Sunteți pe pagina 1din 404

Page 1

M/ `
1.) Name of Re
S
work : - no
De
2.) Name of 66/
vat
ep
the RC
ion
Int
Contractor : -
3.) D/2
of
erp
Agreement 015
4.) Pos
ris
No.Date
: - of -
Start (As per t
es
201
###
5.) Date of :
Agreement) D-
630/
Completion
- 1-
06/
Ty
(As per
201
In
pe
Agreement)
6.) Date of : 62n
Pro
(2
-Completion
d
gre
Blo
(Actual) : -
7.) Serial no. R/
ss
cks
of this bill : - A
-8
Bil
Qtr
RECORD ENTRY
ls.)a
Date of Measurement :- t
NI
Earth work in surface exevation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including
1.1 FT,
disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed :
Ha
1..1.1 All tia,
kinds of Front of D5-6 Ra 1 x 1 x 1 x 21.60 x 8.20
soil nc
hi. 1 x 1 x 1 x 6.40 x 2.00
Front of D2 to Drain Side 1 x 1 x 1 x 21.00 x 8.30
1 x 1 x 1 x 8.10 x 2.10

Total

Contractor Junior Engineer


Page 2

C.O. to P
12.2 Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per directio
12.2.1 charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Block - I
Ground Floor
Common Toilet 4 x 1 x 1.30 x 2.30 x 0.40
Attached Toilet 4 x 1 x 1.50 x 2.25 x 0.40
1st Floor
Common Toilet 4 x 2 x 1.30 x 2.30 x 0.40
Attached Toilet 4 x 1 x 1.50 x 2.25 x 0.40
Plinth Protction Block - 1

Road side 1 x 9.94 x 1.12 x( 0.03 + 0.05 )/

1st Balcony side 1 x 4.54 x 1.12 x( 0.03 + 0.05 )/

2nd Balcony side 1 x 4.70 x 1.12 x( 0.03 + 0.05 )/

Drain Side 1 x 2.82 x 1.15 x( 0.03 + 0.05 )/

1 x 1.76 x 0.89 x( 0.03 + 0.05 )/

1 x 4.40 x 1.20 x( 0.03 + 0.05 )/

Back side 1 x 5.56 x 1.18 x( 0.03 + 0.05 )/

Contractor Junior Engineer


Page 3

Back side 1 x 1.05 x 1.76 x( 0.03 + 0.05 )/

1 x 2.10 x 1.10 x( 0.03 + 0.05 )/

1 x 1.10 x 2.26 x( 0.03 + 0.05 )/

2 x 0.52 x 0.48 x( 0.03 + 0.05 )/

1 x 2.30 x 1.10 x( 0.03 + 0.05 )/

1 x 2.37 x 1.08 x( 0.03 + 0.05 )/

1 x 2.04 x 1.08 x( 0.03 + 0.05 )/

1 x 1.06 x 1.60 x( 0.03 + 0.05 )/

1 x 5.46 x 1.10 x( 0.03 + 0.05 )/

2 x 0.77 x 0.64 x( 0.03 + 0.05 )/

Plinth Protction Block - 1

Road side 1 x 9.90 x 1.12 x( 0.03 + 0.05 )/

1st Balcony side 1 x 4.70 x 1.12 x( 0.03 + 0.05 )/

Contractor Junior Engineer


Page 4

2nd Balcony side 1 x 4.70 x 1.12 x( 0.03 + 0.05 )/

Drain Side 1 x 8.80 x 1.20 x( 0.03 + 0.05 )/

Back side 1 x 5.59 x 1.10 x( 0.03 + 0.05 )/

2 x 0.77 x 0.64 x( 0.03 + 0.05 )/

1 x 1.75 x 1.05 x( 0.03 + 0.05 )/

1 x 2.05 x 1.16 x( 0.03 + 0.05 )/

1 x 2.78 x 1.10 x( 0.03 + 0.05 )/

1 x 5.36 x 1.50 x( 0.03 + 0.05 )/

1 x 2.66 x 1.10 x( 0.03 + 0.05 )/

1 x 2.09 x 1.10 x( 0.03 + 0.05 )/

1 x 1.72 x 1.02 x( 0.03 + 0.05 )/

1 x 5.60 x 1.10 x( 0.03 + 0.05 )/

2 x 0.77 x 0.64 x( 0.03 + 0.05 )/


Total

Contractor Junior Engineer


Page 5

C.O. to P

Date of Measurement :-
2.0 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto p
2.1.1 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Block - I
Boundary Wall Gate to Entrance Gate 1 x 1 x 2.70 x 9.60 x 0.15

Block - II
Boundary Wall Gate to Entrance Gate 1 x 1 x 2.55 x 8.90 x 0.15

1st Floor Block -I & II


Toilet & Bath = 2x2 = 04nos 4 x 1 x 1.45 x 2.25 x 0.08
Ground Floor

Common Toilet 4 x 1 x 1.30 x 2.30 x 0.08


Attached Toilet 4 x 1 x 1.50 x 2.25 x 0.08
1st Floor
Common Toilet 4 x 2 x 1.30 x 2.30 x 0.08
Attached Toilet 4 x 1 x 1.50 x 2.25 x 0.08
Mumty Roof
Flooring 1 x 2 x 4.84 x 2.40 x 0.10
Plinth Protction Block - 1

Road side 1 x 9.94 x 1.12 x( 0.03 + 0.05 )/

Contractor Junior Engineer


Page 6

1st Balcony side 1 x 4.54 x 1.12 x( 0.03 + 0.05 )/

2nd Balcony side 1 x 4.70 x 1.12 x( 0.03 + 0.05 )/

Drain Side 1 x 2.82 x 1.15 x( 0.03 + 0.05 )/

1 x 1.76 x 0.89 x( 0.03 + 0.05 )/

1 x 4.40 x 1.20 x( 0.03 + 0.05 )/

Back side 1 x 5.56 x 1.18 x( 0.03 + 0.05 )/

Back side 1 x 1.05 x 1.76 x( 0.03 + 0.05 )/

1 x 2.10 x 1.10 x( 0.03 + 0.05 )/

1 x 1.10 x 2.26 x( 0.03 + 0.05 )/

2 x 0.52 x 0.48 x( 0.03 + 0.05 )/

1 x 2.30 x 1.10 x( 0.03 + 0.05 )/

1 x 2.37 x 1.08 x( 0.03 + 0.05 )/

1 x 2.04 x 1.08 x( 0.03 + 0.05 )/

Contractor Junior Engineer


Page 7

1 x 1.06 x 1.60 x( 0.03 + 0.05 )/

1 x 5.46 x 1.10 x( 0.03 + 0.05 )/

2 x 0.77 x 0.64 x( 0.03 + 0.05 )/


Plinth Protection Block - 1

Road side 1 x 9.90 x 1.12 x( 0.03 + 0.05 )/

1st Balcony side 1 x 4.70 x 1.12 x( 0.03 + 0.05 )/

2nd Balcony side 1 x 4.70 x 1.12 x( 0.03 + 0.05 )/

Drain Side 1 x 8.80 x 1.20 x( 0.03 + 0.05 )/

Back side 1 x 5.59 x 1.10 x( 0.03 + 0.05 )/

2 x 0.77 x 0.64 x( 0.03 + 0.05 )/

1 x 1.75 x 1.05 x( 0.03 + 0.05 )/

1 x 2.05 x 1.16 x( 0.03 + 0.05 )/

1 x 2.78 x 1.10 x( 0.03 + 0.05 )/

Contractor Junior Engineer


Page 8

1 x 5.36 x 1.50 x( 0.03 + 0.05 )/

1 x 2.66 x 1.10 x( 0.03 + 0.05 )/

1 x 2.09 x 1.10 x( 0.03 + 0.05 )/

1 x 1.72 x 1.02 x( 0.03 + 0.05 )/

1 x 5.60 x 1.10 x( 0.03 + 0.05 )/

2 x 0.77 x 0.64 x( 0.03 + 0.05 )/


Total

C.O. to P
Date of Measurement :-
2.1.2 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Block - I
Boundary Wall Gate to Entrance Gate 1 x 1 x 2.70 x 9.60 x 0.10

Block - II
Boundary Wall Gate to Entrance Gate 1 x 1 x 2.55 x 8.90 x 0.10

1st Floor Block -I & II


Toilet & Bath = 2x2 = 04nos 4 x 1 x 1.45 x 2.25 x 0.30

Total

Contractor Junior Engineer


Page 9

C.O. to P

12.2 Dismantling cement concrete manually / by machanical means including disposal of meterail withon 50 metres as per direction of
12.2.1 Normal concrete1:3:6 or rich mix (i/c equivalent design mix )
Block-I
Near Entrance Gate Chajja 4 x 1 x 2.00 x 0.69 x 0.10
Balcony Chajja 4 x 1 x 3.40 x 0.38 x 0.15
4 x 1 x 1.54 x 0.38 x 0.15
4 x 1 x 3.03 x 0.65 x 0.15
Near Bath Room Chajja 4 x 1 x 3.17 x 0.60 x 0.10
Near Dining Hall Chajja 4 x 1 x 4.38 x 0.60 x 0.10
Near Kitchen Chajja 4 x 1 x 1.09 x 0.60 x 0.10
Mumty Door Chajja 2 x 1 x 1.10 x 0.60 x 0.10

Block-II
Near Entrance Gate Chajja 4 x 1 x 2.00 x 0.69 x 0.10
Jaffri 4 x 2 x 0.46 x 0.69 x 0.10
Balcony Chajja 4 x 1 x 3.40 x 0.38 x 0.15
4 x 1 x 1.54 x 0.38 x 0.15
4 x 1 x 3.03 x 0.65 x 0.15
Near Road Side Chajja 4 x 1 x 1.12 x 0.60 x 0.10
Jaffri 4 x 2 x 0.46 x 0.60 x 0.10
Near Bath Room Chajja 4 x 1 x 3.17 x 0.60 x 0.10
Jaffri 4 x 2 x 0.46 x 0.60 x 0.10
Near Dining Hall Chajja 4 x 1 x 4.38 x 0.60 x 0.15
Jaffri 4 x 2 x 0.46 x 0.60 x 0.10
Near Kitchen Chajja 4 x 1 x 1.09 x 0.60 x 0.10
Jaffri 4 x 2 x 0.46 x 0.60 x 0.10

Contractor Junior Engineer


Page 10

Mumty Door Chajja 2 x 1 x 1.10 x 0.60 x 0.10


4 x 1 x 2.20 x 0.69 x 0.12
4 x 1.00 x 0.94 x 0.69 x 0.12
Kitchen Slab 2 x 1 x 1.10 x 0.60 x 0.10
4 x 2.00 x 2.00 x 0.42 x 0.10

Mark -F Total

C.O. to P
Date of Measurement :-
3.2 Centering and shuttering including strutting, propping etc. and removal of form for:
3.2.3 Weather shade, Chajjas, corbels etc., including edges
Block -I & II
Near Entrance Gate Chajja
Bottom 4 x 1 x 1.80 x 0.69
Front Face 4 x 1 x 1.80 x 0.10
Jaffri Inner Side 4 x 2 x 0.48 x 0.69
Jaffri Outer Side 4 x 2 x 0.58 x 0.69
Jaffri Bottom 2 x 2 x 0.10 x 0.69
Jaffri Front 2 x 2 x 0.10 x 0.58
Balcony Chajja
Bottom 4 x 1 x 3.40 x 0.38
4 x 1 x 3.03 x 0.65
4 x 1 x 1.27 x 0.38
Front Face 4 x 1 x 3.40 x 0.10
4 x 1 x 1.27 x 0.10
4 x 1 x 3.03 x 0.10

Contractor Junior Engineer


Page 11

Side 4 x 1 x 0.38 x 0.10


4 x 1 x 0.10 x 0.69
Near Road Side Chajja
Bottom 4 x 1 x 0.92 x 0.60
Front Face 4 x 1 x 0.92 x 0.10
Jaffri Inner Side 4 x 2 x 0.60 x 0.46
Jaffri Outer Side 4 x 2 x 0.58 x 0.60
Jaffri Bottom 4 x 2 x 0.10 x 0.60
Jaffri Front 4 x 2 x 0.10 x 0.58
Near Bath Room Chajja
Bottom 4 x 1 x 2.97 x 0.50
Side Jaffri Inner Face 4 x 2 x 0.60 x 0.46
Side Jaffri Outer Face 4 x 2 x 0.58 x 0.60
Side Jaffri Bottom 4 x 2 x 0.10 x 0.60
Side Jaffri Front Face 4 x 2 x 0.10 x 0.58
Front Jaffri Bottom 4 x 1 x 0.10 x 2.97
Front Jaffri Inner Face 4 x 1 x 0.14 x 2.97
Front Jaffri Outer Face 4 x 1 x 0.26 x 2.97
Near Dining Hall Chajja
Bottom 4 x 1 x 4.38 x 0.50
Front Jaffri Bottom 4 x 1 x 4.38 x 0.10
Front Jaffri Inner Face 4 x 1 x 4.38 x 0.14
Front Jaffri Outer Face 4 x 1 x 4.38 x 0.26
Near Kitchen Chajja
Bottom 4 x 1 x 0.89 x 0.50
Side Jaffri Inner Face 4 x 2 x 0.50 x 0.46
Side Jaffri Outer Face 4 x 2 x 0.56 x 0.60
Side Jaffri Bottom 4 x 2 x 0.10 x 0.60

Contractor Junior Engineer


Page 12

Side Jaffri Front Face 4 x 2 x 0.10 x 0.58


Front Jaffri Bottom 4 x 1 x 0.10 x 0.89
Front Jaffri Inner Face 4 x 1 x 0.14 x 0.89
Front Jaffri Outer Face 4 x 1 x 0.26 x 0.89
Mumty Door Chajja
Bottom 4 x 1 x 1.08 x 0.58
Front Face 4 x 1 x 1.08 x 0.10
Side Face 4 x 2 x 0.58 x 0.10
Near Entrance Gate Chajja
Bottom 4 x 1 x 2.00 x 0.69
Front Face 4 x 1 x 2.00 x 0.10
Side Face 4 x 2 x 0.69 x 0.10
Balcony Chajja
Bottom 4 x 1 x 3.40 x 0.38
4 x 1 x 3.03 x 0.65
4 x 1 x 1.27 x 0.38
Front Face 4 x 1 x 3.40 x 0.10
4 x 1 x 1.27 x 0.10
4 x 1 x 3.03 x 0.10
Side 4 x 1 x 0.38 x 0.10
4 x 1 x 0.10 x 0.69
Near Road Side Chajja
Bottom 4 x 1 x 1.12 x 0.60
Front Face 4 x 1 x 1.12 x 0.10
Side Face 4 x 2 x 0.60 x 0.10
Near Dining Hall Chajja
Bottom 4 x 1 x 3.17 x 0.60
Front Face 4 x 1 x 3.17 x 0.10

Contractor Junior Engineer


Page 13

Side Face 4 x 2 x 0.60 x 0.10


Near Kitchen Chajja
Bottom 4 x 1 x 4.38 x 0.60
Front Face 4 x 1 x 4.38 x 0.10
Side Face 4 x 2 x 0.60 x 0.10
Mumty Door Chajja
Bottom 4 x 1 x 1.09 x 0.60
Front Face 4 x 1 x 1.09 x 0.10
Side Face 4 x 2 x 0.60 x 0.10
Kitchen Slab
Bottom 4 x 1 x 2.20 x 0.69
Front 4 x 1 x 2.20 x 0.12
Bottom 4 x 1 x 0.97 x 0.69
Front 4 x 1 x 0.97 x 0.12
Bottom 4 x 1 x 2.00 x 0.42
Front 4 x 1 x 2.00 x 0.10

Total

C.O. to P / TCMB

Date of Measurement :-

3.3 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all co

3.3.1 Thermo-Mechanically Treated bars


Particulars 10 ø 12ø

Contractor Junior Engineer


Page 14

Qty.
(Diameter => ø
(Kg)
Near Gate Chajja (Block- I)
Main Bar 10 ø 4 * 1 * 8 * 0.84 26.88
Binder 10 ø 4 * 1 * 5 * 2.05 41.00
Balcony Chajja
Main 10 ø 4 * 1 * 7 * 0.84 23.52
10 ø 4 * 1 * 6 * 0.84 20.16
10 ø 4 * 1 * 12 * 0.84 40.32
Binder 10 ø 4 * 1 * 3 * 3.4 40.80
10 ø 4 * 1 * 3 * 2.02 24.24
10 ø 4 * 1 * 5 * 3.51 70.20
Near Road Side Chajja
Main 10 ø 4 * 1 * 8 * 0.84 26.88
Binder 10 ø 4 * 1 * 5 * 1.18 23.60
Near Bathroom
Main 10 ø 4 * 1 * 7 * 0.84 23.52
Binder 10 ø 4 * 1 * 5 * 3.2 64.00
Lap 10 ø 4 * 1 * 5 * 0.5 10.00
Near Hall Gate
Main 10 ø 4 * 1 * 7 * 0.84 23.52
Binder 10 ø 4 * 1 * 5 * 4.58 91.60
Lap 10 ø 4 * 1 * 5 * 0.5 10.00
Near Kitchen
Main * 4 * 0.84 13.44
10 ø 4 * 1

Contractor Junior Engineer


Page 15

Binder 10 ø 4 * 1 * 5 * 1.14 22.80


Mumty Door Chajja
Main 10 ø 2 * 1 * 5 * 0.70 7.00
Jaffri 10 ø 2 * 1 * 6 * 1.00 12.00
Near Gate Chajja (Block- II)
Main Bar Top 10 ø 4 * 1 * 7 * 0.84 23.52
Jaffri 10 ø 4 * 2 * 4 * 0.84 26.88
Binder 10 ø 4 * 1 * 5 * 2.88 57.60
Balcony Chajja
Main 10 ø 4 * 1 * 5 * 0.84 16.80
10 ø 4 * 1 * 7 * 0.84 23.52
10 ø 4 * 1 * 7 * 0.84 23.52
Binder 10 ø 4 * 1 * 4 * 3.4 54.40
10 ø 4 * 1 * 4 * 2.02 32.32
10 ø 4 * 1 * 6 * 3.51 84.24
Near Road Side Chajja
Main 10 ø 4 * 1 * 6 * 0.84 20.16
Jaffri 10 ø 4 * 2 * 4 * 0.84 26.88
Binder 10 ø 4 * 1 * 5 * 2.04 40.80
Near Bathroom
Main 10 ø 4 * 1 * 6 * 0.98 23.52
Jaffri 10 ø 4 * 2 * 4 * 0.84 26.88
Binder 10 ø 4 * 1 * 5 * 4.09 81.80
Binder 10 ø 4 * 1 * 2 * 3.20 25.60
Lap 10 ø 4 * 1 * 7 * 0.5 14.00

Contractor Junior Engineer


Page 16

Near Hall Gate


Main 10 ø 4 * 1 * 6 * 0.98 23.52
Jaffri 10 ø 4 * 2 * 5 * 4.58 183.20
Binder 10 ø 4 * 1 * 2 * 4.58 36.64
Lap 10 ø 4 * 1 * 7 * 0.5 14.00
Near Kitchen
Main * 4 * 0.98 15.68
10 ø 4 * 1
Jaffri 10 ø 4 * 2 * 4 * 0.84 26.88
Binder 10 ø 4 * 1 * 5 * 2.00 40.00
Binder 10 ø 4 * 1 * 2 * 1.00 8.00
Mumty Door Chajja
Main 10 ø 2 * 1 * 6 * 0.70 8.40
Jaffri 10 ø 2 * 1 * 5 * 1.00 10.00
Kitchen Slab
Main 10 ø 4 * 1 * 5 * 0.70 14.00
Jaffri 10 ø 4 * 1 * 5 * 2.40 48.00
Main 10 ø 4 * 1 * 6 * 0.70 16.80
Jaffri 10 ø 4 * 1 * 5 * 1.07 21.40
Main 10 ø 4 * 2 * 6 * 0.47 22.56
Jaffri 10 ø 4 * 2 * 3 * 2.10 50.40

1584.24 @ 0.617 = ###


Date of C.O. to P / TCMB
Measur
ement :-

Contractor Junior Engineer


Page 17

3.1 Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centring and shuttering,finis
3.1.1 reinforcement - All
1:1.5:3 (1 cement : 1.5work upto
coarse plinth
sand level :stone aggregate 40 mm nominal size)
: 3 graded
Qty. Same Measured for Item No.12.2.1 vide TCMB P -
Block-I
Near Entrance Gate Chajja 4 x 1 x 2.00 x 0.69 x 0.10
Balcony Chajja 4 x 1 x 3.40 x 0.38 x 0.15
4 x 1 x 1.54 x 0.38 x 0.15
4 x 1 x 3.03 x 0.65 x 0.15
Near Bath Room Chajja 4 x 1 x 3.17 x 0.60 x 0.10
Near Dining Hall Chajja 4 x 1 x 4.38 x 0.60 x 0.10
Near Kitchen Chajja 4 x 1 x 1.09 x 0.60 x 0.10
Mumty Door Chajja 2 x 1 x 1.10 x 0.60 x 0.10

Block-II
Near Entrance Gate Chajja 4 x 1 x 2.00 x 0.69 x 0.10
Jaffri 4 x 2 x 0.46 x 0.69 x 0.10
Balcony Chajja 4 x 1 x 3.40 x 0.38 x 0.15
4 x 1 x 1.54 x 0.38 x 0.15
4 x 1 x 3.03 x 0.65 x 0.15
Near Road Side Chajja 4 x 1 x 1.12 x 0.60 x 0.10
Jaffri 4 x 2 x 0.46 x 0.60 x 0.10
Near Bath Room Chajja 4 x 1 x 3.17 x 0.60 x 0.10
Jaffri 4 x 2 x 0.46 x 0.60 x 0.10
Near Dining Hall Chajja 4 x 1 x 4.38 x 0.60 x 0.15
Jaffri 4 x 2 x 0.46 x 0.60 x 0.10
Near Kitchen Chajja 4 x 1 x 1.09 x 0.60 x 0.10
Jaffri 4 x 2 x 0.46 x 0.60 x 0.10

Contractor Junior Engineer


Page 18

Mumty Door Chajja 2 x 1 x 1.10 x 0.60 x 0.10


4 x 1 x 2.20 x 0.69 x 0.12
4 x 1.00 x 0.94 x 0.69 x 0.12
Kitchen Slab 2 x 1 x 1.10 x 0.60 x 0.10
4 x 2.00 x 2.00 x 0.42 x 0.10

Mark -F Total

C.O. to P

Date of Measurement :-

4.2 Brick work with common burnt clay F.P.s.(non modular) bricksof class designation 7.5 in foundation and plinth.
4.2.1 Cement mortar 1:6 (1 cement : 6 coarse sand)
Front of Qtr. 1 to 4( Boundry Wall)
Wall 1 x 1 x 3.47 x 0.25 x 1.30
Piller 1 x 2 x 1.80 x 0.39 x 0.39
Drain side 1 x 1 x 1.20 x 0.25 x 1.10
Qtr.no- 5 to 8 Side Wall 1 x 1 x 2.52 x 0.25 x 1.30
Piller 1 x 1 x 1.80 x 0.40 x 0.40
Wall 1 x 1 x 3.28 x 0.25 x 1.30
Wall 1 x 1 x 2.97 x 0.25 x 1.40
Spring 1 x 1 x 1 x 3.47 x 0.39
Piller 1 x 2 x 1 x 1.20 x 0.39
Drain side 1 x 1 x 1 x 2.52 x 0.39
Qtr.no- 5 to 8 Side Wall 1 x 1 x 2 x 3.28 x 0.39

Contractor Junior Engineer


Page 19

Piller 1 x 1 x 1 x 2.78 x 0.39


Wall 1 x 1 x 1 x 2.97 x 0.39
Wall 1 x 1 x 1 x 2.82 x 0.39
Piller 3 x 1 x 1 x 3.20 x 0.39
Wall 2 x 1 x 1 x 2.80 x 0.39
Wall 2 x 1 x 1 x 3.00 x 0.39

Total

C.O. to P

Date of Measurement :-

Providing and fixing 18mm thick gang saw cut mirror polished (premoulded and prepolished) machine cut for kitchen platforms,
,window sills , facias and similar locations of required size of approved shade, colour and texture laid over 20mm thick base cemen
4 coarse sand) with joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing m
5.1
to edge to give high gloss finish etc. complete at all levels.

5.1.1 Granite of any colour and shade


5.1.1.1 Area of slab upto 0.50 sqm.
Kitchen
Slab side 4 x 2 x 2.10 x 0.10
Slab side 4 x 2 x 1.96 x 0.10
Partation wall 4 x 2 x 0.76 x 0.16

Contractor Junior Engineer


Page 20

Partation wall 4 x 2 x 0.76 x 0.16


Slab side 4 x 2 x 0.83 x 0.10
Store Room
Slab 4 x 2 x 0.92 x 0.21
Slab 4 x 2 x 1.02 x 0.20
Slab 4 x 2 x 1.02 x 0.21
Total

C.O. to P
Date of Measurement :-

5.1.2 Area of slab over 0.50 sqm.


Kitchen
Slab 4 x 2 x 2.10 x 0.63
Slab 4 x 2 x 1.96 x 0.36
4 x 2 x 0.84 x 0.56
Store Room
Slab 4 x 2 x 0.87 x 0.52
Slab 4 x 2 x 0.87 x 0.46
Slab 4 x 2 x 0.87 x 0.41
Puja Room
Slab 4 x 2 x 1.00 x 0.62
Slab 4 x 2 x 1.00 x 0.62

Total

C.O. to P

Contractor Junior Engineer


Page 21

Date of Measurement :-

Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer) o
colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and
8.3
thick bed of cement Mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing
with pigment of matching shade complete.

Attached Bath /Bed Rom


Sawar side 8 x 1 x 2.46 x 2.03
Window Side 8 x 1 x 1.50 x 1.92
Window Kopla 8 x 2 x 0.10 x 1.14
8 x 1 x 0.50 x 0.10
Less -8 x 1 x 0.50 x 1.14
Beasin side 8 x 1 x 2.63 x 2.06
Kopla 8 x 1 x 0.16 x 1.85
8 x 1 x 0.45 x 0.16
Less -8 x 1 x 0.16 x 0.16
8 x 1 x 0.78 x 1.85
8 x 1 x 0.32 x 1.85
Non Attached Bath
Door Side 8 x 1 x 2.60 x 2.05
Window Side 8 x 1 x 1.30 x 1.93
Kopla 8 x 2 x 1.11 x 0.10
8 x 1 x 0.55 x 0.10
Less Window -8 x 1 x 1.11 x 0.55
Sawar side 8 x 1 x 2.58 x 2.03

Contractor Junior Engineer


Page 22

8 x 1 x 0.57 x 2.05
Kopla 8 x 1 x 0.17 x 1.83
8 x 1 x 0.16 x 0.24
8 x 1 x 0.30 x 2.50
Kitchen
Plateform 8 x 1 x 0.62 x 0.57
8 x 1 x 0.32 x 0.18
8 x 2 x 1.91 x 0.57
8 x 1 x 0.30 x 0.57
8 x 1 x 0.18 x 0.75
8 x 1 x 0.30 x 1.64
8 x 1 x 0.22 x 0.90
8 x 1 x 0.40 x 1.64
8 x 1 x 2.09 x 1.64
Less Window -8 x 1 x 0.88 x 0.78
8 x 2 x 0.78 x 0.10
8 x 1 x 0.88 x 0.10

Total

C.O. to P
Date of Measurement :-
Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality confo
8.4 approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick Cement Mortar 1:4 (1 Cement : 4 Coarse
pointing theAttached
joints with white
Bath /Bedcement
Rom and matching pigment etc., complete.

Contractor Junior Engineer


Page 23

Toilet 8 x 1 x 2.25 x 1.50


Kopla 8 x 1 x 0.47 x 0.43
Door, Sill 8 x 1 x 0.73 x 0.30
Common Toilet
Floor 8 x 1 x 2.30 x 1.30
8 x 1 x 1.30 x 0.10
Sill 8 x 1 x 0.74 x 0.30
8 x 1 x 0.40 x 0.23

Mark- L M
Total
C.O. to P

Date of Measurement :-

Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption's
8.5 0.08% and conforming to IS : 15622 of approved make in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4
sand) including grouting the joints with white cement and matching pigments etc., complete.
8.5.1 Size of Tile 600x600 mm
Attached Bath /Bed Rom
Floor 8 x 1 x 4.56 x 3.38
Door, Sill 8 x 1 x 0.92 x 0.14
Puja room
Floor 8 x 1 x 1.00 x 2.40
Door, Sill 8 x 1 x 0.74 x 0.21

Contractor Junior Engineer


Page 24

Corridor
Floor 8 x 1 x 1.63 x 0.98
Dining Hall
Floor 8 x 1 x 2.98 x 4.40
8 x 1 x 1.68 x 0.70
Corridor
Floor 8 x 1 x 1.72 x 0.80
Kitchen
Floor 8 x 1 x 2.60 x 2.13
Kopla 8 x 1 x 1.66 x 0.08
Less Plateform Wall -2 x 1 x 0.17 x 0.54
Store
Floor 8 x 1 x 1.52 x 0.84
Sill 8 x 1 x 0.23 x 0.66
Sill 8 x 1 x 0.34 x 0.75
Bed Room
Floor 8 x 1 x 3.27 x 3.32
8 x 1 x 1.95 x 0.43
Sill 8 x 1 x 0.31 x 0.91
Attached Balcony Bed Room
Floor 8 x 1 x 4.55 x 3.13
Sill 8 x 1 x 0.47 x 1.02
Sill 8 x 1 x 0.48 x 0.91
Sill 8 x 1 x 0.31 x 0.94
1st floor Balcony 04 Nos.

Contractor Junior Engineer


Page 25

Floor 4 x 1 x 1.45 x 2.70


Ground floor Balcony 04 Nos.
Floor 4 x 1 x 1.41 x 2.48
Sill 4 x 1 x 0.95 x 0.09
Sill 4 x 1 x 2.05 x 2.10

Mark- N Total

C.O. to P

Date of Measurement :-

8.6 Deduct for not using 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) bedding in laying of floor tiles.
Quantity Brought from /Page No. /Item No:- 8.4 Mark-M
Quantity Brought from /Page No. /Item No:- 8.5 Mark-N
Total

C.O. to P
Date of Measurement :-

8.7 Fixing glazed/ Ceramic/ Vitrified floor tiles with cement based high polymer modified quick-set tile adhesive (Water based) conformi
thickness.
Quantity Brought from TMCB /Page No. /Item No:- 8.4 Mark-M
Quantity Brought from TMCB /Page No. /Item No:- 8.5 Mark-N
Total

Contractor Junior Engineer


Page 26

C.O. to P
Date of Measurement :-

Providing and fixing 1mm thick M.S sheet door with frame of 40x40x6mm angle iron and 3 mm gusset plate and corners,aii necess
7.1
including appalaying coat of approved steel primer.
7.1.1 Using flats 30x6mm for digonal braces and central cross pice.
Mumty
Door 2 x 1 x 0.94 x 2.06
2 x 1 x 0.78 x 2.01

Total

C.O. to P
Date of Measurement :-
Total

C.O. to P

Date of Measurement :-
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dump
12.4
metres lead.

