RISK ASSESSMENT AND JOB ANALYSIS

DATE : 12/12/2019
RA No. : 08
P.O.BOX No. 462, Abu Dhabi Rev. : 00
Tel. +971 2 5511 462, Fax. +971 2 551 3331
Email: fibrex@fibrex.ae; www.fibrex.ae

PROJECT: Residential Building THIS RISK ASSESSMENT/JSA IS TO BE REVIEWED MONTHLY BY THE


DEVELOPERS.
LOCATION: Saadiyat Island

JOB DESCRIPTION: Use of Mobile Crane

PLANNED HIGH RISK CONSTRUCTION ACTIVITY: Yes/No

Work at Heights Work on Roof Excavations Confined Space entry


Using Hazardous Substances Demolition Work Asbestos Removal Use of heavy plant
In the event of injury is a member of the work team First Aid Qualified? √ YES NO If yes, their Name? Mr. Khalid
Point where an injured person may receive treatment: MINOR INJURY: Male nurse in clinic SERIOUS INJURY:
RISK ASSESSMENT/JSA DEVELOPED BY: REVIEWED & APPROVED BY THE FOLLOWING PERSONNEL:
No. Name Signature Position Employee # No. Name Signature Position Date
1 Kashinath Dhakal Safety 1 Eng. Mr. Makram Project
Officer 17140 Takiddine Director
2 2 Eng. Mr. Ayham Sr. CM
Maklad
3 3
4 4
5 5

HAZARD PROMPT –Yes or No Identify the job hazards


Electrical Yes Vehicles Yes Pressure Yes Weather Yes Hot Work Yes Heat Yes SMF or Yes
Asbestos
No No No No No No No
Chemical Yes Height Yes Access Yes Bacteria Yes Rotating Yes Dehydration Yes Confined Yes
Equipment space
No No No No No No No

Page 1 of 4
Ref.: FCG-HSE-FM-0049 REV. 0
RISK ASSESSMENT AND JOB ANALYSIS
DATE : 12/12/2019
RA No. : 08
P.O.BOX No. 462, Abu Dhabi Rev. : 00
Tel. +971 2 5511 462, Fax. +971 2 551 3331
Email: fibrex@fibrex.ae; www.fibrex.ae

HAZARD PROMPT –Yes or No Identify the job hazards


Tools Yes Depth Yes Vibration Yes Dust Yes
Moving Yes Hot / Cold Yes Lighting Yes
Plant Objects
No No No No No No No
HAZARD PROMPT –Yes or No Identify the job hazards
Gases Yes Weight Yes Noise Yes Slip / Yes CALCULATOR
Lifting Yes Overhead Yes Manual Yes
RISK SCORE
Trip Equipment Hazards Handling
No Use The No
Risk Score CalculatorNo No Of Risk Of Each Hazard.
To Determine The Level No Risk = likelihood x severity
No (L x S) No

What would theREQUIREMENTS TAGGING & SIGNS Hierarchy ofPERMITS


Controls &
P.P.E PLANT, EQUIPMENT & TOOLS FOR JOB
SEVERITY (S) Use What is the LIKELIHOOD of an occurrence? (L) Use INSTRUCTION
Use
Of an occurrence be? X Almost Very 4 Likely 3 Unlikely 2 Very 1 Use or removed
Can the hazard be Eliminated
Safety Harness Certain
Hearing Protection5 Likely Ladder Fire Blanket Unlikely
Men Working Above from the work place?
MSDSs
Static Line SCBA Hand Tools Excavator Personal Locks Instruction Manuals
Disaster
Steel Capped Boots 5 High 25
Airline High 20Shovel High 15 Medium 10
Winch Medium 5 Danger
Personal Can the product or process be (SPI)
Procedures substituted
Multiple Fatalities Tags for a less hazardous alternative?
Hard Hat
Very Serious 4 Air Purifying
High 20 Welding
High 16 Machine
High 12 Extension
Medium 8 Out of Service
Medium 4 Tagsthe hazard be
Can Work Instructions
engineered away with
Respirator Leads guards or barriers?
Major Illness or Injury, disability
Tinted Safety Glasses EN Confined Space Compactor Power Source Information Tags Hot Work Permit
Serious 166b High 15
Harness High 12 Medium 9 Low 6 Low 3 Can Administration Controls be adopted
Serious but non-permanent
Mono Goggles injury 3 Gloves – PVC Drill Crane Lifting Equip i.e. procedures, job rotation
Lifting Plan etc
or ill health Certificates
Work days lost
Face Shield EN 166b Gloves – Hyflex Grinder EWP Flag man Excavation Permit
Substantial (Nitrile)
Medium 10 Medium 8 Low 6 Low 4 Low 2 Can Personal Protective Equipment &
Medical Sun
attention needed.
Screen 2Gloves – Leather Scaffold Fans Clothing be worn
General warning to safe guard
Confined Spaceagainst
Riggers signage hazards?
Permit
No work restrictions.
Clear Safety Glasses EN
Minor 1 HighMedium
Vis Vest5 Fire Extinguisher
Medium 4 Low 3 Tag lines
Low 2 Low 1
166b
Minor cuts & bruises or sickness
Dust mask Welding mask

