Sunteți pe pagina 1din 7

Online Web Page Builder

Project Proposal

Project Supervisor

Ms. Komal Hasan (Lecturer)

Project Members

Ujala Fiaz
CIIT/SP17-MCS-116/VHR

Laiba Tanveer
CIIT/SP17-MCS-135/VHR

Department of Computer Science

COMSATS University Vehari

Page I
Table of Contents
1.Introduction 1

1.1 Objective 1

1.2 Problem Statement 1

2. Project Scope 2

3. Methodology 2

4. Resource Requirement 2

4.1 Hardware Resources 3

4.2 Software Resources 3

5. Tools/Technology 3

6. Expertise of the Team Members and Work Division 3

7.Time Schedule 4

8. Milestone Description 4

9. Project Risks 5

Page II
1.Introduction:

Different number of fields require different type of public or social dealing with use of
different web applications secondly it is almost desire of a person who belongs to some
business of other fields to take services on a very low price for web designing. Our
application allows a person to use already build templates for their business or field work . It
is specifically designed for the internal use for companies. This software helps to
design graphical web pages this software is embedded in a website for professional
use and be available for customers to tailor web pages as per their need. The system
helps the user to build web pages with effective graphical user interface (GUI). User
does not have to work specifically for GUI. System will display various web page
templates, visiting cards, CV’s formats and logos according to their preference. This
system will save the time of the user and will help the user to concentrate on the main
functionality required in the web page.
This system will provide user with professional web page template. They can select
the templates based on the requirements and functionality. Here in the system user
can build whole web site by just selecting the content and images required in their
web page. User can design each and every web page in their web sites according to
their preference by selecting images and contents. User can even specify position of
the content to be placed. When user logins to the system, system will display various
templates to the user. User has to select the template. System will display various
pages of that template by clicking on the particular page he must specify the content
an image that needs to be placed in the web page. User can place the content and can
view the template simultaneously. Once the user clicks on to the submit button system
will generate the web site. System will send code and .rar file to the users email id.
User can build customer websites easily using this application. User does not have to
know any coding languages to build web pages. With the help of this system, user can
work on main functionality required in their web page.

1.2 Objective:

I. It will manage web pages.


II. It also manages visiting cards, CV’s formats and logos of different
companies.
III. User can edit their web pages by their self or by ordering to the website
admin.

1.3 Problem Statement:

Now a day’s people like different color full designs but didn’t have enough
time or abilities to design their web pages by itself. Web page builder
embedded in a website for professional use and available for customer as per
their need. The web pages will be designed automatically or manually
according to user requirements.

Page 1
2. Project Scope:

We are going to develop a web page builder for any organization. This project will
work on different categories of daily life. It has different categories like.
I. Health care.
II. Education field.
III. Business field.
IV. Entertainment.
V. News channels

This system will help people to design their web pages in simple and essay way
without any wastage of time. There will be several templates available for different
types of organizations for different purposes. Different CV formats will also be
available and different designs of logo for visiting cards will also be available.

3. Methodology:

We’re adopting prototype model for this project. The Prototyping Model is a systems
development method (SDM) in which a prototype (an early approximation of a
final system or product) is built, tested, and then reworked as necessary until an
acceptable prototype is finally achieved from which the complete system or
product can be developed. It is majorly a trial –and-error process which works in
an iterative fashion.

Requirement Quick Building


Gathering Design Prototype

Product Refining Customer


Prototype Evaluation

Figure 1: Prototype Model

Page 2
4. Resource requirement:

4.1 Hardware resources:

I. OS: Windows 10.


II. Microsoft PowerPoint.
III. Microsoft word.

4.2 Software resources:

IV. Visual studio 2015


V. SQL server 2012
VI. C#

5. Tools/Technology:

Software Utilization

Visual studio 2015 Tool to code asp.net and c#.


Microsoft MySQL server To handle database.
Argo UML To develop UML diagram.
Microsoft office Project diagram and report project.

6. Expertise of the Team Members and Work Division:

Name Reg. no Responsibility (Roles)


Ujala Fiaz SP17-MCS- Project proposal
116 Software Requirements Specification
Software Design Document.
Implementation of recruitment module
Design Interface of whole system.
Reporting of allocated module.
Test plan for the allocated modules.
Laiba SP17-MCS- Project proposal
Tanveer 135 Software Requirements Specification
Software Design Document.
Implementation of employee information
module.
Implementation of user management module.
Reporting of allocated modules.
Test plan for the allocated modules.
7. Time Schedule:

ID Deliverable Team Due Date Remar


members ks
M001 Project proposal Laiba 28-sep-2018
Ujala
M002 Software Requirements Laiba 5-oct-2018
Specification Ujala
M003 Software Design Document Laiba 20-oct-2018
(Initial Draft) Ujala
M004 System prototype Laiba 1-nov-2018
Ujala
M005 Alpha release of proposed Laiba 15-nov-2018
system Ujala
M006 Software test plan Laiba 29-nov-2018
Ujala
M007 Beta Release of Proposed Laiba 4-dec-2018
System Ujala
M008 Thesis – Initial draft Laiba 20-dec-2018
Ujala
M009 Final Product of Proposed Laiba 1-jan-2019
System Ujala
M010 Thesis –Final draft Laiba 15-jan-2019
Ujala

8. Milestone Description:

Milestone Milestone Goal

A document outline has been produced describing the


Document outline
format, content and objectives of each major section of a
complete
large document.

Document SRS A document such as a Software Requirements


complete Specification has passed peer review.

Software A complete software design of whole system will be


Design(draft) presented.

Technical The investigation of a technical issue is complete and a


investigation summary of the main issues and conclusions has been
complete presented and approved.

Compile A program compiles without errors. All the requirement


(test)complete clear

Software module A small program or function has been completed and unit
complete tested.

Software product The software product (or one of its components) has
build complete been built an it runs (not necessarily without errors).

A small unit of testing has been completed and test


Test case complete
results recorded.

A bug identified in a Software Anomaly Report (SAR) has


Bug fix complete
been fixed and the SAR closed out.

9. Project Risks:

Possibility Risk Level Preventive action


Schedule Risk Low Proper managing the
development schedule according
to requirement of the project will
reduce this risk.
Operational Risks Medium According to requirement and
leading to the supervisor we will
save from the improper
implementation of the event.
Technical risks Medium Will be handle bye own effort
and
supervisor direction.
Bad communication Low By weekly meeting we will
resolve this risk
Leave one person Low Project Scope must be reduce

Skill Medium By understanding and giving


more time will reduce this risk