Documente Academic
Documente Profesional
Documente Cultură
KUMARAGURUPARAN
Telephone: 00966553440902 | E-mail: kumaranscv@yahoo.com
SUMMARY
• Nationality: Indian
CAREER OBJECTIVE
FTTH PROJECTS
Accomplishments
• Planning and Survey, assistance to design the complete metro links for
expanding the Mobily network in Riyadh region.
1
• Planning of fundamental engineering telecom network survey and
• Consultancy for the study, planning, design for As Built and new
• Consultancy for the study, planning, design for As Built and new
• Planning & Design for Civil and Fiber Infrastructure for ODN
2
• Route Selection, OSP Planning, Fiber Management, Fiber Budget
• Holds the credit for the complete planning and design for Mobily FEP
and FTTH installation projects including all necessary test acceptances
as per Mobily construction standards.
• Planning and Designing of Metro Duct banks for Mobily and STC for key
accounts, FTTM and Junction networks
• Mandrill test and acceptance for each span of the metro duct banks
and reports for further record.
• Managing FTTH projects, distribute the jobs to the Integrators for the
survey and design of FTTH Kingdom wide. Check the all survey
according to the commercial and residential users.
4
Project Manager (Mobily, Saudi Railway and Minstery Of Defense Projects)
• Accomplishments
• Planning & Survey of OSP & ISP for Mobile Sites Backhauling on GPON
resolve the bottle necks and issues in the designs issued for
construction.
• Planning to manage the Project cost within the budget as per design
• Planning for huge number of teams responsible for FTTH cable trouble
shooting and maintenance, rectifying fault registered through WFM,
Managing staff of 75+ persons including Project engineers, Supervisors
and technicians.
• Planning and study of OSP Network auditing for the implemented LDN
routes for STC approx. 3650km in 12 different sections/links. Activity
plan breakdown includes planning prior to start, revision of planning
during progressive period in order to improve the deliverables,
assessment of OSP networks status and health, Locating of buried UG
cables, recording of necessary info for the locating activities, locating
of buried 540 number of splice points, exposing of each cable ends to
make sure the right utility, test pits for detailed testing of FOC’s,
Analyzing of complete field details in comparison with existing data,
pointing out the variations as compared to as built documents,
discussion with client for approving suggestions to be implemented on
the existing networks to fix/resolve the existing issues.
Recommendations towards client to void future disaster situation,
implementation suggestions, achieving commitment in time, final
reporting and discussions with different stakeholders etc.
• Managing of OSP Network auditing for the implemented LDN routes for
Saudi Railway approx. 1200km in 2 different sections/links. Activity
breakdown includes planning prior to start, revision of planning during
progressive period in order to improve the deliverables, assessment of
OSP networks status and health, Locating of buried UG cables,
recording of necessary info for the locating activities, locating of
buried 185 number of splice points, exposing of each cable ends to
make sure the right utility, test pits for detailed testing of FOC’s,
Analyzing of complete field details in comparison with existing data,
pointing out the variations as compared to as built documents,
discussion with client for approving suggestions to be implemented on
the existing networks to fix/resolve the existing issues.
Recommendations towards client to void future disaster situation,
implementation suggestions, achieving commitment in time, final
reporting and discussions with different stakeholders etc.
6
• Implementation of on call maintenance support for Saud Railway
existing network for the length of 1200km cable. Immediately after on
call arranging detailed network survey and analysis. Based on analysis
the repairing task will be initiated to restore the fault. Study and
initiating to produce FJS for any kind of complicated networks.
• Managing of OSP Network auditing for the implemented LDN routes for
Minstery of Defense approx. 5400km in 8 different sections/links. Activity
breakdown includes planning prior to start, revision of planning during
progressive period in order to improve the deliverables, assessment of
OSP networks status and health, Locating of buried UG cables,
recording of necessary info for the locating activities, locating of
buried 1176 number of buried splice points, exposing of cable ends to
make sure the right utility, test pits for detailed testing of FOC’s,
Analyzing of complete field details in comparison with existing data,
pointing out the variations as compared to as built documents,
discussion with client for approving suggestions to be implemented on
the existing networks to fix/resolve the existing issues.
Recommendations towards client to void future disaster situation,
implementation suggestions, achieving commitment in time, final
reporting and discussions with different stakeholders etc.
OSP PROJECTS
Accomplishments
• Ensure that all changes done in the OSP Projects as per process and
the documentation are as in accordance with the approved Standard
Procedure.
• Maintain & process data sheets, interpolate data bases, analyze and
audit the data transactions between the company and the
contractors on timely basis.
7
• Responsible for complete Network design (Passive) of Smart city
Network which includes OSP design for Residential (GPON),Traffic
Signals connectivity (through fiber), Community Portal, business users
etc.
• Validate all design related to the Operator passive infrastructure
including in building and OSP cabling monitoring of the design
implementation.
• Conducting the site acceptance and assure that the site match the
Quality parameters and in parallel the KPI has been designed for the
network.
• Witness & Approve all Service Acceptance Tests based on Final design
in coordination with the Operations and maintenance.
• Review the final detailed BOQ, containing breakdown per all passive,
hardware, support, maintenance and professional services. Review the
implementation roll-out plan and comment on any discrepancies,
Follow-up on key implementations milestones.
Accountabilities
work.
down time to open and closing time frame to complete the cut-over.
• Ensure the all sub-contractors meets their obligation under the terms of
contract.
• Ensure that work operation meets with municipal approval cause least
and projects by the contractor for handling over and execute PAT
reports/templates and invoicing.
• Handling faults and repairs related with fiber optic cable damages
and proactively restoring uninterrupted services.
9
• Planning and executing Fiber Optic change over works and dealing
with scheduled outages.
• Preparing BOQ, Main WOs, and WO issues and providing work orders
to contractors with relevant drawings and relevant details.
KEY SKILLS
10
• Project Time Management:
To ensure project quality assurance and quality control (so that quality
does not overlooked or sacrificed to meet the tight project deadline.
11
• Project planning, monitoring, team tracking, resource allocation,
logistics, material management and technical support to ensure timely
and successful completion of Project. Daily reporting of the project
progress to the client.
• Manage all the issues related to FTTH BOQs/PRs/POs, RFS, PACs & FACs
of all the Mobily regions (Central/East/west) with the C&P and Finance
department Mobily.
Accomplishments-Aramco
• Conduct training for survey and planning for the new designers and
workflow enhancements
12
• Planning and Identifying staff strengths and assist in their growth and
Accomplishments-Mobily
13
Project Engineer for Aramco Project
Accomplishments
• Holds the credit for complete execution of OSP civil (Approx 79 km)
work for FTTH connectivity in Dhahran.
OSP-TELECOM PROJECTS
Accomplishments
• Efficiently handled:
WORK EXPERIENCE
14
Sep’02-Oct’10 Saudi Delta Company Ltd., Riyadh, Saudi Arabia
RF Engineer-CATV, MATV
EDUCATION
CERTIFICATION
• Certified by Saudi Delta Company Ltd. in the category of Best OSP Site
Engineer for the year of 2006, Under Khurasaniya project executed by
ABB & Sumittomo Corporation for Saudi Aramco.
15
• PMP Training Certificate for 35 PDU’s on Project Management
Workshop (Using PMI Approach). Certificate Number KSPMPRYD-June-
016
LANGUAGES
16