/X-2019/R0 16/Oct/19 19/Oct/19 GAMBAR 17/Oct/19 23/Oct/19 A
SD/A-FCT1/PB/05 DETAIL PINTU P.03 (1000x2200) NON fire rated (4bh) DI PAK EDY

SD/A-FCT1/PB/06 DETAIL PINTU P.09 (600x1200) fire rated (8bh)

SD/A-FCT1/PB/07 Accessories Pintu Besi

SD/A-FCT1/KR1/01 POLA KERAMIK LANTAI 1


SD/A-FCT1/KR1/02 POLA KERAMIK LANTAI 1 PARTIAL 1
21 062/DWG-UM/FCT1/X-2019/R0 22/Oct/19 14/Nov/19 A
Status:
A : APPROVED B: APPROVED WITH NOTE C: RETURNED FOR CORRECTION D: DISAPPROVED

NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI


NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL
FCSIT 2
SD/A-FCT.2/DNH.L1/01 1st FLOOR PLAN BRICK WALL

SD/A-FCT.2/DNH.L1/02 1st FLOOR PLAN BRICK WALL PARSIAL 1

SD/A-FCT.2/DNH.L1/03 1st FLOOR PLAN BRICK WALL PARSIAL 2

1 001/DWG-UM/FCT.2/A-PD/V/2019/R0 SD/A-FCT./DNH.L2/01 2nd FLOOR PLAN BRICK WALL 23/May/19 19/Jun/19 A 6/22/2019 6/22/2019

SD/A-FCT.2/DNH.L2/02 2nd FLOOR PLAN BRICK WALL PARSIAL 1

SD/A-FCT.2/DNH.L2/03 2nd FLOOR PLAN BRICK WALL PARSIAL 2

SD/A-FCT.2/SDW.P/01 SCHEDULE DOOR P.02 SAMA

SD/A-FCT.2/SDW.P/02 SCHEDULE DOOR P.03 DENGAN

SD/A-FCT.2/SDW.P/03 SCHEDULE DOOR P.04 FCSIT 1

SD/A-FCT.2/SDW.P/04 SCHEDULE DOOR P.05 GAMBAR

SD/A-FCT.2/SDW.P/05 SCHEDULE DOOR P.06 SUBMIT

SD/A-FCT.2/SDW.P/06 SCHEDULE DOOR P.07 CUMA 1

SD/A-FCT.2/SDW.P/07 SCHEDULE DOOR P.08

SD/A-FCT.2/SDW.P/08 SCHEDULE DOOR P.09

SD/A-FCT.2/SDW.PJ/01 SCHEDULE DOOR PJ.01

SD/A-FCT.2/SDW.PJ/02 SCHEDULE DOOR PJ.01A

SD/A-FCT.2/SDW.PJ/03 SCHEDULE DOOR PJ.02

SD/A-FCT.2/SDW.PJ/04 SCHEDULE DOOR PJ.03

SD/A-FCT.2/SDW.PJ/05 SCHEDULE DOOR PJ.04

2 001/DWG-UM/FCT.1&2/A-PD/V/2019/R0 SD/A-FCT.2/SDW.PJ/06 SCHEDULE DOOR PJ.05 23/May/19 19/Jun/19 GAMBAR 6/22/2019 6/22/2019

SD/A-FCT.2/SDW.PJ/07 SCHEDULE DOOR PJ.06 DI BANTEX

SD/A-FCT.2/SDW.PJ/08 SCHEDULE DOOR PJ.07 FCSIT 1

SD/A-FCT.2/SDW.PJ/09 SCHEDULE DOOR PJ.08

SD/A-FCT.2/SDW.PJ/10 SCHEDULE DOOR PJ.09

SD/A-FCT.2/SDW.PJ/11 SCHEDULE DOOR PJ.10

SD/A-FCT.2/SDW.PJ/12 SCHEDULE DOOR PJ.11

SD/A-FCT.2/SDW.PJ/13 SCHEDULE DOOR PJ.12

SD/A-FCT.2/SDW.PJ/14 SCHEDULE DOOR PJ.13

SD/A-FCT.2/SDW.PJ/15 SCHEDULE DOOR PJ.14

SD/A-FCT.2/SDW.PJ/16 SCHEDULE DOOR PJ.15

SD/A-FCT.2/SDW.PJ/17 SCHEDULE DOOR PJ.16

SD/A-FCT.2/SDW.DT/01 SECTION DETAIL


NOMOR REV. 0 REV. 1 REV. 2 TGL TGL KONDISI
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL
FCSIT 2
SD/A-FCT.2/DNH.L3/01 3rd FLOOR PLAN BRICK WALL

