PRE-FEASIBILITY REPORT
( PFR )
AT
OF
INDEX
SN Contents Page
No.
1.0 EXECUTIVE SUMMARY 6
1.1 Salient features & environmental setting of the project 7
1.2 Production or construction area & population 10
1.3 Top soil & overburden 10
2.0 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION 10
2.(i) Identification of project and project proponent 10
2.(ii) Brief description of the Nature of the project 11
2.(iii) Need for the project and its importance to the Country and or Region 11
2.(iv) Demand – Supply Gap 13
2.(v) Imports Vs. Indigenous Production 13
2.(vi) Export Possibility 13
2.(vii) Domestic / Export Markets 13
2.(viii) Employment generation (Direct & Indirect) due to the project 13
3.0 PROJECT DESCRIPTION 14
3.(i) Type of project including interlinked and interdependent projects 14
3.(ii) Location (map showing General Location, Specific Location & Project boundary & 14
Project site layout) with coordinates
3.(iii) Details of Alternate sites considered and the basis of selecting the proposed site, 15
particularly the environmental considerations
3.(iv) Size or magnitude of operation 15
3.(v) Project description with process details (a schematic diagram / flow chart showing the 16
project layout, components of the project etc should be given)
3.(vi) Raw material required along with estimated quantity, likely source, marketing area of 16
final products, mode of transport of raw materials and finished product
3.(vii) Resource optimization / recycling and reuse envisaged in the project 17
3.(viii) Availability of water its source, energy / power requirement & source 18
3.(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their 19
management / disposal
3.(x) Schematic representation of the feasibility drawing which give information of EIA 21
purpose
4.0 SITE ANALYSIS 21
4.(i) Connectivity 21
4.(ii) Land form, land use and land ownership 22
4.(iii) Topography (along with map) 22
4.(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including 23
area under CRZ)), shortest distances from the periphery of project.
4.(v) Existing Infrastructure 25
4.(vi) Soil Classification 25
4.(vii) Climatic Data 26
4.(viii) Social Infrastructure Available 27
5.0 PLANNING BRIEF 28
5.(i) Planning Concept (Type of industries, facilities, transportation etc.) Town & Country 28
Planning / Development Authority Classification
5.(ii) Population Projection 28
5.(iii) Land Use Planning (Break-up along with green belt etc.) 29
5.(iv) Assessment of Infrastructure Demand (Physical & Social) 29
5.(v) Amenities / Facilities 29
6.0 PROPOSED INFRASTRUCTURE 30
6.(i) Industrial Area (Processing Area) 30
6.(ii) Residential Area (Non-processing area) 30
6.(iii) Green belt 30
6.(iv) Social Infrastructure 30
6.(v) Connectivity (Traffic & Transportation Road / Rail etc.) 31
6.(vi) Drinking Water Management (Source & Supply of water) 31
6.(vii) Sewerage system 31
6.(viii) Industrial Waste Management 31
6.(ix) Solid Waste Management 31
6.(x) Power Requirement & Supply / Source 33
7.0 Rehabilitation and Resettlement (R & R Plan) 33
7.(i) Policy to be adopted (Central / State) in respect of the project affected persons 33
including home oustees, land oustees and landless
8.0 PROJECT SCHEDULE AND COST ESTIMATES 34
8.(i) Likely date of start of production and likely date of completion (time schedule for the 34
LIST OF ANNEXURES
Annexure Nos. Description
Annexure No. 1 Copy of Land Allotment letter from GIDA
Annexure No. 2 Copy of the Possession Certificate
Annexure No. 3 Copy of the Land Tax Receipt
Annexure No. 4 Copy of Location Sketch issued by the concerned authority
Annexure No. 5 Copy of Judgment dt. 09-10-1998, Hon’ble High Court of Kerala ruled that
CRZ provisions are not applicable to the developed land of GIDA.
Annexure No. 6 Copy of Order of Govt. of Kerala dated 12-07-2005
Annexure No. 7 Google map superimposed with the project boundary
Annexure No. 8 Vicinity map (location map) of the project site
Annexure No. 9 Toposheet of Survey of India
Annexure No. 10 Project layout map (conceptual plan)
Annexure No. 11 Activity wise population & daily water consumption details
Annexure No. 12 Daily water consumption balance chart
Annexure No. 13 Topographical contour map of the project site
Annexure No. 14 Resolution passed by the M/s Kondhwa Projects LLP regarding authorized
signatory.