Quantity Brought from TCMB- /Page No. /Item No:- 10.1.1 /Marked (B)
Quantity Brought from TCMB- /Page No. /Item No:- 10.2.1/Marked (C)
Quantity Brought from TCMB- /Page No. /Item No:- 10.2.1/Marked (D)
Quantity Brought from TCMB- /Page No. /Item No:- 12.4/Marked (E)
Quantity Brought from TMCB- /Page No. /Item No:- 8.4/ Marked-M

Contractor Junior Engineer


Page 27

Quantity Brought from TMCB- /Page No. /Item No:- 8.5/Mark-N


Total
C.O. to P
Date of Measurement :-

10.1 12 mm cement plaster of mix :


10.1.1 1:6 (1 cement : 6 coarse sand)
Boundry Wall
Fron of Qtr.No- 1 to 4
Wall 1 x 1 x 15.80 x 1.30
Piller Kopla 2 x 4 x 1.30 x 0.07
Piller No -1 3 x 1 x 1.67 x 0.42
1 x 1 x 0.35 x 0.42
Piller top 1 x 1 x 0.42 x 0.42
Piller No -2 3 x 1 x 1.67 x 0.42
1 x 1 x 0.35 x 0.42
Piller top 1 x 1 x 0.42 x 0.42
Wall 1 x 1 x 12.60 x 1.30
Piller Kopla 2 x 4 x 1.30 x 0.07
Piller 1 x 1 x 1.66 x 0.42
Fron of Road side
Wall 1 x 1 x 39.58 x 1.46
Piller Kopla 2 x 11 x 1.36 x 1.42
Piller side 1 x 1 x 0.42 x 1.43
Piller top 1 x 1 x 0.42 x 0.42

Contractor Junior Engineer


Page 28

Qtr. side
Wall 1 x 1 x 13.40 x 1.22
Piller Kopla 2 x 4 x 1.12 x 0.07
Piller 2 x 3 x 1.70 x 0.43
2 x 1 x 0.40 x 0.34
Piller top 2 x 1 x 0.43 x 0.43
Wall 1 x 1 x 12.74 x 1.18
Piller Kopla 2 x 4 x 1.18 x 0.07

Marked- B Total

C.O. to P / TCMB
Date of Measurement :-
10.2 15 mm cement plaster of mix :
10.2.1 1:6 (1 cement : 6 coarse sand)
Boundry Wall
Fron of Qtr.No- 1 to 4
Wall 1 x 1 x 15.80 x 1.30
Spring top 1 x 1 x 15.80 x 0.42
Spring side 2 x 1 x 15.80 x 0.10
Spring Bottom Kopla 2 x 1 x 3.86 x 0.07
2 x 1 x 3.64 x 0.07
2 x 1 x 3.60 x 0.07
2 x 1 x 3.47 x 0.07

Contractor Junior Engineer


Page 29

Piller Kopla 2 x 4 x 1.30 x 0.07


Piller No -1 3 x 1 x 1.67 x 0.42
1 x 1 x 0.35 x 0.42
Piller top 1 x 1 x 0.42 x 0.42
Piller No -2 3 x 1 x 1.67 x 0.42
1 x 1 x 0.35 x 0.42
Piller top 1 x 1 x 0.42 x 0.42
Wall 1 x 1 x 12.60 x 1.30
Spring top 1 x 1 x 12.60 x 0.43
Spring side 2 x 1 x 12.50 x 0.10
Spring Bottom Kopla 2 x 1 x 2.66 x 0.07
2 x 1 x 2.66 x 0.07
2 x 1 x 2.66 x 0.07
2 x 1 x 2.53 x 0.07
Piller Kopla 2 x 4 x 1.30 x 0.07
Fron of Road side
Wall 1 x 1 x 39.58 x 1.46
Spring top 1 x 1 x 39.58 x 0.43
Spring side 2 x 1 x 39.58 x 0.10
Spring Bottom Kopla 2 x 1 x 3.15 x 0.07
2 x 1 x 3.15 x 0.07
2 x 1 x 3.15 x 0.07
2 x 1 x 3.20 x 0.07
2 x 1 x 3.20 x 0.07
2 x 1 x 3.20 x 0.07

Contractor Junior Engineer


Page 30

2 x 1 x 2.83 x 0.07
2 x 1 x 3.02 x 0.07
2 x 1 x 3.05 x 0.07
2 x 1 x 2.98 x 0.07
2 x 1 x 2.96 x 0.07
Piller Kopla 2 x 11 x 1.36 x 0.07
Piller side 1 x 1 x 0.42 x 1.43
Piller top 1 x 1 x 0.42 x 0.42
Qtr. side
Wall 1 x 1 x 13.40 x 1.22
Spring top 1 x 1 x 13.00 x 0.43
Spring side 2 x 1 x 13.00 x 0.10
Spring Bottom Kopla 2 x 1 x 2.97 x 0.07
2 x 1 x 2.94 x 0.07
2 x 1 x 2.95 x 0.07
2 x 1 x 2.90 x 0.07
Piller Kopla 2 x 4 x 1.12 x 0.07
2 x 1 x 0.40 x 0.34
Piller top 2 x 1 x 0.43 x 0.43
Wall 1 x 1 x 12.74 x 1.18
Spring top 1 x 1 x 12.74 x 0.43
Spring side 2 x 1 x 12.74 x 0.10
Spring Bottom Kopla 2 x 1 x 2.52 x 0.07
2 x 1 x 2.78 x 0.07
2 x 1 x 2.82 x 0.07

Contractor Junior Engineer


Page 31

2 x 1 x 3.28 x 0.07
Piller Kopla 2 x 4 x 1.18 x 0.07

Marked- C Total

Date of Measurement :-
C.O. to P / TCMB
10.3 Cement plaster 1:3 ( 1 cement : 3 coarse sand ) finished with a floating coat of neat cement.

Mumty Roof
Top 1 x 1 x 4.80 x 2.35
Side wall 2 x 1 x 4.80 x 0.20
Side wall 2 x 1 x 2.35 x 0.20
Side wal Top 2 x 1 x 5.14 x 0.15
Side wall Top 1 x 1 x 2.35 x 0.15
Offset Roof 1 x 1 x 2.30 x 0.72

11.1 Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the
11.1.1 patch in proper
With cement shape,
mortar 1:4raking out 4joints
(1cement: and
coarse preparing and plastering the surface of the walls complete, including
sand)
Kitchen Room = D1
Wall 1 x 2 x 1.35 x 0.90
Kopla 1 x 1 x 1.97 x 0.25
Wall 1 x 1 x 2.14 x 0.90
Ciling 1 x 1 x 2.00 x 1.20

Contractor Junior Engineer


Page 32

Shelf Wall 1 x 2 x 0.31 x 0.52


Ceiling 1 x 2 x 0.31 x 1.97
Wall 1 x 1 x 0.31 x 2.13
Shelf Ciling 1 x 1 x 1.98 x 0.61
Kitchen Room = D2
Wall 1 x 2 x 1.00 x 0.90
Kopla 1 x 2 x 2.10 x 0.25
Wall 1 x 1 x 0.80 x 2.90
Ciling 1 x 1 x 2.00 x 1.20
Shelf Wall 1 x 2 x 0.31 x 0.52
Ceiling 1 x 2 x 0.31 x 1.97
Wall 1 x 1 x 0.31 x 2.13
Shelf Ciling 1 x 1 x 1.98 x 0.61
Kitchen Room = D3
Wall 1 x 2 x 1.50 x 0.70
Kopla 1 x 2 x 1.60 x 0.25
Wall 1 x 1 x 0.90 x 2.30
Ciling 1 x 1 x 2.00 x 1.20
Shelf Wall 1 x 2 x 0.31 x 0.52
Ceiling 1 x 2 x 1.50 x 0.40
Wall 1 x 1 x 2.00 x 1.20
Shelf Ciling 1 x 1 x 1.50 x 0.61
Kitchen Room = D7
Wall 1 x 2 x 1.35 x 0.90
Kopla 1 x 1 x 1.97 x 0.25
Wall 1 x 1 x 2.14 x 0.90

Contractor Junior Engineer


Page 33

Ciling 1 x 1 x 2.00 x 1.20


Shelf Wall 1 x 2 x 0.31 x 0.52
Ceiling 1 x 2 x 0.31 x 1.97
Wall 1 x 1 x 0.31 x 2.13
Shelf Ciling 1 x 1 x 1.98 x 0.61
Kitchen Room = D8
Wall 1 x 2 x 1.00 x 0.90
Kopla 1 x 2 x 2.10 x 0.25
Wall 1 x 1 x 0.80 x 2.90
Ciling 1 x 1 x 2.00 x 1.20
Shelf Wall 1 x 2 x 0.31 x 0.52
Ceiling 1 x 2 x 0.31 x 1.97
Wall 1 x 1 x 0.31 x 2.13
Shelf Ciling 1 x 1 x 1.98 x 0.61
Kitchen Room = D4
Wall 1 x 2 x 1.50 x 0.70
Kopla 1 x 2 x 1.60 x 0.25
Wall 1 x 1 x 0.90 x 2.30
Ciling 1 x 1 x 2.00 x 1.20
Shelf Wall 1 x 2 x 0.31 x 0.52
Ceiling 1 x 2 x 1.50 x 0.40
Wall 1 x 1 x 2.00 x 1.20
Shelf Ciling 1 x 1 x 1.50 x 0.61
Com. Bath Room D3
Wall 1 x 1 x 2.30 x 0.90
1 x 2 x 1.32 x 0.90

Contractor Junior Engineer


Page 34

Wall 1 x 1 x 2.30 x 0.90


Ciling 1 x 1 x 2.00 x 1.20
Com. Bath Room D4
Wall 1 x 1 x 2.00 x 0.90
1 x 1 x 1.50 x 0.90
Wall 1 x 1 x 2.30 x 0.90
1 x 1 x 1.50 x 0.90
Ciling 1 x 1 x 2.05 x 1.20
Com. Bath Room D8
Wall 1 x 1 x 2.30 x 0.70
1 x 2 x 1.32 x 0.90
Wall 1 x 1 x 2.00 x 0.90
Ciling 1 x 1 x 2.00 x 1.20
Com. Bath Room D7
Wall 1 x 1 x 2.00 x 0.90
1 x 1 x 1.50 x 0.90
Wall 1 x 1 x 1.80 x 0.90
1 x 1 x 1.50 x 0.90
Ciling 1 x 1 x 1.50 x 1.20
Com. Bath Room D1
Wall 1 x 2 x 2.30 x 0.38
1 x 2 x 1.32 x 0.38
Ciling 1 x 1 x 2.00 x 1.00
Com. Bath Room D5
Wall 1 x 2 x 2.00 x 0.38

Contractor Junior Engineer


Page 35

1 x 2 x 1.00 x 0.38
Ciling 1 x 1 x 1.80 x 0.70
Com. Bath Room D6
Wall 1 x 2 x 1.90 x 0.38
1 x 2 x 1.20 x 0.38
Ciling 1 x 1 x 1.60 x 1.20
Com. Bath Room D2
Wall 1 x 2 x 2.20 x 0.38
1 x 2 x 0.90 x 0.38
Ciling 1 x 1 x 2.00 x 1.00

Attached Bath Room D1


Ceiling 1 x 1 x 1.20 x 1.90
Wall 1 x 2 x 1.50 x 0.80
Beam Side 1 x 2 x 1.00 x 0.97
Attached Bath Room D2
Ceiling 1 x 1 x 1.25 x 1.90
Wall 1 x 2 x 1.35 x 0.80
Beam Side 1 x 2 x 1.60 x 0.97
Attached Bath Room D6
Ceiling 1 x 1 x 1.20 x 1.90
Wall 1 x 2 x 1.50 x 0.80
Beam Side 1 x 2 x 1.00 x 0.97
Attached Bath Room D5
Ceiling 1 x 1 x 1.20 x 1.90
Wall 1 x 2 x 1.50 x 0.80

Contractor Junior Engineer


Page 36

Beam Side 1 x 2 x 1.00 x 0.97


Attached Bath Room D3
Ceiling 1 x 1 x 1.20 x 1.90
Wall 1 x 2 x 1.50 x 0.80
Beam Side 1 x 2 x 1.00 x 0.97
Attached Bath Room D4
Ceiling 1 x 1 x 1.20 x 1.90
Wall 1 x 2 x 1.50 x 0.80
Beam Side 1 x 2 x 1.00 x 0.97
Attached Bath Room D8
Ceiling 1 x 1 x 1.20 x 1.90
Wall 1 x 2 x 1.50 x 0.80
Beam Side 1 x 2 x 1.00 x 0.97
Attached Bath Room D7
Ceiling 1 x 1 x 1.20 x 1.90
Wall 1 x 2 x 1.50 x 0.80
Beam Side 1 x 2 x 1.00 x 0.97
Mark - (G) Total

C.O. to P

C.O. to P

Date of Measurement :-
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plast
10.11 prepare the surface even and smooth complete.

Contractor Junior Engineer


Page 37

Ground Floor
Master Bed Room 2x4= 08 nos.
Ceiling 8 x 1 x 4.53 x 3.31
Wall 8 x 2 x 4.53 x 2.90
8 x 2 x 3.31 x 2.90
Less Door -8 x 1 x 0.50 x 0.97 x 1.94
Less Door -8 x 1 x 0.50 x 0.78 x 1.98
Less Door -8 x 1 x 0.50 x 0.73 x 1.98
Less Window -8 x 1 x 0.50 x 0.89 x 1.16
Less Window -8 x 1 x 0.50 x 1.78 x 1.16
Attached Bath Room 2x4= 08 nos.
Ceiling 8 x 1 x 1.56 x 2.30
Wall 8 x 2 x 2.29 x 0.97
Beam Side 8 x 2 x 1.56 x 0.97
Kopla 8 x 2 x 0.12 x 0.40
8 x 1 x 0.14 x 0.46
8 x 1 x 0.30 x 0.73
Coridoor ( 2x4=08 nos.)
Ciling 8 x 1 x 1.60 x 1.00
8 x 2 x 1.17 x 1.00
Wall 8 x 2 x 1.60 x 2.90
Less Door -8 x 1 x 0.50 x 0.73 x 1.98
Less Slab -8 x 2 x 1.00 x 1.60 x 0.10
G/F Com. Bath Room 2x2= 04 nos.
Wall 4 x 2 x 2.30 x 0.38
4 x 2 x 1.32 x 0.38

Contractor Junior Engineer


Page 38

Ciling 4 x 1 x 2.30 x 1.32


Window Kopla 4 x 1 x 0.52 x 0.08
4 x 2 x 0.26 x 0.17
4 x 1 x 0.70 x 0.30
1st/F Com. Bath Room 2x2= 04 nos.
Wall 4 x 2 x 2.30 x 0.90
4 x 2 x 1.32 x 0.90
Ciling 4 x 1 x 2.30 x 1.32
Window Kopla 4 x 1 x 0.52 x 0.08
4 x 2 x 0.26 x 0.17
4 x 1 x 0.70 x 0.30
G/F Dining Hall 2x2=04 nos.
Wall 4 x 2 x 2.98 x 2.90
4 x 2 x 4.38 x 2.90
Ciling 4 x 1 x 2.98 x 4.38
Less Door -4 x 2 x 0.50 x 1.02 x 1.96
-4 x 2 x 0.50 x 0.87 x 1.96
Open Area -4 x 1 x 1.00 x 1.00 x 1.96
Less Window -4 x 2 x 0.50 x 0.89 x 1.18
Stair Side Coridor 2x4=08 nos.
Wall 4 x 2 x 2.40 x 1.96
Ciling 4 x 1 x 2.40 x 0.80
4 x 1 x 0.65 x 0.87
Less Door -4 x 2 x 0.50 x 0.90 x 1.96
Wardrope
Ceiling Bottom 4 x 5 x 0.34 x 0.52

Contractor Junior Engineer


Page 39

Ciling top 4 x 5 x 0.34 x 0.52


Side 4 x 2 x 0.34 x 1.96
Less -4 x 4 x 1.00 x 0.05 x 0.34
1st/F Dining Hall 2x2=04 nos.
Wall 4 x 2 x 2.98 x 2.90
4 x 2 x 4.38 x 2.90
Ciling 4 x 1 x 2.98 x 4.38
Less Door -4 x 2 x 0.50 x 1.02 x 1.96
-4 x 1 x 0.50 x 0.87 x 1.96
-4 x 1 x 0.50 x 1.00 x 1.96
Less Window -4 x 3 x 0.50 x 0.89 x 1.18
Stair Side Coridor 2x4=08 nos.
Wall 4 x 2 x 2.40 x 1.96
Ciling 4 x 1 x 2.40 x 0.80
4 x 1 x 0.65 x 0.87
Less Door -4 x 2 x 0.50 x 0.90 x 1.96
Wardrope
Ceiling 4 x 5 x 0.34 x 0.52
Ciling top 4 x 5 x 0.34 x 0.52
Side 4 x 2 x 0.34 x 1.96
Less -4 x 4 x 1.00 x 0.05 x 0.34
Kitchen Room =2x4=08Nos.
Wall 8 x 2 x 2.53 x 2.90
Kopla 8 x 1 x 1.97 x 0.07
Wall 8 x 2 x 2.14 x 2.90
Ciling 8 x 1 x 2.14 x 2.53

Contractor Junior Engineer


Page 40

Less tiles -8 x 1 x 0.75 x 1.57


Less tiles -8 x 1 x 2.14 x 1.57
Less tiles -8 x 1 x 0.38 x 1.57
Less tiles -8 x 1 x 2.12 x 0.80
Less tiles -8 x 1 x 0.67 x 0.68
Less Window -8 x 0.50 x 0.40 x 0.90
Shelf Wall 8 x 2 x 0.31 x 0.52
Ceiling 8 x 2 x 0.31 x 1.97
Top 8 x 1 x 0.31 x 2.13
Shelf Ciling 8 x 1 x 1.98 x 0.61
8 x 2 x 0.58 x 0.65
8 x 2 x 0.62 x 0.81
Side Wall 8 x 2 x 0.56 x 0.29
Less Door -8 x 1 x 0.50 x 0.75 x 1.95
Less Door -8 x 1 x 0.50 x 0.87 x 1.95
Less Window -8 x 1 x 0.50 x 0.40 x 0.90
Store Room =2x4=08Nos.
Ciling 8 x 1 x 0.87 x 1.45
Wall 8 x 2 x 0.87 x 1.95
8 x 2 x 1.45 x 1.95
Bottom of Shelf 8 x 2 x 0.40 x 0.60
8 x 1 x 0.53 x 0.60
8 x 3 x 1.45 x 0.21
Less Door -8 x 0.50 x 0.75 x 1.95
Kitchen Box =2x4=08Nos.
Ceiling 8 x 2 x 1.96 x 1.46

Contractor Junior Engineer


Page 41

Wall 8 x 2 x 1.96 x 0.83


8 x 2 x 1.46 x 0.83
Kopla 8 x 1 x 0.14 x 1.46
Inner Box Ciling 8 x 1 x 0.80 x 0.83
Inner Box Wall 8 x 1 x 0.80 x 0.83
Bed Room =2x4=08Nos.
Ceiling 8 x 1 x 3.30 x 3.74
Wall 8 x 2 x 3.30 x 2.90
8 x 2 x 3.79 x 2.90
Cupboard Top & Bottpm 8 x 2 x 0.40 x 1.30
Less Window -8 x 1 x 0.50 x 1.39 x 1.19
Less Door -8 x 1 x 0.50 x 1.02 x 1.96
Side Wall 8 x 2 x 1.82 x 0.52
G/F Attach. Balcony Bed Room 2x2=04Nos.
Wall 4 x 2 x 4.71 x 2.90
4 x 2 x 3.10 x 2.90
Ceiling 4 x 1 x 4.71 x 3.10
Cupboard Top 4 x 1 x 2.05 x 0.13
Cupboard
Wall 4 x 2 x 1.89 x 0.33
Top & Bottom 4 x 4 x 0.98 x 0.33
4 x 6 x 0.68 x 0.33
Side 4 x 5 x 0.30 x 0.33
4 x 3 x 0.20 x 0.33
Less Door -4 x 2 x 0.50 x 1.02 x 1.92
Less Window -4 x 1 x 0.50 x 1.77 x 1.19
1st/F Attach. Balcony Bed Room 2x2=04Nos.

Contractor Junior Engineer


Page 42

Wall 4 x 2 x 4.71 x 2.90


4 x 2 x 3.10 x 2.90
Ceiling 4 x 1 x 4.71 x 3.10
Cupboard Top 4 x 1 x 2.05 x 0.13
Cupboard
Wall 4 x 2 x 1.89 x 0.33
Top & Bottom 4 x 4 x 0.98 x 0.33
4 x 6 x 0.68 x 0.33
Side 4 x 5 x 0.30 x 0.33
4 x 3 x 0.20 x 0.33
Less Door -4 x 3 x 0.50 x 0.93 x 1.92
Less Window -4 x 1 x 0.50 x 1.77 x 1.19
Puja Room 2x4=08Nos.
Ciling 8 x 1 x 2.29 x 1.50
Wall 8 x 2 x 2.29 x 2.90
8 x 2 x 1.50 x 2.90
Cupboard 8 x 2 x 1.95 x 0.50
Ciling 8 x 1 x 1.10 x 0.50
8 x 1 x 1.26 x 0.60
8 x 1 x 1.03 x 0.61
Less Door -8 x 1 x 0.50 x 0.58 x 1.98
Less Window -8 x 1 x 0.50 x 0.78 x 1.18
Staircase 2x1=02Nos.
Mumty, Ceiling 2 x 1 x 5.60 x 2.03
Wall 2 x 2 x( 5.60 + 2.03 )x 8.80
Less Door -2 x 2 x 0.50 x 0.87 x 2.06

Contractor Junior Engineer


Page 43

Less Window -2 x 4 x 0.50 x 1.56 x 0.61


Less Door -2 x 4 x 0.50 x 0.89 x 1.88
Less Door -2 x 2 x 0.50 x 1.02 x 1.96
Less Door 1 x 2 x 2.07 x 1.98 x 1.00
At ciling 1 x 2 x 2.07 x 0.56
At West Slab 1 x 2 x 3.25 x 1.02
2 x 2 x 2.72 x 1.02
Landing 2 x 2 x 3.06 x 1.02
2 x 2 x 1.37 x 2.03
2 x 2 x 1.37 x 2.03
Stair Wall 2 x 2 x 1.02 x 1.10
At West Slab 2 x 3 x 2.94 x 0.89
At West Slab 2 x 3 x 2.94 x( 0.53 + 0.41
2.00
At West Slab 1 x 2 x 3.70 x 0.93
At West Slab 2 x 3 x 3.70 x( 0.53 + 0.41
2.00
At West Slab 2 x 3 x 0.22 x 0.68
At West Slab 1 x 2 x 0.10 x 0.68
Ground Floor Balcony 2x2=04Nos.
Ciling 4 x 1 x 1.15 x 2.37
Wall 4 x 1 x 2.37 x 2.90

4 x 1 x 1.15 x 0.95
Side Wall 4 x 1 x 1.15 x 2.90

Contractor Junior Engineer


Page 44

4 x 1 x 2.37 x 0.95
4 x 1 x 0.30 x 1.93
Chajja Ciling 4 x 1 x 3.50 x 0.67
4 x 1 x 1.25 x 0.67
Round Pillar 4 x 1 x 1.06 x 1.92
Less Door -4 x 1 x 0.50 x 0.90 x 1.92
Less Window 4 x 1 x 0.50 x 0.40 x 1.18
1st Floor Floor Balcony 2x2=04Nos.
Ciling 4 x 1 x 3.00 x 1.90
Wall 4 x 1 x 2.61 x 2.00
4 x 1 x 1.50 x 2.00
Side Wall 4 x 1 x 2.36 x 0.18
4 x 1 x 1.20 x 0.18
Chajja Ciling 4 x 1 x 3.50 x 0.67
4 x 1 x 1.25 x 0.67
Round Piller 4 x 1 x 1.06 x 1.84
Railing Wall 4 x 1 x 2.40 x 0.27
4 x 1 x 1.20 x 0.27
Side 4 x 1 x 0.60 x 0.17
Kopla 4 x 1 x 0.06 x 0.73
Less Door -4 x 1 x 0.50 x 1.05 x 1.86
Less Window -4 x 1 x 0.50 x 0.70 x 1.19

Mark -(A)
Total

Contractor Junior Engineer


Page 45

Total Quantity of Wall Putty


Date of Measurement :-
Distempring with 1st quality acrylic distemper (ready mixed) of apporived manufacturer, of required shade and colour complete, a
10.7 specificition.
10.7.1 Two or more coats on new work
Quantity Brought from TCMB- /Page No. /Item No:- 10.11 / Marked (A) Total Quantity of Acrylic Didtemper
Total Quantity of Acrylic Distemper

C.O. to P
Date of Measurement :-
10.8 Applaying one coat of water thinnable cement primer of approved brand and manufacture on wall.
10.8.1 Water thinnable cement primer.
Quantity Brought from TCMB- /Page No. /Item No:- 10.11 / Marked (A) Total Quantity of Water thinnable primer.
Total Quantity of Water Thinnable Prime

C.O. to P
Date of Measurement :-
10.9 Finishing wall with Acrylic smooth exterior paint of required shade :
10.9.1 New work (Two or more coat applied @1.67 ltr/10sqm over and including priming coat of extrior primer applied @ 2.20kg/10sqm)
Particulars
Outside Block - I
Gate Side 2 * 7.60 * 3.74
2 * 2.65 * 0.80

Contractor Junior Engineer


Page 46

2 * 1.50 * 0.80
2 * 2.93 * 1.00
2 * 1.66 * 1.00
2 * 0.67 * 0.42
Wall 2 * 7.60 * 5.24
Less Window 2 * 2.00 * 0.50 * 1.20 * 1.20
Spring 2 * 2.00 * 2.90 * 0.07
2 * 2.00 * 1.38 * 0.13
Pillar 2 * 2.00 * 1.03 * 2.05
Road Side 2 * 8.04 * 7.60
Less Window 2 * 2.00 * 0.50 * 1.17 * 0.88
Coping 2 * 2.00 * 2.00 * 0.86 * 0.14
2 * 2.00 * 0.86 * 0.14
Backside plaster 2 * 7.60 * 5.72
Less Window 2 * 2.00 * 3.00 * 1.20 * 0.58
2 * 7.60 * 0.76
Near Back Hall 2 * 7.60 * 4.36
Less Window 2 * 5.00 * 0.50 * 0.89 * 1.15
Less Door 2 * 1.00 * 0.50 * 2.04 * 0.90
Near Kitchen 1 * 5.74 * 7.60
Less Window 1 * 2.00 * 2.00 * 0.50 * 1.15 * 0.89
Parapet wall Inner 2 * 5.00 * 0.70
2 * 8.74 * 0.70
2 * 8.48 * 0.75
2 * 11.27 * 0.75
2 * 9.00 * 0.75
Parapet Top Top 2 *( 30.00 + 10.74 )* 0.15

Contractor Junior Engineer


Page 47

Copla 2 * 16.00 * 0.28 * 0.13


Mumty Outer 1 * 2.00 * 5.30 * 2.63
1 * 2.64 * 2.63
Less Door 1 * 2.00 * 0.50 * 0.86 * 2.16
Outside Block - II
Gate Side 2 * 7.60 * 3.74
2 * 2.65 * 0.80
2 * 1.50 * 0.80
2 * 2.93 * 1.00
2 * 1.66 * 1.00
2 * 0.67 * 0.42
Wall 2 * 7.60 * 5.24
Less Window 2 * 2.00 * 0.50 * 1.20 * 1.20
Spring 2 * 2.00 * 2.90 * 0.07
2 * 2.00 * 1.38 * 0.13
Pillar 2 * 2.00 * 1.03 * 2.05
Road Side 2 * 8.04 * 7.60
Less Window 2 * 2.00 * 0.50 * 1.17 * 0.88
Coping 2 * 2.00 * 2.00 * 0.86 * 0.14
2 * 2.00 * 0.86 * 0.14
Backside plaster 2 * 7.60 * 5.72
Less Window 2 * 2.00 * 3.00 * 1.20 * 0.58
2 * 7.60 * 0.76
Near Back Hall 2 * 7.60 * 4.36
Less Window 2 * 5.00 * 0.50 * 0.89 * 1.15
Less Door 2 * 1.00 * 0.50 * 2.04 * 0.90
Near Kitchen 1 * 5.74 * 7.60

Contractor Junior Engineer


Page 48

Less Window 1 * 2.00 * 2.00 * 0.50 * 1.15 * 0.89


Parapet wall Inner 2 * 5.00 * 0.70
2 * 8.74 * 0.70
2 * 8.48 * 0.75
2 * 11.27 * 0.75
2 * 9.00 * 0.75
Parapet Top 2 *( 30.00 + 10.74 )* 0.15
Copla 2 * 16.00 * 0.28 * 0.13
Mumty Outer 1 * 2.00 * 5.30 * 2.63
1 * 2.64 * 2.63
Less Door 1 * 2.00 * 0.50 * 0.86 * 2.16
Chajja Block - I
Near Enterence Gate
Top 4 * 1 * 1.95 * 0.65
Ciling 4 * 1 * 1.95 * 0.55
Side 4 * 2 * 0.55 *( 0.27 + 0.15 )/ 2
4 * 1 * 1.95 * 0.16
Balcony Chajja
Top 4 * 1 * 3.04 * 0.44
Ciling 4 * 1 * 3.04 * 0.67
Side 4 * 1 * 3.04 * 0.12
Side 4 * 1 * 0.37 *( 0.25 + 0.12 )/ 2

Top 4 * 1 * 1.23 * 0.41


Ciling 4 * 1 * 1.23 * 0.67
Side 4 * 1 * 1.25 * 0.12

Contractor Junior Engineer


Page 49

Top 4 * 1 * 3.00 * 0.62


Ciling 4 * 1 * 3.00 * 0.65
Side 4 * 1 * 3.00 * 0.12
Out Side 4 * 1 * 0.60 *( 0.25 + 0.12 )/ 2
Near Road Side
Top 4 * 1 * 1.05 * 0.60
Ciling 4 * 1 * 1.05 * 0.46
Side 4 * 2 * 0.46 *( 0.22 + 0.10 )/ 2
4 * 1 * 1.05 * 0.10
Bath Chajja
Top & Bottem 4 * 2 * 3.20 * 0.42
Side 4 * 2 * 0.42 *( 0.15 + 0.10 )/ 2
Side 4 * 1 * 3.20 * 0.10
Dining Hall
Top 4 * 1 * 4.37 * 0.69
Ciling 4 * 1 * 4.37 * 0.56
Side 4 * 1 * 4.37 * 0.10
Kitchen
Top 4 * 1 * 1.10 * 0.53
Ciling 4 * 1 * 1.10 * 0.47
Side 4 * 2 * 0.47 *( 0.22 + 0.10 )/ 2
Side 4 * 1 * 1.10 * 0.10
Mumty Door
Top 2 * 1 * 1.10 * 0.60
Ciling 2 * 1 * 1.10 * 0.60
Side 2 * 1 * 1.10 * 0.12
2 * 2 * 0.60 * 0.12

Contractor Junior Engineer


Page 50

Chajja Block - II
Near Enterence Gate
Top 4 * 1 * 2.00 * 0.60
Ciling 4 * 1 * 1.76 * 0.69
Out Side 4 * 2 * 0.59 *( 0.70 + 0.59 )/ 2
In Side 4 * 2 * 0.60 * 0.46
Jaffri Bottom 4 * 2 * 0.60 * 0.12
Side 4 * 1 * 2.01 * 0.12
Bottom 4 * 2 * 0.05 * 0.12
Balcony Chajja
Top 4 * 1 * 3.04 * 0.44
Ciling 4 * 1 * 3.04 * 0.67
Side 4 * 1 * 3.04 * 0.12
Side 4 * 1 * 0.37 *( 0.25 + 0.12 )/ 2

Top 4 * 1 * 1.23 * 0.41


Ciling 4 * 1 * 1.23 * 0.67
Side 4 * 1 * 1.25 * 0.12

Top 4 * 1 * 3.00 * 0.62


Ciling 4 * 1 * 3.00 * 0.65
Side 4 * 1 * 3.00 * 0.12
Out Side 4 * 1 * 0.60 *( 0.25 + 0.12 )/ 2
Near Road Side
Top 4 * 1 * 1.12 * 0.53
Ciling 4 * 1 * 0.90 * 0.60
Out Side 4 * 2 * 0.45 *( 0.70 + 0.60 )/ 2

Contractor Junior Engineer


Page 51

In Side 4 * 2 * 0.43 * 0.44


Jaffri Bottom 4 * 1 * 0.45 * 0.12
Side 4 * 1 * 1.12 * 0.16
Bottom 4 * 2 * 0.45 * 0.12
Bath Chajja
Top 4 * 1 * 3.26 * 0.56
Ciling 4 * 1 * 3.07 * 0.54
Out Side 4 * 2 * 0.50 *( 0.69 + 0.58 )/ 2
In Side 4 * 2 * 0.50 * 0.41
Jaffri Bottom 4 * 1 * 3.26 * 0.26
Side 4 * 2 * 0.27 * 0.10
Bottom 4 * 1 * 0.50 * 0.10
In Side 4 * 1 * 3.07 * 0.14
Dining Hall
Top 4 * 1 * 4.37 * 0.73
Ciling 4 * 1 * 4.37 * 0.63
Side 4 * 1 * 4.37 * 0.26
4 * 1 * 4.37 * 0.14
Kitchen
Top 4 * 1 * 1.10 * 0.53
Ciling 4 * 1 * 1.10 * 0.47
Out Side 4 * 2 * 0.47 *( 0.22 + 0.10 )/ 2
Side 4 * 1 * 1.10 * 0.10
Mumty Door
Top 2 * 1 * 1.10 * 0.60
Ciling 2 * 1 * 1.10 * 0.60
Side 2 * 1 * 1.10 * 0.12

Contractor Junior Engineer


Page 52

2 * 2 * 0.60 * 0.12
Block - 1 & 2
10 mm Chips Groating Wall
Front 2 * 1 * 1 * 1 * 6.95 * 2.84
Side 2 * 1 * 1 * 2 * 6.95 * 0.75
Fince 2 * 1 * 1 * 1 * 6.95 * 0.20
1 * 1 * 1 * 1 * 6.95 * 0.34
Less Window -2 * 2 * 1 * 0.5 * 0.64 * 1.54
2 * 1 * 1 * 1 * 2.84 * 0.12
2 * 2 * 1 * 1 * 0.56 * 0.20
Boundry Wall
Fron of Qtr.No- 1 to 4
Wall 1 x 1 x 15.80 x 1.30
Spring top 1 x 1 x 15.80 x 0.42
Spring side 2 x 1 x 15.80 x 0.10
Spring Bottom Kopla 2 x 1 x 3.86 x 0.07
2 x 1 x 3.64 x 0.07
2 x 1 x 3.60 x 0.07
2 x 1 x 3.47 x 0.07
Piller Kopla 2 x 4 x 1.30 x 0.07
Piller No -1 3 x 1 x 1.67 x 0.42
1 x 1 x 0.35 x 0.42
Piller top 1 x 1 x 0.42 x 0.42
Piller No -2 3 x 1 x 1.67 x 0.42
1 x 1 x 0.35 x 0.42