SD/A-FCT.2/DNH.L3/02 3rd FLOOR PLAN BRICK WALL PARSIAL 1

SD/A-FCT.2/DNH.L3/03 3rd FLOOR PLAN BRICK WALL PARSIAL 2

3 001/DWG-UM/FCT.2/A-PD/VI/2019/R0 SD/A-FCT.2/DNH.L4/01 4th FLOOR PLAN BRICK WALL 21/Jun/19 11/Jul/19 A

SD/A-FCT.2/DNH.L4/02 4th FLOOR PLAN BRICK WALL PARSIAL 1

SD/A-FCT.2/DNH.L4/03 4th FLOOR PLAN BRICK WALL PARSIAL 2

4 001/DWG-UM/FCT.1&2/A-PD/VI/2019/R0 SD/A-FCT.2/SDW/P.01 SCHEDULE DOOR P.01 FCSIT 1&2 21/Jun/19 11/Jul/19 A

SD/A-FCT2/SDW.J/01 SCHEDULE WINDOW J.01

SD/A-FCT2/SDW.J/02 SCHEDULE WINDOW J.02

SD/A-FCT2/SDW.J/03 SCHEDULE WINDOW J.03

SD/A-FCT2/SDW.J/04 SCHEDULE WINDOW J.04

SD/A-FCT2/SDW.J/05 SCHEDULE WINDOW J.05

SD/A-FCT2/SDW.J/06 SCHEDULE WINDOW J.06


5 004/DWG-UM/FCT/1&2/A-DWS/VII-2019/R0 3/Jul/19 15/Jul/19 A
SD/A-FCT2/SDW.J/07 SCHEDULE WINDOW J.07

SD/A-FCT2/SDW.J/08 SCHEDULE WINDOW J.08

SD/A-FCT2/SDW.J/09 SCHEDULE WINDOW J.09

SD/A-FCT2/SDW.J/10 SCHEDULE WINDOW J.10

SD/A-FCT2/SDW.J/11 SCHEDULE WINDOW J.11

SD/A-FCT2/SDW.J/12 SCHEDULE WINDOW J.12

SD/A-FCT2/KR1/01 POLA KERAMIK LANTAI 1

revisi pak
6 027/DWG-UM/VIII-2019/R0 SD/A-FCT2/KR1/02 POLA KERAMIK LANTAI 1 PARTIAL 1 30/Aug/19 12/Sep/19 9/17/2019
dheri

SD/A-FCT2/KR1/03 POLA KERAMIK LANTAI 1 PARTIAL 2

SD/A-FCT2/WC1/01 PUBLIC TOILET

SD/A-FCT2/WC1/02 POLA KERAMIK PUBLIC TOILET

SD/A-FCT2/WC1/03 POLA RANGKA PLAFOND PUBLIC TOILET

SD/A-FCT2/WC1/04 POTONGAN A - A PLAFOND PUBLIC TOILET

SD/A-FCT2/WC1/05 POTONGAN A - A PLAFOND PUBLIC TOILET

SD/A-FCT2/WC1/06 POTONGAN B - B PLAFOND PUBLIC TOILET DIGANTIK


7 025/DWG-UM/VIII-2019/R0 29/Aug/19 5/Sep/19 9/28/2019
AN A
SD/A-FCT2/WC1/07 POTONGAN B - B PLAFOND PUBLIC TOILET

SD/A-FCT2/WC1/08 POTONGAN C - C PLAFOND PUBLIC TOILET

SD/A-FCT2/WC1/09 POTONGAN D - D PLAFOND PUBLIC TOILET

SD/A-FCT2/WC1/10 POTONGAN E - E PLAFOND PUBLIC TOILET

SD/A-FCT2/WC1/11 POTONGAN F - F PLAFOND PUBLIC TOILET


NOMOR REV. 0 REV. 1 REV. 2 TGL TGL
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI KONDISI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL LAPANGAN

FCSIT 2
SD/A-FCT2/WC2/01 PUBLIC TOILET

SD/A-FCT2/WC2/02 POLA KERAMIK PUBLIC TOILET

SD/A-FCT2/WC2/03 POLA RANGKA PLAFOND PUBLIC TOILET

SD/A-FCT2/WC2/04 POTONGAN A - A PLAFOND PUBLIC TOILET

SD/A-FCT2/WC2/05 POTONGAN A - A PLAFOND PUBLIC TOILET

SD/A-FCT2/WC2/06 POTONGAN B - B PLAFOND PUBLIC TOILET A TAPI


DIGANTIK
8 026/DWG-UM/VIII-2019/R0 30/Aug/19 5/Sep/19 AN 9/28/2019
SD/A-FCT2/WC2/07 POTONGAN B - B PLAFOND PUBLIC TOILET SEBAGIAN