Since the built-up area of the project is more than 1,50,000 sq.m. and hence
Categorized as Category B1 (Schedule 8(b)) of EIA Notification, 2006. Therefore, as per
EIA Notification, 2006, the draft Terms of Reference (ToR) for EIA Study is prepared
based on the Standard Terms of Reference published by Ministry of Environment
Forests & Climate change on Township and Area Development Project in April, 2015.
The project site is within the highly populated urbanized area of Kochi Municipal
Corporation. The external services like storm water, road network, water supply, electric
supply etc. are available in the project vicinity.
The land for the proposed project is an extension of the Marine Drive behind the High
Court of Kerala. The land was fully developed by the Cochin Port Trust under Goshree
Island Development Authority (GIDA) scheme.
The land for the project which was part of 25 Hectares of converted land was purchased
from Goshree Island Development Authority (GIDA, a Govt. of Kerala undertaking
constituted by Govt. of Kerala under Town Planning Act on 18th May, 1994) under the
Vypeen Bridges scheme project of GIDA.
The project proponent purchased the land through auction from GIDA. The copy of the
land allotment document is enclosed at Annexure No. 1.
The possession certificate and land tax receipt in favor of M/s Kondhwa Projects LLP
(the project proponent) are provided at Annexure No. 2 & 3 respectively.
The copy of location sketch issued by the concern authority for the proposed site is
attached at Annexure No. 4.
As per the following observation of High Court of Kerala and Govt. of Kerala regarding
the applicability of CRZ on the land of GIDA is provided below :-
o Order of Hon’ble High Court of Kerala dt. 09-10-1998 in CMP No. 27517 of
1998 (the Hon’ble High Court Ruled that “Taking all aspects of the matter into
account, we find it difficult to hold prima face that the land proposed to be
reclaimed will fall within CRZ. Also Commercial construction activity is
permissible on the land ward side of the water front road proposed on the
land proposed to be reclaimed for the Vypeen Bridges project” ).
o Order of Local Self Government, Govt. of Kerala dt. 12-07-2005 stating that
the land assigned to GIDA will not fall within the CRZ.
The copy of the High Court Judgment dated 09-10-1998, Hon'ble High Court of Kerala
Rules that CRZ provisions are not applicable to the developed land of GIDA is attached as
Annexure No. 5.
Also Order of Govt. of Kerala confirm this aspect. The same is provided at Annexure
No. 6.
Mangalavanam Bird Sanctuary and its eco sensitive zone and the
project site is within 0.5 km (SE).
Interstate boundary None within 15 km. radius of the site
As per Office Memorandum dated 15-03-2010, Ministry of
Environment & Forests declared "Greater Cochin (Eloor-Edayar
Industrial Belt - about 9 km and Ambalamugal Industrial Areas -
Critically polluted area as
about 11 km)" as Critically Polluted Area as per the CEPI
identified by CPCB
(Comprehensive Environmental Pollution Index) and a moratorium
was imposed. Subsequently, vide O.M. dated 23-05-2011,
Ministry of Environment & Forests lifted the Moratorium.
Sr. Approx. Distance &
Name
No. Direction
Archeological Features
1. Mattanchery Palace (Museum), Kochi 4 km. (S)
2. St. Francis Church, Fort Kochi 4.5 km. (SW)
Approx.
Sr.
Name Distance &
No.
Direction
1. Kochi Naval Base 5.4 km. (S)
(Southern Naval Command Office)
Defense installations
2. INHS Sanjivani Hospital, Kochi Naval Base 5.3 km (S)
3. Air Force Selection Centre, Kakkanad 8.1 km. (NE)
4. Kochi CSD Depot, Kadavanthra 3 km. (SE)
5. Indian Coast Guard 3.5 km. (SW)
6. CISF Colony, Ambalamugal 10 km. (SE)
The project proponent purchased the land through auction from GIDA.