Contractor Junior Engineer


Page 53

Piller top 1 x 1 x 0.42 x 0.42


Wall 1 x 1 x 12.60 x 1.30
Spring top 1 x 1 x 12.60 x 0.43
Spring side 2 x 1 x 12.50 x 0.10
Spring Bottom Kopla 2 x 1 x 2.66 x 0.07
2 x 1 x 2.66 x 0.07
2 x 1 x 2.66 x 0.07
2 x 1 x 2.53 x 0.07
Piller Kopla 2 x 4 x 1.30 x 0.07
Fron of Road side
Wall 1 x 1 x 39.58 x 1.46
Spring top 1 x 1 x 39.58 x 0.43
Spring side 2 x 1 x 39.58 x 0.10
Spring Bottom Kopla 2 x 1 x 3.15 x 0.07
2 x 1 x 3.15 x 0.07
2 x 1 x 3.15 x 0.07
2 x 1 x 3.20 x 0.07
2 x 1 x 3.20 x 0.07
2 x 1 x 3.20 x 0.07
2 x 1 x 2.83 x 0.07
2 x 1 x 3.02 x 0.07
2 x 1 x 3.05 x 0.07
2 x 1 x 2.98 x 0.07
2 x 1 x 2.96 x 0.07
Piller Kopla 2 x 11 x 1.36 x 1.42

Contractor Junior Engineer


Page 54

Piller side 1 x 1 x 0.42 x 1.43


Piller top 1 x 1 x 0.42 x 0.42
Qtr. side
Wall 1 x 1 x 13.40 x 1.22
Spring top 1 x 1 x 13.00 x 0.43
Spring side 2 x 1 x 13.00 x 0.10
Spring Bottom Kopla 2 x 1 x 2.97 x 0.07
2 x 1 x 2.94 x 0.07
2 x 1 x 2.95 x 0.07
2 x 1 x 2.90 x 0.07
Piller Kopla 2 x 4 x 1.12 x 0.07
2 x 1 x 0.40 x 0.34
Piller top 2 x 1 x 0.43 x 0.43
Wall 1 x 1 x 12.74 x 1.18
Spring top 1 x 1 x 12.74 x 0.43
Spring side 2 x 1 x 12.74 x 0.10
Spring Bottom Kopla 2 x 1 x 2.52 x 0.07
2 x 1 x 2.78 x 0.07
2 x 1 x 2.82 x 0.07
2 x 1 x 3.28 x 0.07
Piller Kopla 2 x 4 x 1.18 x 0.07
Boundry Wall
Fron of Qtr.No- 1 to 4
Wall 1 x 1 x 15.80 x 1.30
Piller Kopla 2 x 4 x 1.30 x 0.07

Contractor Junior Engineer


Page 55

Piller No -1 3 x 1 x 1.67 x 0.42


1 x 1 x 0.35 x 0.42
Piller top 1 x 1 x 0.42 x 0.42
Piller No -2 3 x 1 x 1.67 x 0.42
1 x 1 x 0.35 x 0.42
Piller top 1 x 1 x 0.42 x 0.42
Wall 1 x 1 x 12.60 x 1.30
Piller Kopla 2 x 4 x 1.30 x 0.07
Piller 1 x 1 x 1.66 x 0.42
Fron of Road side
Wall 1 x 1 x 39.58 x 1.46
Piller Kopla 2 x 11 x 1.36 x 1.42
Piller side 1 x 1 x 0.42 x 1.43
Piller top 1 x 1 x 0.42 x 0.42
Qtr. side
Wall 1 x 1 x 13.40 x 1.22
Piller Kopla 2 x 4 x 1.12 x 0.07
Piller 2 x 3 x 1.70 x 0.43
2 x 1 x 0.40 x 0.34
Piller top 2 x 1 x 0.43 x 0.43
Wall 1 x 1 x 12.74 x 1.18
Piller Kopla 2 x 4 x 1.18 x 0.07
Ground Floor Balcony 2x2=04Nos.
Ciling 4 x 1 x 1.15 x 2.37
Wall 4 x 1 x 2.37 x 2.90

Contractor Junior Engineer


Page 56

4 x 1 x 1.15 x 0.95
Side Wall 4 x 1 x 1.15 x 2.90
4 x 1 x 2.37 x 0.95
4 x 1 x 0.30 x 1.93
Chajja Ciling 4 x 1 x 3.50 x 0.67
4 x 1 x 1.25 x 0.67
Round Pillar 4 x 1 x 1.06 x 1.92
Less Door -4 x 0.50 x 0.90 x 1.92
Less Window -4 x 0.50 x 0.40 x 1.18
1st Floor Floor Balcony 2x2=04Nos.
Ciling 4 x 1 x 3.00 x 1.90
Wall 4 x 1 x 2.61 x 2.00
4 x 1 x 1.50 x 2.00
Side Wall 4 x 1 x 2.36 x 0.18
4 x 1 x 1.20 x 0.18
Chajja Ciling 4 x 1 x 3.50 x 0.67
4 x 1 x 1.25 x 0.67
Round Piller 4 x 1 x 1.06 x 1.84
Railing Wall 4 x 1 x 2.40 x 0.27
4 x 1 x 1.20 x 0.27
Side 4 x 1 x 0.60 x 0.17
Kopla 4 x 1 x 0.06 x 0.73
Less Door -4 x 0.50 x 1.05 x 1.86
Less Window -4 x 0.50 x 0.70 x 1.19

Total -

Contractor Junior Engineer


Page 57

Total Qty.of Acrylic Smooth exterior paints


C.O. to P / TCMB

Date of Measurement :-
10.5 Net cement punning
Chajja Block - I
Near Enterence Gate
Top 4 * 1 * 1.95 * 0.75
Balcony Chajja
Top 4 * 1 * 3.04 * 0.54
Top 4 * 1 * 1.23 * 0.51
Top 4 * 1 * 3.00 * 0.72
Near Road Side
Top 4 * 1 * 1.05 * 0.70
Bath Chajja
Top 4 * 1 * 3.20 * 0.52
Dining Hall
Top 4 * 1 * 4.37 * 0.79
Kitchen
Top 4 * 1 * 1.10 * 0.63
Balcony Roof
Top 2 * 1 * 1.55 * 2.70
Mumty Door
Top 2 * 1 * 1.10 * 0.70
Chajja Block - II
Near Enterence Gate
Top 4 * 1 * 2.00 * 0.70

Contractor Junior Engineer


Page 58

Balcony Chajja
Top 4 * 1 * 3.04 * 0.54
Top 4 * 1 * 1.23 * 0.51
Top 4 * 1 * 3.00 * 0.72
Near Road Side
Top 4 * 1 * 1.12 * 0.63
Bath Chajja
Top 4 * 1 * 3.26 * 0.66
Dining Hall
Top 4 * 1 * 4.37 * 0.83
Kitchen
Top 4 * 1 * 1.10 * 0.63
Balcony Roof
Top 2 * 1 * 1.55 * 2.70
Mumty Door
Top 2 * 1 * 1.10 * 0.70
Total -

C.O. to P / TCMB

Date of Measurement :-
Providing and fixing factory made P.V.C. door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm ri
mitred at corners and joined with 2 Nos. of 150mm long brackets of 15x15mm M.S. square tube, the vertical door frame profiles to
19x19mm M.S. square tube of 19 gauge, EPDM rubber gasket weather seal to be provided through out the frame. The door frame to
6.9
using M.S. screws of 65/100mm size, complete as per manufacturers specification and direction of Engineer-in-Charge.

Building( 01 & 02)

Contractor Junior Engineer


Page 59

G. Floor/Bathroom.
Common Toilet
Vertical = 4 x 2 x 1 x 2.11
Horizental = 4 x 1 x 1 x 0.68
Attached Toilet
Vertical 4 x 2 x 1 x 2.11
Horizental 4 x 1 x 1 x 0.64
Building( 01 & 02)
1st Floor/Bathroom.
Common Toilet
Vertical 4 x 2 x 1 x 2.11
Horizental 4 x 1 x 1 x 0.68
Attached Toilet
Vertical 4 x 2 x 1 x 2.11
Horizental 4 x 1 x 1 x 0.64

Total

C.O. to P

Date of Measurement :-
6.10 Providing and fixing factory made panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and s
6.10.1 for styles
30 mm andplain
thick 15x15mm for top
PVC door & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture . M
shutters.
1 5mm thick heat moulded01PVC
Building( 'C' channel of size 30mm thickness, 70mm width out of which 50mm shall be flat and 20mm shall b
& 02)
angle on both side forming styles; and 5mm thick, 95mm wide PVC sheet out of which 75mm shall be flat and 20mm shall be taper
G. Floor/Bathroom.
inner side to form top and bottom rail and 115mm wide PVC sheet out of which 75mm shall be flat and 20mm shall be tapered on
Common
rail. Top, bottom and lockToilet 4 sidexof the panel.
rails shall be provided both 1 x
10mm 0.66
(5mm x 2 x
) thick, 2.05
20mm wide cross PVC sheet be pr
top rail & bottom rail. paneling of 5mm thick both side PVC sheet to be fitted in the M.S. frame welded/ sealed to the styles & rail
(5mm+2mm) thick Attached
x 15mm Toilet
wide PVC sheet beading 4 on inner
x side,1and joined
x together
0.62 withx solvent
2.06cement adhesive. An addition
of 20mm width is to be stuck on the interior side of the 'C' Channel using PVC solvent adhesive etc. complete as per direction of E
Manufacturer’s specification & drawing.
Contractor Junior Engineer
Page 60

Building( 01 & 02)


1st Floor/Bathroom.
Common Toilet 4 x 1 x 0.66 x 2.05

Attached Toilet 4 x 1 x 0.62 x 2.06

Total

C.O. to P

Date of Measurement :-
14.1 Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100mm sand cast Iron P or S trap, 10 litre low level w
14.1.1 cistern, including
White Vitreous flush
china pipe,pattern
Orissa with manually controlled
W.C. pan device (handle
of size 580x440mm with lever) conforming
integral to IS : 7231, with all fittings and fixtures c
type foot rests.
cutting and making good the walls and floors wherever required :

Ground Floor( 2x2=4 nos.) 2 x 2 x 1.00


1st Floor (2x2=4 noa.) 2 x 2 x 1.00
Total

C.O. to P

Date of Measurement :-
14.2 Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitr
14.2.1 cistern
W.C. pan& C.P.
withflush bend with
ISI marked fittings
white & C.I.brackets,
solid plastic seat and 40mm
lid. flush bend, overflow arrangement with specials of standard make and
coupling of approved municipal design complete including painting of fittings and brackets, cutting and making good the walls a
required :

Contractor Junior Engineer


Page 61

Ground Floor( 2x2=4 nos.)


1st Floor (2x2=4 noa.)
2 x 2 x 1.00
2 x 2 x 1.00
Total

C.O. to P

Date of Measurement :-
14.3 Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps,32 mm C.P. brass waste of standard pattern, in
14.3.1 painting
White Vitreous China Flat back Washofbasin
fittings
sizeand brackets,
550x400 mm cutting and making
with a single 15 mmgood the walls
C.P. brass wherever
pillar tap. require :
Ground Floor ( 2x1=02 nos ) 2 x 1 x 2.00
1st Floor ( 2x1=02 nos ) 2 x 1 x 2.00
Total

C.O. to P

Date of Measurement :-
14.3.2 White Vitreous China Flat back Wash basin size 450x300 mm with a single 15 mm C.P. brass pillar tap.
Ground Floor ( 2x1=02 nos ) 2 x 1 x 2.00
1st Floor ( 2x1=02 nos ) 2 x 1 x 2.00
Total

C.O. to P

Contractor Junior Engineer


Page 62

Date of Measurement :-

14.4 Providing and fixing Stainless Steel A Isi 304 (18/8)kitchen sink as per IS:13983 with C.I brickets,cutting and making good the wall wh

14.4.1 Kitchen sink without drain board.


14.4.1.1 610x460mm bowl depth 200mm.
Ground Floor ( 2x1=02 nos ) 2 x 1 x 2.00
1st Floor ( 2x1=02 nos ) 2 x 1 x 2.00
Total

C.O. to P

Date of Measurement :-
14.5 Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete.
14.5.1 Semi rigid pipe
14.5.1.1 32 mm
dia Ground Floor 2 x 2 x 3.00
1st Floor 2 x 2 x 3.00
Total

C.O. to P

Date of Measurement :-
14.6 Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of a
14.6.1 shade with 6450x350
Oval Shape mm thick
mmhard board
(Outer backing :
dimensions)
Ground Floor 2 x 2 x 2.00

Contractor Junior Engineer


Page 63

1st Floor 2 x 2 x 2.00


Total

C.O. to P

Date of Measurement :-
14.7 Providing and fixing 600 x120 x5 mm glass shelf with edges round off,suppoted on anodised aluminium angle frame with C.P.bras
rail complete fixed with 40
Ground mm long screws,rawl plugs
Floor 2 etc.,complete.
x 2 x 2.00
1st Floor 2 x 2 x 2.00
Total

C.O. to P

Date of Measurement :-

Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked with cover and suitable loc
15.7
making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank

2 x 1 x 1000
Total

C.O. to P

Date of Measurement :-
15.8 Providing and fixing C.P. brass bib cock of approved quality conforming to IS:8931

Contractor Junior Engineer


Page 64

15.8.1 15 mm nominal bore.


Block - I & II
Ground Floor

Kitchen 2 x 4 x 1.00
Common Toilet 2 x 4 x 1.00

Total

C.O. to P

Date of Measurement :-
15.9 Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less then 690
15.9.1 15 mm nominal bore
Block - I & II
Kitchen 2 x 4 x 1.00

Total

C.O. to P

Date of Measurement :-
15.11 Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931
15.11.1 15 mm nominal bore
Gijar point 2 x 4 x 2.00

Contractor Junior Engineer


Page 65

Toilet Besin 2 x 4 x 1.00


Dining Hall Besin 2 x 4 x 1.00
Systern 2 x 4 x 2.00
Kitchen 2 x 4 x 1.00

Total

C.O. to P

Date of Measurement :-
17.1 Providing and laying water proofing treatment to vertical and horizontal surfaces of depressed portions of W.C., kitchen and the li
:_x000D_
1st Floor Toilet & Bath = 4Nos.
i) Ist course of applying cement slurry @ 4.4 Kg/sqm4 mixedxwith water
2 proofing
x compound
1.45 x conforming
1.00 to IS 2645 in recommended
rounding off junction of vertical and horizontal surface._x000D_
4 x 4 x 1.45 x 0.55
ii) IInd course of 20mm cement plaster 1:3 (1 cement : 3 coarse sand) mixed with water proofing compound in recommended propo
4 x
rounding off junction of vertical and horizontal surface._x000D_ 4 x 1.00 x 0.55
4
iii) IIIrd course of applying blown or residual bitumen x
applied hot1at 1.7 x 0.25
Kg. per x 1.45
sqm of area._x000D_
iv) IVth course of 400 micron thick PVC sheet. (Overlaps at joints of PVC sheet should be 100 mm wide and pasted to each other w
Kg/sqm.)
Total

C.O. to P

Date of Measurement :-
15.1 Providing and fixing G.I. pipes complete with G.I. fittingsand clamps, i/c cutting making good the walls etc.
15.1.1 25 mm dia nominal bore Internal work- Exposed on wall.
Near Drain to Supplay Line

Contractor Junior Engineer


Page 66

Inlit Line Building no . 01 1 x 1 x 2 x 16.30


Horizental 1 x 1 x 2 x 22.40
1 x 1 x 2 x 2.00
1 x 1 x 2 x 1.45

Inlit Line Building no . 02 1 x 1 x 4 x 7.45


Horizental 1 x 1 x 4 x 1.90
1 x 1 x 2 x 0.65
1 x 1 x 2 x 1.75
1 x 1 x 2 x 14.70
1 x 1 x 2 x 2.40
1 x 1 x 2 x 10.00

Inlit Line Building no .01 & 02 2 x 2 x 2 x 8.70


Verticl 2 x 2 x 1 x 2.10
Horizental 2 x 2 x 1 x 1.32
Horizental 2 x 2 x 2 x 0.35
Vertical
Tarrece 2 x 2 x 1 x 0.45
Tank Out- Let Horizental 2 x 2 x 1 x 0.15
Horizental 2 x 1 x 2 x 8.56
Verticl 2 x 1 x 1 x 0.30
Horizental 2 x 1 x 1 x 1.05
Horizental 2 x 1 x 2 x 0.30
Horizental

Contractor Junior Engineer


Page 67

Mark-(I) Total

C.O. to P
Date of Measurement :-
Extra Item Marble stone flooring with 18 mm thick marble stone, as per sample ofmarble approved by Engineer-in-charge, over 20 mm (avera
No.1 cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed withgrey cement slurry, including rubbing and polishing complete w
(i) Udaipur green marble
Ground Floor Entrance
Floor 1 x 2 x 3.40 x 2.08
2 x 2 x 3.30 x( 0.19 + 0.10 )
2
Ground Floor Landing 1 x 2 x 1.66 x 2.30
Less -1 x 2 x 0.40 x 0.88
Mumty 1 x 2 x 1.42 x 1.97
2 x 2 x 0.80 x 0.13
Skirting (From Mumty to G/Fl.) 1 x 2 x 2.67 x 0.10
1 x 2 x 2.12 x 0.10
1 x 2 x 1.07 x 0.10
9 x 2 x 0.36 x 0.10
1 x 2 x 0.14 x 0.10
1 x 2 x 1.45 x 0.10
1 x 2 x 1.97 x 0.10
1 x 2 x 1.81 x 0.10
1 x 2 x 0.40 x 0.10
7 x 2 x 0.36 x 0.10

Contractor Junior Engineer


Page 68

8 x 2 x 0.36 x 0.10
1 x 2 x 1.38 x 0.10
1 x 2 x 1.97 x 0.10
8 x 2 x 0.70 x 0.10
1 x 2 x 1.71 x 0.10
21 x 2 x 0.38 x 0.10
1 x 2 x 1.23 x 0.10
1 x 2 x 0.48 x 0.10
1 x 2 x 1.66 x 0.10
1 x 2 x 0.80 x 0.10
Total Mark-P

Tread 11 x 2 x 0.90 x 0.28


Riser 12 x 2 x 0.90 x 0.15
Landing 1 x 2 x 1.47 x 1.97
1 x 2 x 0.10 x 0.90
Tread 7 x 2 x 0.90 x 0.28
Riser 8 x 2 x 0.90 x 0.15
1st Floor
Tread 7 x 2 x 0.90 x 0.28
Riser 8 x 2 x 0.90 x 0.17
Landing 1 x 2 x 1.54 x 1.99
1 x 2 x 1.70 x 0.90
Tread 10 x 2 x 0.90 x 0.28

Contractor Junior Engineer


Page 69

Riser 11 x 2 x 0.90 x 0.15


Ground Floor
Balcony 2 x 2 x 0.30 x 2.84
2 x 2 x 0.30 x 1.41
Balcony Steps
Floor 2 x 2 x 3.11 x 0.28
2 x 2 x 1.70 x 0.28
Scarting 2 x 2 x 0.40 x 0.10
2 x 2 x 2.82 x 0.13
2 x 2 x 1.70 x 0.13
2 x 2 x 3.11 x 0.19
2 x 2 x 2.01 x 0.19
Side 2 x 2 x 0.30 x 0.28
2 x 2 x 0.24 x 0.19
Back Side Steps 01 Nos
1 x 1 x 0.90 x 0.17
1 x 1 x 0.85 x 0.26
1 x 1 x 0.85 x 0.24
1 x 1 x 0.37 x 0.10
1 x 1 x 0.23 x 0.10
1 x 1 x 0.50 x 0.10
1 x 1 x 0.30 x 0.25
1 x 1 x 0.18 x 0.10
1 x 1 x 0.23 x 0.10
1 x 1 x 0.85 x 0.11

Contractor Junior Engineer


Page 70

Back Side Steps 03 Nos


3 x 1 x 0.90 x 0.27
3 x 1 x 0.85 x 0.17
3 x 1 x 0.49 x 0.10
3 x 1 x 0.22 x 0.17
3 x 1 x 0.32 x 0.07
3 x 1 x 0.30 x 0.25
3 x 1 x 0.09 x 0.10
3 x 1 x 0.82 x 0.15
3 x 1 x 0.82 x 0.25
Total Mark-Q
TotalQuantity of Green marble

C.O. to P

Date of Measurement :-
Extra Item Marble stone flooring with 18 mm thick marble stone, as per sample ofmarble approved by Engineer-in-charge, over 20 mm (avera
No.2 cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed withgrey cement slurry, including rubbing and polishing complete w
(i) Extra for pre finished nosing to treads of steps of marble stone.
Entrance of Stair
Side 2 x 2 x 3.26
2 x 1 x 1.10
Tread of Stair
1st Flight 2 x 12 x 0.90

Contractor Junior Engineer


Page 71

2nd Flight 2 x 7 x 0.90


3rd Flight 2 x 7 x 0.90
4th Flight 2 x 12 x 0.90
Balcon Steps
Floor 2 x 2 x 2.84
Floor 2 x 2 x 1.41
Tread 2 x 2 x 3.11
Tread 2 x 2 x 1.70
Balcon Steps
Tread 2 x 2 x 0.85
Tread 2 x 2 x 0.85

Total

Date of Measurement :-
Extra Item Providing edge moulding to 18mm thick marble stone counters, Vanities etc. including machine polishing to edge to give high glo
No.3 as per design approved by Engineer-in-Charge.

(i) Granite Work


Kitchen
2 x 4 x 1.94
2 x 4 x 2.11
Store
2 x 4 x 1.04
2 x 4 x 0.94
2 x 4 x 0.90

Contractor Junior Engineer


Page 72

6 x 4 x 0.90
Puja Room
4 x 2 x 1.00
4 x 2 x 1.00
Total

C.O. to P

Date of Measurement :-
Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer) with water absorption less than 0
Extra Item
% and conforming to I.S. 15622, of approved make in all colours & shade in skirting, riser of steps, over 12 mm thick bed of cemen
No.5
mortar 1:3 (1 cement: 3 coarse sand), including grouting the joint with white cement & matching pigments etc. complete.
(i) Size of Tile 600x600 mm
Re-Measured
Scarting / 8nos Qtr.
Attached Bath /Bed Rom 8 x 1 x 3.37 x 0.10
8 x 1 x 4.50 x 0.10
8 x 1 x 0.78 x 0.10
8 x 1 x 0.43 x 0.10
8 x 1 x 0.90 x 0.10
8 x 1 x 3.50 x 0.10
8 x 1 x 1.10 x 0.10
8 x 1 x 1.32 x 0.10
8 x 1 x 1.00 x 0.10
8 x 1 x 2.55 x 0.10

Contractor Junior Engineer


Page 73

Corridor 8 x 1 x 3.96 x 0.10


8 x 1 x 0.56 x 0.10
8 x 1 x 0.33 x 0.10

Dining Hall 8 x 1 x 2.03 x 0.10


8 x 1 x 4.65 x 0.10
8 x 1 x 2.03 x 0.10

Corridor 8 x 1 x 1.72 x 0.10


8 x 1 x 0.90 x 0.10
8 x 1 x 2.61 x 0.10
8 x 1 x 0.52 x 0.10

Bed Room 8 x 1 x 2.80 x 0.10


8 x 1 x 3.20 x 0.10
8 x 1 x 3.28 x 0.10
8 x 1 x 3.76 x 0.10

Attached Balcony Bed Room 8 x 1 x 3.60 x 0.10


8 x 1 x 3.20 x 0.10
8 x 1 x 3.88 x 0.10
8 x 1 x 2.47 x 0.10

Balcony 4 x 1 x 3.28 x 0.10


4 x 1 x 1.20 x 0.10

Contractor Junior Engineer


Page 74

4 x 1 x 2.90 x 0.10

G/Floor Balcony 4 x 1 x 3.06 x 0.10


4 x 1 x 1.20 x 0.10
4 x 1 x 0.46 x 0.10

Kitchen 8 x 1 x 1.06 x 0.10


8 x 1 x 2.04 x 0.10
8 x 1 x 2.00 x 0.10
8 x 1 x 0.80 x 0.10

Store 8 x 1 x 3.80 x 0.10


Total

C.O. to P

Date of Measurement :-
Extra Item Providing and fixing C.P. brass wall mixer of approved quality of Essco(Model No.MQT-517B) or equivalent make as per complete
No.6 Engineer-in-charge. Overhead shower with Arm of Jaquar or equivalent make.

(i) Wall mixture 3-in-1 system with provision for bath.


Ground Floor 2 x 2 x 2.00
1st Floor 2 x 2 x 2.00
Total

C.O. to P

Contractor Junior Engineer


Page 75

Date of Measurement :-
Extra Item Providing and fixing C.P. brass Overhead shower of approved quality of jaquar or equivalent make as per as per direction of the E
No.7

(i) C.P brass Overhead shower with Arm ( Model No : OHS-1985)


Ground Floor 2 x 4 x 1.00
1st Floor 2 x 4 x 1.00

Total

C.O. to P

Date of Measurement :-
Extra Item Providing and fixing 600 mm long C.P. brass Towel rail with C.P brass bracets of approved design of (Essco Model No. ACE-1111)
No.8 quality as per direction of the Engineer-in-charge.

(i) Ground Floor 2 x 2 x 2.00


1st Floor 2 x 2 x 2.00
Total

C.O. to P
Date of Measurement :-

Contractor Junior Engineer


Page 76

Extra Item Providing and fixing C.P. brass Two Way Bib cock (Model No. 41-KN) of approved quality as per direction of the Engineer-in-char
No.9

(i) Ground Floor 2 x 2 x 1.00


1st Floor 2 x 2 x 1.00
Total

C.O. to P
Date of Measurement :-
Extra Item Providing and fixing C.P. brass hand Shower (Model No. ALD-573) of approved quality as per direction of the Engineer-in-charge
No.10

(i) Ground Floor 2 x 2 x 1.00


1st Floor 2 x 2 x 1.00
Total

C.O. to P

Date of Measurement :-
Extra Item Providing and fixing G.I. pipes complete with G.I. fittingsand clamps, i/c cutting making good the walls etc.
No- 11 Internal work- Exposed on wall.
(i) 20 mm dia nominal bore
Tarrece (02 nos Building)
Both side Tank Connection Pipe
Horizental 2 x 1 x 1 x 2.27
Horizental 2 x 1 x 1 x 0.65
Vertical 2 x 1 x 1 x 7.76
Horizental 2 x 1 x 2 x 0.20

Contractor Junior Engineer


Page 77

Kitchen Line (Inlet Pipe )


.Horizental 2 x 1 x 1 x 5.30
Horizental 2 x 1 x 1 x 5.20
Horizental 2 x 1 x 1 x 1.60
2 x 1 x 1 x 1.55
Vertical 2 x 1 x 1 x 1.55
Vertical 2 x 1 x 1 x 7.45
Horizental 2 x 1 x 2 x 0.25
Vertical 2 x 1 x 1 x 2.75
Horizental 2 x 1 x 1 x 0.20
Vertical 2 x 1 x 1 x 0.35
Toilet Line (Inlet Pipe )
.Horizental 2 x 1 x 1 x 2.16
Horizental 2 x 1 x 1 x 0.16
Vertical 2 x 1 x 1 x 0.10
Vertical 2 x 1 x 1 x 0.75
Vertical 2 x 1 x 1 x 2.70
Vertical 2 x 1 x 1 x 0.50
Horizental 2 x 1 x 2 x 0.20
Horizental 2 x 1 x 1 x 1.42
Vertical 2 x 1 x 1 x 0.30
Horizental 2 x 1 x 1 x 2.40
Vertical 2 x 1 x 1 x 0.30
.Horizental 2 x 1 x 1 x 5.20
Horizental 2 x 1 x 1 x 5.15
.Horizental 2 x 1 x 1 x 1.75
Vertical 2 x 1 x 1 x 0.30

Contractor Junior Engineer


Page 78

.Horizental 2 x 1 x 1 x 1.73
Vertical 2 x 1 x 1 x 2.10
.Horizental 2 x 1 x 1 x 0.30
Vertical 2 x 1 x 1 x 2.10
Horizental 2 x 1 x 2 x 0.30
Horizental 2 x 1 x 1 x 0.20
Total
Mark-(G)
C.O. to P

Date of Measurement :-
Extra Item Providing and fixing G.I. pipes complete with G.I. fittingsand clamps, i/c cutting making good the walls etc.
No- 12 Internal work- Exposed on wall.

(i) 15 mm dia nominal bore


Vertical 2 x 1 x 1 x 2.30
Vertical 2 x 1 x 1 x 5.30
Vertical 2 x 1 x 1 x 5.40
Vertical 2 x 1 x 1 x 4.00
G/Floor Kitchen Line (Inlet Pipe )
Vertical 2 x 2 x 1 x 4.30
Horizental 2 x 2 x 1 x 0.45
Horizental 2 x 2 x 1 x 0.85
2 x 2 x 1 x 0.85
Vertical 2 x 2 x 1 x 1.20
Vertical 2 x 2 x 1 x 0.35

Contractor Junior Engineer


Page 79

Mark-(H) Total

Date of Measurement :-
Extra Item 19 mm thick Plyboard for cupboard partation
No- 14

Ground Floor Cupboard


Horizental 2 x 4 x 2 x 4 x 0.51 x
2 x 4 x 2 x 1 x 0.51 x
2 x 4 x 2 x 2 x 0.51 x
Vertical 2 x 4 x 2 x 4 x 0.58 x
Horizental 2 x 4 x 2 x 1 x 0.58 x
Vertical 2 x 4 x 2 x 2 x 0.25 x

Total =

C.O. to P / TCMB

Date of Measurement :-
Extra Item With ready mixed pink or Grey primer of approved brand andmanufacture on wood work (hard and soft wood)
No- 15

Contractor Junior Engineer


Page 80

(i) Wood Primer


Ground Floor 1st & 2nd Building(2x2=04 nos.)
Back side Door 4 x 2 x 1.30 x 0.85 x 2.04
Kitchen Door 4 x 2 x 1.30 x 0.89 x 2.03
Stair side door 4 x 2 x 1.30 x 0.89 x 2.06
Drawing room Door 4 x 2 x 1.30 x 1.02 x 2.07
Bed Room Door 4 x 2 x 1.30 x 1.00 x 2.07
Master Bed Room Door 4 x 2 x 1.30 x 1.04 x 2.07
Puja Room Door 4 x 2 x 1.30 x 0.77 x 2.07
Store Room Door 4 x 2 x 1.30 x 0.77 x 2.03
Balcony Side Door 4 x 2 x 1.30 x 1.03 x 2.05
1st Floor 1st & 2nd Building(2x2=04 nos.)
Kitchen Door 4 x 2 x 1.30 x 0.89 x 2.03
Stair side door 4 x 2 x 1.30 x 0.89 x 2.06
Drawing room Door 4 x 2 x 1.30 x 1.02 x 2.07
Bed Room Door 4 x 2 x 1.30 x 1.00 x 2.07
Master Bed Room Door 4 x 2 x 1.30 x 1.04 x 2.07
Puja Room Door 4 x 2 x 1.30 x 0.77 x 2.07
Store Room Door 4 x 2 x 1.30 x 0.77 x 2.03
Balcony Side Door 4 x 2 x 1.30 x 1.03 x 2.05
Drawing room Stair side Door 4 x 2 x 1.30 x 1.02 x 1.98
Ground & 1st Floor 1st & 2nd Building(2x4=08 nos.)
Drawing room Cupboard 4 x 2 x 2 x 1.30 x 1.17 x
Puja Room Cupboard 4 x 2 x 2 x 1.30 x 1.18 x

Drawing room Cupboard Shelf (2x4x2=16nos)


Horizental 16 x 4 x 2 x 1.30 x 0.51 x
16 x 1 x 2 x 1.30 x 0.51 x

Contractor Junior Engineer


Page 81

16 x 2 x 2 x 1.30 x 0.51 x
Vertical 16 x 4 x 2 x 1.30 x 0.58 x
Horizental 16 x 1 x 2 x 1.30 x 0.58 x
Vertical 16 x 2 x 2 x 1.30 x 0.58 x
To

C.O. to P
Date of Measurement :-
Extra Item Providing and fixing on wall face unplasticised - Rigid PVC rain water pipes conforming to IS :13592 Type A, including jointing w
No- 16 conforming IS :5382,living 10 mm gap for thermal expansion, (i) single socketed pipes.
(i) Cowel
2 x 4 x 1 x 1.00

Total

C.O. to P
Extra Item Providing and fixing on wall face unplasticised - Rigid PVC rain water pipes conforming to IS :13592 Type A, including jointing w
No- 16 conforming IS :5382,living 10 mm gap for thermal expansion, (i) single socketed pipes.
(ii) Plane Tee
Kitchen 2 x 2 x 1 x 1.00
Toilet 2 x 3 x 1 x 1.00

Total
C.O. to P

Contractor Junior Engineer


Page 82

Extra Item Providing and fixing on wall face unplasticised - Rigid PVC rain water pipes conforming to IS :13592 Type A, including jointing w
No- 16 conforming IS :5382,living 10 mm gap for thermal expansion, (i) single socketed pipes.
(iii) Door Band
2 x 2 x 1 x 4.00
2 x 2 x 1 x 1.00

Total
C.O. to P
Extra Item Providing and fixing on wall face unplasticised - Rigid PVC rain water pipes conforming to IS :13592 Type A, including jointing w
No- 16 conforming IS :5382,living 10 mm gap for thermal expansion, (i) single socketed pipes.
(iv) Nanahi Traf
2 x 2 x 2 x 3.00

Total

C.O. to P
Date of Measurement :-
Extra Item Providing and fixing G.I. Union in G.I. pipe including cutting and threadingthe pipe and making
No- 17 long screws etc. complete (New work) :
(i) 25 mm nominal bore
2 x 1 x 1 x 12.00

Total

Contractor Junior Engineer


Page 83

C.O. to P
Date of Measurement :-
Extra Item Providing and fixing G.I. Union in G.I. pipe including cutting and threadingthe pipe and making
No- 18 long screws etc. complete (New work) :
(i) 20 mm nominal bore

2 x 1 x 1 x 4.00

Total

C.O. to P
Date of Measurement :-
Extra Item Providing and fixing G.I. Union in G.I. pipe including cutting and threadingthe pipe and making
No- 19 long screws etc. complete (New work) :
(i) 15 mm nominal bore

2 x 1 x 1 x 9.00

Total

C.O. to P
Date of Measurement :-
Extra Item Providing and fixing gun metal gate valve with C.I. wheel of approved quality(screwed end) :
No- 20

Contractor Junior Engineer


Page 84

(i) 25 mm nominal bore 2 x 1 x 1 x 4.00

Total

C.O. to P
Date of Measurement :-
Extra Item P.V.C, water Tank Cover 1000 Liter
No- 21

(i) 2 x 1 x 1 x 3.00

Total

C.O. to P
Date of Measurement :-
Extra Item PVC Tank Connector
No- 22

(i) 2 x 1 x 1 x 4.00

Total

C.O. to P

Contractor Junior Engineer


Page 85

Date of Measurement :-
Extra Item Providing and fixing CP extension nipple for G.I pipe, fittings of approved quality and colour.
No- 23

(i) 15 mm normal bore.Weighing not less then 100 gms 4 x 2 x 19 x 1.00

Total
C.O. to P

Date of Measurement :-
Extra Item Dismantling steel work in built up sections in angles, tees, flats andchannels including all gusset plates, bolts, nuts, cutting rivets,
No- 24 dismembering and stacking within 50metres lead.
(i) Gril

Boundary wall Gate to Entrance Gate 2 x 1 x 1 x 1.5 x 9.2

Total

C.O. to P

Date of Measurement :-
Extra Item Excavation Soil and Clining
No- 25

Contractor Junior Engineer


Page 86

(i) Between Block-I & II 5.30 x 9.90 x( 0.40 + 0.50 + 0.55 )


3.80 x 5.20 x( 0.42 + 0.53 + 0.48 )
5.30 x 9.90 x( 0.60 + 0.83 + 0.51 )
Between Drain & Building 3.60 x 23.30 x( 1.20 + 1.57 + 1.30 )
9.80 x 7.00 x( 0.90 + 1.20 + 1.00 )
Road Side 2.00 x 23.30 x( 0.49 + 0.43 + 0.34 )
Back Side (Cornor of Bouandry) 5.00 x 3.00 x( 0.60 + 0.40 + 0.30 )
9.30 x 8.20 x( 0.49 + 0.43 + 0.34 )

Total

C.O. to P

Date of Measurement :-
Extra Item Wood frame Making
No- 26
(i) Wood frame Making
Size of Door Frame 2.02 x 1.05
Horizental 4 x 2 x 1.05 x 0.13 x 0.08
Vertical 4 x 2 x 2.02 x 0.13 x 0.08

Total
C.O. to P
Date of Measurement :-
Extra Item Dismantling G.I. pipes (external work) including excavation and refillingtrenches after taking out the pipes, manually/ by mechan
No.27 meansincluding stacking of pipes within 50 metres lead as per direction ofEngineer-in-charge :

Contractor Junior Engineer


Page 87

(i) 15 mm to 40 mm nominal bore


Bath room
Vertical 1.60 + 1.45 + 3.34 + 1.60 + 1.45
Horizental 1.85 + 1.78 + 1.85 + 1.85 + 0.00

Kitchen 1.85 + 1.78 + 1.85


0.40 + 2.00
Quantity Brought from TCMB- /Page No. /Extra Item No:- 11 /Marked (G)
Quantity Brought from TCMB- /Page No. /Extra Item No:- 12 /Marked (H)
Quantity Brought from TCMB- /Page No. /Item No:- 15.1.1 /Marked (I)
Total

C.O. to P
Date of Measurement :-
Extra Item
No.28 C.P Jalli 5"

Bath room 4 x 2 x 2
Kitchen 4 x 2 x 1
Total

C.O. to P

Contractor Junior Engineer


Page 88

Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not
Extra Item
exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting
No.4
out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

(i) All kinds of soil.