SD/A-FCT2/WC2/08 POTONGAN C - C PLAFOND PUBLIC TOILET

SD/A-FCT2/WC2/09 POTONGAN D - D PLAFOND PUBLIC TOILET

SD/A-FCT2/WC2/10 POTONGAN E - E PLAFOND PUBLIC TOILET

SD/A-FCT2/WC2/11 POTONGAN F - F PLAFOND PUBLIC TOILET

SD/A-FCT2/WC2/01 TOILET HEAD OF LAB. TIK AS : 10 - 11 - F LANTAI 1

SD/A-FCT2/WC2/02 POTOGAN A - A TOILET HEAD OF LAB. TIK AS : 10 - 11 - F LANTAI 1


9 028/DWG-UM/VIII-2019/R0 4/Sep/19 18/Sep/19 A
SD/A-FCT2/WC2/03 POTOGAN B - B & C -C TOILET HEAD OF LAB. TIK AS : 10 - 11 - F LANTAI 1

SD/A-FCT2/PTR/01 PATRY AS : 12 - G - H LANTAI 1 - 4


revisi pak
029/DWG-UM/IX-2019/R0 4/Sep/19 6/Sep/19
SD/A-FCT2/PTR/02 POTOGAN PANTRY AS : 12 - G - H LANTAI 1 - 4 dheri

10
SD/A-FCT2/PTR/01 PATRY AS : 12 - G - H LANTAI 2 - 4
029/DWG-UM/IX-2019/R1 7/Sep/19 18/Sep/19 A
SD/A-FCT2/PTR/02 POTOGAN PANTRY AS : 12 - G - H LANTAI 2 - 4

SD/A-FCT2/WDH/01
TEMPAT WUDHU AS : 11 - E LANTAI 2
11 030/DWG-UM/IX-2019/R0 4/Sep/19 8/Oct/19 A
SD/A-FCT2/WDH/02 POTOGAN TEMPAT WUDHU AS : 11 - E LANTAI 2

SD/A-FCT2/JAN/01 JANITOR AS : 11 - E LANTAI 1, 3 & 4


12 031/DWG-UM/IX-2019/R0 4/Sep/19 18/Sep/19 A
SD/A-FCT2/JAN/02 POTOGAN JANITOR AS : 11 - E LANTAI 1, 3 & 4

SD/A-FCT2/KR2/01 POLA KERAMIK LANTAI 2

SD/A-FCT2/KR2/02 POLA KERAMIK LANTAI 2 PARTIAL 1


13 032/DWG-UM/IX-2019/R0 7/Sep/19 18/Sep/19 A
SD/A-FCT2/KR2/03 POLA KERAMIK LANTAI 2 PARTIAL 2

SD/A-FCT2/KR3/01 POLA KERAMIK LANTAI 3

SD/A-FCT2/KR3/02 POLA KERAMIK LANTAI 3 PARTIAL 1 revisi pak


14 032/DWG-UM/IX-2019/R0 7/Sep/19 10/Sep/19 17/Sep/19 23/Oct/19 A
dheri
SD/A-FCT2/KR3/03 POLA KERAMIK LANTAI 3 PARTIAL 2

SD/A-FCT2/KR4/01 POLA KERAMIK LANTAI 4

SD/A-FCT2/KR4/02 POLA KERAMIK LANTAI 4 PARTIAL 1 revisi pak REVISI PAK


14 034/DWG-UM/IX-2019/R0 7/Sep/19 17/Sep/19 dheri 25/Sep/19 15/Oct/19 DHERI 10/16/2019 11/14/2019 A
NOMOR REV. 0 REV. 1 REV. 2 TGL TGL
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI KONDISI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL LAPANGAN

14 034/DWG-UM/IX-2019/R0 FCSIT 2 7/Sep/19 17/Sep/19


revisi pak
25/Sep/19 15/Oct/19
REVISI PAK
10/16/2019 11/14/2019 A
dheri DHERI
SD/A-FCT2/KR4/03 POLA KERAMIK LANTAI 4 PARTIAL 2