As per the land documents (Land allotment papers, possession certificate and land tax
receipt), the land ownership of the proposed land is with M/s Kondhwa Projects LLP.
Name and correspondence : Mr. Majo Joseph, Head Commercial Operations
address of the Applicant M/s Kondhwa Projects LLP
C/o M/s Sobha Limited,
5th Floor, West Wing, Jomer Symphony,
N.H. Bye-pass, Vyttila, Kochi, Kerala-682019.
Ph. No.0484-2977760 / 80 Mobile 09008329755
E-mail :- majo.joseph@sobha.com
Registered address of the : M/s Kondhwa Projects LLP
company Florida Aminity Mundhwa,
Pune, Maharashtra.
The project site is within the highly populated urbanized area of Kochi Municipal
Corporation. The external services like storm water, road network, water supply,
electric supply etc. are available in the project vicinity.
The proposed project site is located within the city limit of Kochi City.
2.(iii) NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND OR
REGION
Real estate is one of the fastest growing sectors of the Indian economy and
contributes about 5% to India's gross domestic product (GDP).
The country's economic growth is driving the demand for real estate in India.
Demand for commercial and residential space is expected to grow at a
compound annual growth rate (CAGR) of 19% between 2010 and 2014 - Tier 1
metropolitan cities are expected to account for about 40% of this. The top three cities
- Mumbai, the NCR and Bengaluru account for 46% of total office space demand in
India.
Indian real estate sector is the fourth largest sector in terms of foreign direct
investment (FDI) in the country.
Growing requirements of space from sectors such as education and healthcare
provide opportunities in the real estate sector. Growth in the number of tourists has
resulted in a demand for multi branded retail showrooms / serviced apartments /
tourist facilities etc.
With some big national players holding land in Kerala, commercial and residential
property prices are also shooting up. Marin Drive, Kochi, the prime location in the
Kochi City that have emerged as the hottest in terms of both demand and value. A
multitude of residential / commercial / office space projects are already on the
development track in the places.
All such developments have brought wonders to the prospects of real estate in
Kerala and its economy has been growing resulting in making high killings.
Investors are also eyeing the plots near Kochi in Kerala. Located in the proximity to
railway station, beach, and other important places.
The upcoming office spaces / shopping complexes / commercial establishments /
apartments in Kerala will feature an array of amenities including covered exclusive
parking, landscaped garden, health club, high-speed lifts, and swimming pool. Apart
from this, the focus is also concentrated on the quality construction. The new building
constructions are built using the best available raw materials and most of them have
a modular kitchen, granite flooring and decent bathroom accessories.
The arrival of event management companies and booming industrial sectors of
Kerala have played a pivotal role in changing the commercial real estate scenario of
the state, which is on a constant rise.
Investments in Kerala real estate promise high returns in the wake of upcoming
constructions. Kerala, emerging as one of the progressive states thus beckons the
prospective investors from all walks of life.
The mixed use development activities in the building construction sector bring about
gains in gross domestic product, i.e. there is though a minor contribution by the
proposed project but will add to gains in G.D.P. (Gross Domestic Product). A total of
25,565 Persons will be employed in the proposed project after full occupancy during
operation phase. It will create employment (though marginally) for local population.
Applicant will pay taxes / duties to Govt. of Kerala, direct and indirect taxes will be paid
thereby contributing to the Regional Revenue. The public revenue will further be put for
infrastructural development and other sectors like health, education and social welfare.
about 25,565 Persons (employment opportunities after full occupancy) and about
2,500 persons (indirect employment).
M/s Kondhwa Projects LLP proposes to construction of Mixed Land use project at GIDA
Land in Sy. Nos. 843/14, 843/15, Ernakulam Village, Kochi Municipal Corporation,
Kanayannur Taluk, Ernakulam District, Kerala.
The project site is within the highly populated urbanized area of Kochi Municipal
Corporation. The external services like storm water, road network, water supply, electric
supply etc. are available in the project vicinity.
The land for the proposed project is an extension of the Marine Drive behind the High
Court of Kerala. The land was fully developed by the Cochin Port Trust under Goshree
Island Development Authority (GIDA) scheme. The project proponent purchased the
land through auction from GIDA.
