Ref. Overall Equipment Effectiveness Calculator Spreadsheet
Ref.
Total
Batch or Total Scheduled Unscheduled Operating Ideal Run Availability Performance
Machine
Product
Scrap 1 Scrap 2
Production
Available
Downtime Downtime Time Rate Rate Rate
Quality Rate OEE
Time
1 1 3 298 400 20 78 302 1.25 79.5% 78.9% 98.7% 61.9%
2 2 5 312 400 20 80 300 1.1 78.9% 94.5% 97.8% 73.0%
3 0 0.0%
4 0 0.0%
5 0 0.0%
6 0 0.0%
7 0 0.0%
8 0 0.0%
9 0 0.0%
10 0 0.0%
3 8 610 800 40 158 602 1.18 79.2% 86.2% 98.2% 67.1%
Plantrun systems automate OEE data
collection, reporting and analysis, saving
staff time and providing highly accurate
information on demand. To find out more
click here www.plantrun.co.uk
Date
Ref. Overall Equipment Effectiveness Calculator Spreadsheet
Ref.
Total
Batch or Total Scheduled Unscheduled Operating Ideal Run Availability Performance
Machine
Product
Scrap 1 Scrap 2
Production
Available
Downtime Downtime Time Rate Rate Rate
Quality Rate OEE
Time
1 1 3 298 400 20 78 302 1.25 79.5% 78.9% 98.7% 61.9%
2 2 5 312 400 20 80 300 1.1 78.9% 94.5% 97.8% 73.0%
3 0 0.0%
4 0 0.0%
5 0 0.0%
6 0 0.0%
7 0 0.0%
8 0 0.0%
9 0 0.0%
10 0 0.0%
3 8 610 800 40 158 602 1.18 79.2% 86.2% 98.2% 67.1%