SD/A-FCT2/TG1/01 TANGGA 1 AS : 11-G-H-LANTAI 1

SD/A-FCT2/TG1/02 TANGGA 1 AS : 11-G-H-LANTAI 2

SD/A-FCT2/TG1/03 TANGGA 1 AS : 11-G-H-LANTAI 3


15 035/DWG-UM/IX-2019/R0 17/Sep/19 14/Nov/19 A
SD/A-FCT2/TG1/04 TANGGA 1 AS : 11-G-H-LANTAI 4

SD/A-FCT2/TG1/05 POTONGAN 1-1 TANGGA 1 AS : 11-G-H

SD/A-FCT2/TG1/06 POTONGAN 2-2 TANGGA 1 AS : 11-G-H

SD/A-FCT2/TG2/01 TANGGA 2 AS : 7-E LANTAI 1 & 2

SD/A-FCT2/TG2/02 TANGGA 2 AS : 7-E LANTAI 3 & 4


16 036/DWG-UM/IX-2019/R0 23/Sep/19 7/Oct/19 A
SD/A-FCT2/TG2/03 POTONGAN 1-1 TANGGA 2

SD/A-FCT2/TG2/04 POTONGAN 2-2 TANGGA 2

SD/A-FCT2/PTR/03 PANTRY AS:12-G LT 1


17 043/DWG-UM/FCT2/X-2019/R0 3/Oct/19 14/Nov/19 A
SD/A-FCT2/PTR/04 POTONGAN PANTRY AS:12-G LT.1

SD/A-FCT2/CH1/01 KOMPOSIT CEILLING LANTAI 1

SD/A-FCT2/CH1/02 KOMPOSIT CEILLING LANTAI 1 PARTIAL 1


18 050/DWG-UM/FCT2/X-2019/R0 10/Oct/19 18/Nov/19 REVISI 22/Nov/19
SD/A-FCT2/CH1/03 KOMPOSIT CEILLING LANTAI 1 PARTIAL 2

SD/A-FCT2/CH2/01 KOMPOSIT CEILLING LANTAI 2

SD/A-FCT2/CH2/02 KOMPOSIT CEILLING LANTAI 2 PARTIAL 1


19 051/DWG-UM/FCT2/X-2019/R0 9/Oct/19
SD/A-FCT2/CH2/03 KOMPOSIT CEILLING LANTAI 2 PARTIAL 2

SD/A-FCT2/CH3/01 KOMPOSIT CEILLING LANTAI 3

SD/A-FCT2/CH3/02 KOMPOSIT CEILLING LANTAI 3 PARTIAL 1


20 052/DWG-UM/FCT2/X-2019/R0 10/Oct/19 18/Nov/19 REVISI 22/Nov/19
SD/A-FCT2/CH3/03 KOMPOSIT CEILLING LANTAI 3 PARTIAL 2

SD/A-FCT2/CH4/01 KOMPOSIT CEILLING LANTAI 4

SD/A-FCT2/CH4/02 KOMPOSIT CEILLING LANTAI 4 PARTIAL 1


21 053/DWG-UM/FCT2/X-2019/R0 11/Oct/19 14/Nov/19 A
SD/A-FCT2/CH4/03 KOMPOSIT CEILLING LANTAI 4 PARTIAL 2

SD/A-FCT2/PB/01 LOKASI PINTU BESI LANTAI 1

SD/A-FCT2/PB/02 LOKASI PINTU BESI LANTAI 2

SD/A-FCT2/PB/03 LOKASI PINTU BESI LANTAI 3


GAK JADI
SD/A-FCT2/PB/04 LOKASI PINTU BESI LANTAI 4 DIPAKE
22 059/DWG-UM/FCT1/X-2019/R0 16/Oct/19 19/Oct/19 GAMBAR 17/Oct/19 23/Oct/19 A
SD/A-FCT2/PB/05 DETAIL PINTU P.03 (1000x2200)Hfire rated (4bh) DI PAK EDY
NOMOR REV. 0 REV. 1 REV. 2 TGL TGL
NO. SHOP DRAWING REMARKS DISTRIBUSI DISTRIBUSI KONDISI
GAK JADI
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS
DIPAKE SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL LAPANGAN
22 059/DWG-UM/FCT1/X-2019/R0 16/Oct/19 19/Oct/19 GAMBAR 17/Oct/19 23/Oct/19 A
FCSIT 2 DI PAK EDY

SD/A-FCT2/PB/06 DETAIL PINTU P.09 (600x1200) fire rated (8bh)