The geographical location of the project site with respect to the project site is given
below:-
Latitude (N) 09°59'31.36"N to 09°59'40.30"N
Longitude (E) 76°16'22.02"E to 76°16'13.17"E
The google map superimposed with project boundary showing location of the site
area is provided at Annexure No. 7.
The vicinity map (location map) of the project site showing the location of project site
is attached at Annexure No. 8.
The toposheet of Survey of India showing the proposed site is enclosed at Annexure
No. 9.
The project site is within the highly populated urbanized area of Kochi Municipal
Corporation. The external services like storm water, road network, water supply, electric
supply etc. are available in the project vicinity. Hence no alternate site considered.
The land for the proposed project is an extension of the Marine Drive behind the
High Court of Kerala. The land was fully developed by the Cochin Port Trust under
Goshree Island Development Authority (GIDA) scheme. The project proponent
purchased the land through auction from GIDA.
The proposed development is in plot area of 4.7632 ha. with total built-up area of
2,94,929.63 sq.m.
Since the built-up area of the project is more than 1,50,000 sq.m. and hence
Categorized as Category B1 (Schedule 8(b)) of EIA Notification, 2006. Therefore, as
per EIA Notification, 2006, the draft Terms of Reference (ToR) for EIA Study is
prepared based on the Standard Terms of Reference published by Ministry of
Environment Forests & Climate change on Township and Area Development Project
in April, 2015.
About 3-4 mini buses for transportation of workers and about 10-15 four wheelers of
senior staff and contractors, visitors, suppliers and about 20-25 two wheelers is
expected.
Thus, the impact due to movement of trucks will be marginal and well within the
carrying capacity of the roads. The expected quantity of raw materials required for
building construction is given below :-
The construction materials would be brought from local suppliers available in the
area. Tippers/ trucks will be used for transportation of the same with average daily
consumption.
Operation phase :-
It is proposed to construct roof rain water storage tanks with total capacity of
8,680 KL within the site which will be use concurrent use as source of water and also
stored it for meeting the water requirement during non-rainy days, thereby conserve
the fresh water.
The sewage generated at site will be treated and recycled within the site for meeting
the water requirement of flushing purposes, gardening purposes and make-up water
requirement for cooling towers attached with the HVAC system and incase of any
excess treated sewage from STP will be discharged as per the KSPCB norms to the
Corporation drain.
The treatment scheme proposed for the domestic sewage is Sequential Batch
Reactor and Tertiary Treatment with UV method for disinfection and ultra filtration
(UF).
The activity wise population & daily water consumption details is attached at
Annexure No. 11.
The daily water consumption balance chart is given at Annexure No. 12.
POWER
The total power requirement will be 11,645 kW during operation phase. The source
of electricity will be from the supply of Kerala State Electricity Board (KSEB). Also
provision of D.G. sets (3,000 kVA x 7 nos.) as standby source during operation
phase.
Construction phase :-
Construction & Demolition Waste, Rule 2016 will be followed for handling of solid
waste from the site during construction phase.
Solid waste generation from the project during construction phase will be about
100 Kg/day and domestic sewage will be about 27 KL/day. The non-biodegradable
waste and other packaging material will be sold to the vendors. The bio-degradable
solid waste will be disposed in a bio-bin system for microbial composting and a
mobile STP for the treatment of domestic sewage from the labour colony.
Operation phase :-
e-Waste :-
Discarded computer parts, monitor, key boards etc. constitutes e-waste and this
waste will be stored in an earmarked area.
E-waste will be generated after 4-5 years latency period
Separate earmarked space will be provided for e-waste storage.
E-waste will be disposed as per E Waste (Management & Handling) Rules.
All the e-waste Generated in the proposed project will be disposed through
M/s Kerala Enviro Infrastructure Ltd. (KEIL), a KSPCB approved agency.
Hazardous waste
As per Hazardous Waste (Management & Handling Rules), the hazardous waste
i.e., the used oil from D.G. sets, discarded oil filters and discarded batteries and
stored separately and will be disposed to CPCB / SPCB authorized vendors only.
