WATER DEMAND CALCULATION

WATER DEMAND CALCULATION OF 12000 BSPD HYDRO SKIMMING


MODULAR REFINERY PROJECT

Contents

1.  AIM ....................................................................................................................................................... 3 

2.  GENERAL INFORMATION ....................................................................................................................... 3 

3.  CODES AND STANDARD ......................................................................................................................... 3 

4.  CALULATION OF WATER REQUIREMENT: ............................................................................................... 4 
4.1  CASE ‐1 (STORAGE TANK) ...................................................................................................................... 4 
4.2  CASE ‐2 (DYKE PROTECTION) ................................................................................................................. 5 
4.3  CASE ‐3 (WAREHOUSE PROTECTION) .................................................................................................... 5 
4.4  PROPOSED FIRE PUMPS AND FIRE WATER STORAGE TANK CAPACITY ................................................. 6 

 
WATER DEMAND CALCULATION OF 12000 BSPD HYDRO SKIMMING
MODULAR REFINERY PROJECT

1. AIM 
The  aim  of  this  document  is  to  clarify  the  Water  Demand  Calculation  for  Fire  protection  system  in 
12000 BSD HYDRO Skimming Modular Refinery Project. 
 
 
2. GENERAL INFORMATION 
Nigeria’s Petroleum Industry is considered to be the largest in Africa and the country is regarded as a 
prominent  exporter  of  Crude  Oil.  Although  Nigeria  being  a  major  source  of  Crude  Oil,  the  country 
lacks  sufficient  refining  capacity  to  support  the  energy  demands  of  the  growing  indigenous 
population. Oil demand has been increasing substantially over time and as of 2014 the total demand 
in Nigeria stood at 396,000 bpd of which the demand for gasoline alone was 284,000 bpd and 50,000 
bpd  for  distillates.  This demand  in  addition  to  the  low  throughput  of  the  existing  refineries  and  an 
increasing  population  have  forced  Nigeria  to  become  a  major  importer  of  petroleum  products  in 
Africa. In 2014 Nigeria imported 156,000 bpd of petroleum products, which was still far from meeting 
the local demand.  
 
Azikel Petroleum Limited plans to develop a 12,000 BPSD Refinery in Yenagoa, Bayelsa State, Nigeria. 
This new Refinery would be a significant step towards providing locally produced petroleum products 
in  addition  to  making  a  significant  contribution  to  the  economic  and  human  development  in  the 
region in a very sustainable manner. 
 
3. CODES AND STANDARD 
 NFPA 11 ‐ Standard for Low, Medium, and High‐Expansion Foam 
 NFPA 13 ‐ Standard for installation of Sprinkler System 
 NFPA 15 ‐ Standard for Water spray Fixed system 
 NFPA 16 ‐ Standard for the Installation of Foam‐Water Sprinkler Systems 
 NFPA 30 ‐ Flammable and combustible Liquids Code 
 IP 19       ‐ Fire Precaution at Petroleum refineries and bulk storage installations 
 
In addition to above, the Water Demand Calculation is in line with the technical requirement 
identified in the technical specifications reference: 1910502‐ENG‐FF‐001. 
WATER DEMAND CALCULATION OF 12000 BSPD HYDRO SKIMMING
MODULAR REFINERY PROJECT

4. CALULATION OF WATER REQUIREMENT: 
4.1 CASE ‐1 (STORAGE TANK) 
While referring to the Overall Plot Plan layout drawing ‐ 1079‐2000‐L01‐501‐001, Largest Tank is TK – 
2103. 
 
1  Design Standard  NFPA‐30, NFPA‐11 & IP CODE – PART 19 
2  Tank (TK‐2103) considered under fire  Ø 32m x 20m (HT) – 1 No. 
3  Type of fire protection proposed  Foam system for liquid surface area 
4  Design Density  4.1 Lpm / sq.m 
5  Foam Concentrate Induction Rate   3% 
6  Foam Solution Discharge Duration Required  30 Minutes 
Total discharge of foam solution for liquid 
7  803.84 x 4.1 Lpm = 3295.74 Lpm 
surface area of tank (π x r²) ………. (A) 
     