SD/A-FCT2/PB/07 Accessories Pintu Besi

SD/A-FCT2/PLF1/01 DENAH RANGKA PLAFOND LANTAI 1

23 071/DWG-UM/FCT2/X-2019/R0 29/Oct/19 14/Nov/19 A


Status:
A : APPROVED B: APPROVED WITH NOTE C: RETURNED FOR CORRECTION D: DISAPPROVED

NOMOR REV. 0 REV. 1 REV. 2 TGL TGL


NO. SHOP DRAWING REMARKS KONDISI
DISTRIBUSI DISTRIBUSI LAPANGAN
PENGAJUAN ASBD DRAWING SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS SUBMIT KEMBALI STATUS PSC PIU INTERNAL
SLC
SD/A-SLC/P.D/01 PAS. DINDING, SLC BUILDING,ZONE 3 DENAH PAS.DINDING LT.1

SD/A-SLC/P.D/01A PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.1 PARTIAL A


1 001/DWG-UM/SLC/A-PD/II/2019/R0 25/02/2019 A 3/26/2019
SD/A-SLC/P.D/01B PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.1 PARTIAL B

SD/A-SLC/P.D/02 PAS. DINDING, SLC BUILDING,ZONE 3 DENAH PAS.DINDING LT.2

SD/A-SLC/P.D/02A PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.2 PARTIAL A


2 002/DWG-UM/SLC/A-PD/II/2019/R0 27/02/2019 A 3/26/2019
SD/A-SLC/P.D/02B PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.2 PARTIAL B

SD/A-SLC/P.D/03 PAS. DINDING, SLC BUILDING,ZONE 3 DENAH PAS.DINDING LT.3

SD/A-SLC/P.D/03A PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.3 PARTIAL A


3 003/DWG-UM/SLC/A-PD/III/2019/R0 02/03/2019 A 3/26/2019
SD/A-SLC/P.D/03B PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.3 PARTIAL B

SD/A-SLC/P.D/04 PAS. DINDING, SLC BUILDING,ZONE 3 DENAH PAS.DINDING LT.4

SD/A-SLC/P.D/04A PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.4 PARTIAL A


4 004/DWG-UM/SLC/A-PD/III/2019/R0 06/03/2019 A 3/26/2019
SD/A-SLC/P.D/04B PAS. DINDING, SLC BUILDING, DENAH PAS.DINDING LT.4 PARTIAL B