M/s Perfect Alloys, Chengannur, M/s Peejay Enterprises, Thiruvalla, M/s Excel
Petrochemicals, Kochi and M/s Cee Jee Lubricants, Aluva are the approved
recyclers for discarded batteries & used oil located in Kerala.
Also, domestic hazardous waste would be generated like discarded paint drums,
pesticide cans, CFL bulbs, tube lights, expired medicines, broken mercury
LIQUID WASTE:
Domestic Sewage :- The total domestic sewage about 1,080 KL/day will be
generated which will be treated through the proposed Sewage Treatment Plant of
capacity 1,220 KLD to be installed within the project premises.
The treatment scheme proposed for the domestic sewage is Sequential Batch
Reactor and Tertiary Treatment with UV method for disinfection and ultra filtration
(UF).
Since the total built-up area of the project is more than 1,50,000 sq.m. and hence
Categorized as Category B1 (Schedule 8(b)) of EIA Notification, 2006. Therefore, as
per EIA Notification, 2006, the draft Terms of Reference (ToR) for EIA Study is
prepared based on the Standard Terms of Reference published by Ministry of
Environment Forests & Climate change on Township and Area Development Project
in April, 2015.
LAND OWNERSHIP
As per the land documents (land allotment papers, possession certificate and land tax
receipt), the land ownership of the proposed land is with M/s Kondhwa Projects LLP
(the project proponent).
The highest elevation of the site area is 1.713 m AMSL (W) and lowest level is
0.71 AMSL (E). As per the contour drawing, the slope from west east direction of the
property. The proposal land is flat land with level difference of about +0.5 m. No
habitant are located in the project site. There exists site office, temporary shed with
small structure / building at site.
The topographical contour map of the project site is attached at Annexure No. 13.
During the proposed development of the site, the existing structures will be removed
from the site.
The project site is within the highly populated urbanized area of Kochi Municipal
Corporation. The external services like storm water, road network, water supply,
electric supply etc. are available in the project vicinity. The proposed project site is
located within the city limit of Kochi City.
CRZ Area Vide Judgment dt. 09-10-1998, Hon’ble High Court of Kerala ruled
that CRZ provisions are not applicable to the developed land of
GIDA. Also Order of Govt. of Kerala confirm this aspect.
matter and plant nutrients. The major crops grown are coconut, tapioca, rubber,
areacanut, pepper, cashew and spices. Small patches of hydromorphic saline soil
are encountered in the coastal tracts of the district in Kanayannur and Cochin taluk.
The tidal backwaters contribute to the salinity of the soil. Coconut is grown in these
soils. Brown hydromorphic soil is the second most prevalent soil type of the district
and they are encountered in valley bottoms. The soil is enriched in clay content and
plant nutrients. The soil is suited for paddy cultivation. Riverine alluvium is restricted
to the banks of rivers and their tributaries. They are composed of sandy to clayey
loam and are enriched in plant nutrients. It is suited for a large variety of crops like
coconut, paddy arecanut, pepper, vegetables etc. In Cochin taluk and the western
parts of Paravur and Aluva taluk coastal alluvium is encountered and is composed of
sand and clay. Coconut is the major crop in these soils.
(Secondary Source :- District Survey Report of Ernakulam District published by
Department of Mining & Geology, Govt. of Kerala).
The project site prior was part of Vembanadu back waters and reclamation of the
back water was carried out by Cochin Port Trust and after reclamation the converted
land was handed over to Goshree Islands Development Authority. The project
proponent did not carry out any reclamation works.
During operation phase the following facilities are provided within the project site :-
Proposed project is mixed land development which consists :-
Commercial retail area / shopping area
Cinema Hall
Office area with associated activities with supporting infrastructure facilities.
Also, the detailed list is elaborated in Form-1 (item no. 9 of Environment Sensitivity).
The site is very well connected by road / rail, district headquarter and to the nearest
towns / cities. The area is self sufficient to cater the needs of the project. These details
are already elaborated.
The detailed list is provided in Form-1 (item no. 9 of Environment Sensitivity).
