Sunteți pe pagina 1din 8

JV Qualification

S.NO.

5
6

NOTE: Financial QR considered for two projects with highest tender estimate.
JV Qualification

Description

i. The bidder must have successfully erected, tested and commissioned substation of 33 KV/11 KV or 66/11KV voltage
class and its associated 33 KV/66 KV lines (as the case may be in bid) in a single turnkey contract in last 7 years as
on the date of bid opening, having installation of at least 50% of the transformation capacity (10 MVA )considered in
proposed bid (i.e. Sum of KVA ratings of Power transformers proposed in the present bid) and 50% of length of 33 KV
lines considered in proposed bid(2.5 kms), and the system so created must be in satisfactory operation for at least
one (1) year as on date of opening of bid
or

ii. The bidder must have successfully erected, tested and commissioned substation of 33 KV/11 KV or 66/11KV voltage
class and its associated 33 KV/66 KV lines (as the case may be in bid) in TWO turnkey contracts in last 7 years as on
the date of bid opening, each having installation of at least 40% of the transformation capacity considered in
proposed bid (i.e. Sum of KVA ratings of Power transformers proposed in the present bid) and 40% of length of 33 KV
lines considered in proposed bid, and the system so created must be in satisfactory operation for at least one (1) year
as on date of opening of bid
or

iii. The bidder must have successfully erected, tested and commissioned substation of 33 KV/11 KV or 66/11KV voltage
class and its associated 33 KV/66 KV lines (as the case may be in bid) in THREE turnkey contracts in last 7 years as on
the date of bid opening, each having installation of at least 30% of the transformation capacity considered in proposed
bid (i.e. Sum of KVA ratings of Power transformers proposed in the present bid) and 30% of length of 33 KV lines
considered in proposed bid, and the system so created must be in satisfactory operation for at least one (1) year as on
date of opening of bid
should have successfully erected, tested and commissioned electrical works of 33 KV/11 KV or 66 KV/11 KV
substation and its associated 33 KV/ 66 KV lines (as the case may be in bid) in a single turnkey contract in last 7
years as on the date of bid opening, having installation of at least 40% of the transformation capacity(8 MVA)
considered in proposed bid for 33/11 KV or 66/11KV substation (i.e. Sum of KVA ratings of Power transformers
proposed in the present bid) and 40% of length of 33 KV lines / 66 KV lines(2 kms) considered in proposed bid, and
the system so created must be in satisfactory operation for at least one (1) year as on date of opening of bid
should have successfully erected, tested and commissioned electrical works of 33 KV / 11 KV or 66 KV / 11 KV
substation and its associated 33 KV / 66 KV lines (as the case may be in bid) in a single turnkey contract in last 7
years as on the date of bid opening, having installation of at least 25% of the transformation capacity(5 MVA)
considered in proposed bid (i.e. Sum of KVA ratings of Power transformers proposed in the present bid) and 25% of
length of 33 KV lines / 66 KV lines(1.25 kms) considered in proposed bid, and the system so created must be in
satisfactory operation for at least one (1) year as on date of opening of bid.
i. Experience in single completed work of projects execution in electrical Transmission or sub-transmission &
distribution sector costing not less than the amount equal to 50% of the estimated amount of the project(8.91
Crores).
Or
ii. Experience in two completed work of projects execution each in electrical Transmission or sub-transmission &
distribution sector costing not less than the amount equal to 40% of the estimated amount(7.128 Crores) of the project
individually.
Or
iii. Experience in three completed work of projects execution each in electrical Transmission or sub-transmission &
distribution sector costing not less than the amount equal to 30% of the estimated amount(5.346 Crores) of the
project individually.
In case a bidder is quoting for more than one project, Pre-Qualification requirement shall be examined on the
basis of sum of project wise requirements of experience of all quoted projects

Net Worth for the each of the last three Financial Years should be positive.
Minimum Average Annual Turnover (MAAT) for best three years out of last five financial years of the bidder should
not be less than 30% of the estimated cost (5.346 Crores) of the project.

Bidder shall have liquid assets (LA) and/ or evidence of access to or availability of fund based credit facilities of not
less than 10% of the estimated cost (1.782) of the project

NOTE: Financial QR considered for two projects with highest tender estimate.
LEAD Bidder JV Partner
(SkipperSeil Limited) (JBS)

should meet jointly


(met by SkipperSeil individually by clause i)

Applicable
(met by SkipperSeil NA
Limited)

Applicable
NA (to be checked &
confirmed by JBS)

shall meet individually shall meet individually


(met by SkipperSeil (to be checked &
individually) confirmed by JBS)

shall meet individually shall meet individually


(met by SkipperSeil (to be checked &
individually) confirmed by JBS)
not less than 40% of the not less than 25% of the shall meet Total
minimum criteria criteria qualification
(met by SkipperSeil (to be checked & collectively as
individually) confirmed by JBS) weel
not less than 40% of the not less than 25% of the Will be met by
minimum criteria criteria Skipper but JBS
(met by SkipperSeil (to be checked & to check 25%
individually) confirmed by JBS) criteria
S. No. Description HALDWANI HARIDWAR RUDRAPUR ROORKEE KICCHA
Tender Value (in
1 8.62 8.35 8.2 9.2 8.53
Crores)
EMD Bid Security
2 17.26 16.72 16.42 18.4 17.08
(in Lacs)
3 Completion Period 12 months
Transformation
4 2x10MVA 2x10MVA 2x10MVA 2x10MVA 2x10MVA
capacity
5 Line Length 3.0 km 3.5 km 0.8 km 5.0 km 1.5 km

17.82 7.128
8.91 5.346
ALMORA
6.72

13.44

2x5MVA
1.31 km

S-ar putea să vă placă și