Page 2 of 4
Ref.: FCG-HSE-FM-0049 REV. 0
No Job Step Hazard / Risk L S Risk New risk score Action
Exposure Score Work Method Statement L After controls By
What are the For Control of Hazard Exposures applied
hazards of each LxS RISK ASSESSMENT AND JOB ANALYSIS
What you do, NOT how you do it job step? What hazard controls will be used? S DATE L :X12/12/2019
S
RA No. : 08
Who will check the effectiveness of the controls?
P.O.BOX No. 462, Abu Dhabi Rev. : 00
What checks will be undertaken? E.g. (Inspection
Tel. +971 2 5511 462, Fax. +971 2 551 3331
Email: fibrex@fibrex.ae; www.fibrex.ae
& ongoing monitoring)
Access to the site Accident with 4 4 16  Mobile crane access will be via designated 1 4 4 CM.
1. other vehicle/ site traffic route. Engineer
pedestrian & work
accident/ property  Access to the work area will be agreed in Foreman
damage due to advance with the Construction Manager and
accident. Site Engineer.
 Banks man or signaler will be permanently
Dust emissions assigned to the mobile crane in the work
area.
 Once mobile crane positioned on desire
area, the area of operation shall barricaded
to stop unauthorized entry, and safety
signage’s to be displayed in area.

 Banks man and traffic marshal will not allow


any one inside the barricading without
permission.
2. Using mobile crane Equipment failure, 4 5 20  Crane operator must have UAE valid Driving 1 5 5 Work
load may dropped, license. ( Heavy Tractor) Foreman
& Crane
Personnel struck  Lifting work permit to be obtain prior to the Operator
by the load. lifting operation.
Serious injury,  Certified crane operator and Banks man to
fatality , property be utilized for lifting operation.
damage
 Only HSE approved 3rd party certified mobile
Exhaust fumes crane and lifting accessories to be use in
from mobile crane operation.
Potential for  All certificates copies with Vehicle License &
hydraulic oil operator UAE valid license will be retained
spillage for HSE documentation.
Noise pollution  The load weight must not exceeded then the
SWL of the crane as per shown in the 3rd
party certificate.
 Consider the ground position while setting
the crane for the operation.
 Tag line to be use when lifting the load,
personnel are to stand clear of load, good
communication between operator and banks
Page 3 of 4
man, clear line of site to be maintained when
Ref.: FCG-HSE-FM-0049 REV. 0
using hand signal.
RISK ASSESSMENT AND JOB ANALYSIS
DATE : 12/12/2019
RA No. : 08
P.O.BOX No. 462, Abu Dhabi Rev. : 00
Tel. +971 2 5511 462, Fax. +971 2 551 3331
Email: fibrex@fibrex.ae; www.fibrex.ae

ANY RESIDUAL RISK SCORE EXCEEDING 12 (HIGH RISK) MUST BE REVIEWED AND REDUCED FURTHER BEFORE ANY
WORK ACTIVITY COMMENCES.

SIGN ON SHEET
Date Name Signature Date Name Signature

IF IT’S NOT SAFE – DON’T DO IT THAT WAY

Page 4 of 4
Ref.: FCG-HSE-FM-0049 REV. 0