The treatment scheme proposed for the domestic sewage is Sequential Batch Reactor
and Tertiary Treatment with UV method for disinfection and ultra filtration (UF).
to the vendors. The bio-degradable solid waste will be disposed in a bio-bin system for
microbial composting.
Operation phase :-
Municipal Solid waste
The proposed project will generate about 5.45 tons/day.
The Solid Waste Management Rules, 2016 will be followed in the Solid Waste
Disposal Mechanism at the site during operation phase.
Collection & segregation within the site (bio-degradable waste (green bins), non-
biodegradable waste (blue bins) and domestic hazardous waste (yellow bins).
The recyclable waste like packaging material, paper etc. would be sold through
approved vendors.
The Bio-degradable waste would be disposed through the Organic Waste
Converter (OWC) system to be installed within the site.
e-Waste :-
Discarded computer parts, monitor, key boards etc. constitutes e-waste and this
waste will be stored in an earmarked area.
E-waste will be generated after 4-5 years latency period.
Separate earmarked space will be provided for e-waste storage.
E-waste will be disposed as per E Waste (Management & Handling) Rules.
All the e-waste Generated in the proposed project will be disposed through M/s
Kerala Enviro Infrastructure Ltd. (KEIL), a KSPCB approved agency.
Hazardous waste
As per Hazardous Waste (Management & Handling Rules), the hazardous waste
i.e., the used oil from D.G. sets, discarded oil filters and discarded batteries and
stored separately and will be disposed to CPCB / SPCB authorized vendors only.
M/s Pefect Alloys, Chengannur, M/s Peejay Enterprises, Thiruvalla, M/s Excel
Petrochemicals, Kochi and M/s Cee Jee Lubricants, Aluva are the approved
recyclers for discarded batteries & used oil located in Kerala.
Also, domestic hazardous waste would be generated like discarded paint drums,
pesticide cans, CFL bulbs, tube lights, expired medicines, broken mercury
thermometers, used batteries, used needles and syringes and contaminated gauge etc.
generated.
The project site is within the highly populated urbanized area of Kochi Municipal
Corporation. The external services like storm water, road network, water supply, electric
supply etc. are available in the project vicinity.
The land for the proposed project is an extension of the Marine Drive behind the High
Court of Kerala. The land was fully developed by the Cochin Port Trust under Goshree
Island Development Authority (GIDA) scheme. The project proponent purchased the
land through auction from GIDA.
The land for the project which was part of 25 Hectares of converted land was purchased
from Goshree Island Development Authority (GIDA, a Govt. of Kerala undertaking
constituted by Govt. of Kerala under Town Planning Act on 18th May, 1994) under the
Vypeen Bridges scheme project of GIDA.
The land ownership is with M/s Kondhwa Projects LLP (the project proponent).
There are some of temporary sheds / structures / building existing at site which will be
cleared from the site.
There is no rehabilitation and resettlement. Also, there is no habitation in the site area,
therefore rehabilitation & resettlement plan is not required / applicable for this project.
region is also likely to develop a number of shopping, hotel, office space, institutional
and amusement facilities within the vicinity thereby, further stimulating the local
economy.
The proposed project is a mixed land use building construction project and thereby the
living index of the people around the project site will definitely improve. Also there will
be various ancillary activities like convenient shops, transport facilities etc. attached to
the project which will benefit the local people and change their living condition. Other
socio-economic benefits are :-
Meeting the house hold items with multi brands to the local community.
Increased businesses with local spending on goods and services;
Entertainment facilities like Cinema hall in the local community.
Office space requirement to the local community which increase the employment
opportunities / business activities in the area.
An increase in business and community confidence in the continuing of
prosperity for the project area;
Financial contribution to the State government through the payment of taxes and
duties thus enabling the State to invest in infrastructure development.
The copy of the Resolution passed by the M/s Kondhwa Projects LLP regarding
authorized signatory is attached at Annexure No. 14.
************************
Project
Site
Annexure No. 8
VICINITY MAP OF THE SITE & SURROUNDINGS
Project site
Annexure No. 9
TOPOSHEET OF SURVEY OF INDIA MARKED WITH PROJECT SITE
Project site
SITE LAYOUT MAP (CONCEPTUAL PLAN) Annexure No. 10
Annexure No. 11