Sunteți pe pagina 1din 7

Via Renata, Puncak

7 March 2018
By J. Indri Prijatmodjo and Abdul Muhaimin
Agenda
 Overview
 Parameters
 Trade Offs
 Example

Satellite Link Budget Analysis -Link Budget Workshop Session


7 March 2018
Overview
KOMPONEN SATELIT
(PAYLOAD)

EIRP
satelit

PFD
G/T

KOMPONEN
JALUR PROPAGASI
FSLup, Atm att., FSLdn, Atm att.,
(Rain att.) (Rain att.)

KOMPONEN EIRP
Grx
STASIUN BUMI Stasiun bumi

Gtx D/C
HPA Ptx LNA
Ptx’ H/C
W/G

Satellite Link Budget Analysis -Link Budget Workshop Session


7 March 2018
Parameters
 Transponder Loading and Utilization
 Single Carrier Operation
 Multi Carrier Operation
 Carrier in Carrier Operation

 Link Budget Optimization


 Required Transponder Resources
 Throughput
 Receive Dish Size
 Availability
 Transmit Power
 Availability
 Balanced and Optimum Link Budget

Satellite Link Budget Analysis -Link Budget Workshop Session


7 March 2018
Design Trade Off (1)
 Goals
 Business
 Throughput
 $/Mbps
 User equipment distribution

Satellite Link Budget Analysis -Link Budget Workshop Session


7 March 2018
Design Trade Off (2)
 Goals
 Engineering
 Space Segment
 RF Sub System

 Antenna Sub System

 Power Sub System

 Ground Segment
 RF Sub System

 Antenna Sub System

Satellite Link Budget Analysis -Link Budget Workshop Session


7 March 2018
Thank You

Satellite Link Budget Analysis -Link Budget Workshop Session


7 March 2018

S-ar putea să vă placă și