Documente Academic
Documente Profesional
Documente Cultură
2SHUDWLRQ +/$%(
Document No.
Edition : A
2XWGRRU7UDQVIRUPHU%XVKLQJ Date : 29.11.02
57.)N9.6,7 Page : 1 of 14
6HULHV&25,3 Amendments :
&RQWHQWV
*(1(5$/'(6,*1
3$&.,1*
%XVKLQJ6XSSO\&RQGLWLRQV
7UDQVSRUW&DVH
/LIWLQJRIWKH%XVKLQJ+DQGOLQJ
5HSDFNLQJIRU)XUWKHU7UDQVSRUW
6725$*(
3URFHHGLQJVDIWHU,QH[SHUW6WRUDJH
,167$//$7,21$1'&200,66,21,1*
7HUPLQDO
&OHDQLQJ'HDHUDWLRQDQG5HVWLQJ7LPH
0HDVXULQJWDS
6(59,&($1'0$,17(1$1&(
63$5(3$576$1'5(3$,5
6SDUH3DUWV
5HSDLU
$33(1',;
*HQHUDO'HVLJQ+/-0
+DQGOLQJRIWKH%XVKLQJ+/-0
7HUPLQDO+/-
0HDVXULQJ7DS+/$%(
Micafil AG. All rights reserved for this document and the presented objects. Duplication, publication to thirds or utilisation beyond the
agreed purpose without ‘ s written agreements is not permitted.
200360 E komplett.doc
+/$%(
,QVWUXFWLRQVIRU(UHFWLRQ 2SHUDWLRQ
Edition A Page 2 of 14
*HQHUDO'HVLJQ
See drawing HLJM 157834
The main insulation of the bushing consists of an insulating body made of resin impregnated
paper with aluminium layers for capacitive grading.
For installation on the transformer a main flange is fixed oil-tight on the insulating body.
To protect the insulating body from environmental pollution, humidity or ultraviolet radiation,
it is covered with composite insulator.
In the head of the bushing a cable bolt is installed for the connection of the draw lead. A
tightening cover with O-rings is installed between the cable bolt and the central tube of the
bushing.
For the measurement of the capacitance and the dissipation factor of the bushing, a self
grounding test tap is installed in the main flange.
3DFNLQJ
%XVKLQJ6XSSO\&RQGLWLRQV
For protection against damages, the bushings are dispatched in wooden transport cases.
The stem conductor is assembled in the bushing. The lower bushing end is protected
against humidity by a plastic bag with a drying cartridge.
7UDQVSRUW&DVH
Gross and net weight, as well as the dimensions are given in the dispatch notice.
/LIWLQJRIWKH%XVKLQJ+DQGOLQJ
(see drawing HLJM148404)
5HPRYLQJWKHEXVKLQJIURPWKHFDVH
Small types can be taken out by hand, larger types need rope and lifting gear.
%ULQJLQJWKHEXVKLQJLQWRYHUWLFDOSRVLWLRQ
The easiest way is by means of two lifting gears and two ropes. One end of the rope is slung
around sheds near the top, the other end is fixed with a hook in the lifting eye at the main
flange. The bushing is lifted first with both lifting gears and the flange end lowered down
afterwards.
$WWHQWLRQ The bushing mustQRW be put down with the lower end to the floor because the
shielding electrode might be damaged.
The bushing should QRW be turned into vertical position with only one rope. The
bushing can slip through and fall down.
5HSDFNLQJIRU)XUWKHU7UDQVSRUW
It is necessary to ensure that the quality of packing, the protection against humidity and
damages, is as good as on delivery.
MICAFIL AG
Badenerstrasse 780, CH-8048 Zürich, Postfach Telefax 01 / 435 64 44; Telefon 01 / 435 63 33
+/$%(
,QVWUXFWLRQVIRU(UHFWLRQ 2SHUDWLRQ
Edition A Page 3 of 14
6WRUDJH
Concerning the storage of the bushing, the location (outdoors, rain protected or indoors) and
the duration of storage (short, medium or long term) must be taken into account. If
necessary a storage container can be ordered from Micafil AG.
&DXWLRQ Generally the moisture protection of the bushing must be mounted all
times.
2XWGRRUSURWHFWHGIURPUDLQ ,QGRRU
6KRUWWHUP In original transportation box, covered with In original transportation box or unpacked.
max.1 year plastic.
Recommended:
Additional moisture protection with a
second plastic bag and desiccant
cartridge.
1RWH
%XVKLQJVZKLFKKDYHEHHQVWRUHGLQVWRUDJHFRQWDLQHUVFDQEHXVHGHYHQDIWHUORQJ
WHUPVWRUDJHZLWKRXWDQ\IXUWKHUWHVWLQJRIWKHEXVKLQJ
MICAFIL AG
Badenerstrasse 780, CH-8048 Zürich, Postfach Telefax 01 / 435 64 44; Telefon 01 / 435 63 33
+/$%(
,QVWUXFWLRQVIRU(UHFWLRQ 2SHUDWLRQ
Edition A Page 4 of 14
3URFHHGLQJVDIWHU,QH[SHUW6WRUDJH
If it is suspicious whether the storage conditions are conform to the table afore, it is possible
that humidity has entered into the insulation by a diffusion process. This must be confirmed
by capacitance and power factor measurement at about 10 kV. If the deviation of the power
factor is too big, please contact Micafil AG for further information about the drying procedure.
,QVWDOODWLRQDQG&RPPLVVLRQLQJ
7HUPLQDO
See drawing HLJ 579423.
