Don’t Change in This sheet Download Excel Sheet Link Given in Article Below this Excel sheet

Enter Your House Built up Area in Sq ft Red Color Area


Requirement Unit of Approx Approx
S. Percentage For a 500 sq ft Enter Your House S.No. Quantit
Item of work of Materia measurement Qyt for Qyt for cu.
No. of total work house Area in Sq ft y
cu. ft ft
Construction
Rate per Sq ft
2 1,000 8,000 Area of Construction in Sq ft 1000 350
.
Excavation in ordinary
1 3% 60 480 1 Cement Bags/sqft 0.4 400 140
soil and concrete
2 Foundation 5% 100 800 2 Sand (cu ft) Cut/sqft 1.81 1,810 634
Construction upto plinth Aggregate
3 5% 100 800 3 Cut/sqft 1.14 1140 399
(cu ft)
Superstructure in
4 25% 500 4,000 4 Bricks Nos/Sqft 34 34000 11900
brickwork
5 Roofing includ 17% 340 2,720 5 Size Stone Nos/Sq ft 11 11000 3850
6 Flooring 6% 120 960 6 Steel Kg/Sqft 2.1 2100 735
Wood work i.e. Joinery,
7 13% 260 2,080 7 Wood CuF/Sqft 0.077 77 26.95
doors and windows
8 Internal finishes 6% 120 960
9 External finishes 3% 60 480
10 Water supply 4% 80 640
11 Sanitary work 8% 160 1,280
12 Electrification 5% 100 800
13 Total 100% 2,000 16,000

Cement 330rs/bag 1 bag= 50kg


Sand 1mt sand cost=1800
1mt=14.67
rs cft
brick 6-8 rs per each
Aggregate 24-30 rs/cft
Steel Tmt 44k -48k rs/mt
White marble70-90 /sft
Black granite 130-180/sqft
Tile 40-80/sft