8  Water Demand for Adjacent Tank  (TK‐2102 & Same as TK‐2103 For Future) 
9  Size of the Tank    
  TK‐2102  Ø 20.2m x 20m (HT) – 1 No. 
  Same as TK‐2103 for Future  Ø 32m x 20m (HT) – 1 No. 
Design Density of Water Application Required 
10  2 Lpm / sq.m 
for the Adjacent Tanks 
11  Water Demand for the Adjacent Tanks    
  TK‐2102   
  (Shell Area x 0.50) + (Roof Area)  (1268.56 x 0.50) + 324.75 = 959.03 sq.m 
    959.03 sq.m x 2 Lpm = 1918.06 Lpm 
     
  Same as TK‐2103   
  (Shell Area x 0.50) + (Roof Area)  (2009.60 x 0.50) + 826.45 = 1831.25 sq.m 
    1831.25 sq.m x 2 Lpm = 3662.5 Lpm 
  Total Water Demand for Adjacent Tanks…...(B)  1918.06 + 3662.5 = 5580.56 Lpm 
     
12  Hose Stream Demand…...(C)  3785 Lpm 
     
13  Water Demand for all Systems  (A) + (B) + (C) = 12661.30 Lpm 
  Add 10% Hydraulic Imbalance   12661.30 x 1.10 = 13927.43 Lpm 
     
14  Total Fire Water Demand Required for Case‐1  13927.43 Lpm 
 
 
WATER DEMAND CALCULATION OF 12000 BSPD HYDRO SKIMMING
MODULAR REFINERY PROJECT

 
4.2 CASE ‐2 (DYKE PROTECTION) 
While referring to the Overall Plot Plan layout drawing ‐ 1079‐2000‐L01‐501‐001, Largest Dyke is Tk – 
2103. 
 
1  Design Standard  NFPA‐11 
2  Dyke (TK‐2103) considered under fire  1635 sq.m 
3  Type of fire protection proposed  Foam system for liquid surface area 
4  Design Density  6.5 Lpm / sq.m 
5  Foam Concentrate Induction Rate   3% 
6  Foam Solution Discharge Duration Required  30 Minutes 
Total discharge of foam solution for liquid 
7  1635 x 6.5 Lpm = 10627.5 Lpm 
surface area of Dyke  
  Add 10% Hydraulic Imbalance   10627.5 x 1.10 = 11690.25 Lpm 
     
8  Total Fire Water Demand Required for Case‐2  11690.25 Lpm 
 
4.3 CASE ‐3 (WAREHOUSE PROTECTION) 

1  Design Standard  NFPA‐13 
2  Warehouse considered under fire  36.30m x 13.30m = 482.79 sq.m 
3  Type of fire protection proposed  Sprinkler System 
4  Design Density  10.2 Lpm / sq.m 
5  Area of Sprinkler Operation  354 sq.m 
6  Water Demand for Sprinkler System…….(A)  3610.8 Lpm 
     
7  Hose Stream Demand…...(B)  3785 Lpm 
     
8  Water Demand for all Systems  (A) + (B) = 7395.8 Lpm 
  Add 10% Hydraulic Imbalance   7395.8 x 1.10 = 8135.38 Lpm 
     
9  Total Fire Water Demand Required for Case‐3  8135.38 Lpm 
 
   
WATER DEMAND CALCULATION OF 12000 BSPD HYDRO SKIMMING
MODULAR REFINERY PROJECT

 
So, after referring Case ‐1, Case ‐2 & Case ‐3, Highest water demand found in Case ‐1 i.e. 13927.43 
LPM.  Based on same Fire Pump and Fire Water Storage Tank Capacity is selected. 
 
4.4 PROPOSED FIRE PUMPS AND FIRE WATER STORAGE TANK CAPACITY 
 
Considered worst case water demand (As per 
1  13927.43 Lpm 
Case‐1) 
     
Fire Water Pump Set Proposed (As per 
2  17033 Lpm at 10 Bar 
Specification) 
     
Minimum duration Fire Water Reserve Required 
3  480 minutes of Pumping Capacity  
(As per Specification) 
     
4  Fire Water Storage Tank Proposed  480 x 17033 = 8176 m³ 
     
Fire Water Storage Tank Required as per 
5  8300 m³ 