SD/NKE/SLC/A07-001 LAYOUT SCHEDULE DOORS & WINDOWS

SD/NKE/SLC/DS-001 DOOR TYPE P1

SD/NKE/SLC/DS-002 DOOR TYPE P2

SD/NKE/SLC/DS-003 DOOR TYPE P3

SD/NKE/SLC/DS-004 DOOR TYPE P4

SD/NKE/SLC/DS-005 DOOR TYPE P5

SD/NKE/SLC/DS-006 DOOR TYPE PJ1

SD/NKE/SLC/DS-007 DOOR TYPE PJ2

SD/NKE/SLC/DS-008 DOOR TYPE PJ3

SD/NKE/SLC/DS-009 DOOR TYPE PJ4

SD/NKE/SLC/DS-010 DOOR TYPE PK-1


001/DWG-UM/SLC/A-PD/IV/2019/R0 04/04/2019 6/Apr/19 REVISI
SD/NKE/SLC/DS-011 DOOR TYPE PS

SD/NKE/SLC/A03-001 WINDOW TYPE J1

SD/NKE/SLC/A03-002 WINDOW TYPE J1A

SD/NKE/SLC/A03-003 WINDOW TYPE J2

SD/NKE/SLC/A03-004 WINDOW TYPE J3

5
001/DWG-UM/SLC/A-PD/IV/2019/R0 04/04/2019 6/Apr/19 REVISI

SD/NKE/SLC/A03-005 WINDOW TYPE J4

SD/NKE/SLC/A03-006 WINDOW TYPE J5


5
SD/NKE/SLC/A03-007 WINDOW TYPE J6, J7A

SD/NKE/SLC/A03-008 WINDOW TYPE BV

SD/NKE/SLC/A03-009 WINDOW TYPE BV1

SD/NKE/SLC/A07-001 LAYOUT SCHEDULE DOORS & WINDOWS


SD/NKE/SLC/DS-001 DOOR TYPE P1
SD/NKE/SLC/DS-002 DOOR TYPE P2
SD/NKE/SLC/DS-003 DOOR TYPE P3
SD/NKE/SLC/DS-004 DOOR TYPE P4
SD/NKE/SLC/DS-005 DOOR TYPE P5
SD/NKE/SLC/DS-006 DOOR TYPE PJ1
SD/NKE/SLC/DS-007 DOOR TYPE PJ2
SD/NKE/SLC/DS-008 DOOR TYPE PJ3
SD/NKE/SLC/DS-009 DOOR TYPE PJ4
SD/NKE/SLC/DS-010 DOOR TYPE PK-1
001/DWG-UM/SLC/A-PD/IV/2019/R0 5/Apr/19
SD/NKE/SLC/DS-011 DOOR TYPE PS
SD/NKE/SLC/A03-001 WINDOW TYPE J1
SD/NKE/SLC/A03-002 WINDOW TYPE J1A
SD/NKE/SLC/A03-003 WINDOW TYPE J2
SD/NKE/SLC/A03-004 WINDOW TYPE J3
SD/NKE/SLC/A03-005 WINDOW TYPE J4
SD/NKE/SLC/A03-006 WINDOW TYPE J5
SD/NKE/SLC/A03-007 WINDOW TYPE J6, J7A
SD/NKE/SLC/A03-008 WINDOW TYPE BV
SD/NKE/SLC/A03-009 WINDOW TYPE BV1

SD/A-SLC/PL.LT.1/01 POLA FINISH LANTAI


SD/A-SLC/PL.LT.1/02 DENAH POLA LANTAI
SD/A-SLC/PL.LT.1/03 SLC BUILDING , LANTAI 1 ZONE 3
SD/A-SLC/PL.LT.2/01 POLA FINISH LANTAI
SD/A-SLC/PL.LT.2/02 DENAH POLA LANTAI
SD/A-SLC/PL.LT.2/03 SLC BUILDING , LANTAI 2 ZONE 3
4 005/DWG-UM/SLC/A-PL/V/2019/R0 SD/A-SLC/PL.LT.3/01 POLA FINISH LANTAI 15/05/2019 17/May/19 D 18/May/19
SD/A-SLC/PL.LT.3/02 DENAH POLA LANTAI
SD/A-SLC/PL.LT.3/03 SLC BUILDING , LANTAI 3 ZONE 3
SD/A-SLC/PL.LT.4/01 POLA FINISH LANTAI
SD/A-SLC/PL.LT.4/02 DENAH POLA LANTAI
SD/A-SLC/PL.LT.4/03 SLC BUILDING , LANTAI 4 ZONE 3

SD/A-SLC/CL.LT.1/01 DENAH CEILING LT.1


SD/A-SLC/CL.LT.1/02 DENAH CEILING LT.1 (PARTIAL A)
SD/A-SLC/CL.LT.1/03 DENAH CEILING LT.1 (PARTIAL B)
SD/A-SLC/CL.LT.2/01 DENAH CEILING LT.2
SD/A-SLC/CL.LT.2/02 DENAH CEILING LT.2 (PARTIAL A)
SD/A-SLC/CL.LT.2/03 DENAH CEILING LT.2 (PARTIAL B)
5 006/DWG-UM/SLC/A-CL/V/2019/R0 SD/A-SLC/CL.LT.3/01 DENAH CEILING LT.3 18/05/2019
SD/A-SLC/CL.LT.3/02 DENAH CEILING LT.3 (PARTIAL A)
SD/A-SLC/CL.LT.3/03 DENAH CEILING LT.3 (PARTIAL B)
SD/A-SLC/CL.LT.4/01 DENAH CEILING LT.4
SD/A-SLC/CL.LT.4/02 DENAH CEILING LT.4 (PARTIAL A)
5 006/DWG-UM/SLC/A-CL/V/2019/R0 18/05/2019

SD/A-SLC/CL.LT.4/03 DENAH CEILING LT.4 (PARTIAL B)

ICT
SD/A-ICT/DNH.L1/01 1st FLOOR PLAN

SD/A-ICT/DNH.L1/02 1st FLOOR PLAN - PARTIAL 1


1 001/DWG-UM/ICT/A-PD/III/2019/R0 12/Mar/19 A 3/26/2019
SD/A-ICT/DNH.L1/03 1st FLOOR PLAN - PARTIAL 2

SD/A-ICT/DNH.L2/01 2nd FLOOR PLAN - BRICK WALL

001/DWG-UM/ICT/A-PD/III/2019/R0 SD/A-ICT/DNH.L2/02 2nd FLOOR PLAN - BRICK WALL, PARSIAL 1 16/Mar/19 D

SD/A-ICT/DNH.L2/03 2nd FLOOR PLAN - BRICK WALL, PARSIAL 2


2
SD/A-ICT/DNH.L2/01 2nd FLOOR PLAN - BRICK WALL
NAMBAH
001/DWG-UM/ICT/A-PD/III/2019 SD/A-ICT/DNH.L2/02 2nd FLOOR PLAN - BRICK WALL, PARSIAL 1 30/Mar/19 6/Apr/19 D
PAS.DINDING
SD/A-ICT/DNH.L2/03 2nd FLOOR PLAN - BRICK WALL, PARSIAL 2

