METHOD STATEMENT
PROJECT: Cannon Hall Museum OUR REF: 0473/03/2017
DISTRIBUTION
Doc0164FT
METHOD STATEMENT
DESCRIPTION OF WORKS
Erect warning signage and mobile tower and check all plant is working in a satisfactory
2.
condition
Once completed and the supervisor deems area of works safe, begin cleaning process.
3.
Pre wet all stonework using the DOFF system
4. Apply via kill spray Lynobor 10 biocide to all area and leave to dwell for 2-4 hours
Thoroughly rinse down using the DOFF super heated water system 150 degrees, 2 litres
5.
per min, 30 psi and clean the stonework as much as is possible.
Once completed carefully remove by hand all failed cementitious repairs and clean out
6.
the joints , to leave dust free
Measure and install matching stone indents to original lines and profiles and fix utilising
7.
stainless steel threaded dowels (4mm) if required in conjunction with a lime mortar
De-scale all loose and flaking areas of stone using appropriate hand tools and phosphor
8.
bronze brushes back to sound surface
9. Once completed pack away all equipment and leave area in a clean and tidy condition
Doc0164FT
METHOD STATEMENT SUMMARY
PRINT DATE
Doc0164FT
ORGANISATION STRUCTURE
MANAGING DIRECTOR
ELTON TUDOR
SUPERVISORS
Scott Pearson
Iain Pearson
OPERATIVES
A Logan
C Logan
Doc0164FT
RISK ASSESSMENT - Site
HAZARD IDENTIFICATION
YES NO YES NO
Slips and Trips X Electrical X
Manual Handling X COSHH X
Hand Tools X Noise X
Excavations X Working at Height X
Machinery/Lifting Equipment X Dust/Fumes X
Fire X Lighting X
Fall of material X 3rd party (Contractor) X
WHO MIGHT BE HARMED?
YES NO YES NO
Own Personnel X Office Staff or Visitors X
Other Contractors X Members of the Public X
First Aid Reportable Major Disablement Fatal
Potential severity of injury or illness X
Happens Happens Happens on Happens Certain to
Rarely Each Year Most Jobs Regularly Happen
Probability of injury or illness X
ASSESSMENT OF RISK PRIOR TO THE IMPLEMENTATION OF CONTROL MEASURE
LOW MODERATE SUBSTANTIAL HIGH
X
PROPOSED CONTROL MEASURES TO REDUCE THE RISKS
Correct PPE to be used for specific tasks
Visual inspection to be carried out every day before commencement of work.
Operatives to exercise due diligence when at work at all times.
Induction training on-site to familiarise ourselves with the potential risks
EQUIPMENT TO BE USED
YES NO YES NO
Lifting X Cradle X
Mechanical hoist X Excavation shoring X
Mobile elevating working platform X Mechanical tools X
Ladder X Task lighting X
Hoist X CAT X
Test Equipment X Ventilation/Extraction Equipment X
Scaffolding X Lifting slings/chains X
Mobile scaffolds X Mechanical plant (State) X
PERSONAL PROTECTIVE EQUIPMENT NEEDED
YES NO YES NO
Safety Helmet – Full Air Feed/Control X Gloves X
Safety Helmet – Hard Hat X Eye protection X
Protective Footwear X Hearing Protection X
High Visibility Clothing X Overalls X
Face Respirator X Body Harness X
OVERALL ASSESSMENT OF RISK
LOW MODERATE SUBSTANTIAL HIGH ESP(Extra Special Precautions)
X
Doc0164FT
RISK ASSESSMENT – Manual Handling
TASK
YES NO
Are you holding object at a distance from the trunk? X
Is there any twisting in your movement? X
Is there bending in your posture? X
Is there a risk of sudden movement of load? X
Does it require frequent or prolonged physical effort? X
Does it occur frequently? X
Does it occur repetitively? X
INDIVIDUAL CAPACITY
Does the job require unusual height or strength? X
Does it put at risk those who are pregnant/have health problems? X
Does it require special knowledge or training to be done safely? X
LOAD
Is it heavy? X
Is it bulky? X
Is it difficult to grasp? X
Is it unstable or with content likely to shift? X
Is it sharp? X
Is it hot? X
ENVIRONMENT
Is there sufficient space? X
Is there an uneven, slippery or unstable floor? X
Are there variations in levels of floors or work surfaces? X
Is the temperature too extreme? X
Is it poorly lit? X
Doc0164FT