Drain 1 x( 30.00 + 8.50 )x 1.30 x( 0.70 + 1.00 + 1.20
3
Drain 1 x( 30.00 + 2.50 )x 1.30 x( 0.80 + 1.50 + 1.00
3
Water Line 1 x 1 x 23.00 x 0.80 x 0.40
2 x 1 x 4.00 x 0.40 x 0.40
1 x 1 x 16.00 x 0.80 x 0.40
Drain 1 x 1 x 7.30 x 1.30 x 1.00
Total

C.O. to P
2.1.2 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Drain 1 x 1 x 38.10 x 1.00 x 0.08
Drain 1 x 1 x 32.50 x 1.00 x 0.08
Drain 1 x 1 x 7.30 x 1.10 x 0.08

Total

C.O. to P

Contractor Junior Engineer


Page 89

Extra Item Brick work with common burnt clay F.P.s.(non modular) bricksof class designation 7.5 in foundation and plinth.
No- 13

(i) Cement mortar 1:4 (1 cement : 4 coarse sand C.O. to P


Dranage work
Brick work 2 x( 30.00 + 8.10 )x 0.25 x( 0.38 + 0.56 + 0.78 )
3
Brick work 2 x( 30.00 + 2.50 )x 0.25 x( 0.60 + 0.88 + 0.78 )
3
2 x 7.30 x 0.25 x 0.35

Total

C.O. to P
2.0 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto p
2.1.1 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Drain Flooring Work
Cooping 1 x 2 x( 30 + 8.10 )x 0.25 x
Drain Bottom Flooring 2 x 1 x( 30 + 8.10 )x 0.25 x
Cooping 1 x 2 x( 30 + 2.50 )x 0.25 x
Drain Bottom Flooring 2 x 1 x( 30 + 2.50 )x 0.25 x
Drain 1 x 1 x 7.30 x 0.40 x 0.05
Drain 1 x 1 x 7.30 x 0.25 x 0.08
Total

C.O. to P
10.3 Cement plaster 1:3 ( 1 cement : 3 coarse sand ) finished with a floating coat of neat cement.
Drain Wall top 2 x 1 x 38.10 x 0.25

Contractor Junior Engineer


Page 90

2 x 1 x 32.50 x 0.25
Bottom 1 x 1 x 38.10 x 0.33
1 x 1 x 32.50 x 0.33
Side wall 2 x 38.10 x( 0.30 + 0.64 + 0.70 )
3.00
2 x 32.50 x( 0.55 + 0.83 + 0.75 )
3.00
Drain Wall top 2 x 1 x 7.30 x 0.25
Bottom 1 x 1 x 7.30 x 0.40
Side wall 2 x 1 x 7.30 x 0.35

Total

C.O. to P

Date of Measurement :-
9.2 Providing and fixing on wall face unplasticised - Rigid PVC rain water pipes conforming to IS :13592 Type A, including jointing w
9.2.1 ring
110mmconforming
dimiter IS :5382,living 10 mm gap for thermal expansion, (i) single socketed pipes.
(Rain Water) Vertical 2 x 4 x 1 x 6.70
Toilet Area
Vertical 2 x 4 x 1 x 8.40
West water pipe
Vertical 2 x 2 x 1 x 3.60
2 x 2 x 1 x 3.40

Contractor Junior Engineer


Page 91

Horizental 2 x 2 x 2 x 2.30
Kitchen
Vertical 2 x 2 x 1 x 3.40
W.C to Out 2 x 2 x 2 x 1.20
Horizental 2 x 2 x 1 x 0.50

Total

C.O. to P

Date of Measurement :-
9.3 Providing and fixing on wall face unplasticised - PVC molded fittings/accessorise for unplasticised Rigid PVC rain water pipes co
to IS :13592 Type A, including jointing with seal ring conforming IS :5382,living 10 mm gap for thermal expansion.
9.3.1 Single tee with door
9.3.1.1 110x110x110 mm

(Qtr.no- 6,8) 1 x 1 x 1 x 5.00


(Qtr.no- 5,7) 1 x 1 x 1 x 4.00
(Qtr.no- 1,3) 1 x 1 x 1 x 4.00
(Qtr.no- 2,4) 1 x 1 x 1 x 5.00

Total

C.O. to P

Date of Measurement :-
9.3.2 Bend 85.7 °
9.3.2.1 110mm bend 2 x 6 x 1 x 1.00

Contractor Junior Engineer


Page 92

2 x 6 x 1 x 1.00
8 x 2 x 1 x 2.00
Total

C.O. to P

Date of Measurement :-
9.3.3 Shoe(Plain)
9.3.3.1 110mm shoe
(Qtr.no- 6,8) 2 x 4 x 1 x 1.00
West Line 1 x 2 x 1 x 4.00
(Qtr.no- 5,7) 1 x 2 x 1 x 4.00
(Qtr.no- 1,3) 1 x 2 x 1 x 4.00
1 x 2 x 2 x 4.00

Total

C.O. to P

Date of Measurement :-
Providing and fixing unplasticised - PVC Pipe clamp of approved design to unplasticised PVC rain water pipes by means of 50x
9.4 hard wood plugs,screwedwith M.S Screws of required length,including cutting brick work and fixing in cement morter 1:4 (1 ceme
sand ) and making good the wall etc.

9.4.1 110mm 2 x 4 x 1 x 8.00

Contractor Junior Engineer


Page 93

2 x 8 x 1 x 4.00

3 x 2 x 1 x 2.00
2 x 2 x 8 x 2.00

Total

C.O. to P

Date of Measurement :-
10.1 Providing with synthetic enamel paint of approved brand and manufactur to give an even shade :

10.10.1 Two or more coats on new work


Ground Floor 1st & 2nd Building(2x2=04
Back nos.)
side Door 4 x 2 x 1.30 x 0.85 x 2.04
Kitchen Door 4 x 2 x 1.30 x 0.89 x 2.03
Stair side door 4 x 2 x 1.30 x 0.89 x 2.06
Drawing room Door 4 x 2 x 1.30 x 1.02 x 2.07
Bed Room Door 4 x 2 x 1.30 x 1.00 x 2.07
Master Bed Room Door 4 x 2 x 1.30 x 1.04 x 2.07
Puja Room Door 4 x 2 x 1.30 x 0.77 x 2.07
Store Room Door 4 x 2 x 1.30 x 0.77 x 2.03
Balcony Side Door 4 x 2 x 1.30 x 1.03 x 2.05
1st Floor 1st & 2nd Building(2x2=04 nos.)
Kitchen Door 4 x 2 x 1.30 x 0.89 x 2.03
Stair side door 4 x 2 x 1.30 x 0.89 x 2.06

Contractor Junior Engineer


Page 94

Drawing room Door 4 x 2 x 1.30 x 1.02 x 2.07


Bed Room Door 4 x 2 x 1.30 x 1.00 x 2.07
Master Bed Room Door 4 x 2 x 1.30 x 1.04 x 2.07
Puja Room Door 4 x 2 x 1.30 x 0.77 x 2.07
Store Room Door 4 x 2 x 1.30 x 0.77 x 2.03
Balcony Side Door 4 x 2 x 1.30 x 1.03 x 2.05
Drawing room Stair side Door 4 x 2 x 1.30 x 1.02 x 1.98
Balcony Grill 4 x 2 x 1 x 0.50 x 0.40
Balcony Grill 4 x 2 x 1 x 0.50 x 0.40
Ground & 1st Floor 1st & 2nd
Building(2x4=08 nos.)
Drawing room Cupboard 4 x 2 x 2 x 1.30 x 1.17
Puja Room Cupboard 4 x 2 x 2 x 1.30 x 1.18
Stair Landing Grill 2 x 4 x 2 x 0.50 x 0.64
Stair Entrance Grill(Building -1) 1 x 1 x 2 x 0.50 x 1.96
Stair Entrance Grill(Building -2) 1 x 1 x 2 x 0.50 x 1.83
Boundary Wall Grill(Building -1&2) 2 x 1 x 2 x 0.50 x 2.39
Mumty Door 2 x 2 x 2 x 1.20 x 0.94
Mumty Door 2 x 2 x 2 x 1.20 x 0.75

Drawing room Cupboard Shelf (2x4x2=16nos)


Horizental 16 x 4 x 2 x 1.30 x 0.51
16 x 1 x 2 x 1.30 x 0.51
16 x 2 x 2 x 1.30 x 0.51
Vertical 16 x 4 x 2 x 1.30 x 0.58
Horizental 16 x 1 x 2 x 1.30 x 0.58
Vertical 16 x 2 x 2 x 1.30 x 0.58
To

Contractor Junior Engineer


Page 95

C.O. to P

Date of Measurement :-
Providing and fixing aluminium slidingdoor bolts, ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868
6.5 required colour or shade with nut and screws etc. complete :
6.5.1 250x16
mm
Ground floor 4 x 9 x 1.00

1st floor 4 x 9 x 1.00


Total

C.O. to P

Date of Measurement :-

6.6.1 250x10 mm

Ground floor
Wooden Door Shutter 4 x 2 x 9.00
Cupboard 4 x 2 x 2.00

Contractor Junior Engineer


Page 96

1st floor
Wooden Door Shutter 4 x 2 x 9.00
Cupboard 4 x 2 x 2.00

Total

C.O. to P

Date of Measurement :-

6.6.2 150x10 mm

Ground floor
P.V.C Door Shutter 4 x 2 x 2.00
Cupboard 4 x 2 x 2.00
1st floor
P.V.C Door Shutter 4 x 2 x 2.00
Cupboard 4 x 2 x 2.00

Total

C.O. to P

Date of Measurement :-
Providing and fixing aluminium tower bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) trans
6.7 dyed to required colour or shade with necessary screws etc. complete :

Contractor Junior Engineer


Page 97

6.7.1 125mm

Ground floor
Wooden Door Shutter 4 x 2 x 9.00
1st floor
Wooden Door Shutter 4 x 2 x 9.00

Total

C.O. to P

Date of Measurement :-
Providing and fixing aluminium Hanging door stoper, ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1
6.8 transparent or dyed to required colour or shade with necessary screws etc. complete :
6.8.1 Twin
rubber
door
Ground floor
stoper
Wooden Door Shutter 4 x 1 x 9.00
1st floor
Wooden Door Shutter 4 x 1 x 9.00

Total

C.O. to P

Contractor Junior Engineer


Page 98

Date of Measurement :-
Providing and fixing ISI marked flush door shutters conforming to IS : 2202(part 1)non-decorative type,core of block board contruc
6.1 wood and will marked commercial 3 play verticalgrains or crocc bands and faceVeneers on both face of shutter :

6.1.1 35 mm thick including ISI markedStainless steel bult hinges with necessary screws
Ground Floor (2x2= 4nos)
Stair side Entrance Doo Shutterr 2 x 2 x 0.81 x 2.00
Drawing Room Door Shutter 2 x 2 x 0.94 x 2.03
Balcony Side Door Shutter 2 x 2 x 0.97 x 2.03
Bed Room Door Shutter 2 x 2 x 0.93 x 2.03
Master Bed Room Door Shutter 2 x 2 x 0.95 x 2.02
Puja Room Door Shutter 2 x 2 x 0.68 x 2.02
Dining Hall Door Shutter 2 x 2 x 0.82 x 2.02
Kitchen Door Shutter 2 x 2 x 0.81 x 2.02
Store Door Shutter 2 x 2 x 0.67 x 2.00
1st Floor (2x2= 4nos)
Stair side Entrance Doo Shutterr 2 x 2 x 0.79 x 1.93
Drawing Room Door Shutter 2 x 2 x 0.94 x 1.95
Balcony Side Door Shutter 2 x 2 x 0.97 x 1.98
Bed Room Door Shutter 2 x 2 x 0.96 x 1.97
Master Bed Room Door Shutter 2 x 2 x 0.95 x 1.98
Puja Room Door Shutter 2 x 2 x 0.68 x 1.97
Stair Side Door Shutter 2 x 2 x 0.96 x 1.99
Kitchen Door Shutter 2 x 2 x 0.78 x 1.97
Store Door Shutter 2 x 2 x 0.67 x 1.96

Total

Contractor Junior Engineer


Page 99

C.O. to P / TCMB
Date of Measurement :-

6.1.2 25 mm thick (for cupboard) including IS marked nicket plasted bright finished M.s piano hinges with necessary screws.
Ground Floor Cupboard
Bed Room 2 x 2 x 1.08 x 1.84
Puja Room 2 x 2 x 1.06 x 1.85
1st Floor Cupboard
Bed Room 2 x 2 x 1.02 x 1.75
Puja Room 2 x 2 x 1.03 x 1.73

Total
C.O. to P / TCMB

Date of Measurement :-
10.2 15 mm cement plaster on rough side of single or half brick wall of mix:
10.2.1 1:6 (1 cement: 6 coarse sand)
Particulars
Outside Block - I
Gate Side 2 * 7.60 * 3.74
2 * 2.65 * 0.80
2 * 1.50 * 0.80

Contractor Junior Engineer


Page 100

2 * 2.93 * 1.00
2 * 1.66 * 1.00
2 * 0.67 * 0.42
Wall 2 * 7.60 * 5.24
Less Window 2 * 2.00 * 0.50 * 1.20 * 1.20
Spring 2 * 2.00 * 2.90 * 0.07
2 * 2.00 * 1.38 * 0.13
Pillar 2 * 2.00 * 1.03 * 2.05
Road Side 2 * 8.04 * 7.60
Less Window 2 * 2.00 * 0.50 * 1.17 * 0.88
Coping 2 * 2.00 * 2.00 * 0.86 * 0.14
2 * 2.00 * 0.86 * 0.14
Backside plaster 2 * 7.60 * 5.72
Less Window 2 * 2.00 * 3.00 * 1.20 * 0.58
2 * 7.60 * 0.76
Near Back Hall 2 * 7.60 * 4.36
Less Window 2 * 5.00 * 0.50 * 0.89 * 1.15
Less Door 2 * 1.00 * 0.50 * 2.04 * 0.90
Near Kitchen 1 * 5.74 * 7.60
Less Window 1 * 2.00 * 2.00 * 0.50 * 1.15 * 0.89
Parapet wall Inner 2 * 5.00 * 0.70
2 * 8.74 * 0.70
2 * 8.48 * 0.75
2 * 11.27 * 0.75
2 * 9.00 * 0.75

Contractor Junior Engineer


Page 101

Parapet Top Top 2 *( 30.00 + 10.74 )* 0.15


Copla 2 * 16.00 * 0.28 * 0.13
Mumty Outer 1 * 2.00 * 5.30 * 2.63
1 * 2.64 * 2.63
Less Door 1 * 2.00 * 0.50 * 0.86 * 2.16
Outside Block - II
Gate Side 2 * 7.60 * 3.74
2 * 2.65 * 0.80
2 * 1.50 * 0.80
2 * 2.93 * 1.00
2 * 1.66 * 1.00
2 * 0.67 * 0.42
Wall 2 * 7.60 * 5.24
Less Window 2 * 2.00 * 0.50 * 1.20 * 1.20
Spring 2 * 2.00 * 2.90 * 0.07
2 * 2.00 * 1.38 * 0.13
Pillar 2 * 2.00 * 1.03 * 2.05
Road Side 2 * 8.04 * 7.60
Less Window 2 * 2.00 * 0.50 * 1.17 * 0.88
Coping 2 * 2.00 * 2.00 * 0.86 * 0.14
2 * 2.00 * 0.86 * 0.14
Backside plaster 2 * 7.60 * 5.72
Less Window 2 * 2.00 * 3.00 * 1.20 * 0.58
2 * 7.60 * 0.76
Near Back Hall 2 * 7.60 * 4.36

Contractor Junior Engineer


Page 102

Less Window 2 * 5.00 * 0.50 * 0.89 * 1.15


Less Door 2 * 1.00 * 0.50 * 2.04 * 0.90
Near Kitchen 1 * 5.74 * 7.60
Less Window 1 * 2.00 * 2.00 * 0.50 * 1.15 * 0.89
Parapet wall Inner 2 * 5.00 * 0.70
2 * 8.74 * 0.70
2 * 8.48 * 0.75
2 * 11.27 * 0.75
2 * 9.00 * 0.75
Parapet Top Top 2 *( 30.00 + 10.74 )* 0.15
Copla 2 * 16.00 * 0.28 * 0.13
Mumty Outer 1 * 2.00 * 5.30 * 2.63
1 * 2.64 * 2.63
Less Door 1 * 2.00 * 0.50 * 0.86 * 2.16

Mark -(D) To

C.O. to P / TCMB

Date of Measurement :-
10.4 6 mm cement plaster of mix :
10.4.1 1:3 (1 cement : 3 fine sand)

Contractor Junior Engineer


Page 103

Chajja Block - I
Near Enterence Gate
Top 4 * 1 * 1.95 * 0.65
Ciling 4 * 1 * 1.95 * 0.55
Side 4 * 2 * 0.55 *( 0.27 + 0.15 )/ 2
4 * 1 * 1.95 * 0.16
Balcony Chajja
Top 4 * 1 * 3.04 * 0.44
Ciling 4 * 1 * 3.04 * 0.67
Side 4 * 1 * 3.04 * 0.12
Side 4 * 1 * 0.37 *( 0.25 + 0.12 )/ 2

Top 4 * 1 * 1.23 * 0.41


Ciling 4 * 1 * 1.23 * 0.67
Side 4 * 1 * 1.25 * 0.12

Top 4 * 1 * 3.00 * 0.62


Ciling 4 * 1 * 3.00 * 0.65
Side 4 * 1 * 3.00 * 0.12
Out Side 4 * 1 * 0.60 *( 0.25 + 0.12 )/ 2
Near Road Side
Top 4 * 1 * 1.05 * 0.60
Ciling 4 * 1 * 1.05 * 0.46
Side 4 * 2 * 0.46 *( 0.22 + 0.10 )/ 2
4 * 1 * 1.05 * 0.10
Bath Chajja
Top & Bottem 4 * 2 * 3.20 * 0.42

Contractor Junior Engineer


Page 104

Side 4 * 2 * 0.42 *( 0.15 + 0.10 )/ 2


Side 4 * 1 * 3.20 * 0.10
Dining Hall
Top 4 * 1 * 4.37 * 0.69
Ciling 4 * 1 * 4.37 * 0.56
Side 4 * 1 * 4.37 * 0.10
Kitchen
Top 4 * 1 * 1.10 * 0.53
Ciling 4 * 1 * 1.10 * 0.47
Side 4 * 2 * 0.47 *( 0.22 + 0.10 )/ 2
Side 4 * 1 * 1.10 * 0.10
Mumty Door
Top 2 * 1 * 1.10 * 0.60
Ciling 2 * 1 * 1.10 * 0.60
Side 2 * 1 * 1.10 * 0.12
2 * 2 * 0.60 * 0.12
Chajja Block - II
Near Enterence Gate
Top 4 * 1 * 2.00 * 0.60
Ciling 4 * 1 * 1.76 * 0.69
Out Side 4 * 2 * 0.59 *( 0.70 + 0.59 )/ 2
In Side 4 * 2 * 0.60 * 0.46
Jaffri Bottom 4 * 2 * 0.60 * 0.12
Side 4 * 1 * 2.01 * 0.12
Bottom 4 * 2 * 0.05 * 0.12
Balcony Chajja
Top 4 * 1 * 3.04 * 0.44

Contractor Junior Engineer


Page 105

Ciling 4 * 1 * 3.04 * 0.67


Side 4 * 1 * 3.04 * 0.12
Side 4 * 1 * 0.37 *( 0.25 + 0.12 )/ 2

Top 4 * 1 * 1.23 * 0.41


Ciling 4 * 1 * 1.23 * 0.67
Side 4 * 1 * 1.25 * 0.12

Top 4 * 1 * 3.00 * 0.62


Ciling 4 * 1 * 3.00 * 0.65
Side 4 * 1 * 3.00 * 0.12
Out Side 4 * 1 * 0.60 *( 0.25 + 0.12 )/ 2
Near Road Side
Top 4 * 1 * 1.12 * 0.53
Ciling 4 * 1 * 0.90 * 0.60
Out Side 4 * 2 * 0.45 *( 0.70 + 0.60 )/ 2
In Side 4 * 2 * 0.43 * 0.44
Jaffri Bottom 4 * 1 * 0.45 * 0.12
Side 4 * 1 * 1.12 * 0.16
Bottom 4 * 2 * 0.45 * 0.12
Bath Chajja
Top 4 * 1 * 3.26 * 0.56
Ciling 4 * 1 * 3.07 * 0.54
Out Side 4 * 2 * 0.50 *( 0.69 + 0.58 )/ 2
In Side 4 * 2 * 0.50 * 0.41
Jaffri Bottom 4 * 1 * 3.26 * 0.26
Side 4 * 2 * 0.27 * 0.10

Contractor Junior Engineer


Page 106

Bottom 4 * 1 * 0.50 * 0.10


In Side 4 * 1 * 3.07 * 0.14
Dining Hall
Top 4 * 1 * 4.37 * 0.73
Ciling 4 * 1 * 4.37 * 0.63
Side 4 * 1 * 4.37 * 0.26
4 * 1 * 4.37 * 0.14
Kitchen
Top 4 * 1 * 1.10 * 0.53
Ciling 4 * 1 * 1.10 * 0.47
Out Side 4 * 2 * 0.47 *( 0.22 + 0.10 )/ 2
Side 4 * 1 * 1.10 * 0.10
Mumty Door
Top 2 * 1 * 1.10 * 0.60
Ciling 2 * 1 * 1.10 * 0.60
Side 2 * 1 * 1.10 * 0.12
2 * 2 * 0.60 * 0.12

Mark -(E) To

C.O. to P / TCMB

Date of Measurement :-

6.2.1 20 mm dia.

Cupboard 8 x 2 x 1 x 1.00 x 0.80

Contractor Junior Engineer


Page 107

Total

C.O. to P

Date of Measurement :-
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel pri
7.5 required.

7.5.1 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

Bouandry Wall Gate 02 nos.


Angle - 40 x 40 x 6 mm 2 x 2 x 2 x 1.45 = 11.60
Horizental 2 x 2 x 2 x 1.17 = 9.36
Vertical 2 x 2 x 2 x 0.15 = 1.20
Lugs
Total = 22.16
Unit Weight @ 1.00 M/kg x 22.16 mtrs

10 mm Squara Bar 2 x 2 x 12 x 1.43 = 68.64


Horizental 2 x 2 x 6 x 1.15 = 27.60
Vertical
Total = 96.24
Unit Weight @ 1.00 M/kg x 96.24 mtrs

Contractor Junior Engineer


Page 108

40 x 6 Flat 2 x 2 x 4 x 0.05 = 0.80

Total = 0.80
Unit Weight @ 1.00 M/kg x 0.80 mtrs

20 x 6 Flat 2 x 2 x 1 x 0.17 = 0.68


1 x 2 x 1 x 0.06 = 0.12

Total = 0.80
Unit Weight @ 1.00 M/kg x 0.80 mtrs

Ø16 mm Round Bar 2 x 1 x 1 x 0.06 = 0.12


bolt
Total = 0.12
Unit Weight @ 1.00 M/kg x 0.12 mtrs

25 x 5 Flat 1 x 2 x 1 x 0.10 = 0.20


2 x 2 x 4 x 0.10 = 1.60
Total = 1.80
Unit Weight @ 1.00 M/kg x 1.80 mtrs

Entrance Gate Block - I

Contractor Junior Engineer


Page 109

Angle - 40 x 40 x 6 mm 1 x 1 x 2 x 0.97 = 1.94


Horizental 1 x 1 x 2 x 1.96 = 3.92
Vertical 1 x 1 x 3 x 0.15 = 0.45
Lugs
Total = 6.31
Unit Weight @ 1.00 M/kg x 6.31 mtrs

10 mm Squara Bar 1 x 1 x 21 x 0.94 = 19.74


Horizental 1 x 1 x 2 x 1.95 = 3.90
Vertical
Total = 23.64
Unit Weight @ 1.00 M/kg x 23.64 mtrs

40 x 6 Flat 1 x 1 x 2 x 0.17 = 0.34


1 x 1 x 2 x 0.05 = 0.10

Total = 0.44
Unit Weight @ 1.00 M/kg x 0.44 mtrs

20 x 6 Flat 1 x 1 x 1 x 0.27 = 0.27


1 x 1 x 1 x 0.18 = 0.18
1 x 1 x 1 x 0.17 = 0.17
1 x 1 x 1 x 0.25 = 0.25
1 x 1 x 2 x 0.15 = 0.30
1 x 1 x 20 x 0.10 = 2.00

Contractor Junior Engineer


Page 110

Total = 2.55
Unit Weight @ 1.00 M/kg x 2.55 mtrs

Ø16 mm Round Bar 2 x 1 x 2 x 0.30 = 1.20


Slaiding door bolt
Total = 1.20
Unit Weight @ 1.00 M/kg x 1.20 mtrs

Entrance Gate Block - II


Angle - 40 x 40 x 6 mm 1 x 1 x 2 x 0.97 = 1.94 Me
Horizental 1 x 1 x 2 x 1.83 = 3.66 Me
Vertical 1 x 1 x 3 x 0.15 = 0.45 Me
Lugs
Total = 6.05
Unit Weight @ 1.00 M/kg x 6.05 mtrs

10 mm Squara Bar 1 x 1 x 20 x 0.94 = 18.80 Me


Horizental 1 x 1 x 2 x 1.82 = 3.64 Me
Vertical
Total = 22.44
Unit Weight @ 1.00 M/kg x 22.44 mtrs

40 x 6 Flat 1 x 1 x 2 x 0.17 = 0.34 Me

Contractor Junior Engineer


Page 111

1 x 1 x 2 x 0.05 = 0.10 Me

Total = 0.44
Unit Weight @ 1.00 M/kg x 0.44 mtrs

20 x 6 Flat 1 x 1 x 1 x 0.27 = 0.27 Me


1 x 1 x 1 x 0.18 = 0.18 Me
1 x 1 x 1 x 0.17 = 0.17 Me
1 x 1 x 1 x 0.25 = 0.25 Me
1 x 1 x 2 x 0.15 = 0.30 Me
1 x 1 x 20 x 0.10 = 2.00 Me

Total = 2.55
Unit Weight @ 1.00 M/kg x 2.55 mtrs

Ø16 mm Round Bar 2 x 1 x 2 x 0.30 = 1.20 Me


Slaiding door bolt
Total = 1.20
Unit Weight @ 1.00 M/kg x 1.20 mtrs

Window Grill
Window Sise 1800x1200
Ground Floor

Contractor Junior Engineer


Page 112

12 mm Square Bar 4 x 3 x 8 x 1.75 = 168.00 Me


4 x 3 x 2 x 0.30 = 7.20 Me
4 x 3 x 2 x 0.21 = 5.04 Me
4 x 3 x 1 x 0.59 = 7.08 Me
Window Sise 1800x1200
1st Floor
12 mm Square Bar 4 x 3 x 8 x 1.75 = 168.00 Me
4 x 3 x 2 x 0.30 = 7.20 Me
4 x 3 x 2 x 0.21 = 5.04 Me
4 x 3 x 1 x 0.59 = 7.08 Me
Window Sise 900x1200
Ground Floor
12 mm Square Bar 4 x 4 x 8 x 0.88 = 112.64 Me
4 x 4 x 2 x 0.20 = 6.40 Me
4 x 4 x 2 x 0.23 = 7.36 Me
Window Sise 900x1200
1st Floor
12 mm Square Bar 4 x 3 x 8 x 0.88 = 84.48 Me
4 x 3 x 2 x 0.20 = 4.80 Me
4 x 3 x 2 x 0.23 = 5.52 Me
Window Sise 600x1200
Ground Floor
12 mm Square Bar 4 x 3 x 8 x 0.58 = 55.68 Me
4 x 3 x 2 x 0.20 = 4.80 Me
4 x 3 x 2 x 0.36 = 8.64 Me
Window Sise 600x1200

Contractor Junior Engineer


Page 113

1st Floor
12 mm Square Bar 4 x 5 x 8 x 0.58 = 92.80 Me
4 x 5 x 2 x 0.20 = 8.00 Me
4 x 5 x 2 x 0.36 = 14.40 Me
Total = 780.16
Unit Weight @ 1.13 M/kg x 780.16 mtrs

Providing and fixing factory made ISI marked steel glazed doors, windowsand ventilators, side /top /centre hung, with beading and all memberssuch
7.2 complete of standard rolledsteel sections, joints mitred and flash butt welded and sash bars tenonedand riveted, including providing and fixing of hin
approved steel
Fixing with primer,
15x3 but excluding
mm lugs 10 cm longtheembedded
cost of otherfittings, complete
in cementconcrete all as
block per approved
15x10x10 cm ofdesign, (sectional
C.C. 1:3:6 weight
(1 Cement : 3of onlysteel :members
coarsesand 6 gradedshall
stonebeagg
m
7.2.1 mm nominal size)
Window Sise 1800x1200(4x3=12nos)
Ground Floor
Z-Section
Frame
12 x 2 x 2 x 1.76 = 84.48 Me
12 x 2 x 2 x 1.13 = 54.24 Me
Pannel
12 x 2 x 2 x 1.11 = 53.28 Me
12 x 2 x 2 x 0.58 = 27.60 Me
Window Sise 1800x1200(4x3=12nos)
1st floor
Z-Section
Frame
12 x 2 x 2 x 1.76 = 84.48 Me
12 x 2 x 2 x 1.13 = 54.24 Me
Pannel

