WORK ITEM BREAKDOWN

CONTOH - 1
Project Name : Paket RBI Inspection Methode :
: o Hardness Test Inspection
: o Replication Test
: o Steel test (Magnetic Flux Leakage Test)
: o Steel test (Eddy Curent Test) Inspection
: o UT Phased Array Inspection
: o Steel test (Eddy Curent Test) Inspection

Work Package No : (TA-SD)-ME-0026 2.250.000,00


WO No : RRBI19-TA
Work Period : MARCH 2020 TENTATIVE

Unit Rate
No. Deskripsi Qty Satuan Tools/ Total Keterangan
Material Upah Total
Consumable

A. RBI Inspection Methode Hardness Test Inspection


Hardness Test Inspection for E-0201
1 1 unit
(Include Tools & Man Power)
Hardness Test Inspection for E-0501
2 1 unit
(Include Tools & Man Power)

B. RBI Inspection Methode Replication Test


Replication Test for E-0201
1 1 unit
(Include Tools & Man Power)

C. RBI Inspection Methode Steel test (Magnetic Flux Leakage Test) Inspection
Steel test (Magnetic Flux Leakage Test) Inspection
1 1 unit
for E-0211 (Include Tools & Man Power)

Steel test (Magnetic Flux Leakage Test) Inspection


2 1 unit
for E-0217 (Include Tools & Man Power)

Steel test (Magnetic Flux Leakage Test) Inspection


3 1 unit
for E-0212A (Include Tools & Man Power)

Steel test (Magnetic Flux Leakage Test) Inspection


4 1 unit
for E-0212B (Include Tools & Man Power)

Steel test (Magnetic Flux Leakage Test) Inspection


5 1 unit
for E-0208 (Include Tools & Man Power)

Steel test (Magnetic Flux Leakage Test) Inspection


6 1 unit
for E-0312 (Include Tools & Man Power)

D. RBI Inspection Methode Steel test (Eddy Curent Test) Inspection


Steel test (Eddy Curent Test) Inspection for E-
1 1 unit
0213A (Include Tools & Man Power)
Steel test (Eddy Curent Test) Inspection for E-
2 1 unit
0213B (Include Tools & Man Power)

E. RBI Inspection Methode UT Phased Array Inspection


UT Phased Array Inspection for E-0208 (Include
1 1 unit
Tools & Man Power)
UT Phased Array Inspection for E-0501 (Include
2 1 unit
Tools & Man Power)
UT Phased Array Inspection for E-0502 (Include
3 1 unit
Tools & Man Power)
UT Phased Array Inspection for R-0502 (Include
4 1 unit
Tools & Man Power)
F RBI Inspection Methode UT Flaw Inspection
UT Flaw Inspection for Z-4201-X1-F1A, Z-4201-
1 X1-F1B 1 unit
(Include Tools & Man Power)
UT Flaw Inspection for Z-4201-X1-F1A, Z-4201-
2 X1-F1B 1 unit
(Include Tools & Man Power)

Total

D Dokumen yang harus disertakan dalam penawaran harga :


a. Surat penawaran yang ditandatangani oleh pimpinan perusahaan / yang diberi wewenang.
b. Breakdown penawaran harus sedetail mungkin.
c. Form JSA (Job Safety Analysis) yang sudah diisi.
d. Technical specification / Product Data Sheet
e. Prosedur / Methode /Rigging study u/ pekerjaan
f. Format Penawaran melampirkan :
* Penawaran Harga ( Work Item Breakdown ) Lihat CONTOH - 1
* Cost Item Breakdown Lihat CONTOH - 2
* Man Power & Equipment Schedule Lihat CONTOH - 3
g. Schedule
h. List Tools & Man Power
i. List pengalaman kerja