The cable bolt (5) can be taken out of the central tube after removing the cover nut (2)
together with the tightening cap (4). For insertion of the cable bolt into the central tube from
the transformer side of the bushing, the fixation ring (3) and the tightening cover (4) must be
removed from the cable bolt.
In order to withstand the transient voltages between conductor cable and central tube, the
conductor cable should be covered with an insulation layer of about 1mm.
An appropriate hole for soldering in the cable conductor, should first be drilled into the cable
bolt (max. ∅ 35mm and max. hole depth 70mm). The connection can be done by soldering
or brazing. According to the recommendations of the manufacturer of the pressing tool,
crimping is also possible.
After connecting the draw lead, the deaeration screw (1) has to be exchanged with a ring
screw M12 (acc. DIN 444A or similar; max. ∅ 28mm) for pulling the cable bolt through the
bushing by a rope. The tightening cover (4), the fixation ring and the cover nut must be
placed on the rope before pulling the cable bolt through the central tube. Then the cable bolt
with the draw lead is to be inserted into the bushing. Afterwards, the tightening cover with
the O-rings is to be inserted between the cable bolt and the central tube, and the fixation ring
is to be put into one of the grooves of the cable bolt. Now the cable bolt can be fixed with the
cover nut (width between flats: 40 mm) with a torque of 50 Nm. After removing the ring
screw, the deareation screw (1) must be reinstalled.
$WWHQWLRQ
,I WKH GHDHUDWLRQ VFUHZ LV QRW LQVWDOOHG SURSHUO\ ZDWHU FDQ HQWHU GLUHFWO\ LQWR WKH
WUDQVIRUPHU
&OHDQLQJ'HDHUDWLRQDQG5HVWLQJ7LPH
The bushing must have environmental temperature before installation to avoid condensation
on the bushing surface.
The lower part of the bushing must be cleaned thoroughly with a clean, dry and non-fluffy
fabric before installation.
The transformer can be evacuated with mounted bushings. If the transformer is evacuated
while it is being filled, the central tube must not be deaerated.
MICAFIL AG
Badenerstrasse 780, CH-8048 Zürich, Postfach Telefax 01 / 435 64 44; Telefon 01 / 435 63 33
+/$%(
,QVWUXFWLRQVIRU(UHFWLRQ 2SHUDWLRQ
Edition A Page 5 of 14
If the bushing is not evacuated, the central tube must be deaerated with the deareation
screw at the top end of the conductor.
$WWHQWLRQ $IWHUGHDHUDWLQJWKHFHQWUDOWXEHRIWKHEXVKLQJLWLVQHFHVVDU\WRFRQWURO
LIWKHGHDHUDWLRQVFUHZLVIL[HGWLJKWO\
+LJKYROWDJH≥8Q9VKRXOGEHDWWDFKHGWRWKHEXVKLQJHDUOLHVWKRXUV
DIWHUILOOLQJWKHWUDQVIRUPHUZLWKRLO
0HDVXULQJWDS
See instruction HLAB200203E.
$WWHQWLRQ )RUFRQQHFWLRQRQO\XVHWKHSOXJDFFRUGLQJWR+/-0ILJ RU DQ
DGDSWHUSOXJDFFRUGLQJWRILJ1HYHUIRUFHWKHJURXQGLQJVSULQJZLWKD
WRRO,QVHUYLFHWKHFRYHURIWKHPHDVXULQJWDSPXVWEHLQVWDOOHG
MICAFIL AG
Badenerstrasse 780, CH-8048 Zürich, Postfach Telefax 01 / 435 64 44; Telefon 01 / 435 63 33
+/$%(
,QVWUXFWLRQVIRU(UHFWLRQ 2SHUDWLRQ
Edition A Page 6 of 14
6HUYLFHDQG0DLQWHQDQFH
Before putting the bushing into service, carry out a measurement of dissipation factor tan δ
and capacity C1 between high voltage lead and test tap at a voltage up to 10 kV in order to
have a reference for later checks.
The bushings do not need any maintenance.
6SDUH3DUWVDQG5HSDLU
6SDUH3DUWV
When ordering spare parts always indicate the serial number and the type of bushing.
5HSDLU
Repair only according to Micafil AG instructions. For this, give the serial number and the type
of bushing and an exact description of the damage.
$SSHQGL[
*HQHUDO'HVLJQ +/-0
MICAFIL AG
Badenerstrasse 780, CH-8048 Zürich, Postfach Telefax 01 / 435 64 44; Telefon 01 / 435 63 33
RIP - Technology for SF6 / Oil - Bushings
2
Technical Data and Dimensions
Dimension Flange dimensions for: RTKG 72.5 -350 / 2000
drawing D13 RTKG 72.5 -350 / 2500
4 x M12 D14 Aluminium, RTKG 123 -550 / 2000
25 deep silver plated RTKG 123 -550 / 2500
RTKG 145 -650 / 2000
80
RTKG 170 -750 / 2000
22.5°
D10
45
L2
D9 °
Sealing area
A Ra = 1.6 (N7)
D8 View A:
D12
D11
SF6 side
s2
B
LF
Test tap
s1
L
L6 20
n11 x Øw
D1 Sealing area
Ra = 3.2 (N8) De-aeration of transformer
opposite to test tap 22.5°
L16
Grounded D2 45
length °
D5
20
D4
D3
Oil side
115
n3 x Øv
20
22.5
22.5° 11.5° ° 11.5° 22.5
°
45
°
View A:
D11
D12
D11
D12
D11
D12
SF6 side
View B:
D4
D3
D4
D3
D4
D3
Oil side
M12 (2 x 180°) M12 (2 x 180°) M12 (2 x 180°) M12 (2 x 180°) M12 (2 x 180°) M12 (2 x 180°)