Contractor Junior Engineer


Page 114

12 x 2 x 2 x 1.11 = 53.28 Me
12 x 2 x 2 x 0.58 = 27.60 Me
Window Sise 900x1200(4x4=16nos)
Ground Floor
Z-Section
Frame
16 x 2 x 2 x 1.16 = 74.24 Me
16 x 2 x 2 x 0.84 = 53.76 Me
Pannel
16 x 2 x 2 x 1.12 = 71.68 Me
16 x 2 x 2 x 0.43 = 27.20 Me
Window Sise 900x1200(4x5=20nos)
1st floor
Z-Section
Frame
20 x 2 x 2 x 1.16 = 92.80 Me
20 x 2 x 2 x 0.84 = 67.20 Me
Pannel
20 x 2 x 2 x 1.12 = 89.60 Me
20 x 2 x 2 x 0.43 = 34.00 Me
Window Sise 600x1200(4x3=12nos)
Ground Floor
Z-Section
Frame
12 x 1 x 2 x 1.17 = 28.08 Me
12 x 1 x 2 x 0.58 = 13.92 Me
Pannel

Contractor Junior Engineer


Page 115

12 x 1 x 2 x 1.14 = 27.24 Me
12 x 1 x 2 x 0.55 = 13.20 Me
Window Sise 600x1200(4x3=12nos)
1st floor
Z-Section
Frame
12 x 2 x 2 x 1.17 = 56.16 Me
12 x 2 x 2 x 0.58 = 27.84 Me
Pannel
12 x 2 x 2 x 1.14 = 54.48 Me
12 x 2 x 2 x 0.55 = 26.40 Me
Total = 1197.00
Unit Weight @ 1.00 M/kg x 1197.00 mtrs

Window Sise 1800x1200(4x3=12nos)


Ground Floor
T-Section
Pannel
12 x 2 x 3 x 0.53 = 38.16 Me
Window Sise 1800x1200(4x3=12nos)
1st floor
T-Section
Pannel
12 x 2 x 3 x 0.53 = 38.16 Me
Window Sise 900x1200(4x4=16nos)
Ground Floor
T-Section

Contractor Junior Engineer


Page 116

Pannel
16 x 2 x 3 x 0.43 = 40.80 Me
Window Sise 900x1200(4x5=20nos)
1st floor
T-Section
Pannel
20 x 2 x 3 x 0.43 = 51.00 Me
Window Sise 600x1200(4x3=12nos)
Ground Floor
T-Section
Pannel
12 x 1 x 3 x 0.55 = 19.80 Me
Window Sise 600x1200(4x3=12nos)
1st floor
T-Section
Pannel
12 x 2 x 3 x 0.55 = 39.60 Me
Total = 227.52
Unit Weight @ 1.00 M/kg x 227.52 mtrs

Window Sise 1800x1200(4x3=12nos)


Ground Floor
Molion 12 x 1 x 2 x 1.13 = 27.12 Me

Window Sise 1800x1200(4x3=12nos)


1st floor

Contractor Junior Engineer


Page 117

Molion 12 x 1 x 2 x 1.13 = 27.12 Me

Window Sise 900x1200(4x4=16nos)


Ground Floor
Molion 16 x 1 x 1 x 1.16 = 18.56 Me

Window Sise 900x1200(4x5=20nos)


1st floor
Molion 20 x 1 x 1 x 1.16 = 23.20 Me

Total = 96.00
Unit Weight @ 1.00 M/kg x 96.00 mtrs

Window Sise 1800x1200(4x3=12nos)


Ground Floor
25x5 Flat 12 x 1 x 4 x 0.07 = 3.36 Me

Window Sise 1800x1200(4x3=12nos)


1st floor
25x5 Flat 12 x 1 x 4 x 0.07 = 3.36 Me

Window Sise 900x1200(4x4=16nos)


Ground Floor
25x5 Flat 16 x 1 x 2 x 0.07 = 2.24 Me

Window Sise 900x1200(4x5=20nos)

Contractor Junior Engineer


Page 118

1st floor
25x5 Flat 20 x 1 x 2 x 0.07 = 2.80 Me

Window Sise 600x1200(4x3=12nos)


Ground Floor
25x5 Flat 12 x 1 x 3 x 0.07 = 2.52 Me

Window Sise 600x1200(4x3=12nos)


1st floor
25x5 Flat 12 x 1 x 3 x 0.07 = 2.52 Me
Total = 16.80
Unit Weight @ 1.00 M/kg x 16.80 mtrs

Window Sise 1800x1200(4x3=12nos)


Ground Floor
20x5 Flat 12 x 1 x 2 x 0.08 = 1.80 Me

Window Sise 1800x1200(4x3=12nos)


1st floor
20x5 Flat 12 x 1 x 2 x 0.08 = 1.80 Me

Window Sise 900x1200(4x4=16nos)


Ground Floor
20x5 Flat 16 x 1 x 2 x 0.08 = 2.40 Me

Window Sise 900x1200(4x5=20nos)

Contractor Junior Engineer


Page 119

1st floor
20x5 Flat 20 x 1 x 2 x 0.08 = 3.00 Me

Window Sise 600x1200(4x3=12nos)


Ground Floor
20x5 Flat 12 x 1 x 3 x 0.08 = 2.70 Me

Window Sise 600x1200(4x3=12nos)


1st floor
20x5 Flat 12 x 1 x 3 x 0.08 = 2.70 Me
Total = 14.40
Unit Weight @ 1.00 M/kg x 14.40 mtrs

Window Sise 1800x1200(4x3=12nos)


Ground Floor
Hinz 12 x 1 x 2 x 2.00 = 48.00 Me

Window Sise 1800x1200(4x3=12nos)


1st floor
Hinz 12 x 1 x 2 x 2.00 = 48.00

Window Sise 900x1200(4x4=16nos)


Ground Floor
Hinz 16 x 1 x 2 x 2.00 = 64.00

Window Sise 900x1200(4x5=20nos)

Contractor Junior Engineer


Page 120

1st floor
Hinz 20 x 1 x 2 x 2.00 = 80.00

Window Sise 600x1200(4x3=12nos)


Ground Floor
Hinz 12 x 1 x 1 x 2.00 = 24.00

Window Sise 600x1200(4x3=12nos)


1st floor
Hinz 12 x 1 x 1 x 2.00 = 24.00
Total = 288.00
Unit Weight @ 1.00 M/kg x 288.00 mtrs

Window Sise 1800x1200(4x3=12nos)


Ground Floor
Handle Stay 12 x 1 x 2 x 2.00 = 48.00

Window Sise 1800x1200(4x3=12nos)


1st floor
Handle Stay 12 x 1 x 2 x 2.00 = 48.00

Window Sise 900x1200(4x4=16nos)


Ground Floor
Handle Stay 16 x 1 x 2 x 2.00 = 64.00

Contractor Junior Engineer


Page 121

Window Sise 900x1200(4x5=20nos)


1st floor
Handle Stay 20 x 1 x 2 x 2.00 = 80.00

Window Sise 600x1200(4x3=12nos)


Ground Floor
Handle Stay 12 x 1 x 1 x 2.00 = 24.00

Window Sise 600x1200(4x3=12nos)


1st floor
Handle Stay 12 x 1 x 1 x 1.00 = 12.00
Total = 276.00
Unit Weight @ 1.00 M/kg x 276.00 mtrs

Window Sise 1800x1200(4x3=12nos)


Ground Floor
Pag Stay Stand 12 x 1 x 2 x 2.00 = 48.00 Me

Window Sise 1800x1200(4x3=12nos)


1st floor
Pag Stay Stand 12 x 1 x 2 x 2.00 = 48.00

Window Sise 900x1200(4x4=16nos)


Ground Floor
Pag Stay Stand 16 x 1 x 2 x 2.00 = 64.00

Contractor Junior Engineer


Page 122

Window Sise 900x1200(4x5=20nos)


1st floor
Pag Stay Stand 20 x 1 x 2 x 2.00 = 80.00

Window Sise 600x1200(4x3=12nos)


Ground Floor
Pag Stay Stand 12 x 1 x 1 x 2.00 = 24.00

Window Sise 600x1200(4x3=12nos)


1st floor
Pag Stay Stand 12 x 1 x 1 x 1.00 = 12.00
Total = 276.00
Unit Weight @ 1.00 M/kg x 276.00 mtrs

Window Sise 1800x1200(4x3=12nos)


Ground Floor
Pag Stay Lock 12 x 1 x 2 x 2.00 = 48.00 Me

Window Sise 1800x1200(4x3=12nos)


1st floor
Pag Stay Lock 12 x 1 x 2 x 2.00 = 48.00

Window Sise 900x1200(4x4=16nos)


Ground Floor

Contractor Junior Engineer


Page 123

Pag Stay Lock 16 x 1 x 2 x 2.00 = 64.00

Window Sise 900x1200(4x5=20nos)


1st floor
Pag Stay Lock 20 x 1 x 2 x 2.00 = 80.00

Window Sise 600x1200(4x3=12nos)


Ground Floor
Pag Stay Lock 12 x 1 x 1 x 2.00 = 24.00

Window Sise 600x1200(4x3=12nos)


1st floor
Pag Stay Lock 12 x 1 x 1 x 1.00 = 12.00
Total = 276.00
Unit Weight @ 1.00 M/kg x 276.00 mtrs

Contractor Junior Engineer


Page 124

ncluding

= 177.12 Sqm
= 12.80 Sqm
= 174.3 Sqm
= 17.01 Sqm

Total = 381.23 Sqm

Contractor Junior Engineer


Page 125

O. to P / TCMB
s per direction of Engineer - in -

= 4.78 Cum
= 5.40 Cum

= 9.57 Cum
= 5.40 Cum

2.00 = 0.42 Cum

2.00 = 0.19 Cum

2.00 = 0.20 Cum

2.00 = 0.12 Cum

2.00 = 0.06 Cum

2.00 = 0.20 Cum

2.00 = 0.25 Cum

Contractor Junior Engineer


Page 126

2.00 0.07 Cum

2.00 = 0.09 Cum

2.00 = 0.09 Cum

2.00 = -0.02 Cum

2.00 = 0.09 Cum

2.00 = 0.10 Cum

2.00 = 0.08 Cum

2.00 = 0.06 Cum

2.00 = 0.23 Cum

2.00 = -0.04 Cum

2.00 = 0.42 Cum

2.00 = 0.20 Cum

Contractor Junior Engineer


Page 127

2.00 = 0.20 Cum

2.00 = 0.40 Cum

2.00 = 0.23 Cum

2.00 = -0.04 Cum

2.00 = 0.07 Cum

2.00 = 0.09 Cum

2.00 = 0.11 Cum

2.00 = 0.30 Cum

2.00 = 0.11 Cum

2.00 = 0.09 Cum

2.00 = 0.07 Cum

2.00 = 0.23 Cum

2.00 = -0.04 Cum


= 29.78 Cum

Contractor Junior Engineer


Page 128

O. to P / TCMB

l work upto plinth level :

= 3.89 Cum

= 3.40 Cum

= 1.04 Cum

= 0.96 Cum
= 1.08 Cum

= 1.91 Cum
= 1.08 Cum

= 2.32 Cum

2.00 = 0.42 Cum

Contractor Junior Engineer


Page 129

2.00 = 0.19 Cum

2.00 = 0.20 Cum

2.00 = 0.12 Cum

2.00 = 0.06 Cum

2.00 = 0.20 Cum

2.00 = 0.25 Cum

2.00 0.07 Cum

2.00 = 0.09 Cum

2.00 = 0.09 Cum

2.00 = -0.02 Cum

2.00 = 0.09 Cum

2.00 = 0.10 Cum

2.00 = 0.08 Cum

Contractor Junior Engineer


Page 130

2.00 = 0.06 Cum

2.00 = 0.23 Cum

2.00 = -0.04 Cum

2.00 = 0.42 Cum

2.00 = 0.20 Cum

2.00 = 0.20 Cum

2.00 = 0.40 Cum

2.00 = 0.23 Cum

2.00 = -0.04 Cum

2.00 = 0.07 Cum

2.00 = 0.09 Cum

2.00 = 0.11 Cum

Contractor Junior Engineer


Page 131

2.00 = 0.30 Cum

2.00 = 0.11 Cum

2.00 = 0.09 Cum

2.00 = 0.07 Cum

2.00 = 0.23 Cum

2.00 = -0.04 Cum


= 20.31 Cum

O. to P / TCMB

= 2.59 Cum

= 2.27 Cum

= 3.92 Cum

= 15.07 Cum

Contractor Junior Engineer


Page 132

O. to P / TCMB

r direction of Engineer - in - charge.

= 0.55 Cum
= 0.78 Cum
= 0.35 Cum
= 1.18 Cum
= 0.76 Cum
= 1.05 Cum
= 0.26 Cum
= 0.13 Cum

= 0.55 Cum
= 0.25 Cum
= 0.78 Cum
= 0.35 Cum
= 1.18 Cum
= 0.27 Cum
= 0.22 Cum
= 0.76 Cum
= 0.22 Cum
= 1.58 Cum
= 0.22 Cum
= 0.26 Cum
= 0.22 Cum

Contractor Junior Engineer


Page 133

= 0.13 Cum
= 0.73 Cum
= 0.31 Cum
= 0.13 Cum
= 0.67 Cum

13.89 Cum

O. to P / TCMB

= 4.97 Sqm
= 0.72 Sqm
= 2.65 Sqm
= 3.20 Sqm
= 0.28 Sqm
= 0.23 Sqm

= 5.17 Sqm
= 7.88 Sqm
= 1.93 Sqm
= 1.36 Sqm
= 0.51 Sqm
= 1.21 Sqm

Contractor Junior Engineer


Page 134

= 0.15 Sqm
= 0.28 Sqm

= 2.21 Sqm
= 0.37 Sqm
= 2.21 Sqm
= 2.78 Sqm
= 0.48 Sqm
= 0.46 Sqm

= 5.94 Sqm
= 2.21 Sqm
= 2.78 Sqm
= 0.48 Sqm
= 0.46 Sqm
= 1.19 Sqm
= 1.66 Sqm
= 3.09 Sqm

= 8.76 Sqm
= 1.75 Sqm
= 2.45 Sqm
= 4.56 Sqm

= 1.78 Sqm
= 1.84 Sqm
= 2.69 Sqm
= 0.48 Sqm

Contractor Junior Engineer


Page 135

= 0.46 Sqm
= 0.36 Sqm
= 0.50 Sqm
= 0.93 Sqm

= 2.51 Sqm
= 0.43 Sqm
= 0.46 Sqm

= 5.52 Sqm
= 0.80 Sqm
= 0.55 Sqm

= 5.17 Sqm
= 7.88 Sqm
= 1.93 Sqm
= 1.36 Sqm
= 0.51 Sqm
= 1.21 Sqm
= 0.15 Sqm
= 0.28 Sqm

= 2.69 Sqm
= 0.45 Sqm
= 0.48 Sqm

= 7.61 Sqm
= 1.27 Sqm

Contractor Junior Engineer


Page 136

= 0.48 Sqm

= 10.51 Sqm
= 1.75 Sqm
= 0.48 Sqm

= 2.62 Sqm
= 0.44 Sqm
= 0.48 Sqm

= 6.07 Sqm
= 1.06 Sqm
= 2.68 Sqm
= 0.47 Sqm
= 3.36 Sqm
= 0.80 Sqm

Total = 155.88 Sqm

inding all complete upto plinth level.

Contractor Junior Engineer


Page 137

Contractor Junior Engineer


Page 138

Contractor Junior Engineer


Page 139

Kg

Contractor Junior Engineer


Page 140

uttering,finishing and

= 0.55 Cum
= 0.78 Cum
= 0.35 Cum
= 1.18 Cum
= 0.76 Cum
= 1.05 Cum
= 0.26 Cum
= 0.13 Cum

= 0.55 Cum
= 0.25 Cum
= 0.78 Cum
= 0.35 Cum
= 1.18 Cum
= 0.27 Cum
= 0.22 Cum
= 0.76 Cum
= 0.22 Cum
= 1.58 Cum
= 0.22 Cum
= 0.26 Cum
= 0.22 Cum

Contractor Junior Engineer


Page 141

= 0.13 Cum
= 0.73 Cum
= 0.31 Cum
= 0.13 Cum
= 0.67 Cum

13.89 Cum

O. to P / TCMB

= 1.13 Cum
= 0.55 Cum
= 0.33 Cum
= 0.82 Cum
= 0.29 Cum
= 1.07 Cum
= 1.04 Cum
= 1.35 Cum
= 0.94 Cum
= 0.98 Cum
= 2.56 Cum

Contractor Junior Engineer


Page 142

= 1.08 Cum
= 1.16 Cum
= 1.10 Cum
= 3.74 Cum
= 2.18 Cum
= 2.34 Cum

= 22.66 Cum

O. to P / TCMB

n platforms, vanity counters


k base cement mortar 1:4 (1 cement :
ing, curing moulding and polishing

= 1.68 Sqm
= 1.57 Sqm
= 0.97 Sqm

Contractor Junior Engineer


Page 143

= 0.97 Sqm
= 0.66 Sqm

= 1.55 Sqm
= 1.63 Sqm
= 1.71 Sqm
= 10.74 Sqm

O. to P / TCMB

= 10.58 Sqm
= 5.64 Sqm
= 3.76 Sqm

= 3.62 Sqm
= 3.20 Sqm
= 2.85 Sqm

= 4.96 Sqm
= 4.96 Sqm

= 39.57 Sqm

O. to P / TCMB

Contractor Junior Engineer


Page 144

anufacturer) of approved make in all


of steps and dados over 12 mm
ing pointing in white cement mixed

= 39.95 Sqm
= 23.04 Sqm
= 1.82 Sqm
= 0.40 Sqm
= -4.56 Sqm
= 43.34 Sqm
= 2.37 Sqm
= 0.58 Sqm
= -0.20 Sqm
= 11.54 Sqm
= 4.74 Sqm

= 42.64 Sqm
= 20.07 Sqm
= 1.78 Sqm
= 0.44 Sqm
= -4.88 Sqm
= 41.90 Sqm

Contractor Junior Engineer


Page 145

= 9.35 Sqm
= 2.49 Sqm
= 0.31 Sqm
= 6.00 Sqm

= 2.83 Sqm
= 0.46 Sqm
= 17.42 Sqm
= 1.37 Sqm
= 1.08 Sqm
= 3.94 Sqm
= 1.58 Sqm
= 5.25 Sqm
= 27.42 Sqm
= -5.49 Sqm
= 1.25 Sqm
= 0.70 Sqm

= 300.93 Sqm

O. to P / TCMB

quality conforming to IS : 15622 of


ent : 4 Coarse sand) including

Contractor Junior Engineer


Page 146

= 27.00 Sqm
= 1.62 Sqm
= 1.75 Sqm

= 23.92 Sqm
= 1.04 Sqm
= 1.78 Sqm
= 0.74 Sqm

= 57.85 Sqm

O. to P / TCMB

absorption's less than


4 (1 cement : 4 coarse

= 123.30 Sqm
= 1.03 Sqm

= 19.20 Sqm
= 1.24 Sqm

Contractor Junior Engineer


Page 147

= 12.78 Sqm

= 104.90 Sqm
= 9.41 Sqm

= 11.01 Sqm

= 44.30 Sqm
= 1.00 Sqm
= -0.18 Sqm

= 10.21 Sqm
= 1.21 Sqm
= 2.04 Sqm

= 86.85 Sqm
= 6.71 Sqm
= 2.26 Sqm

= 113.93 Sqm
= 3.84 Sqm
= 3.49 Sqm
= 2.33 Sqm

Contractor Junior Engineer


Page 148

= 15.66 Sqm

= 13.99 Sqm
= 0.34 Sqm
= 17.22 Sqm

= 608.07 Sqm

O. to P / TCMB

r tiles.

57.85
608.07
= 665.92 Sqm

O. to P / TCMB

sed) conforming to IS: 15477, in average 3mm

57.85
608.07
= 665.92 Sqm

Contractor Junior Engineer


Page 149

O. to P / TCMB

ers,aii necessary fittings complete,

= 3.87 Sqm
= 3.14 Sqm

Total = 7.01 Sqm

O. to P / TCMB

= #REF! Cum

O. to P / TCMB

h to the dumping ground within 50

182.70
207.58
1162.52
227.48
57.85

Contractor Junior Engineer


Page 150

608.07
= 2446.20 Sqm
O. to P / TCMB

= 20.54 Sqm
= 0.73 Sqm
= 2.10 Sqm
= 0.15 Sqm
= 0.18 Sqm
= 2.10 Sqm
= 0.15 Sqm
= 0.18 Sqm
= 16.38 Sqm
= 0.73 Sqm
= 0.70 Sqm

= 57.79 Sqm
= 42.49 Sqm
= 0.60 Sqm
= 0.18 Sqm

Contractor Junior Engineer


Page 151

= 16.35 Sqm
= 0.63 Sqm
= 4.39 Sqm
= 0.27 Sqm
= 0.37 Sqm
= 15.03 Sqm
= 0.66 Sqm

= 182.70 Sqm

= 20.54 Sqm
= 6.64 Sqm
= 3.16 Sqm
= 0.54 Sqm
= 0.51 Sqm
= 0.50 Sqm
= 0.49 Sqm

Contractor Junior Engineer


Page 152

= 0.73 Sqm
= 2.10 Sqm
= 0.15 Sqm
= 0.18 Sqm
= 2.10 Sqm
= 0.15 Sqm
= 0.18 Sqm
= 16.38 Sqm
= 5.42 Sqm
= 2.50 Sqm
= 0.37 Sqm
= 0.37 Sqm
= 0.37 Sqm
= 0.35 Sqm
= 0.73 Sqm

= 57.79 Sqm
= 17.02 Sqm
= 7.92 Sqm
= 0.44 Sqm
= 0.44 Sqm
= 0.44 Sqm
= 0.45 Sqm
= 0.45 Sqm
= 0.45 Sqm

Contractor Junior Engineer


Page 153

= 0.40 Sqm
= 0.42 Sqm
= 0.43 Sqm
= 0.42 Sqm
= 0.41 Sqm
= 2.09 Sqm
= 0.60 Sqm
= 0.18 Sqm

= 16.35 Sqm
= 5.59 Sqm
= 2.60 Sqm
= 0.42 Sqm
= 0.41 Sqm
= 0.41 Sqm
= 0.41 Sqm
= 0.63 Sqm
= 0.27 Sqm
= 0.37 Sqm
= 15.03 Sqm
= 5.48 Sqm
= 2.55 Sqm
= 0.35 Sqm
= 0.39 Sqm
= 0.39 Sqm

Contractor Junior Engineer


Page 154

= 0.46 Sqm
= 0.66 Sqm

= 207.58 Sqm

= 11.28 Sqm
= 1.92 Sqm
= 0.94 Sqm
= 1.54 Sqm
= 0.35 Sqm
= 1.66 Sqm

= 2.43 Sqm
= 0.49 Sqm
= 1.93 Sqm
= 2.40 Sqm

Contractor Junior Engineer


Page 155

= 0.32 Sqm
= 1.22 Sqm
= 0.66 Sqm
= 1.21 Sqm

= 1.80 Sqm
= 1.05 Sqm
= 2.32 Sqm
= 2.40 Sqm
= 0.32 Sqm
= 1.22 Sqm
= 0.66 Sqm
= 1.21 Sqm

= 2.10 Sqm
= 0.80 Sqm
= 2.07 Sqm
= 2.40 Sqm
= 0.32 Sqm
= 1.20 Sqm
= 2.40 Sqm
= 0.92 Sqm

= 2.43 Sqm
= 0.49 Sqm
= 1.93 Sqm

Contractor Junior Engineer


Page 156

= 2.40 Sqm
= 0.32 Sqm
= 1.22 Sqm
= 0.66 Sqm
= 1.21 Sqm

= 1.80 Sqm
= 1.05 Sqm
= 2.32 Sqm
= 2.40 Sqm
= 0.32 Sqm
= 1.22 Sqm
= 0.66 Sqm
= 1.21 Sqm

= 2.10 Sqm
= 0.80 Sqm
= 2.07 Sqm
= 2.40 Sqm
= 0.32 Sqm
= 1.20 Sqm
= 2.40 Sqm
= 0.92 Sqm

= 2.07 Sqm
= 2.38 Sqm

Contractor Junior Engineer


Page 157

= 2.07 Sqm
= 2.40 Sqm

= 1.80 Sqm
= 1.35 Sqm
= 2.07 Sqm
= 1.35 Sqm
= 2.46 Sqm

= 1.61 Sqm
= 2.38 Sqm
= 1.80 Sqm
= 2.40 Sqm

= 1.80 Sqm
= 1.35 Sqm
= 1.62 Sqm
= 1.35 Sqm
= 1.80 Sqm

= 1.75 Sqm
= 1.00 Sqm
= 2.00 Sqm

= 1.52 Sqm

Contractor Junior Engineer


Page 158

= 0.76 Sqm
= 1.26 Sqm

= 1.44 Sqm
= 0.91 Sqm
= 1.92 Sqm

= 1.67 Sqm
= 0.68 Sqm
= 2.00 Sqm

= 2.28 Sqm
= 2.40 Sqm
= 1.94 Sqm

= 2.38 Sqm
= 2.16 Sqm
= 3.10 Sqm

= 2.28 Sqm
= 2.40 Sqm
= 1.94 Sqm

= 2.28 Sqm
= 2.40 Sqm

Contractor Junior Engineer


Page 159

= 1.94 Sqm

= 2.28 Sqm
= 2.40 Sqm
= 1.94 Sqm

= 2.28 Sqm
= 2.40 Sqm
= 1.94 Sqm

= 2.28 Sqm
= 2.40 Sqm
= 1.94 Sqm

= 2.28 Sqm
= 2.40 Sqm
= 1.94 Sqm
= 172.65 Sqm

O. to P / TCMB

= 17.69 Sqm
O. to P / TCMB

over the plastered wall surface to

Contractor Junior Engineer


Page 160

= 119.95 Sqm
= 210.19 Sqm
= 153.58 Sqm
= -7.53 Sqm
= -6.18 Sqm
= -5.78 Sqm
= -4.13 Sqm
= -8.26 Sqm

= 28.70 Sqm
= 35.54 Sqm
= 24.21 Sqm
= 0.77 Sqm
= 0.52 Sqm
= 1.75 Sqm

= 12.80 Sqm
= 18.72 Sqm
= 74.24 Sqm
= -5.78 Sqm
= -2.56 Sqm

= 6.99 Sqm
= 4.01 Sqm

Contractor Junior Engineer


Page 161

= 12.14 Sqm
= 0.17 Sqm
= 0.35 Sqm
= 0.84 Sqm

= 16.56 Sqm
= 9.50 Sqm
= 12.14 Sqm
= 0.17 Sqm
= 0.35 Sqm
= 0.84 Sqm

= 69.14 Sqm
= 101.62 Sqm
= 52.21 Sqm
= -8.00 Sqm
= -6.82 Sqm
= -7.84 Sqm
= -4.20 Sqm

= 37.63 Sqm
= 7.68 Sqm
= 2.26 Sqm
= -7.06 Sqm

= 3.54 Sqm

Contractor Junior Engineer


Page 162

= 3.54 Sqm
= 5.33 Sqm
= -0.27 Sqm

= 69.14 Sqm
= 101.62 Sqm
= 52.21 Sqm
= -8.00 Sqm
= -3.41 Sqm
= -3.92 Sqm
= -6.30 Sqm

= 37.63 Sqm
= 7.68 Sqm
= 2.26 Sqm
= -7.06 Sqm

= 3.54 Sqm
= 3.54 Sqm
= 5.33 Sqm
= -0.27 Sqm

= 117.39 Sqm
= 1.10 Sqm
= 99.30 Sqm
= 43.31 Sqm

Contractor Junior Engineer


Page 163

= -9.42 Sqm
= -26.88 Sqm
= -4.77 Sqm
= -13.57 Sqm
= -3.64 Sqm
= -1.44 Sqm
= 2.58 Sqm
= 9.77 Sqm
= 5.28 Sqm
= 9.66 Sqm
= 6.03 Sqm
= 8.04 Sqm
= 2.60 Sqm
= -5.85 Sqm
= -6.79 Sqm
= -1.44 Sqm

= 10.09 Sqm
= 27.14 Sqm
= 45.24 Sqm
= 3.84 Sqm
= 2.54 Sqm
= 7.31 Sqm
= -5.85 Sqm

= 45.79 Sqm

Contractor Junior Engineer


Page 164

= 26.03 Sqm
= 19.39 Sqm
= 1.64 Sqm
= 5.28 Sqm
= 5.31 Sqm

= 98.74 Sqm
= 153.12 Sqm
= 175.86 Sqm
= 8.32 Sqm
= -6.62 Sqm
= -8.00 Sqm
= 15.14 Sqm

= 109.27 Sqm
= 71.92 Sqm
= 58.40 Sqm
= 1.07 Sqm

= 4.99 Sqm
= 5.17 Sqm
= 5.39 Sqm
= 1.98 Sqm
= 0.79 Sqm
= -7.83 Sqm
= -4.21 Sqm

Contractor Junior Engineer


Page 165

= 109.27 Sqm
= 71.92 Sqm
= 58.40 Sqm
= 1.07 Sqm

= 4.99 Sqm
= 5.17 Sqm
= 5.39 Sqm
= 1.98 Sqm
= 0.79 Sqm
= -10.71 Sqm
= -4.21 Sqm

= 27.48 Sqm
= 106.26 Sqm
= 69.60 Sqm
= 15.60 Sqm
= 4.40 Sqm
= 6.05 Sqm
= 5.03 Sqm
= -4.59 Sqm
= -3.68 Sqm

= 22.74 Sqm
= 268.58 Sqm
= -3.58 Sqm

Contractor Junior Engineer


Page 166

= -3.81 Sqm
= -6.69 Sqm
= -4.00 Sqm
= 8.20 Sqm
= 2.32 Sqm
= 6.63 Sqm
= 11.10 Sqm
= 12.48 Sqm
= 11.12 Sqm
= 11.12 Sqm
= 4.49 Sqm
= 15.70 Sqm
) = 8.29 Sqm

= 6.88 Sqm
) = 10.43 Sqm

= 0.90 Sqm
= 0.14 Sqm

= 10.90 Sqm

= 27.49 Sqm

= 4.39 Sqm
= 13.34 Sqm

Contractor Junior Engineer


Page 167

= 9.01 Sqm
= 2.32 Sqm
= 9.38 Sqm
= 3.35 Sqm
= 8.14 Sqm
= -3.46 Sqm
= -0.94 Sqm

= 22.80 Sqm
= 20.88 Sqm
= 12.00 Sqm
= 1.70 Sqm
= 0.86 Sqm
= 9.38 Sqm
= 3.35 Sqm
= 7.80 Sqm
= 2.59 Sqm
= 1.30 Sqm
= 0.41 Sqm
= 0.18 Sqm
= -3.91 Sqm
= -1.67 Sqm

= 3330.91 Sqm

Contractor Junior Engineer


Page 168

ll Putty = 3330.91 Sqm

ur complete, as per manufacturer's

per 3330.91 Sqm


Distemper 3330.91 Sqm

O. to P / TCMB

rimer. 3330.91 Sqm


nable Primer 3330.91 Sqm

O. to P / TCMB

0kg/10sqm)
Qty.
(Sqm)
= 56.85 Sqm
= 4.24 Sqm

Contractor Junior Engineer


Page 169

= 2.40 Sqm
= 5.86 Sqm
= 3.32 Sqm
= 0.56 Sqm
= 79.65 Sqm
= -2.88 Sqm
= 0.81 Sqm
= 0.72 Sqm
= 8.45 Sqm
= 122.21 Sqm
= -2.06 Sqm
= 0.96 Sqm
= 0.48 Sqm
= 86.94 Sqm
= -8.35 Sqm
= 11.55 Sqm
= 66.27 Sqm
= -5.12 Sqm
= -1.84 Sqm
= 43.62 Sqm
= -2.05 Sqm
= 7.00 Sqm
= 12.24 Sqm
= 12.72 Sqm
= 16.91 Sqm
= 13.50 Sqm
= 12.22 Sqm

Contractor Junior Engineer


Page 170

= 1.12 Sqm
= 27.88 Sqm
= 6.94 Sqm
= -1.86 Sqm

= 56.85 Sqm
= 4.24 Sqm
= 2.40 Sqm
= 5.86 Sqm
= 3.32 Sqm
= 0.56 Sqm
= 79.65 Sqm
= -2.88 Sqm
= 0.81 Sqm
= 0.72 Sqm
= 8.45 Sqm
= 122.21 Sqm
= -2.06 Sqm
= 0.96 Sqm
= 0.48 Sqm
= 86.94 Sqm
= -8.35 Sqm
= 11.55 Sqm
= 66.27 Sqm
= -5.12 Sqm
= -1.84 Sqm
= 43.62 Sqm

Contractor Junior Engineer


Page 171

= -2.05 Sqm
= 7.00 Sqm
= 12.24 Sqm
= 12.72 Sqm
= 16.91 Sqm
= 13.50 Sqm
= 12.22 Sqm
= 1.12 Sqm
= 27.88 Sqm
= 6.94 Sqm
= -1.86 Sqm

