Sunteți pe pagina 1din 5

Name: Abdul Sami.

Add:L-34 sector 5c-1 north Karachi.


Mobile # 0336-3498426.
E-mail: abdulsm4@gmail.com
CNIC # 42101-0517090-5

Objective:

The main objective is to enhance my knowledge skill so that i would use my previous knowledge that
i have taken from an engineering institution or from my experience and where you will find me as
punctual and loyal to my responsibility.

Academic career:
B .E in CIVIL (URBAN ENGINEERING)from (Ned university of Engr. and
technology) in December 2013

 First year : ISTdivision


 Second year : ISTdivision
 Third year : ISTdivision
 Final year : ISTdivision

Major subject:

 Transportation Engineering  Water resource and management


 Traffic Engineering  Urban Planning
 Mechanics of (Soil, Solid, Fluid,  Surveying
Steel)  Environmental Engineering
 Cost Estimation  Reinforced Concrete Design
 Construction Planning and  Disaster Management
Management  Engineering drawing
 Structure analysis

F.sc from govt. Delhi College (pre-engineering):

 First year 73.36%


 Second year 74.36%

Academic activity:

 Presentation on safari hill villas, including all construction material used in the project
 Presentation on construction of highway and geotextile application on highway construction
 Presentation on GPS
 Presentation on silica fumes used as replacement of cementing material
 Presentation on ‘hub Caracrete’ (process of making pavers)
 Presentation on Intra-city bus transportation system
 Designing of retaining wall on GEO-5 software
 Preparation of BORE LOG on STRATER software

Final year project:

 Development of an experimental setup for monotonic and cyclicplate load testing machine.
Project is based on steel structure analysis.

Experience:

 One month internship in Uraizee’s and partner firm.


 One month internship in Al-Ghazi builders and developers.
 4 year, 3 month experience of piling work on different projects. Here I was working
as a site engineer as well as planning engineer for Atlas Pakistan PVT (Ltd.).

 Detailed activity in Atlas Pakistan Pvt (Ltd.).


Project: 1 Karachi Shipyard and Engineering Works:
Project code: Marine and General Civil Works for Ship lift and Transfer
System.

 Casting of vertical pile/foundation pile of Diameter 1000mm and 1500mm and


the depth up to 21m to 35m pile by using Straight rotary (IMT-220, BG-22,
R-930) , Reverse rotary and Percussion machine.
 Casting of secant pile(Male and Female pile) of diameter 1500mm and depth
up to 35m by using Straight rotary (IMT-220, BG-22, R-930).
 Perform planning operation on PRIMAVERA P6.
 Perform Cost estimation for piles and calculate BBS (Bar Bending Schedule).
 Perform 3-Pile load test for the test pile by using blocks load. The test load
was 589Ton, 900Ton and 1200Ton for 36hours.
 Estimate quantity of concrete for each pile.
 Perform all tests before and after borewash, such as Marsh cone test, density
test, PH value and Sand content.
 Prepare Site reports, concrete pour slip, Bore log and inspection request for
pile layout, guide wall layout and steel cage.
 Responsible for complete documentation.
 Collecting bore log sample for each pile and identify different type of soil.
 Performing pile integrity test (PIT) for selected piles.
 Performing PDT (pile dynamic load test) on foundation pile.
 Casting of RAKER PILE/INCLINED PILE at a depth of 38m with an angle of
15degree.
 Analyze bar bending schedule of raked pile.
 Dealing with Client (KSEW), Consultant (NESPAK) and Contractor (POSCO
ENGEERING) and fulfil their requirements.
Project: 2 Karachi Central Tower.
Project code: shoring works for the construction of multistory residential
building at Clifton.

 Demobilization of machinery and all basic objects for the site.


 Casting of secant pile (male and female) across the whole boundary.
 Pile diameter was 750mm and the depth was 6.5m to 7m.
 Working as a planning engineer for the site.
 Dealing with client: central builders and developers pvt. Ltd.

Project: 3 Underpass project at Mehran hotel.

 Casting of secant piles at a diameter of 600mm and 780mm.


 Total 1230 piles casted on site at about 3.5 month by using two straight rotary
IMT-220 and SR-60.
 My key responsibility is to look over all the construction activity related to
piling works and preparing bills on half month basis.
 Different anchor pile was also casted at the basement of underpass at a depth
of 12m
 Preparing site reportsbore logs and analysis Bar Bending Schedule.
 Project tracking was also done on primavera p6.
 Dealing with client (KMC), consultant (NAA) and contractor (shamsher
khan).

Project: 4 Underpass project at Golimar.

 Casting of secant piles at a diameter of 600mm and 780mm.


 Total 575 piles casted on site before Eid break by using two straight rotary
IMT-220 and SR-60.
 My key responsibility is to look over all the construction activity related to
piling works and preparing bills on half month basis.
 Preparing site reports, bore logs and analysis Bar Bending Schedule.
 Project tracking was also done on primavera p6.
 Dealing with client (KMC), consultant (NAA) and contractor (M/S king’s
groups and CO.).

Project: 5 Piling work at PIBT Project.

 Working as a senior site engineer and project planner.


 Casting of vertical pile/foundation pile of 1.2m.
 Dealing with Korean Construction Company (as a main contractor) and china
harbor Construction Company (as a consultant).
Project: 6 Piling work at Green line Bus Project at Karachi. (From
Golimar Chowrangi to GuruMandir)

 Working as a project Engineer.


 Casting 3-test pile at 5-star, KDA- chowrangi, Sakhi Hassan Chowrangi.
 Handle all Activity Related to piling works.
 Casing of foundation pile of 900mm dia pile from straight rotary auger
machine (IMT-220)
 Prepare bar bending schedule of steel cage.
 Prepare bore-logs, pile construction reports and analyzing bills and invoices.

Rashid And Brothers Piling contractor.

 SL &v TS Project of piling work.


 Here I was working as a construction manager for piling work from June, 2016
to Aug 2016.
 I was responsible to prepare monthly invoices according to BOQ’s on interval of
every 15 days.
 Prepare running bills of steel fabricators according to bar bending schedule and
given rates of BOQ’s.
 Prepare bar bending schedule for foundation pile and secant pile.
 Designing the setup of pile load test of 1400 tons.
 Execute the load test according to the design and prepare technical report of its
results.
 Perform marsh cone test, density test, PH value test and sand content test of pile
before starting of concrete.
 Prepare daily progress report, weekly progress report and monthly progress
report and compare the actual work done as compare to planned work.
 Satisfy to main contractor and consultant and solve their quarries.

AL-Mumtaz builders:-

Project: Piling work at Mehran university (Advance Institute of water


resource engineering and management).

 Working and planning as a senior site engineer.


 Casting of vertical pile of 610mm dia.
 Performing 5-static load test of 410Tonne test pile and also casting 239 pile at
Jamshoro.
 Preparing construction site reports, bore logs.
 Manage or deal different meetings with client (USAID), consultant (Qavi
engineering limited)
 Performing pile Integrity Test (PIT) on Foundation piles.
Computer skill:

 MS-word  Geo-5
 MS-excel  MS-project
 MS-PowerPoint  AutoCAD
 MS-outlook  PRIMAVERA P6
 Strater  Internet surfing and browsing

Language skill:

 English language (including writing and speaking)


 Urdu language (including writing and speaking)

Reference:

 Reference will be furnished on request.

S-ar putea să vă placă și