Proposed Construction of
“Park Avenue”
at
by
1
Address. 9th Floor, A-Tower, ICC Building, Ring Road,
Surat 395002, Gujarat
E-mail. vsquaredevelopers02@gmail.com
Fax No. -
24. Whether there is any litigation pending against There is no litigation pending against the project
the project and/or land in which the project is and/or land in which the proposed project to be set
proposed to be set up? up.
(a) Name of the Court
(b) Case No.
(c) Order/Directions of the Court, if any and its
relevance with the proposed project.
2
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause
physical changes in the locality (topography, land use, changes in water bodies, etc.)
2. Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short supply):
4.7 Construction or demolition wastes. Yes Constructional waste will be utilized during
internal road making etc.
4.8 Redundant machinery or equipment. No None.
4.9 Contaminated soils or other materials. No Not Applicable.
4.10 Agricultural wastes. No Not Applicable.
4.11 Other solid wastes. No None.
7. Risks of contamination of land or water from releases of pollutants into the ground or into
sewers, surface waters, groundwater, coastal waters or the sea:
8. Risk of accidents during construction or operation of the Project, which could affect human
health or the environment
9. Factors which should be considered (such as consequential development) which could lead
to environmental effects or the potential for cumulative impacts with other existing or
planned activities in the locality.
8
(III) Environmental Sensitivity
9
I hereby give an under taking that the data and information given in the application and enclosure are true
to the best of my knowledge and belief and I am aware that if any part of the data and information
submitted is found to be false or misleading at any stage, the project will be rejected and clearance given,
if any to the project will be revoked at our risk and cost.
Date: 02/12/2017
Vishnu Goenka
(Partner)
V Square Developer
9th Floor, A-Tower, ICC Building,
Ring Road, Surat 395002,
Gujarat
10
LIST OFANNEXURE
ANNEXURE
TITLE
NO.
I LAYOUT OF PROPOSED PLAN (CONSTRUCTION WORKS)
II WATER REQUIREMENT AND ITS SOURCE
III SUPPORTING INFRASTRUCTURE AND FACILITY
11
ANNEXURE – I
LAYOUT OF PROPOSED PALN (CONSTRUCTION WORKS)
12
ANNEXURE – II
WATER REQUIREMENT AND ITS SOURCE
During Construction Phase total water requirement shall be met through Ground. Domestic waste water
shall be generated during construction phase which will be disposed off through SMC drainage.
During Operational Phase total water requirement shall be met through SMC water supply. Domestic
waste shall be generated during operational phase which will be disposed off through drainage system of
SMC.
13
ANNEXURE – III
SUPPORTING INFRASTRUCTURE & FACILITY
A. INTERNAL FACILITIES:
1. Earthquake proof, R.C.C. Design
2. Basement Parking and ground floor parking
3. Building Details
14