= 5.07 Sqm
= 4.29 Sqm
= 0.92 Sqm
= 1.25 Sqm

= 5.35 Sqm
= 8.15 Sqm
= 1.46 Sqm
= 0.27 Sqm

= 2.02 Sqm
= 3.30 Sqm
= 0.60 Sqm

Contractor Junior Engineer


Page 172

= 7.44 Sqm
= 7.80 Sqm
= 1.44 Sqm
= 0.44 Sqm

= 2.52 Sqm
= 1.93 Sqm
= 0.59 Sqm
= 0.42 Sqm

= 10.75 Sqm
= 0.42 Sqm
= 1.28 Sqm

= 12.06 Sqm
= 9.79 Sqm
= 1.75 Sqm

= 2.33 Sqm
= 2.07 Sqm
= 0.60 Sqm
= 0.44 Sqm

= 1.32 Sqm
= 1.32 Sqm
= 0.26 Sqm
= 0.29 Sqm

Contractor Junior Engineer


Page 173

= 4.80 Sqm
= 4.86 Sqm
= 3.04 Sqm
= 2.21 Sqm
= 0.58 Sqm
= 0.96 Sqm
= 0.04 Sqm

= 5.35 Sqm
= 8.15 Sqm
= 1.46 Sqm
= 0.27 Sqm

= 2.02 Sqm
= 3.30 Sqm
= 0.60 Sqm

= 7.44 Sqm
= 7.80 Sqm
= 1.44 Sqm
= 0.44 Sqm

= 2.37 Sqm
= 2.16 Sqm
= 2.34 Sqm

Contractor Junior Engineer


Page 174

= 1.51 Sqm
= 0.22 Sqm
= 0.72 Sqm
= 0.43 Sqm

= 7.30 Sqm
= 6.63 Sqm
= 2.54 Sqm
= 1.64 Sqm
= 3.39 Sqm
= 0.22 Sqm
= 0.20 Sqm
= 1.72 Sqm

= 12.76 Sqm
= 11.01 Sqm
= 4.54 Sqm
= 2.45 Sqm

= 2.33 Sqm
= 2.07 Sqm
= 0.60 Sqm
= 0.44 Sqm

= 1.32 Sqm
= 1.32 Sqm
= 0.26 Sqm

Contractor Junior Engineer


Page 175

= 0.29 Sqm

= 39.48 Sqm
= 20.85 Sqm
= 2.78 Sqm
= 2.36 Sqm
= -1.97 Sqm
= 0.68 Sqm
= 0.45 Sqm

= 20.54 Sqm
= 6.64 Sqm
= 3.16 Sqm
= 0.54 Sqm
= 0.51 Sqm
= 0.50 Sqm
= 0.49 Sqm
= 0.73 Sqm
= 2.10 Sqm
= 0.15 Sqm
= 0.18 Sqm
= 2.10 Sqm
= 0.15 Sqm

Contractor Junior Engineer


Page 176

= 0.18 Sqm
= 16.38 Sqm
= 5.42 Sqm
= 2.50 Sqm
= 0.37 Sqm
= 0.37 Sqm
= 0.37 Sqm
= 0.35 Sqm
= 0.73 Sqm

= 57.79 Sqm
= 17.02 Sqm
= 7.92 Sqm
= 0.44 Sqm
= 0.44 Sqm
= 0.44 Sqm
= 0.45 Sqm
= 0.45 Sqm
= 0.45 Sqm
= 0.40 Sqm
= 0.42 Sqm
= 0.43 Sqm
= 0.42 Sqm
= 0.41 Sqm
= 42.49 Sqm

Contractor Junior Engineer


Page 177

= 0.60 Sqm
= 0.18 Sqm

= 16.35 Sqm
= 5.59 Sqm
= 2.60 Sqm
= 0.42 Sqm
= 0.41 Sqm
= 0.41 Sqm
= 0.41 Sqm
= 0.63 Sqm
= 0.27 Sqm
= 0.37 Sqm
= 15.03 Sqm
= 5.48 Sqm
= 2.55 Sqm
= 0.35 Sqm
= 0.39 Sqm
= 0.39 Sqm
= 0.46 Sqm
= 0.66 Sqm

= 20.54 Sqm
= 0.73 Sqm

Contractor Junior Engineer


Page 178

= 2.10 Sqm
= 0.15 Sqm
= 0.18 Sqm
= 2.10 Sqm
= 0.15 Sqm
= 0.18 Sqm
= 16.38 Sqm
= 0.73 Sqm
= 0.70 Sqm

= 57.79 Sqm
= 42.49 Sqm
= 0.60 Sqm
= 0.18 Sqm

= 16.35 Sqm
= 0.63 Sqm
= 4.39 Sqm
= 0.27 Sqm
= 0.37 Sqm
= 15.03 Sqm
= 0.66 Sqm

= 10.90 Sqm
= 27.49 Sqm

Contractor Junior Engineer


Page 179

= 4.39 Sqm
= 13.34 Sqm
= 9.01 Sqm
= 2.32 Sqm
= 9.38 Sqm
= 3.35 Sqm
= 8.14 Sqm
= -3.46 Sqm
= -0.94 Sqm

= 22.80 Sqm
= 20.88 Sqm
= 12.00 Sqm
= 1.70 Sqm
= 0.86 Sqm
= 9.38 Sqm
= 3.35 Sqm
= 7.80 Sqm
= 2.59 Sqm
= 1.30 Sqm
= 0.41 Sqm
= 0.18 Sqm
= -3.91 Sqm
= -1.67 Sqm

= 2046.90 Sqm

Contractor Junior Engineer


Page 180

or paints 2046.90 Sqm

= 5.85 Sqm

= 6.57 Sqm
= 2.51 Sqm
= 8.64 Sqm

= 2.94 Sqm

= 6.66 Sqm

= 13.81 Sqm

= 2.77 Sqm

= 8.37 Sqm

= 1.54 Sqm

= 5.60 Sqm

Contractor Junior Engineer


Page 181

= 6.57 Sqm
= 2.51 Sqm
= 8.64 Sqm

= 2.82 Sqm

= 8.61 Sqm

= 14.51 Sqm

= 2.77 Sqm

= 8.37 Sqm

= 1.54 Sqm
= 121.60 Sqm

uded 5mm rigid PVC foam sheet,


e profiles to be reinforced with
door frame to be fixed to the wall
e.

Contractor Junior Engineer


Page 182

= 16.88 Metre
= 2.72 Metre

= 16.88 Metre
= 2.56 Metre

= 16.88 Metre
= 2.72 Metre

= 16.88 Metre
= 2.56 Metre

= 78.08 Metre

O. to P / TCMB

ckness and size of 19mm x 19mm


anufacture . M.S. frame covered with
20mm shall be tapered in 45degree
shall be tapered in 45 degree on the
e tapered on both sides to form lock
C sheet be provided = 5.41 for
as gap insert Sqm
styles & rails with 7mm
An additional 5mm = thick PVC5.10
strip Sqm
direction of Engineer-in-charge.

Contractor Junior Engineer


Page 183

= 5.41 Sqm

= 5.10 Sqm

= 21.02 Sqm

O. to P / TCMB

e low level white P.V.C. flushing


and fixtures complete including

= 4.00 Each
= 4.00 Each
Total = 8.00 Each

O. to P / TCMB

vel white vitreous china flushing


ard make and mosquito proof
d the walls and floors wherever

Contractor Junior Engineer


Page 184

= 4.00 Each
= 4.00 Each
Total = 8.00 Each

O. to P / TCMB

rd pattern, including

= 4.00 Each
= 4.00 Each
Total = 8.00 Each

O. to P / TCMB

= 4.00 Each
= 4.00 Each
Total = 8.00 Each

O. to P / TCMB

Contractor Junior Engineer


Page 185

d the wall wherever required.

= 4.00 Each
= 4.00 Each
Total = 8.00 Each

O. to P / TCMB

= 12.00 Each
= 12.00 Each
Total = 24.00 Each

O. to P / TCMB

ded frame of approved make and

= 8.00 Each

Contractor Junior Engineer


Page 186

= 8.00 Each
Total = 16.00 Each

O. to P / TCMB

with C.P.brass brackets and guard


= 8.00 Each
= 8.00 Each
Total = 16.00 Each

O. to P / TCMB

d suitable locking arrangement and

= 2000.00 Liters
Total = 2000.00 Liters

O. to P / TCMB

Contractor Junior Engineer


Page 187

= 8.00 Each
= 8.00 Each

Total = 16.00 Each

O. to P / TCMB

less then 690 gms.

= 8.00 Each

Total = 8.00 Each

O. to P / TCMB

931

= 16.00 Each

Contractor Junior Engineer


Page 188

= 8.00 Each
= 8.00 Each
= 16.00 Each
= 8.00 Each

Total = 56.00 Each

O. to P / TCMB

hen and the like consisting of

ecommended proportions
= including
11.60 Sqm
=
ended proportion including
12.76 Sqm
= 8.80 Sqm
= 1.45 Sqm
each other with bitumen @ 1.7
Total = 34.61 Sqm

O. to P / TCMB

Contractor Junior Engineer


Page 189

= 32.60 Metre
= 2.00 Metre
= 2.00 Metre
= 2.00 Metre

= 4.00 Metre
= 4.00 Metre
= 2.00 Metre
= 2.00 Metre
= 2.00 Metre
= 2.00 Metre
= 2.00 Metre

= 8.00 Metre
= 4.00 Metre
= 4.00 Metre
= 8.00 Metre

= 4.00 Metre
= 4.00 Metre
= 4.00 Metre
= 2.00 Metre
= 2.00 Metre
= 4.00 Metre

Contractor Junior Engineer


Page 190

Total = 100.60 Metre

O. to P / TCMB

20 mm (average) thick baseof


g complete with :

= 14.14 Sqm
= 1.91 Sqm

= 7.64 Sqm
= -0.70 Sqm
= 5.59 Sqm
= 0.42 Sqm
= 0.53 Sqm
= 0.42 Sqm
= 0.21 Sqm
= 0.65 Sqm
= 0.03 Sqm
= 0.29 Sqm
= 0.39 Sqm
= 0.36 Sqm
= 0.08 Sqm
= 0.50 Sqm

Contractor Junior Engineer


Page 191

= 0.58 Sqm
= 0.28 Sqm
= 0.39 Sqm
= 1.12 Sqm
= 0.34 Sqm
= 1.60 Sqm
= 0.25 Sqm
= 0.10 Sqm
= 0.33 Sqm
= 0.16 Sqm
37.61

= 5.54 Sqm
= 3.24 Sqm
= 5.79 Sqm
= 0.18 Sqm
= 3.53 Sqm
= 2.16 Sqm

= 3.53 Sqm
= 2.45 Sqm
= 6.13 Sqm
= 3.06 Sqm
= 5.04 Sqm

Contractor Junior Engineer


Page 192

= 2.97 Sqm

= 3.41 Sqm
= 1.69 Sqm

= 3.48 Sqm
= 1.90 Sqm
= 0.16 Sqm
= 1.47 Sqm
= 0.88 Sqm
= 2.36 Sqm
= 1.53 Sqm
= 0.34 Sqm
= 0.18 Sqm

= 0.15 Sqm
= 0.22 Sqm
= 0.20 Sqm
= 0.04 Sqm
= 0.02 Sqm
= 0.05 Sqm
= 0.08 Sqm
= 0.02 Sqm
= 0.02 Sqm
= 0.09 Sqm

Contractor Junior Engineer


Page 193

= 0.73 Sqm
= 0.43 Sqm
= 0.15 Sqm
= 0.11 Sqm
= 0.07 Sqm
= 0.23 Sqm
= 0.03 Sqm
= 0.37 Sqm
= 0.62 Sqm
64.65
= 102.26 Sqm

O. to P / TCMB

20 mm (average) thick baseof


g complete with :

= 13.04 Metre
= 2.20 Metre

= 21.60 Metre

Contractor Junior Engineer


Page 194

= 12.60 Metre
= 12.60 Metre
= 21.60 Metre

= 11.36 Metre
= 5.64 Metre
= 12.44 Metre
= 6.80 Metre

= 3.40 Metre
= 3.40 Metre

Total = 126.68 Metre

give high gloss finish etc. complete

= 15.52 Metre
= 16.88 Metre

= 8.32 Metre
= 7.52 Metre
= 7.20 Metre

Contractor Junior Engineer


Page 195

= 21.60 Metre

= 8.00 Metre
= 8.00 Metre
Total = 93.04 Metre

O. to P / TCMB

on less than 0.08


bed of cement
te.

= 2.70 Sqm
= 3.60 Sqm
= 0.62 Sqm
= 0.34 Sqm
= 0.72 Sqm
= 2.80 Sqm
= 0.88 Sqm
= 1.06 Sqm
= 0.80 Sqm
= 2.04 Sqm

Contractor Junior Engineer


Page 196

= 3.17 Sqm
= 0.45 Sqm
= 0.26 Sqm

= 1.62 Sqm
= 3.72 Sqm
= 1.62 Sqm

= 1.38 Sqm
= 0.72 Sqm
= 2.09 Sqm
= 0.42 Sqm

= 2.24 Sqm
= 2.56 Sqm
= 2.62 Sqm
= 3.01 Sqm

= 2.88 Sqm
= 2.56 Sqm
= 3.10 Sqm
= 1.98 Sqm

= 1.31 Sqm
= 0.48 Sqm

Contractor Junior Engineer


Page 197

= 1.16 Sqm

= 1.22 Sqm
= 0.48 Sqm
= 0.18 Sqm

= 0.85 Sqm
= 1.63 Sqm
= 1.60 Sqm
= 0.64 Sqm

= 3.04 Sqm
= 64.55 Sqm

O. to P / TCMB

per complete direction of the

= 8.00 Each
= 8.00 Each
= 16.00 Each

O. to P / TCMB

Contractor Junior Engineer


Page 198

ection of the Engineer-in-charge.

= 8.00 Each
= 8.00 Each

= 16.00 Each

O. to P / TCMB

o. ACE-1111)Size- of approved

= 8.00 Each
= 8.00 Each
= 16.00 Each

O. to P / TCMB

Contractor Junior Engineer


Page 199

ineer-in-charge.

= 4.00 Each
= 4.00 Each
= 8.00 Each

O. to P / TCMB

eer-in-charge.

= 4.00 Each
= 4.00 Each
= 8.00 Each

O. to P / TCMB

= 4.54 Metre
= 1.30 Metre
= 15.52 Metre
= 0.40 Metre

Contractor Junior Engineer


Page 200

= 10.60 Metre
= 10.40 Metre
= 3.20 Metre
= 3.10 Metre
= 3.10 Metre
= 14.90 Metre
= 0.50 Metre
= 5.50 Metre
= 0.40 Metre
= 0.70 Metre

= 4.32 Metre
= 0.32 Metre
= 0.20 Metre
= 1.50 Metre
= 5.40 Metre
= 1.00 Metre
= 0.40 Metre
= 2.84 Metre
= 0.60 Metre
= 4.80 Metre
= 0.60 Metre
= 10.40 Metre
= 10.30 Metre
= 3.50 Metre
= 0.60 Metre

Contractor Junior Engineer


Page 201

= 3.46 Metre
= 4.20 Metre
= 0.60 Metre
= 4.20 Metre
= 0.60 Metre
= 0.40 Metre
Total = 134.40 Metre

O. to P / TCMB

= 4.60 Metre
= 10.60 Metre
= 10.80 Metre
= 8.00 Metre

= 17.20 Metre
= 1.80 Metre
= 3.40 Metre
= 3.40 Metre
= 4.80 Metre
= 1.40 Metre

Contractor Junior Engineer


Page 202

Total = 66.00 Metre

0.38 = 6.33
1.97 = 8.20
0.78 = 6.49
0.39 = 8.40
1.92 = 10.33
0.79 = 1.58

41.33
Sqm

Contractor Junior Engineer


Page 203

= 18.03
= 18.79
= 19.07
= 21.96
= 21.53
= 22.39
= 16.58
= 16.26
= 21.96

= 18.79
= 19.07
= 21.96
= 21.53
= 22.39
= 16.58
= 16.26
= 21.96
= 21.00

1.95 = 47.46
1.95 = 47.86

0.38 = 32.25
1.97 = 41.80

Contractor Junior Engineer


Page 204

0.78 = 33.10
0.39 = 37.64
1.92 = 46.33
0.79 = 38.12
Total = 680.67
Sqm

O. to P / TCMB

ng jointing with seal ring

= 8.00 Each

Total = 8.00 Each

O. to P / TCMB
ng jointing with seal ring

= 4.00 Each
= 6.00 Each

Total = 10.00 Each


O. to P / TCMB

Contractor Junior Engineer


Page 205

ng jointing with seal ring

= 16.00 Each
= 4.00 Each

Total = 20.00 Each


O. to P / TCMB
ng jointing with seal ring

= 24.00 Each

Total = 24.00 Each

O. to P / TCMB

= 24.00 Each

Total = 24.00 Each

Contractor Junior Engineer


Page 206

O. to P / TCMB

= 8.00 Each

Total = 8.00 Each

O. to P / TCMB

= 18.00 Each

Total = 18.00 Each

O. to P / TCMB

Contractor Junior Engineer


Page 207

= 8.00 Each

Total = 8.00 Each

O. to P / TCMB

= 6.00 Each

Total = 6.00 Each

O. to P / TCMB

= 8.00 Each

Total = 8.00 Each

O. to P / TCMB

Contractor Junior Engineer


Page 208

= 152.00 Each

Total = 152.00 Each


O. to P / TCMB

utting rivets, weldingetc. including

= 27.6 Sqm

Total = 27.60 Sqm

O. to P / TCMB

Contractor Junior Engineer


Page 209

= 25.36 Cum
= 9.42 Cum
= 33.93 Cum
= 113.80 Cum
= 70.89 Cum
= 19.57 Cum
= 6.50 Cum
= 32.03 Cum

Total = 311.50 Cum

O. to P / TCMB

= 0.08 Cum
= 0.16 Cum

Total = 0.24 Cum


O. to P / TCMB

y/ by mechanical

Contractor Junior Engineer


Page 210

= 9.44 Metre
= 7.33 Metre

= 5.48 Metre
= 2.40 Metre
134.40
66.00
100.60
Total = 325.65 Metre

O. to P / TCMB

= 16.00 Each
= 8.00 Each
Total = 24.00 Each

O. to P / TCMB

Contractor Junior Engineer


Page 211

s (not
uding getting

)= 48.38 Cum

)= 46.48 Cum

= 7.36 Cum
= 1.28 Cum
= 5.12 Cum
= 9.49 Cum
= 118.11 Cum

O. to P / TCMB

= 3.05 Cum
= 2.60 Cum
= 0.64 Cum

= 6.29 Cum

O. to P / TCMB

Contractor Junior Engineer


Page 212

O. to P / TCMB

= 10.92 Cum

= 12.24 Cum

= 5.11 Cum

Total = 28.27 Cum

O. to P / TCMB
l work upto plinth level :

0.05 = 0.95 Cum


0.05 = 0.95 Cum
0.05 = 0.81 Cum
0.05 = 0.81 Cum
= 0.15 Cum
= 0.15 Cum
Total = 3.67 Cum

O. to P / TCMB

= 19.05 Sqm

Contractor Junior Engineer


Page 213

= 16.25 Sqm
= 12.38 Sqm
= 10.56 Sqm
= 41.66 Sqm

= 46.15 Sqm

= 3.65 Sqm
= 2.92 Sqm
= 5.11 Sqm

Total = 157.73 Cum

O. to P / TCMB

ng jointing with seal

= 53.60 Metre

= 67.20 Metre

= 14.40 Metre
= 13.60 Metre

Contractor Junior Engineer


Page 214

= 9.20 Metre

= 13.60 Metre
= 4.80 Metre
= 2.00 Metre

Total = 178.40 Metre

O. to P / TCMB

water pipes conforming

= 5.00 Each
= 4.00 Each
= 4.00 Each
= 5.00 Each

Total = 18.00 Each

O. to P / TCMB

= 12.00 Each

Contractor Junior Engineer


Page 215

= 12.00 Each
= 32.00 Each
Total = 44.00 Each

O. to P / TCMB

= 8.00 Each
= 8.00 Each
= 8.00 Each
= 8.00 Each
= 16.00 Each

Total = 48.00 Each

O. to P / TCMB

means of 50x50x50 mm
er 1:4 (1 cement : 4 Corse

= 64.00 Each

Contractor Junior Engineer


Page 216

= 64.00 Each

= 12.00 Each
= 64.00 Each

Total = 204.00 Each

O. to P / TCMB

= 18.03
= 18.79
= 19.07
= 21.96
= 21.53
= 22.39
= 16.58
= 16.26
= 21.96

= 18.79
= 19.07

Contractor Junior Engineer


Page 217

= 21.96
= 21.53
= 22.39
= 16.58
= 16.26
= 21.96
= 21.00
x 2.60 = 4.16
x 1.47 = 2.35

x 1.95 = 47.46
x 1.95 = 47.86
x 1.54 = 7.88
x 1.95 = 3.82
x 1.94 = 3.55
x 1.45 = 6.93
x 2.08 = 18.77
x 1.95 = 14.04

x 0.38 = 32.25
x 1.97 = 41.80
x 0.78 = 33.10
x 0.39 = 37.64
x 1.92 = 46.33
x 0.79 = 38.12
Total = 742.17

Contractor Junior Engineer


Page 218

O. to P / TCMB

per IS : 1868 ) transparent or dyed to

= 36.00 Each

= 36.00 Each
Total = 72.00 Each

O. to P / TCMB

= 72.00 Each
= 16.00 Each

Contractor Junior Engineer


Page 219

= 72.00 Each
= 16.00 Each

Total = 176.00 Each

O. to P / TCMB

= 16.00 Each
= 16.00 Each

= 16.00 Each
= 16.00 Each

Total = 64.00 Each

O. to P / TCMB

: 1868 ) transparent or

Contractor Junior Engineer


Page 220

= 72.00 Each

= 72.00 Each

= 144 Each

O. to P / TCMB

0 as per IS : 1868 )

= 36.00 Each

= 36.00 Each

Total = 72.00 Each

O. to P / TCMB

Contractor Junior Engineer


Page 221

board contruction withframe of 1st class hard

= 6.48 Sqm
= 7.63 Sqm
= 7.88 Sqm
= 7.55 Sqm
= 7.68 Sqm
= 5.49 Sqm
= 6.63 Sqm
= 6.54 Sqm
= 5.36 Sqm

= 6.10 Sqm
= 7.33 Sqm
= 7.68 Sqm
= 7.56 Sqm
= 7.52 Sqm
= 5.36 Sqm
= 7.64 Sqm
= 6.15 Sqm
= 5.25 Sqm

Total = 121.83 Sqm

Contractor Junior Engineer


Page 222

rews.

= 7.95 Sqm
= 7.84 Sqm

= 7.14 Sqm
= 7.13 Sqm

Total = 30.06 Sqm

Qty. (Sqm)

= 56.85 Sqm
= 4.24 Sqm
= 2.40 Sqm

Contractor Junior Engineer


Page 223

= 5.86 Sqm
= 3.32 Sqm
= 0.56 Sqm
= 79.65 Sqm
= -2.88 Sqm
= 0.81 Sqm
= 0.72 Sqm
= 8.45 Sqm
= 122.21 Sqm
= -2.06 Sqm
= 0.96 Sqm
= 0.48 Sqm
= 86.94 Sqm
= -8.35 Sqm
= 11.55 Sqm
= 66.27 Sqm
= -5.12 Sqm
= -1.84 Sqm
= 43.62 Sqm
= -2.05 Sqm
= 7.00 Sqm
= 12.24 Sqm
= 12.72 Sqm
= 16.91 Sqm
= 13.50 Sqm

Contractor Junior Engineer


Page 224

= 12.22 Sqm
= 1.12 Sqm
= 27.88 Sqm
= 6.94 Sqm
= -1.86 Sqm

= 56.85 Sqm
= 4.24 Sqm
= 2.40 Sqm
= 5.86 Sqm
= 3.32 Sqm
= 0.56 Sqm
= 79.65 Sqm
= -2.88 Sqm
= 0.81 Sqm
= 0.72 Sqm
= 8.45 Sqm
= 122.21 Sqm
= -2.06 Sqm
= 0.96 Sqm
= 0.48 Sqm
= 86.94 Sqm
= -8.35 Sqm
= 11.55 Sqm
= 66.27 Sqm

Contractor Junior Engineer


Page 225

= -5.12 Sqm
= -1.84 Sqm
= 43.62 Sqm
= -2.05 Sqm
= 7.00 Sqm
= 12.24 Sqm
= 12.72 Sqm
= 16.91 Sqm
= 13.50 Sqm
= 12.22 Sqm
= 1.12 Sqm
= 27.88 Sqm
= 6.94 Sqm
= -1.86 Sqm

Total - = 1162.52 Sqm

Contractor Junior Engineer


Page 226

= 5.07 Sqm
= 4.29 Sqm
= 0.92 Sqm
= 1.25 Sqm

= 5.35 Sqm
= 8.15 Sqm
= 1.46 Sqm
= 0.27 Sqm

= 2.02 Sqm
= 3.30 Sqm
= 0.60 Sqm

= 7.44 Sqm
= 7.80 Sqm
= 1.44 Sqm
= 0.44 Sqm

= 2.52 Sqm
= 1.93 Sqm
= 0.59 Sqm
= 0.42 Sqm

= 10.75 Sqm

Contractor Junior Engineer


Page 227

= 0.42 Sqm
= 1.28 Sqm

= 12.06 Sqm
= 9.79 Sqm
= 1.75 Sqm

= 2.33 Sqm
= 2.07 Sqm
= 0.60 Sqm
= 0.44 Sqm

= 1.32 Sqm
= 1.32 Sqm
= 0.26 Sqm
= 0.29 Sqm

= 4.80 Sqm
= 4.86 Sqm
= 3.04 Sqm
= 2.21 Sqm
= 0.58 Sqm
= 0.96 Sqm
= 0.04 Sqm

= 5.35 Sqm

Contractor Junior Engineer


Page 228

= 8.15 Sqm
= 1.46 Sqm
= 0.27 Sqm

= 2.02 Sqm
= 3.30 Sqm
= 0.60 Sqm

= 7.44 Sqm
= 7.80 Sqm
= 1.44 Sqm
= 0.44 Sqm

= 2.37 Sqm
= 2.16 Sqm
= 2.34 Sqm
= 1.51 Sqm
= 0.22 Sqm
= 0.72 Sqm
= 0.43 Sqm

= 7.30 Sqm
= 6.63 Sqm
= 2.54 Sqm
= 1.64 Sqm
= 3.39 Sqm
= 0.22 Sqm

Contractor Junior Engineer


Page 229

= 0.20 Sqm
= 1.72 Sqm

= 12.76 Sqm
= 11.01 Sqm
= 4.54 Sqm
= 2.45 Sqm

= 2.33 Sqm
= 2.07 Sqm
= 0.60 Sqm
= 0.44 Sqm

= 1.32 Sqm
= 1.32 Sqm
= 0.26 Sqm
= 0.29 Sqm

Total - = 227.48 Sqm

= 12.80 Meter

Contractor Junior Engineer


Page 230

Total = 12.80 Meter

O. to P / TCMB

roved steel primer using structural steel etc. as

Mtrs
Mtrs
Mtrs

Mtrs
= 22.16 Kg

Mtrs
Mtrs

Mtrs
= 96.24 Kg

Contractor Junior Engineer


Page 231

Mtrs

Mtrs
= 0.8 Kg

Mtrs
Mtrs

Mtrs
= 0.8 Kg

Mtrs

Mtrs
= 0.12 Kg

Mtrs
Mtrs
Mtrs
= 1.8 Kg

Contractor Junior Engineer


Page 232

Mtrs
Mtrs
Mtrs

Mtrs
= 6.31 Kg

Mtrs
Mtrs

Mtrs
= 23.64 Kg

Mtrs
Mtrs

Mtrs
= 0.44 Kg

Mtrs
Mtrs
Mtrs
Mtrs
Mtrs
Mtrs

Contractor Junior Engineer


Page 233

Mtrs
= 2.55 Kg

Mtrs

Mtrs
= 1.2 Kg

Metre
Metre
Metre

Mtrs
= 6.05 Kg

Metre
Metre

Mtrs
= 22.44 Kg

Metre

Contractor Junior Engineer


Page 234

Metre

Mtrs
= 0.44 Kg

Metre
Metre
Metre
Metre
Metre
Metre

Mtrs
= 2.55 Kg

Metre

Mtrs
= 1.2 Kg

Contractor Junior Engineer


Page 235

Metre
Metre
Metre
Metre

Metre
Metre
Metre
Metre

Metre
Metre
Metre

Metre
Metre
Metre

Metre
Metre
Metre

Contractor Junior Engineer


Page 236

Metre
Metre
Metre
Mtrs
= 881.58 Kg

l memberssuch as F7D, F4B, K11 B and K12 B etc.


nd fixing of hinges, pivots, includingpriming coat of
bers shall
raded stonebeaggregate
measured20for payment).

Metre
Metre

Metre
Metre

Metre
Metre

Contractor Junior Engineer


Page 237

Metre
Metre

Metre
Metre

Metre
Metre

Metre
Metre

Metre
Metre

Metre
Metre

Contractor Junior Engineer


Page 238

Metre
Metre

Metre
Metre

Metre
Metre
Mtrs
= 1197 Kg

Metre

Metre

Contractor Junior Engineer


Page 239

Metre

Metre

Metre

Metre
Mtrs
= 227.52 Kg

Metre

Contractor Junior Engineer


Page 240

Metre

Metre

Metre

Mtrs
= 96 Kg

Metre

Metre

Metre

Contractor Junior Engineer


Page 241

Metre

Metre

Metre
Mtrs
= 16.8 Kg

Metre

Metre

Metre

Contractor Junior Engineer


Page 242

Metre

Metre

Metre
Mtrs
= 14.4 Kg

Metre

Nos

Nos

Contractor Junior Engineer


Page 243

Nos

Nos

Nos
Nos
= 288 Kg

Nos

Nos

Nos

Contractor Junior Engineer


Page 244

Nos

Nos

Nos
Nos
= 276 Kg

Metre

Nos

Nos

Contractor Junior Engineer


Page 245

Nos

Nos

Nos
Nos
= 276 Kg

Metre

Nos

Contractor Junior Engineer


Page 246

Nos

Nos

Nos

Nos
Nos
= 276 Kg

Contractor Junior Engineer


Extra Providing and fixing on wall face unplasticised
Item - Rigid PVC rain water pipes conforming to IS :
No.16 13592 Type A, including jointing with seal ring
conforming IS :5382,living 10 mm gap for
thermal expansion, (i) single socketed pipes.

(i) Cowel
BF TCMB P-
Total Qty.
(ii) Plane Tee
BF TCMB P-
Total Qty.
(iii) Door Band
BF TCMB P-
Total Qty.
(iv) Nanahi Traf
BF TCMB P-
Total Qty.
Extra 25 mm nominal bore
Item
No.17
BF TCMB P-
Total Qty.
Extra 20 mm nominal bore
Item
No.18
BF TCMB P-
Total Qty.
Extra 15 mm nominal bore
Item
No.19
BF TCMB P-
Total Qty.
Extra Providing and fixing gun metal gate valve
Item with C.I. wheel of approved quality(screwed
No.20 end) :

BF TCMB P-
Total Qty.
Extra P.V.C, water Tank Cover 1000 Liter
Item
No.21
BF TCMB P-
Total Qty.
Extra PVC Tank Connector
Item
No.22
BF TCMB P-
Total Qty.
Extra Providing and fixing CP extension nipple for
Item G.I pipe, fittings of approved quality and
No.23 colour.

BF TCMB P-
Total Qty.
Extra Dismantling steel work in built up sections in
Item angles, tees, flats andchannels including all
No.24 gusset plates, bolts, nuts, cutting rivets,
weldingetc. including dismembering and
stacking within 50metres lead.
BF TCMB P-
Total Qty.
Extra Excavation Soil and Clining
Item
No.25
BF TCMB P-
Total Qty.
Extra Wood frame Making
Item
No.26
BF TCMB P-
Total Qty.
Extra Dismantling G.I. pipes (external work)
Item including excavation and refillingtrenches
No.27 after taking out the pipes, manually/ by
mechanical meansincluding stacking of pipes
within 50 metres lead as per direction
ofEngineer-in-charge :
BF TCMB P-
Total Qty.
Extra C.P Jalli 5"
Item
No.28
BF TCMB P-
Total Qty.
Page 252

ABSTRACT OF COST
1.) Name of work : - Renovation of Post D-1-Type (2 Blocks-8 Qtrs.)at NIFT, Hatia, Ranchi.

2.) Name of the Contractor : - M/S Deep Interprises

3.) Agreement no. : - 66/RCD/2015-2016

4.) Date of Start (As per Agreement) : - 2-Jan-16

5.) Date of Completion (As per Agreement) : - 30/06/2016

6.) Reference to previous measurements, if any : - 1st R/A Bill

7.) Serial no. of this bill : - 2nd R/A Bill


Particulars Quantity Unit Full Rate Prov.Rate
Page 253
Page 254

Finishing wall with Acrylic smooth exterior paint of


10.9 required shade :
Page 255

15.7 Providing and placing on terrace (at all floor levels)


polyethylene water storage tank ISI : 12701 marked
with cover and suitable locking arrangement and
making
QBF/P- necessary holes for inlet, outlet and overflow
/RCD/TCMB- 2000.00 Liter
pipes but without fittings and the base support for
Total Qty. 2000.00 Liter
tank
(a) 4000.00 Liter 7.50 7.50
(b) 1200.00 Liter 7.50 7.50
(c) -3200.00 Liter 7.50 6.75
15.8 Providing and fixing C.P. brass bib cock of approved
quality conforming to IS:8931

15.8.1 15 mm nominal bore.