SD/A-ICT/DNH.L2/01 2nd FLOOR PLAN - BRICK WALL

SD/A-ICT/DNH.L2/02 2nd FLOOR PLAN - BRICK WALL, PARSIAL 1


4/9/2019 10/May/19 A
001/DWG-UM/ICT/A-PD/III/2019/R3 SD/A-ICT/DNH.L2/03 2nd FLOOR PLAN - BRICK WALL, PARSIAL 2

SD/A-ICT/DNH.L3/01 3rd FLOOR PLAN - BRICK WALL

001/DWG-UM/ICT/A-PD/III-2019/R0 SD/A-ICT/DNH.L3/02 3rd FLOOR PLAN - BRICK WALL, PARSIAL 1 21/Mar/19 6/Apr/19 D

SD/A-ICT/DNH.L3/03 3rd FLOOR PLAN - BRICK WALL, PARSIAL 2


3
SD/A-ICT/DNH.L3/01 3rd FLOOR PLAN - BRICK WALL

SD/A-ICT/DNH.L3/02 3rd FLOOR PLAN - BRICK WALL, PARSIAL 1


001/DWG-UM/ICT/A-PD/III-2019/R1 9/Apr/19 10/May/19 A
SD/A-ICT/DNH.L3/03 3rd FLOOR PLAN - BRICK WALL, PARSIAL 2

SD/A-ICT/DH.DW-1/01 DOOR & WINDOW PLAN 1st FLOOR

SD/A-ICT/DH.DW-2/02 DOOR & WINDOW PLAN 2nd FLOOR

SD/A-ICT/DH.DW-3/03 DOOR & WINDOW PLAN 3rd FLOOR

SD/A-ICT/DH.DW-4/04 DOOR & WINDOW PLAN 4th FLOOR

SD/A-ICT/SC.DW-P/01 SCHEDULE DOOR P.01

SD/A-ICT/SC.DW-P/02 SCHEDULE DOOR P.02

SD/A-ICT/SC.DW-P/03 SCHEDULE DOOR P.03

SD/A-ICT/SC.DW-P/04 SCHEDULE DOOR P.04

SD/A-ICT/SC.DW-P/05 SCHEDULE DOOR P.05

SD/A-ICT/SC.DW-P/06 SCHEDULE DOOR P.06

SD/A-ICT/SC.DW-P/07 SCHEDULE DOOR P.07

SD/A-ICT/SC.DW-P/08 SCHEDULE DOOR P.08

SD/A-ICT/SC.DW-P/09 SCHEDULE DOOR P.09

001/DWG-UM/ICT/A-DWS/IV/2019/R0
4 5/Apr/19
SD/A-ICT/SC.DW-PJ/01 SCHEDULE DOOR PJ.01

001/DWG-UM/ICT/A-DWS/IV/2019/R0 SD/A-ICT/SC.DW-PJ/02 SCHEDULE DOOR PJ.02


4 5/Apr/19
SD/A-ICT/SC.DW-PJ/03 SCHEDULE DOOR PJ.03

SD/A-ICT/SC.DW-PJ/04 SCHEDULE DOOR PJ.04

SD/A-ICT/SC.DW-PJ/05 SCHEDULE DOOR PJ.05

SD/A-ICT/SC.DW-PJ/06 SCHEDULE DOOR PJ.06

SD/A-ICT/SC.DW-PJ/07 SCHEDULE DOOR PJ.07

SD/A-ICT/SC.DW-PJ/08 SCHEDULE DOOR PJ.08

SD/A-ICT/SC.DW-PJ/09 SCHEDULE DOOR PJ.09

SD/A-ICT/SC.DW-PJ/10 SCHEDULE DOOR PJ.10

SD/A-ICT/SC.DW-PJ/11 SCHEDULE DOOR PJ.11

SD/A-ICT/SC.DW-PJ/12 SCHEDULE DOOR PJ.12

SD/A-ICT/SC.DW-PJ/13 SCHEDULE DOOR PJ.13

SD/A-ICT/SC.DW-PJ/14 SCHEDULE DOOR PJ.14

SD/A-ICT/SC.DW-PJ/15 SCHEDULE DOOR PJ.15

SD/A-ICT/SDT.SDW/01 SECTION AND DETAIL

SD/A-ICT/DNH.L4/01 4th FLOOR PLAN - BRICK WALL

SD/A-ICT/DNH.L4/02 4th FLOOR PLAN - BRICK WALL, PARSIAL 1 6/Apr/19


001/DWG-UM/ICT/A-PD/IV-2019/R0
SD/A-ICT/DNH.L4/03 4th FLOOR PLAN - BRICK WALL, PARSIAL 2

ILAB
SD/S-ILB/BW/01-R0 BRICK WALL PLAN LEVEL 1

SD/S-ILB/BW/02-R0 BRICK WALL PLAN LEVEL 1 (PARTIAL 1)

SD/S-ILB/BW/03-R0 BRICK WALL PLAN LEVEL 1 (PARTIAL 2)

SD/S-ILB/BW/04-R0 SECTION LEVEL 1

