No Job Step Hazard / Risk L S Risk New risk score Action
Exposure Score Work Method Statement L After controls By
What are the For Control of Hazard Exposures applied
hazards of each LxS RISK ASSESSMENT AND JOB ANALYSIS
What you do, NOT how you do it job step? What hazard controls will be used? S DATE L :X12/12/2019
S
RA No. : 08
Who will check the effectiveness of the controls?
P.O.BOX No. 462, Abu Dhabi Rev. : 00
What checks will be undertaken? E.g. (Inspection
Tel. +971 2 5511 462, Fax. +971 2 551 3331
Email: fibrex@fibrex.ae; www.fibrex.ae
& ongoing monitoring)
Access to the site Accident with 4 4 16 Mobile crane access will be via designated 1 4 4 CM.
1. other vehicle/ site traffic route. Engineer
pedestrian & work
accident/ property Access to the work area will be agreed in Foreman
damage due to advance with the Construction Manager and
accident. Site Engineer.
Banks man or signaler will be permanently
Dust emissions assigned to the mobile crane in the work
area.
Once mobile crane positioned on desire
area, the area of operation shall barricaded
to stop unauthorized entry, and safety
signage’s to be displayed in area.
ANY RESIDUAL RISK SCORE EXCEEDING 12 (HIGH RISK) MUST BE REVIEWED AND REDUCED FURTHER BEFORE ANY
WORK ACTIVITY COMMENCES.