QBF/P- /RCD/TCMB- 16.00 Each
Total Qty. 16.00 Each
(a) 24.00 Each 750.00 750.00
(b) 8.00 Each 750.00 750.00
(c) -16.00 Each 750.00 675.00
15.9 Providing and fixing C.P. brass long body bib cock of
approved quality conforming to IS standards and
weighing not less then 690 gms.
15.9.1 15 mm nominal bore
QBF/P- /RCD/TCMB- 8.00 Each
Total Qty. 8.00 Each
(a) 24.00 Each 850.00 850.00
(b) 8.00 Each 850.00 850.00
(c) -24.00 Each 850.00 765.00
Page 256

17.1 Providing and laying water proofing treatment to


vertical
QBF/P- and/RCD/TCMB-
horizontal surfaces of depressed portions 34.61 Sqm
of W.C., kitchen and the like consisting of :_x000D_
Total Qty. 34.61 Sqm
i) Ist course of applying cement slurry @ 4.4 Kg/sqm
(a) 46.00 Sqm 650.00 650.00
mixed with water proofing compound conforming to
(b) 14.00 Sqm 650.00 650.00
IS 2645 in recommended proportions including
rounding off junction of vertical and horizontal (c) -25.39 Sqm 650.00 585.00
surface._x000D_
ii) IInd course of 20mm cement plaster 1:3 (1 cement :
3 coarse sand) mixed with water proofing compound
in recommended proportion including rounding off
junction of vertical and horizontal surface._x000D_
iii) IIIrd course of applying blown or residual bitumen
applied hot at 1.7 Kg. per sqm of area._x000D_
iv) IVth course of 400 micron thick PVC sheet.
(Overlaps at joints of PVC sheet should be 100 mm
wide and pasted to each other with bitumen @ 1.7
Kg/sqm.)
Page 257

6.1 Providing and fixing ISI marked flush door shutters


conforming to IS : 2202(part 1)non-decorative
type,core of block board contruction withframe of 1st
class hard wood and will marked commercial 3 play
verticalgrains or crocc bands and faceVeneers on both
face of shutter :

6.1.1 35 mm thick including ISI markedStainless steel bult


hinges with necessary screws

Total Qty. 121.83 Sqm


a) 80.00 Sqm 2200.00 2200.00
b) 24.00 Sqm 2200.00 2200.00
c) 17.83 Sqm 2200.00 1980.00
Page 258

Date of Measurement :- 0

6.2.1 20 mm dia.

(A)
Page 259

(A) + (B) =
Less Already Paid in 1st R/A (-)

Say
RECOVERIES : -

1. SD @ 2.5% on Amount 5255375 131384.38


Page 260

Less : Already recovered up to 1st R/A vide CMB- / P-18 = 17006.00

Now to be recovered = 114378.38

2. IT @ 2% = 135040.00

Less : Already recovered up to 1st R/A vide CMB- / P-18 = 13605.00

Now to be recovered = 121435.00

3. J-Vat @ 4% = 270079.00

Less : Already recovered up to 1st R/A vide CMB- / P-18 = 27209.00

Now to be recovered = 242870.00

4. Labour Cess @ 1% = 67520.00

Less : Already recovered up to 1st R/A vide CMB- / P-18 = 6802.00

Now to be recovered = 60718.00

5. Gross Royalty up to 2nd R/A = 11780.00

Less : Already recovered up to 1st R/A vide CMB- / P-18 = 124.00

Now to be recovered = 11656.00

Recovery of Secured Advance for Vetrified Tiles = 874800.00

Net Recovery to be recovered 1425857.38

Net Payable Amount

Certificate :
Page 261

1 The Work is carried out as per CPWD specification and as per direction of EIC.

2 Water is arranged by the contractor his own cost.

3 No labour complain has been received so far.

4 The work is in progress.

5 All mandatory test has been carried out.

6 Site order book has been verified before preparation of bill.

The work is in progress.


7

Junior Engineer Assistant Engineer


RCSD, CPWD Ranchi Central Division
Contrator Hinoo, Ranchi CPWD, Ranchi
Page 262

)at NIFT, Hatia, Ranchi.

Amount (Rs.)
Page 263
Page 264
Page 265

30000.00 30000.00
9000.00 9000.00
-21600.00 -21600.00

18000.00 18000.00
6000.00 6000.00
-10800.00 -10800.00

20400.00 20400.00
6800.00 6800.00
-18360.00 -18360.00
Page 266

29900.00 29900.00
9100.00 9100.00
-14853.15 -14853.15
Page 267

176000.00 176000.00
52800.00 52800.00
35303.40 35303.40
Page 268

327690.25
Page 269

6751982.21
680235.20
6071747.01
4126727.00
Page 270

-1425857.38

2700869.63
Page 271

sistant Engineer
hi Central Division
CPWD, Ranchi
Page 272
Page 273
Page 274
Page 275
Page 276
Page 277
Page 278
Page 279
Page 280
Page 283

ABSTRACT OF COST
1.) Name of work : - Renovation of Post D-1-Type (2 Blocks-8 Qtrs.)at NIFT, Hatia, Ranchi.

2.) Name of the Contractor : - M/S Deep Interprises

3.) Agreement no. : - 66/RCD/2015-2016

4.) Date of Start (As per Agreement) : - 2-Jan-16

5.) Date of Completion (As per Agreement) : - 30/06/2016

6.) Reference to previous measurements, if any : - 1st R/A Bill

7.) Serial no. of this bill : - 2nd R/A Bill


Particulars Quantity Unit Full Rate Prov.Rate
1.1 Earth work in surface exevation not exceeding 30 cm
in depth but exceeding 1.5m in width as well as 10
sqm on plan including disposal of excavated earth
upto 50 m and lift upto 1.5m , disposed soil to be
levelled and neatly dressed :

1..1.1 All kinds of soil


QBF/P- /RCD/TCMB- 381.23 Sqm
Total Qty. 381.23 Sqm
a) 300.00 Sqm 5.00 5.00
b) 90.00 Sqm 5.00 5.00
c) -8.77 Sqm 5.00 4.50
Page 284

2 Providing and laying in position cement concrete of


specified grade excluding the cost of centring and
shuttering - All work upto plinth level :
1:2:4 (1 cement : 2 coarse sand : 4 graded stone
2.1.1 aggregate 20 mm nominal size)
QBF/P- /RCD/TCMB- 20.31 Sqm
Total Qty. 20.31 Sqm
a) 15.00 Sqm 5500.00 5500.00
b) 4.50 Sqm 5500.00 5500.00

2.1.2 1:4:8 (1 cement : 4 coarse sand : 8 graded stone


aggregate 40 mm nominal size)
QBF/P- /RCD/TCMB- 15.07 Cum
Total Qty. 15.07 Cum
a) 5.00 Cum 4500.00 4500.00
b) 1.50 Cum 4500.00 4500.00
c) 8.57 Cum 4500.00 4050.00

3.2 Centering and shuttering including strutting,


propping etc. and removal of form for:

3.2.3 Weather shade, Chajjas, corbels etc., including edges

QBF/P- /RCD/TCMB- 155.88 Sqm


Total Qty. 155.88 Sqm
a) 200.00 Sqm 430.00 430.00
b) 60.00 Sqm 430.00 430.00
c) -104.12 Sqm 430.00 387.00
Page 285

3.3 Steel reinforcement for R.C.C. work including


straightening, cutting, bending, placing in position
and binding all complete upto plinth level.

3.3.1 Thermo-Mechanically Treated bars

QBF/P- /RCD/TCMB- 977.48 Kg


Total Qty. 977.48 Kg
a) 2000.00 Kg 55.00 55.00
b) 600.00 Kg 55.00 55.00
c) -1622.52 Kg 55.00 49.50

3.1 Providing and laying in position specified grade of


reinforced cement concrete , excluding the cost of
centring and shuttering,finishing and reinforcement -
All work upto plinth level :

1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone


3.1.1
aggregate 40 mm nominal size)
QBF/P- /RCD/TCMB- 13.89 Cum
Total Qty. 13.89 Cum
a) 22.00 Cum 6000.00 6000.00
b) 6.60 Cum 6000.00 6000.00
c) -14.71 Cum 6000.00 5400.00

4.2 Brick work with common burnt clay F.P.s.(non


modular) bricksof class designation 7.5 in foundation
and plinth.
Page 286

4.2.1 Cement mortar 1:6 (1 cement : 6 coarse sand)

B/F CMB/446 P - 43 7.91


QBF/P- /RCD/CMB- 22.66 Cum
Total Qty. 22.66 Cum
a) 4.00 Cum 5500.00 5500.00
b) 1.20 Cum 5500.00 5500.00
c) 17.46 Cum 5500.00 4950.00

5.1 Providing and fixing 18mm thick gang saw cut mirror
polished (premoulded and prepolished) machine cut
for kitchen platforms, vanity counters ,window sills ,
facias and similar locations of required size of
approved shade, colour and texture laid over 20mm
thick base cement mortar 1:4 (1 cement : 4 coarse
sand) with joints treated with white cement, mixed
with matching pigment, epoxy touch ups, including
rubbing, curing moulding and polishing to edge to
give high gloss finish etc. complete at all levels.

5.1.1 Granite of any colour and shade

5.1.1.1 Area of slab upto 0.50 sqm.


QBF/P- /RCD/TCMB- 10.74 Sqm
Total Qty. 10.74 Sqm
a) 4.00 Sqm 3100.00 3100.00
b) 1.20 Sqm 3100.00 3100.00
c) 5.54 Sqm 3100.00 2790.00
Page 287

5.1.2 Area of slab over 0.50 sqm.


QBF/P- /RCD/TCMB- 39.57 Sqm
Total Qty. 39.57 Sqm
a) 32.00 Sqm 3200.00 3200.00
b) 9.60 Sqm 3200.00 3200.00
c) -2.03 Sqm 3200.00 2880.00

Providing and fixing Ist quality ceramic glazed wall


8.3 tiles conforming to IS : 15622 (thickness to be specified
by the manufacturer) of approved make in all colours,
shades except burgundy, bottle green, black of any
QBF/P- /RCD/TCMB- 300.93 Sqm
size as approved by Engineer-in-Charge in skirting,
risers of steps and dados over 12 mm thick bed Total
of Qty. 300.93 Sqm
cement Mortar 1:3 (1 cement : 3 coarse sand) and a) 360.00 Sqm 750.00 750.00
jointing with grey cement slurry @ 3.3kg per sqm b) 108.00 Sqm 750.00 750.00
including pointing in white cement mixed with c) -167.07 Sqm 750.00 675.00
pigment of matching shade complete.
Providing and laying Ceramic glazed floor tiles of size
300x300 mm (thickness to be specified by the
8.4 manufacturer) of 1st quality conforming to IS : 15622
of approved make in colours such as White, Ivory,
Grey, Fume Red Brown, laid on 20 mm thick Cement
QBF/P-
Mortar 1:4 /RCD/CMB-
(1 Cement : 4 Coarse sand) including 57.85 Sqm
Total Qty.
pointing the joints with white cement and matching 57.85 Sqm
pigment etc., complete. a) 200.00 Sqm 800.00 800.00
b) 60.00 Sqm 800.00 800.00
c) -202.15 Sqm 800.00 720.00
Page 288

8.5 Providing and laying vitrified floor tiles in different


sizes (thickness to be specified by the manufacturer)
with water absorption's less than 0.08% and
conforming to IS : 15622 of approved make in all
colours and shades, laid on 20mm thick cement
mortar 1:4 (1 cement : 4 coarse sand) including
grouting the joints with white cement and matching
pigments etc., complete.
8.5.1 Size of Tile 600x600 mm
QBF/P- /RCD/CMB- 608.07 Sqm
Total Qty. 608.07 Sqm
a) 424.00 Sqm 1250.00 1250.00
b) 127.20 Sqm 1250.00 1250.00
c) 56.87 Sqm 1250.00 1125.00

Deduct for not using 20 mm thick cement mortar 1:4


8.6 (1 cement : 4 coarse sand) bedding in laying of floor
tiles.

QBF/P- /RCD/CMB- 665.92 Sqm


Total Qty. 665.92 Sqm -350.00 -350.00

8.7 Fixing glazed/ Ceramic/ Vitrified floor tiles with


cement based high polymer modified quick-set tile
adhesive (Water based) conforming to IS: 15477, in
average 3mm thickness.

QBF/P- /RCD/CMB- 665.92 Sqm


Total Qty. 665.92 Sqm 350.00 350.00
Page 289

Providing and fixing 1mm thick M.S sheet door with


frame of 40x40x6mm angle iron and 3 mm gusset
7.1 plate and corners,aii necessary fittings complete,
including appalaying coat of approved steel primer.

Using flats 30x6mm for digonal braces and central


7.1.1 cross pice.
QBF/P- /RCD/TCMB- 7.01 Sqm
Total Qty. 7.01 Sqm
a) 8.00 Sqm 2400.00 2400.00
b) 2.40 Sqm 2400.00 2400.00
b) -3.39 Sqm 2400.00 2160.00

12.2 Dismantling cement concrete manually / by


machanical means including disposal of meterail
withon 50 metres as per direction of Engineer - in -
charge.

Normal concrete1:3:6 or rich mix (i/c equivalent


12.2.1 design mix )
QBF/P- /RCD/TCMB- #REF! Cum
Total Qty. #REF! Cum
a) 20.00 Cum 850.00 850.00
b) 6.00 Cum 850.00 850.00
b) #REF! Cum 850.00 765.00

12.4 Dismantling old plaster or skirting raking out joints


and cleaning the surface for plaster including disposal
of rubbish to the dumping ground within 50 metres
lead.
Page 290

QBF/P- /RCD/TCMB- 2446.20 Sqm


Total Qty. 2446.20 Sqm
a) 3000.00 Sqm 20.00 20.00
b) 900.00 Sqm 20.00 20.00
b) -1453.80 Sqm 20.00 18.00

10.1 12 mm cement plaster of mix :


1:6 (1 cement : 6 coarse sand)
10.1.1

QBF/P- /RCD/TCMB- 182.70 Sqm


Total Qty. 182.70 Sqm
a) 1500.00 Sqm 175.00 175.00
b) 450.00 Sqm 175.00 175.00
b) -1767.30 Sqm 175.00 157.50

10.2 15 mm cement plaster of mix :

10.2.1 1:6 (1 cement : 6 coarse sand)


QBF/P- /RCD/TCMB- 207.58 Sqm
QBF/P- /RCD/TCMB- 1162.52 Sqm
Total Qty. 1370.10 Sqm
a) 1500.00 Sqm 185.00 185.00
b) 450.00 Sqm 185.00 185.00
b) -579.90 Sqm 185.00 166.50
Page 291

Cement plaster 1:3 ( 1 cement : 3 coarse sand ) finished


with a floating coat of neat cement.
10.3

QBF/P- /RCD/TCMB- 17.69 Sqm


Total Qty. 17.69 Sqm
a) 50.00 Sqm 230.00 230.00
b) 15.00 Sqm 230.00 230.00
b) -47.31 Sqm 230.00 207.00

10.11 Providing and applying white cement based putty of


average thickness 1 mm, of approved brand and
manufacturer, over the plastered wall surface to
prepare the surface even and smooth complete.

QBF/P- /RCD/TCMB- 3330.91 Sqm


Total Qty. 3330.91 Sqm
a) 2000.00 Sqm 90.00 90.00
b) 600.00 Sqm 90.00 90.00
b) 730.91 Sqm 90.00 81.00

11.1 Repairs to plaster of thickness 12 mm to 20 mm in


patches of area 2.5 sq. meters and under, including
cutting the patch in proper shape, raking out joints
and preparing and plastering the surface of the walls
complete, including disposal of rubbish to the
dumping ground within 50 metres lead :
11.1.1 With cement mortar 1:4 (1cement: 4 coarse sand)
QBF/P- /RCD/TCMB- 172.65 Sqm
Page 292

Total Qty. 172.65 Sqm


a) 230.00 Sqm 250.00 250.00
b) 69.00 Sqm 250.00 250.00
b) -126.35 Sqm 250.00 225.00

10.7 Distempring with 1st quality acrylic distemper (ready


mixed) of apporived manufacturer, of required shade
and colour complete, as per manufacturer's
specificition.

10.7.1 Two or more coats on new work


QBF/P- /RCD/TCMB- 3330.91 Sqm
Total Qty. 3330.91 Sqm
a) 2000.00 Sqm 40.00 40.00
b) 600.00 Sqm 40.00 40.00
b) 730.91 Sqm 40.00 36.00

10.8 Applaying one coat of water thinnable cement primer


of approved brand and manufacture on wall.

10.8.1 Water thinnable cement primer.


QBF/P- /RCD/TCMB- 3330.91 Sqm
Total Qty. 3330.91 Sqm
a) 2000.00 Sqm 35.00 35.00
b) 600.00 Sqm 35.00 35.00
b) 730.91 Sqm 35.00 31.50
Page 293

Finishing wall with Acrylic smooth exterior paint of


10.9 required shade :

New work (Two or more coat applied @1.67


10.9.1 ltr/10sqm over and including priming coat of extrior
primer applied @ 2.20kg/10sqm)
QBF/P- /RCD/TCMB- 2046.90 Sqm
Total Qty. 1600.00 Sqm
a) 2000.00 Sqm 72.00 72.00
b) 600.00 Sqm 72.00 72.00
b) -1000.00 Sqm 72.00 64.80

10.5 Net cement punning

QBF/P- /RCD/TCMB- 121.60 Sqm


Total Qty. 121.60 Sqm
(a) 180.00 Sqm 40.00 40.00
(b) 54.00 Sqm 40.00 40.00
(c) -112.40 Sqm 40.00 36.00
Page 294

6.9 Providing and fixing factory made P.V.C. door frame


of size 50x47mm with a wall thickness of 5mm, made
out of extruded 5mm rigid PVC foam sheet, mitred at
corners and joined with 2 Nos. of 150mm long
brackets of 15x15mm M.S. square tube, the vertical
door frame profiles to be reinforced with 19x19mm
M.S. square tube of 19 gauge, EPDM rubber gasket
weather seal to be provided through out the frame.
The door frame to be fixed to the wall using M.S.
screws of 65/100mm size, complete as per
manufacturers specification and direction of
Engineer-in-Charge.

QBF/P- /RCD/TCMB- 78.08 Meter


Total Qty. 78.08 Meter
(a) 110.00 Meter 450.00 450.00
(b) 33.00 Meter 450.00 450.00
(c) -64.92 Meter 450.00 405.00

6.1 Providing and fixing factory made panel PVC door


shutter consisting of frame made out of M.S. tubes of
19 gauge thickness and size of 19mm x 19mm for
styles
30 mmand 15x15mm
thick plain PVC fordoor
top &shutters.
bottom rails. M.S.
6.10.1
frame shall have a coat of steel primers of approved
QBF/P- /RCD/TCMB-
make and manufacture . M.S. frame covered with 21.02 Sqm
5mm thick heat moulded PVC 'C' channel of Total size Qty. 21.02 Sqm
30mm thickness, 70mm width out of which 50mm (a) 16.00 Sqm 3000.00 340.00
shall be flat and 20mm shall be tapered in 45degree (b) 5.00 Sqm 3000.00 340.00
angle on both side forming styles; and 5mm thick, (c) 0.02 Sqm 3000.00 2700.00
14.1 95mm wide
Providing PVC
and sheet
fixing out of
water which
closet 75mm shall
squatting pan be
flat and type
(Indian 20mm shall
W.C. be )tapered
pan in 45 degree
with 100mm on Iron
sand cast the P
inner
or side10
S trap, to litre
formlow toplevel
and bottom rail and
white P.V.C. 115mm
flushing
wide
cistern, including flush pipe, with manually flat and
PVC sheet out of which 75mm shall be
20mm shalldevice
controlled be tapered
(handleon lever)
both sides to form to
conforming lock
IS :rail.
Top, bottom
7231, with alland lockand
fittings railsfixtures
shall becomplete
providedincluding
both side
of the panel.
cutting 10mm (5mm
and making good thex 2 walls
) thick,and
20mm wide
floors
Page 295

14.1.1 White Vitreous china Orissa pattern W.C. pan of size


580x440mm with integral type foot rests.
QBF/P- /RCD/TCMB- 8.00 Each
Total Qty. 8.00 Each 3500.00 3500.00
14.2 Providing and fixing white vitreous china pedestal
type water closet (European type) with seat and lid, 10
litre low level white vitreous china flushing cistern &
C.P.
W.C.flush bendISI
pan with with fittings
marked & C.I.brackets,
white solid plastic40mm
seat and
14.2.1
flush bend, overflow arrangement with specials of
lid.
QBF/P- /RCD/TCMB- 8.00 Each
standard make and mosquito proof coupling of
approved municipal design complete including Total Qty. 8.00 Each 3500.00 3500.00
14.3 Providing
painting ofand fixing
fittings andwash basin cutting
brackets, with C.I.and
brackets,
making15
mm
goodC.P.
the brass
walls pillar taps,32
and floors mm C.P.required
wherever brass waste
: of
standard pattern, including painting of fittings and
brackets, cutting and making good the walls wherever
require :

White Vitreous China Flat back Wash basin size


14.3.1 550x400 mm with a single 15 mm C.P. brass pillar tap.

QBF/P- /RCD/TCMB- 8.00 Each


Total Qty. 8.00 Each 2100.00 2100.00
14.3.2 White Vitreous China Flat back Wash basin size
450x300 mm with a single 15 mm C.P. brass pillar tap.

QBF/P- /RCD/TCMB- 8.00 Each


Total Qty. 8.00 Each 2100.00 2100.00
14.4 Providing and fixing Stainless Steel A Isi 304
(18/8)kitchen sink as per IS:13983 with C.I
brickets,cutting and making good the wall wherever
required.
14.4.1 Kitchen sink without drain board.
Page 296

14.4.1.1 610x460mm bowl depth 200mm.


QBF/P- /RCD/TCMB- 8.00 Each
Total Qty. 8.00 Each 3400.00 3400.00
14.5 Providing and fixing P.V.C. waste pipe for sink or
wash basin including P.V.C. waste fittings complete.

14.5.1 Semi rigid pipe


14.5.1.1 32 mm dia
QBF/P- /RCD/TCMB- 24.00 Each
Total Qty. 24.00 Each 80.00 80.00
14.6 Providing and fixing mirror of superior glass (of
approved quality) and of required shape and size
with plastic moulded frame of approved make and
shade with 6450x350
mm thick hard board backing :
14.6.1 Oval Shape mm (Outer dimensions)
QBF/P- /RCD/TCMB- 16.00 Each
Total Qty. 16.00 Each
(a) 14.00 Each 650.00 650.00
(b) 5.00 Each 650.00 650.00
(c) -3.00 Each 650.00 585.00
14.7 Providing and fixing 600 x120 x5 mm glass shelf with
edges round off,suppoted on anodised aluminium
angle frame with C.P.brass brackets and guard rail
complete
QBF/P- fixed with 40 mm long screws,rawl plugs
/RCD/TCMB- 16.00 Each
etc.,complete.
Total Qty. 16.00 Each
(a) 14.00 Each 500.00 500.00
(b) 5.00 Each 500.00 500.00
(c) -3.00 Each 500.00 450.00
Page 297

15.7 Providing and placing on terrace (at all floor levels)


polyethylene water storage tank ISI : 12701 marked
with cover and suitable locking arrangement and
making
QBF/P- necessary holes for inlet, outlet and overflow
/RCD/TCMB- 2000.00 Liter
pipes but without fittings and the base support for
Total Qty. 2000.00 Liter
tank
(a) 4000.00 Liter 7.50 7.50
(b) 1200.00 Liter 7.50 7.50
(c) -3200.00 Liter 7.50 6.75
15.8 Providing and fixing C.P. brass bib cock of approved
quality conforming to IS:8931

15.8.1 15 mm nominal bore.


QBF/P- /RCD/TCMB- 16.00 Each
Total Qty. 16.00 Each
(a) 24.00 Each 750.00 750.00
(b) 8.00 Each 750.00 750.00
(c) -16.00 Each 750.00 675.00
15.9 Providing and fixing C.P. brass long body bib cock of
approved quality conforming to IS standards and
weighing not less then 690 gms.
15.9.1 15 mm nominal bore
QBF/P- /RCD/TCMB- 8.00 Each
Total Qty. 8.00 Each
(a) 24.00 Each 850.00 850.00
(b) 8.00 Each 850.00 850.00
(c) -24.00 Each 850.00 765.00
Providing and fixing C.P. brass angle valve for basin `
15.11 mixer and geyser points of approved quality
conforming to IS:8931
Page 298

15.11.1 15 mm nominal bore


QBF/P- /RCD/TCMB- 56.00 Each
Total Qty. 56.00 Each
(a) 24.00 Each 650.00 650.00
(b) 8.00 Each 650.00 650.00
(c) 24.00 Each 650.00 585.00

17.1 Providing and laying water proofing treatment to


vertical
QBF/P- and/RCD/TCMB-
horizontal surfaces of depressed portions 34.61 Sqm
of W.C., kitchen and the like consisting of :_x000D_Total Qty. 34.61 Sqm
i) Ist course of applying cement slurry @ 4.4 Kg/sqm
(a) 46.00 Sqm 650.00 650.00
mixed with water proofing compound conforming to
(b) 14.00 Sqm 650.00 650.00
IS 2645 in recommended proportions including
rounding off junction of vertical and horizontal (c) -25.39 Sqm 650.00 585.00
surface._x000D_
15.1 Providing andof
ii) IInd course fixing
20mm G.I.cement
pipes complete
plaster 1:3with G.I. :
(1 cement
fittingsand
3 coarse sand) clamps,
mixed i/c cutting
with making
water good
proofing the walls
compound
etc.
in recommended proportion including rounding off
Internal
junction of vertical and horizontal surface._x000D_
work-
iii) Exposed
IIIrd course onapplying
of wall.
15.1.1 25 mm dia nominal bore blown or residual bitumen
applied hot at 1.7 Kg. per sqm of area._x000D_
QBF/P- /RCD/TCMB-
iv) IVth course of 400 micron thick PVC sheet. 100.60 Meter
(Overlaps at joints of PVC sheet should be 100 Total
mmQty. 100.60 Meter
wide and pasted to each other with bitumen @ 1.7 a) 120.00 Meter 300.00 300.00
Kg/sqm.) b) 36.00 Meter 300.00 300.00
c) -55.40 Meter 300.00 270.00
9.2 Providing and fixing on wall face unplasticised -
Rigid PVC rain water pipes conforming to IS :13592
Type A, including jointing with seal ring conforming
IS :5382,living
9.2.1 110mm dimiter10 mm gap for thermal expansion, (i)
single socketed pipes.
QBF/P- /RCD/TCMB- 178.40 Meter
Page 299

Total Qty. 178.40 Meter


a) 160.00 Meter 220.00 220.00
b) 48.00 Meter 220.00 220.00
c) -29.60 Meter 220.00 198.00
9.3 Providing and fixing on wall face unplasticised - PVC
molded fittings/accessorise for unplasticised Rigid
PVC rain water pipes conforming to IS :13592 Type A,
including jointing with seal ring conforming IS :
5382,living 10 mm gap for thermal expansion.
9.3.1 Single tee with door
9.3.1.1 110x110x110 mm
QBF/P- /RCD/TCMB- 18.00 Each
Total Qty. 18.00 Each
a) 24.00 Each 200.00 200.00
b) 8.00 Each 200.00 200.00
c) -14.00 Each 200.00 180.00

9.3.2 Bend 85.7 °


9.3.2.1 110mm bend
QBF/P- /RCD/TCMB- 44.00 Each
Total Qty. 44.00 Each
a) 16.00 Each 120.00 120.00
b) 5.00 Each 120.00 120.00
c) 23.00 Each 120.00 108.00

9.3.3 Shoe(Plain)
9.3.3.1 110mm shoe
QBF/P- /RCD/TCMB- 48.00 Each
Page 300

Total Qty. 48.00 Each


a) 40.00 Each 180.00 180.00
b) 12.00 Each 180.00 180.00
c) -4.00 Each 180.00 162.00

9.4 Providing and fixing unplasticised - PVC Pipe clamp


of approved design to unplasticised PVC rain water
pipes by means of 50x50x50 mm hard wood
plugs,screwedwith M.S Screws of required
length,including cutting brick work and fixing in
cement morter 1:4 (1 cement : 4 Corse sand ) and
9.4.1 110mm
making good the wall etc.
QBF/P- /RCD/TCMB- 204.00 Each
Total Qty. 204.00 Each
a) 80.00 Each 80.00 80.00
b) 24.00 Each 80.00 80.00
c) 100.00 Each 80.00 72.00
10.1 Providing with synthetic enamel paint of approved
brand and manufactur to give an even shade :

10.10.1 Two or more coats on new work


QBF/P- /RCD/TCMB- 742.17 Sqm
Total Qty. 742.17 Sqm
a) 250.00 Sqm 66.00 66.00
b) 75.00 Sqm 66.00 66.00
c) 417.17 Sqm 66.00 59.40
Page 301

6.5 Providing and fixing aluminium slidingdoor bolts, ISI


marked anodised (anodic coating not less than grade
AC 10 as per IS : 1868 ) transparent or dyed to
required colour or shade with nut and screws etc.
complete :
6.5.1 250x16 mm
QBF/P- /RCD/TCMB- 72.00 Each
Total Qty. 72.00 Each
a) 80.00 Each 250.00 250.00
b) 24.00 Each 250.00 250.00
c) -32.00 Each 250.00 225.00
6.1 Providing and fixing ISI marked flush door shutters
conforming to IS : 2202(part 1)non-decorative
type,core of block board contruction withframe of 1st
class hard wood and will marked commercial 3 play
verticalgrains or crocc bands and faceVeneers on both
face of shutter :
6.1.1 35 mm thick including ISI markedStainless steel bult
hinges with necessary screws
QBF/P- /RCD/TCMB- 121.83 Sqm
Total Qty. 121.83 Sqm
a) 80.00 Sqm 2200.00 2200.00
b) 24.00 Sqm 2200.00 2200.00
c) 17.83 Sqm 2200.00 1980.00
6.1.2 25 mm thick (for cupboard) including IS marked
nicket plasted bright finished M.s piano hinges with
necessary screws.
QBF/P- /RCD/TCMB- 30.06 Sqm
Total Qty. 30.06 Sqm
a) 42.00 Sqm 1850.00 1850.00
Page 302

b) 12.60 Sqm 1850.00 1850.00


c) -24.54 Sqm 1850.00 1665.00
10.4 6 mm cement plaster of mix :

10.4.1 1:3 (1 cement : 3 fine sand)


QBF/P- /RCD/TCMB- 227.48 Sqm
Total Qty. 227.48 Sqm
a) 180.00 Sqm 135.00 135.00
b) 54.00 Sqm 135.00 135.00
c) -6.52 Sqm 135.00 121.50
Date of Measurement :- 0

6.2.1 20 mm dia.
QBF/P- /RCD/TCMB- 12.80 Meter
Total Qty. 12.80 Meter
a) 180.00 Meter 140.00 140.00
b) 54.00 Meter 140.00 140.00
c) -221.20 Meter 140.00 126.00
Err:509 Err:509

Err:509 Err:509
QBF/P- /RCD/TCMB- Err:509 Sqm
Total Qty. 39.94 Sqm
a) 20.00 Sqm 690.00 690.00
b) 6.00 Sqm 690.00 690.00
c) 13.94 Sqm 690.00 621.00
7.5 Steel work welded in built up sections/ framed work,
including cutting, hoisting, fixing in position and
7.5.1 applying a priming
In gratings, coat ofbar,
frames, guard approved
ladder,steel primer
railings,
using
QBF/P-structural
brackets, gates steel
and etc. asworks
similar
/RCD/TCMB- required. 0.00 Kg
Page 303

Total Qty. 39.94 Kg


a) 20.00 Kg 690.00 690.00
b) 6.00 Kg 690.00 690.00
c) 13.94 Kg 690.00 621.00

(A)
Extra Item
Marble stone flooring with 18 mm thick marble stone,
as per sample ofmarble approved by Engineer-in-
Extra Item charge, over 20 mm (average) thick baseof cement
mortar 1:4 (1 cement : 4 coarse sand) laid and jointed
No.1
withgrey cement slurry, including rubbing and
polishing complete with :

(i) Udaipur green marble


QBF/P- /RCD/TCMB- 102.26 Sqm
Total Qty. 102.26 Sqm 1599.75

Marble stone flooring with 18 mm thick marble stone,


Extra Item as per sample ofmarble approved by Engineer-in-
No.2 charge, over 20 mm (average) thick baseof cement
mortar 1:4 (1 cement : 4 coarse sand) laid and jointed
withgrey cement slurry, including rubbing and
(i) Extra for pre
polishing finished
complete nosing
with : to treads of steps of
marble
QBF/P-stone./RCD/TCMB- 126.68 Meter
Total Qty. 126.68 Meter 250.22
Page 304

Providing edge moulding to 18mm thick marble stone


Extra Item counters, Vanities etc. including machine polishing to
No.3 edge to give high gloss finish etc. complete as per
design approved by Engineer-in-Charge.
(i) Granite Work
QBF/P- /RCD/TCMB- 93.04 Meter
Total Qty. 93.04 Meter 200.00

Earth work in excavation by mechanical means


(Hydraulic Excavator )/ manual means in foundation
Extra Item trenches or drains (not exceeding 1.5 m in width or 10
No.4 sqm on plan) including dressing of sides and
ramming of bottoms, lift upto 1.5 m, including getting
out the excavated soil and disposal of surplus
excavated soil as directed, within a lead of 50 m.
All kinds of soil. 118.11 Cum
Total Qty. 118.11 Cum 143.35

Providing and laying Vitrified tiles in different sizes


Extra Item (thickness to be specified by manufacturer) with water
No.5 absorption less than 0.08 % and conforming to I.S.
15622, of approved make in all colours & shade in
Size of Tile
skirting, 600x600
riser mm
of steps, over 12 mm thick bed of 64.55 Sqm
cement mortar 1:3 (1 cement: 3 coarse sand), Total Qty.
including 64.55 Sqm 1288.29
grouting the joint with white cement & matching
Providing andcomplete.
pigments etc. fixing C.P. brass wall mixer of
Extra Item approved quality of Essco(Model No.MQT-517B) or
No.6 equivalent make as per complete direction of the
Engineer-in-charge. Overhead shower with Arm of
QBF/P- /RCD/TCMB-
Jaquar or equivalent make. 16.00 Each
Total Qty. 16.00 Each 3750.00
Page 305

Providing and fixing C.P. brass Overhead shower of


Extra Item approved quality of jaquar or equivalent make as per
No.7 as per direction of the Engineer-in-charge.