SD/S-ILB/BW/05-R0 BRICK WALL TOILET PLAN LEVEL 1

SD/S-ILB/BW/06-R0 SECTION LEVEL 1

1 001/DWG-UM/ILB/IV-2019/R0 SD/S-ILB/PJ/01-R0 DETAIL DOOR & WINDOW 16/Apr/19

SD/S-ILB/PJ/02-R0 DETAIL DOOR & WINDOW

SD/S-ILB/PJ/03-R0 DETAIL DOOR & WINDOW

SD/S-ILB/PJ/04-R0 DETAIL DOOR & WINDOW

SD/S-ILB/PJ/05-R0 FLOOR HARDENER LEVEL 1

SD/S-ILB/PJ/6-R0 DETAIL DOOR & WINDOW

SD/A-ILB/BW2/01-R0 BRICK WALL PLAN LEVEL 2

2 001/DWG-UM/ILB/V-2019/R0 11/May/19
SD/A-ILB/BW2/02-R0 BRICK WALL PLAN LEVEL 2 (PARTIAL 1)

SD/A-ILB/BW2/03-R0 BRICK WALL PLAN LEVEL 2 (PARTIAL 2)


2 001/DWG-UM/ILB/V-2019/R0 11/May/19
SD/A-ILB/BW2/04-R0 BRICK WALL TOILET PLAN LEVEL 2

SD/A-ILB/BW2/05-R0 SECTION LEVEL 2

SD/S-ILB/KP/01-R0 COLUMN PRACTICE DOOR WINDOW

SD/S-ILB/KP/02-R0 COLUMN PRACTICE DOOR WINDOW


19 001/DWG-UM/ILB/IV-2019/R0 29/Apr/19
SD/S-ILB/KP/03-R0 COLUMN PRACTICE DOOR WINDOW

SD/S-ILB/EXITS/01-R0 ELEVATION LAND EXISTING PLAN

19 001/DWG-UM/ILB/IV-2019/R0 SD/S-ILB/EXITS/02-R0 SECTION LAND EXISTING 29/Apr/19 10/May/19 A 5/16/2019 5/16/2019

PHARMACY
MATERIAL APPROVAL Contractor Logo
PROJECT NAME: PROJECT LOCATION: CONTRACTOR NAME: REFERENCE NO:

PROPOSED MATERIAL DATA

a Material Name
b Proposed Date
c Sub Contractor / Supplier
d Proposed Material Description
Product
Type

Description

e Material Description as per contract / technical specification


Product
Type

Description

f Reference
Drawing Number
Technical Specification page no.
Others
g Installed location
Room / Zone / Axis
Floor
h Attachment
Material Sample Enclosed Not enclosed
Brochure Enclosed Not enclosed
Test result Enclosed Not enclosed
i Other data Proposed by,
Sub Contractor, Contractor / Main Contractor,

EVALUATION
Base of Evaluation LOCAL CONSULTANT LPKR PROJECT TEAM DMT / BU REPRESENTATIVE
a. Drawing As per drawing As per drawing As per drawing
Not as per drawing Not as per drawing Not as per drawing
b. Technical Specification As per specification As per specification As per specification
Not as per specification Not as per specification Not as per specification
CONCLUSION

a Approve Note:
LOCAL CONSULTANT
Approve with note
Return for Correctio
Disapprove
( )
b Approve Note:
LPKR PROJECT TEAM
Approve with note
Return for Correctio
Disapprove
( )
c Approve Note:
DMT / BU REPRESENTATIVE
Approve with note
Return for Correctio
Disapprove
( )

S-ar putea să vă placă și