QBF/P- /RCD/TCMB- 16.00 Each


Total Qty. 16.00 Each 1750.00

Providing and fixing 600 mm long C.P. brass Towel


rail with C.P brass bracets of approved design of
Extra Item (Essco Model No. ACE-1111)Size- of approved quality
No.8 as per direction of the Engineer-in-charge.

QBF/P- /RCD/TCMB- 16.00 Each


Total Qty. 16.00 Each 1095.00

Providing and fixing C.P. brass Two Way Bib cock


(Model No. 41-KN) of approved quality as per
Extra Item direction of the Engineer-in-charge.
No.9

QBF/P- /RCD/TCMB- 8.00 Each


Total Qty. 8.00 Each 1250.00

Providing and fixing C.P. brass hand Shower (Model


Extra Item No. ALD-573) of approved quality as per direction of
No.10 the Engineer-in-charge.

QBF/P- /RCD/TCMB- 8.00 Each


Total Qty. 8.00 Each 1875.00
Page 306

Providing and fixing G.I. pipes complete with G.I.


Extra Item fittingsand clamps, i/c cutting making good the walls
No.11 etc.
Internal
work- Exposed on wall.
(i) 20 mm dia nominal bore
QBF/P- /RCD/TCMB- 134.40 Metre
Total Qty. 134.40 Metre 226.91
Providing and fixing G.I. pipes complete with G.I.
Extra Item fittingsand clamps, i/c cutting making good the walls
No.12 etc.
Internal
work- Exposed on wall.
(i) 15 mm dia nominal bore
QBF/P- /RCD/TCMB- 66.00 Metre
Total Qty. 66.00 Metre 195.78
Brick work with common burnt clay F.P.s.(non
Extra Item modular) bricksof class designation 7.5 in foundation
No.13 and plinth.

(i) Cement mortar 1:4 (1 cement : 4 coarse sand


QBF/P- /RCD/TCMB- 28.27 Cum
Total Qty. 28.27 Cum 4776.92
19 mm thick Plyboard for cupboard partation
Extra Item
No.14

QBF/P- /RCD/TCMB- 41.33 Sqm


Total Qty. 41.33 Sqm 0.00
Page 307

With ready mixed pink or Grey primer of approved


Extra Item brand andmanufacture on wood work (hard and soft
No.15 wood)

(i) Wood Primer


QBF/P- /RCD/TCMB- 680.67 Sqm
Total Qty. 680.67 Sqm 30.00
Providing and fixing on wall face unplasticised -
Extra Item Rigid PVC rain water pipes conforming to IS :13592
No.16 Type A, including jointing with seal ring conforming
IS :5382,living 10 mm gap for thermal expansion, (i)
single socketed pipes.
(i) Cowel
QBF/P- /RCD/TCMB- 8.00 Metre
Total Qty. 8.00 Metre 0.00
(ii) Plane Tee
QBF/P- /RCD/TCMB- 10.00 Each
Total Qty. 10.00 Each 226.23
(iii) Door Band
QBF/P- /RCD/TCMB- 20.00 Each
Total Qty. 20.00 Each 0.00
(iv) Nanahi Traf
QBF/P- /RCD/TCMB- 24.00 Each
Total Qty. 24.00 Each 0.00
25 mm nominal bore
Extra Item
No.17

QBF/P- /RCD/TCMB- 24.00 Each


Total Qty. 24.00 Each 182.13
Page 308

20 mm nominal bore
Extra Item
No.18

QBF/P- /RCD/TCMB- 8.00 Each


Total Qty. 8.00 Each 171.57
15 mm nominal bore
Extra Item
No.19

QBF/P- /RCD/TCMB- 18.00 Each


Total Qty. 18.00 Each 150.41
Providing and fixing gun metal gate valve with C.I.
Extra Item wheel of approved quality(screwed end) :
No.20

QBF/P- /RCD/TCMB- 8.00 Each


Total Qty. 8.00 Each 390.33
P.V.C, water Tank Cover 1000 Liter
Extra Item
No.21

QBF/P- /RCD/TCMB- 6.00 Each


Total Qty. 6.00 Each 0.00
PVC Tank Connector
Extra Item
No.22

QBF/P- /RCD/TCMB- 8.00 Each


Page 309

Total Qty. 8.00 Each 0.00


Providing and fixing CP extension nipple for G.I pipe,
Extra Item fittings of approved quality and colour.
No.23

QBF/P- /RCD/TCMB- 152.00 Each


Total Qty. 152.00 Each 150.00
Dismantling steel work in built up sections in angles,
Extra Item tees, flats andchannels including all gusset plates,
No.24 bolts, nuts, cutting rivets, weldingetc. including
dismembering and stacking within 50metres lead.
QBF/P- /RCD/TCMB- 27.60 Sqm
Total Qty. 27.60 Sqm 0.00
Excavation Soil and Clining
Extra Item
No.25

QBF/P- /RCD/TCMB- 311.50 Cum


Total Qty. 311.50 Cum 0.00
Wood frame Making
Extra Item
No.26

QBF/P- /RCD/TCMB- 0.24 Cum


Total Qty. 0.24 Cum 48876.00
Dismantling G.I. pipes (external work) including
Extra Item excavation and refillingtrenches after taking out the
No.27 pipes, manually/ by mechanical meansincluding
stacking of pipes within 50 metres lead as per
direction ofEngineer-in-charge :
Page 310

QBF/P- /RCD/TCMB- 325.65 Metre


Total Qty. 325.65 Metre 52.66
C.P Jalli 5"
Extra Item
No.28

QBF/P- /RCD/TCMB- 24.00 Each


Total Qty. 24.00 Each 140.00

(B)

(A) + (B) =
Less Already Paid in 1st R/A (-)

Say
RECOVERIES : -

1. SD @ 2.5% on Amount 5255375 131384.38

Less : Already recovered up to 1st R/A vide CMB- / P-18 = 17006.00

Now to be recovered = 114378.38

2. IT @ 2% = 14245.00

Less : Already recovered up to 1st R/A vide CMB- / P-18 = 13605.00

Now to be recovered = 640.00

3. J-Vat @ 4% = 28491.00

Less : Already recovered up to 1st R/A vide CMB- / P-18 = 27209.00


Page 311

Now to be recovered = 1282.00

4. Labour Cess @ 1% = 7123.00

Less : Already recovered up to 1st R/A vide CMB- / P-18 = 6802.00

Now to be recovered = 321.00

5. Gross Royalty up to 2nd R/A = 11780.00

Less : Already recovered up to 1st R/A vide CMB- / P-18 = 124.00

Now to be recovered = 11656.00

Recovery of Secured Advance for Vetrified Tiles = 874800.00

Net Recovery to be recovered 1003077.38

Net Payable Amount

Certificate :

1 The Work is carried out as per CPWD specification and as per direction of EIC.

2 Water is arranged by the contractor his own cost.

3 No labour complain has been received so far.

4 The work is in progress.

5 All mandatory test has been carried out.


Page 312

6 Site order book has been verified before preparation of bill.

The work is in progress.


7

Junior Engineer Assistant Engineer


RCSD, CPWD Ranchi Central Division
Contrator Hinoo, Ranchi CPWD, Ranchi
Page 313

)at NIFT, Hatia, Ranchi.

Amount (Rs.)

1500.00 1500.00
450.00 450.00
-39.47 -39.47
Page 314

82500.00 82500.00
24750.00 24750.00

22500.00 22500.00
6750.00 6750.00
34708.50 34708.50

86000.00 86000.00
25800.00 25800.00
-40294.44 -40294.44
Page 315

110000.00 110000.00
33000.00 33000.00
-80314.74 -80314.74

132000.00 132000.00
39600.00 39600.00
-79434.00 -79434.00
Page 316

22000.00 22000.00
6600.00 6600.00
86427.00 86427.00

12400.00 12400.00
3720.00 3720.00
15456.60 15456.60
Page 317

102400.00 102400.00
30720.00 30720.00
-5846.40 -5846.40

270000.00 270000.00
81000.00 81000.00
-112772.25 -112772.25

160000.00 160000.00
48000.00 48000.00
-145548.00 -145548.00
Page 318

530000.00 530000.00
159000.00 159000.00
63978.75 63978.75

-233072.00 -233072.00

233072.00 233072.00
Page 319

19200.00 19200.00
5760.00 5760.00
-7322.40 -7322.40

17000.00 17000.00
5100.00 5100.00
#REF! #REF!
Page 320

60000.00 60000.00
18000.00 18000.00
-26168.40 -26168.40

262500.00 262500.00
78750.00 78750.00
-278349.75 -278349.75

277500.00 277500.00
83250.00 83250.00
-96553.35 -96553.35
Page 321

11500.00 11500.00
3450.00 3450.00
-9793.17 -9793.17

180000.00 180000.00
54000.00 54000.00
59203.71 59203.71
Page 322

57500.00 57500.00
17250.00 17250.00
-28428.75 -28428.75

80000.00 80000.00
24000.00 24000.00
26312.76 26312.76

70000.00 70000.00
21000.00 21000.00
23023.67 23023.67
Page 323

144000.00 144000.00
43200.00 43200.00
-64800.00 -64800.00

7200.00 7200.00
2160.00 2160.00
-4046.40 -4046.40
Page 324

49500.00 49500.00
14850.00 14850.00
-26292.60 -26292.60

5440.00 5440.00
1700.00 1700.00
54.00 54.00
Page 325

28000.00 28000.00

28000.00 28000.00

16800.00 16800.00

16800.00 16800.00
Page 326

27200.00 27200.00

1920.00 1920.00

9100.00 9100.00
3250.00 3250.00
-1755.00 -1755.00

7000.00 7000.00
2500.00 2500.00
-1350.00 -1350.00
Page 327

30000.00 30000.00
9000.00 9000.00
-21600.00 -21600.00

18000.00 18000.00
6000.00 6000.00
-10800.00 -10800.00

20400.00 20400.00
6800.00 6800.00
-18360.00 -18360.00
Page 328

15600.00 15600.00
5200.00 5200.00
14040.00 14040.00

29900.00 29900.00
9100.00 9100.00
-14853.15 -14853.15

36000.00 36000.00
10800.00 10800.00
-14958.00 -14958.00
Page 329

35200.00 35200.00
10560.00 10560.00
-5860.80 -5860.80

4800.00 4800.00
1600.00 1600.00
-2520.00 -2520.00

1920.00 1920.00
600.00 600.00
2484.00 2484.00
Page 330

7200.00 7200.00
2160.00 2160.00
-648.00 -648.00

6400.00 6400.00
1920.00 1920.00
7200.00 7200.00

16500.00 16500.00
4950.00 4950.00
24779.90 24779.90
Page 331

20000.00 20000.00
6000.00 6000.00
-7200.00 -7200.00

176000.00 176000.00
52800.00 52800.00
35303.40 35303.40

77700.00 77700.00
Page 332

23310.00 23310.00
-40859.10 -40859.10

24300.00 24300.00
7290.00 7290.00
-792.18 -792.18

25200.00 25200.00
7560.00 7560.00
-27871.20 -27871.20

13800.00 13800.00
4140.00 4140.00
8656.74 8656.74
Page 333

13800.00 13800.00
4140.00 4140.00
8656.74 8656.74

3749960.18

163590.44 163590.44

31697.87 31697.87
Page 334

18608.00 18608.00

16931.07 16931.07

83159.12 83159.12

60000.00 60000.00
Page 335

28000.00 28000.00

17520.00 17520.00

10000.00 10000.00

15000.00 15000.00
Page 336

30496.70 30496.70

12921.48 12921.48

135043.53 135043.53

0.00 0.00
Page 337

20420.10 20420.10

0.00 0.00

2262.30 2262.30

0.00 0.00

0.00 0.00

4371.12 4371.12
Page 338

1372.56 1372.56

2707.38 2707.38

3122.64 3122.64

0.00 0.00
Page 339

0.00 0.00

22800.00 22800.00

0.00 0.00

0.00 0.00

11730.24 11730.24
Page 340

17148.73 17148.73

3360.00 3360.00

712263.27

712263.27
680235.20
32028.07
4126727.00
Page 341

-1003077.38

3123649.63
Page 342

sistant Engineer
hi Central Division
CPWD, Ranchi
Page 343
Page 344
Page 345
Page 346
Page 347
Page 348
Page 349
Page 350
Page 351
Page 352
Page 353
Page 354
Page 355
Page 356
Page 357
Page 358
Page 359
Page 360
Page 361
Page 362
Page 363
Page 364
Page 365
Page 366
Page 367
Page 368
Page 369
Page 370
Page 371
Page 372
Theoretical consumption statement of cement

1. Name of Work : - Renovation of Post Graduate Hostel (V.A Sarabhai Hostel) NIFFT, Hatia, Ranchi

2. Situation : - NIFFT, Hatia, Ranchi

3. Agency : - M/S Deep Interprises.

4. Agreement No. : - 87/RCD/2015-2016

5. Sl. No. of this Bill : - 2nd R/A Bill

Item No. Brief Description Qty. Co-efficient Cement Req


1:4:8 (1 cement : 4 coarse sand : 8
graded stone aggregate 40 mm
nominal size)

2.1.2

Err:509 Err:509 Err:509 Sqm 0.13512 Qtl/Sqm Err:509


Centering and shuttering including
strutting, propping etc. and removal
of form for:

3.2

Err:509 sqm 0.1044 qtl/sqm Err:509


Item No. Brief Description Qty. Co-efficient Cement Req
Steel reinforcement for R.C.C. work
including straightening, cutting,
bending, placing in position and
binding all complete upto plinth
level.

3.3

Err:509 sqm 0.1242 qtl/sqm Err:509

Providing and laying in position


specified grade of reinforced cement
concrete , excluding the cost of
3.1
centring and shuttering,finishing and
reinforcement - All work upto plinth
level :

3.1.1 1:1.5:3 (1 cement : 1.5 coarse sand : 3 g Err:509 Cum 0.1242 Qtl./ Sqm Err:509
Brick work with common burnt clay
F.P.s.(non modular) bricksof class
designation 7.5 in foundation and
plinth.

4.2

4.2.1 Cement mortar 1:6 (1 cement : 6 coarse Err:509 Cum 0.1242 Qtl./ Sqm Err:509
5.1 Providing and fixing 18mm thick gang saw cut mirror polished (premoulded and prepolished)
Qtl./100Sq
5.1.1 Granite of any colour and shade 10.74 Sqm 3.60 0.39
m
Item No. Brief Description Qty. Co-efficient Cement Req
Providing and laying vitrified floor
tiles in different sizes (thickness to be
specified by the manufacturer) with
water absorption's less than 0.08%
and conforming to IS : 15622 of
8.5
approved make in all colours and
shades, laid on 20mm thick cement
mortar 1:4 (1 cement : 4 coarse sand)
including grouting the joints with
white cement and matching pigments
etc., complete.
8.5.1 Size of Tile 600x600 mm 608.07 Sqm 6.95 qtl/100sqm 42.2609

Providing and fixing C.P. brass angle


valve for basin mixer and geyser
15.11 Err:509 sqm 0.0123 qtl/sqm Err:509
points of approved quality
conforming to IS:8931

Providing and laying water proofing


17.1
treatment to vertical and horizontal
surfaces
Err:509 of depressed portions of
Err:509 W.C., kitchen and the like consisting Err:509 cum 3.20 qtl/cum Err:509
of :_x000D_
Providing edge moulding to 18mm
i)
thick marbleofstone
Ist course applying cement
counters, Vanities
Extra slurry @ 4.4 Kg/sqm mixed with
etc. including machine polishing to
Item water proofing compound
edge to give high gloss finish etc.
No.3 conforming to IS 2645 in
complete as per design approved by
Marble stone flooring
recommended with 18
proportions mm
including
(i) Engineer-in-Charge.
Granite Work 93.04 sqm 7.67 qtl/100sqm 7.14
thick marble stone, as per sample
rounding off junction of vertical and
ofmarble
horizontalapproved by Engineer-in-
surface._x000D_
Extra charge, over 20ofmm
ii) IInd course 20mm(average)
cementthick
Item baseof cement mortar 1:4 (1 cement
plaster 1:3 (1 cement : 3 coarse sand):
No.1 4mixed
coarse sand)
with laidproofing
water and jointed
withgrey cement slurry,
compound in recommended including
rubbing
proportion andincluding
polishingrounding
completeoff
with : of vertical and horizontal
junction
surface._x000D_
Item No. Brief Description Qty. Co-efficient Cement Req

(i) Udaipur green marble 102.26 cum 1.30 Qtl/cum 132.94


Marble stone flooring with 18 mm
thick marble stone, as per sample
ofmarble approved by Engineer-in-
Extra charge, over 20 mm (average) thick
Item baseof cement mortar 1:4 (1 cement :
No.2 4 coarse sand) laid and jointed
withgrey cement slurry, including
rubbing and polishing complete
Extra for pre finished nosing to treads Qtl./100Sq
(i) with : 126.68 Sqm 9.50 12.030
of steps of marble stone. m
Providing and fixing C.P. brass wall
mixer of approved quality of
Extra Essco(Model No.MQT-517B) or
Item equivalent make as per complete
No.6 direction of the Engineer-in-charge.
Overhead shower with Arm of Jaquar
or equivalent make.
Qtl./100Sq
Err:509 Err:509 16.00 Sqm 5.70 0.910
m
Providing and fixing C.P. brass
Extra Overhead shower of approved
Item quality of jaquar or equivalent make
No.7 as per as per direction of the
Engineer-in-charge.
Qtl./100Sq
Err:509 Err:509 16.00 Sqm 5.70 0.910
m

TOTAL Err:509

TOTAL of Variation (+)2% Err:509

TOTAL of Variation (-)2% Err:509

Qty Received from Agency Bags 850.00

Qty. utilised As per Cement Bags 850.00

Balance Bags 0.00

Contrator JE, RCSD- AE, RCSD-


consumption statement of cement

aduate Hostel (V.A Sarabhai Hostel) NIFFT, Hatia, Ranchi

Cement Req.

Qtl.

qtl
Cement Req.

qtl

Qtl.

Qtl.
ang saw cut mirror polished (premoulded and prepolished) machine cut for kitchen platforms, vanity counters ,win
Qtl.
Cement Req.

Qtl.

qtl

qtl

qtl
Cement Req.

Qtl.

Qtl.

Qtl.

Qtl.

Qtl

Qtl

Qtl

AE, RCSD-
Page 381
STATEMENT OF THEORETICAL CONSUMPTION OF BRICKS/STONE CHIPS/SAND
1. Name of Work : - Renovation of Post Graduate Hostel (V.A Sarabhai Hostel) NIFFT, Hatia, Ranchi

2. Situation : - NIFFT, Hatia, Ranchi

3. Agency : - M/S Deep Interprises.

4. Agreement No. : - 87/RCD/2015-2016

5. Sl. No. of this Bill : - 2nd R/A Bill

Cost of Royalty : - Err:509 Sub Div : - RCSD-I


Aggregates Sand Bricks
Agreem Execute Theoretica
ent d Theoretical l Co-
Brief Description of Item Unit Co-efficient Co-efficient
Item Quantit consumption consumpti efficient
No. y on
4.1 1:4:8 (1 cement : 4 coarse sand : 8
graded stone aggregate 40 mm nominal
size)

Err:509 Err:509 Err:509 sqm 0.0240 cum Err:509 cum


3.2 Centering and shuttering including
strutting, propping etc. and removal of
form for:

Err:509 sqm 0.0150 cum Err:509 cum


3.3 Steel reinforcement for R.C.C. work Err:509 sqm 0.0257 cum Err:509 cum
including straightening, cutting,
3.1 Providing and laying in position
bending, placing in position and
specified grade of reinforced cement
3.1.1 binding(1allcement
1:1.5:3 complete upto
: 1.5 plinth
coarse level.
sand : 3 Err:509 sqm 0.0257 cum Err:509 cum
concrete , excluding the cost of centring
graded stone aggregate 40 mm nominal
4.2 and work
Brick shuttering,finishing
with common burnt clay and
size)
reinforcement
F.P.s.(non - All work
modular) upto plinth
bricksof class
4.2.1 Cement mortar 1:6 (1 cement : 6 coarse Err:509 sqm 0.0257 cum Err:509 cum
level :
designation 7.5 in foundation and
sand)
5.1 plinth.
Providing and fixing 18mm thick gang
saw cut mirror polished (premoulded
and prepolished) machine cut for
Aggregates Sand Bricks
Page 382

Agreem Execute Theoretica


ent d Theoretical l Co-
Brief Description of Item Unit Co-efficient Co-efficient
Item Quantit consumption consumpti efficient
No. y on
5.1.1 Granite of any colour and shade 10.74 sqm 0.0154 cum 0.1655 cum
8.5 Providing and laying vitrified floor
tiles in different sizes (thickness to be
8.5.1 Size of Tile 600x600 mm
specified by the manufacturer) with
water absorption's less than 0.08% and 608.07 sqm 0.019581 cum 11.9066 cum
15.11 conforming
Providing and to IS : 15622
fixing C.P.ofbrass
approved
angle
make
valve for basin mixer and geyserlaid
in all colours and shades, on
points
20mm thick cement
of approved quality mortar 1:4 to
conforming (1
cement
IS:8931 : 4 coarse sand) including
grouting the joints with white cement
and matching pigments etc., complete.

Err:509 Sqm 0.023968 Cum Err:509 Cum

17.1 Providing and laying water proofing


treatment to vertical and horizontal
Err:509 Err:509 Err:509 cum 0.89 cum Err:509 cum 0.45 cum Err:509 cum
surfaces of depressed portions of W.C.,
kitchen andedge
Extra Item Providing the moulding
like consisting
to 18mm of
No.3 :_x000D_
thick marble stone counters, Vanities
i) Ist including
etc. course of applying
machine cement slurry
polishing to
(i) Granite Work 93.04 sqm 0.0154 cum 1.4336 cum
@ 4.4 Kg/sqm mixed with
edge to give high gloss finish etc. water
proofing compound
complete conforming
as per design approved to by
IS
2645 in recommended proportions
Engineer-in-Charge.
Aggregates Sand Bricks
Page 383

Agreem Execute Theoretica


ent d Theoretical l Co-
Brief Description of Item Unit Co-efficient Co-efficient
Item Quantit consumption consumpti efficient
No. y on
Extra Item Marble stone flooring with 18 mm thick
No.1 marble stone, as per sample ofmarble
approved by Engineer-in-charge, over
(i) Udaipur green marble 102.26 Sqm 0.94 /cum 96.12 Sqm 0.47 /cum 48.06 Sqm
20 mm (average) thick baseof cement
mortar stone
Extra Item Marble 1:4 (1flooring
cement with
: 4 coarse
18 mmsand)
thick
No.2 laid and
marble jointed
stone, as perwithgrey cement
sample ofmarble
slurry, including
approved rubbing and polishing
by Engineer-in-charge, over
(i) Extra for pre finished nosing to treads 126.68 sqm 0.0268 cum 3.3887 cum 46.50 sqm
complete
20 with :
mm (average) thick baseof cement
of steps of marble stone.
mortar 1:4 (1 cement : 4 coarse sand)
laid and jointed withgrey cement
slurry, including rubbing and polishing Total Err:509 Cum Err:509 Cum
complete with :
Aggregates Sand Bricks
Page 384

Agreem Execute Theoretica


ent d Theoretical l Co-
Brief Description of Item Unit Co-efficient Co-efficient
Item Quantit consumption consumpti efficient
No. y on
Summary
Sl. No. Material Qty. Unit Rate = Amount of Royalty

1. Stone Agreegate Err:509 Cum 126.00 = Err:509

2. Sand Err:509 Cum 64.00 = Err:509

3. Bricks 5890.62 /400 Nos. 48.00 = 707.00

Gross Royalty up to 2nd R/A = Err:509

11780.00

Royalty Recovered up to 1st R/A = 124.00

Net Royalty to be deducted = Err:509

Contractor JE, RPSD-I AE, RPSD-I


Page 385
NSUMPTION OF BRICKS/STONE CHIPS/SAND
ostel) NIFFT, Hatia, Ranchi

Bricks
Theoretical
consumptio
n
Bricks Page 386

Theoretical
consumptio
n
Bricks Page 387

Theoretical
consumptio
n

5890.62 Nos

5890.62 Nos.
Bricks Page 388

Theoretical
consumptio
n

AE, RPSD-I
CERTIFIED that the Measurement Book contains 51(Fifty one )leaves

Measurement Book No. RPD/CMB/324

Pato Builders Pvt Ltd. JE, RPSD-II AE, RPSD-II EE, RPD, CPWD
Contractor CPWD, Ranchi CPWD, Ranchi Ranchi Project Division
DIVISION :- Ranchi Project Division, CPWD, Ranchi

SUB-DIVISION:- Ranchi Project Sub-Division No.-II

MEASUREMENT BOOK

BOOK NO.- RPD/CMB/324

Name of work :- C/0 3Nos.240 men Barrack for 209 CoBRA BN.,
Khunti (Jharkhand) i/c internal Water Supply,
Sanitary Installation & Drainage & Electrical
Installation S/W:-Development Work.

Name of the Contractor :-Pato Builders Pvt Ltd.

Agreement No:- 52/RPD/2012-13


Test check statement
Division:Ranchi Project Division, CPWD, Ranchi Sub-Division- RPSD-II

Name of Renovation of Post Graduate Hostel (V.A. Sarabhai Hostel) NIFT, Hatia, Ranchi
work

Name of the Contractor :- M/S Deep Interprises

Reference to Agreement no 87/RCD/2015-2016

Date of start ( Act.)

Date of completiom :In progress

Serial no of this bill :- 2nd R/A


Sl. No. Detail of Test Check Ref. of MB Test Check by AE Test Chek by EE
1 Test Check in this bill

Uptodate Test Check=

% of age test Check=


Signature of AE Signature of EE
1.1.1 17.5 Providing and fixing white vitreous china flat back half stall urinal of size 580x380x350mm with
white PVC automatic flushing cistern, with fittings, standard size C.P. brass flush pipe, spreaders
17.5.1 Single half stall urinal with 5 litre P.V.C. automatic flushing cistern.
Code Description Rate Unit Qty Total
Details of
cost for one
no

MATERIAL
7379 White 1535.00 each 1 each 1535
vitreous
china clay
half stall
urinal flat
back
580x380x350
mm or angle
back
450x375x350
mm with
waste fittings
as per IS :
2556

7359 P.V.C. 600.00 each 1 each 600


automatic
flushing
cistern 5 lts
capacity

1532 Flush pipe 240.00 each 1 each 240


with union
spreaders
and clamps
all in C.P.
brass for
single stall

1891 C.I. trap for 200.00 each 1 each 200


standard
urinal with
vent arm
with
operating
and other
couplings in
C.P.brass: 50
mm dia

9999 Red lead, 1.74 L.S. 17.55 L.S. 30.54


white lead
and gaskit

9999 Cement, sand 1.74 L.S. 26.91 L.S. 46.82


and grit etc.

9999 Painting of 1.74 L.S. 26 L.S. 45.24


fittings etc.
9977 Carriage of 0.00 L.S. 40.43 L.S. 0
materials
LABOUR
0116 Fitter (grade 377.00 Day 1.75 Day 659.75
1)
0123 Mason (brick 377.00 Day 2 Day 754
layer) 1st
class

0114 Beldar 257.00 Day 4 Day 1028


TOTAL 5139.35
Add 1 % for 51.39
water
charges

TOTAL 5190.74
Add 15 % for 778.61
contractor's
profit and
overheads

Cost for one 5969.35


no
Say 5969.35

1.2.1 17.7 Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps,32 mm C.P. brass
waste of standard pattern, including painting of fittings and brackets, cutting and making good the
17.7.2 White Vitreous China Wash basin size 630x450 mm with a single 15 mm C.P. brass pillar tap.
Code Description Rate Unit Qty Total
Details of
cost for one
no

MATERIAL
1947 Vitreous 850.00 each 1 each 850
china flat
back wash
basin
630x450 mm

1885 15 mm 550.00 each 1 each 550


C.P.brass tap

1951 C.P. brass 75.00 each 1 each 75


waste 32 mm

1309 C.I. bracket 65.00 pair 1 pair 65


for wash
basin and
sinks

9999 Red lead, 1.74 L.S. 16.12 L.S. 28.05


white lead
and gaskit

9999 Cement, sand 1.74 L.S. 13.39 L.S. 23.3


and grit etc.

9999 Painting of 1.74 L.S. 26.91 L.S. 46.82


brackets,
fittings etc.

9977 Carriage of 0.00 L.S. 13.52 L.S. 0


materials
LABOUR
0116 Fitter (grade 377.00 Day 0.3 Day 113.1
1)
0123 Mason (brick 377.00 Day 0.33 Day 124.41
layer) 1st
class
0114 Beldar 257.00 Day 0.63 Day 161.91
TOTAL 2037.59
Add 1 % for 20.38
water
charges

TOTAL 2057.97
Add 15 % for 308.7
contractor's
profit and
overheads

Cost for one 2366.67


no
Say 2366.65

1.3.1 17.32 Providing and fixing mirror of superior glass (of approved quality) and of required shape and size
with plastic moulded frame of approved make and shade with 6 mm thick hard board backing :
17.32.4 Rectangular shape 1500x450 mm
Code Description Rate Unit Qty Total
Details of
cost for one
no.

MATERIAL
7115 Rectangular 700.00 each 1 each 700
shape
1500x450
mm Mirror
with Plastic
moulded
frame

Hard board
1.50x0.45 =
0.675 sqm

Add wastage
@ 10% =
0.0675 sqm

= 0.7425
sqm say
0.74sqm

7116 Hard board 6 180.00 sqm 0.74 sqm 133.2


mm thick
7048 Rawl plug 50 20.00 each 6 each 120
mm
(designation
10 no.)

0588 Chromium 125.00 100 Nos 6 Nos 7.5


plated Brass
screws 25
mm

9999 Sundries 1.74 L.S. 1.43 L.S. 2.49


9977 Carriage of 0.00 L.S. 4.16 L.S. 0
materials
LABOUR
0112 Carpenter 342.00 Day 0.33 Day 112.86
2nd class
0114 Beldar 257.00 Day 0.33 Day 84.81
TOTAL 1160.86
Add 1 % for 11.61
water
charges

TOTAL 1172.47
Add 15 % for 175.87
contractor's
profit and
overheads

Cost of one 1348.34


no.
Say 1348.35

2.1.1 18.22 Providing and fixing C.P. brass shower rose with 15 or 20 mm inlet :
18.22.1 100 mm diameter
Code Description Rate Unit Qty Total
Details of
cost for one
no.

Materials :-
1878 Shower rose 40.00 each 1 each 40
C.P.brass for
15 to 20 mm
inlet 100 mm
dia

9988 Carriage of 0.00 L.S. 6.76 L.S. 0


materials and
fixing charges

TOTAL 40
Add 1 % for 0.4
water
charges

TOTAL 40.4
Add 15 % for 6.06
contractor's
profit and
overheads

Cost of one 46.46


no.
Say 46.45

2.1.2 18.22 Providing and fixing C.P. brass shower rose with 15 or 20 mm inlet :
18.22.2 150 mm diameter
Code Description Rate Unit Qty Total
Details of
cost for one
no.

Materials :-
1879 Shower rose 75.00 each 1 each 75
C.P.brass for
15 to 20 mm
inlet 150 mm
dia

9988 Carriage of 0.00 L.S. 8.06 L.S. 0


materials and
fixing charges

TOTAL 75
Add 1 % for 0.75
water
charges

TOTAL 75.75
Add 15 % for 11.36
contractor's
profit and
overheads

Cost of one 87.11


no.
Say 87.1

2.2.1 18.53 Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality
conforming to IS:8931
18.53.1 15 mm nominal bore
Code Description Rate Unit Qty Total
Details of
cost for one
no.

Materials:
7261 C.P. Brass 550.00 each 1 each 550
angle valve
15 mm

9988 Carriage and 0.00 L.S. 11.31 L.S. 0


fixing charges

TOTAL 550
Add 1 % for 5.5
water
charges

TOTAL 555.5
Add 15 % for 83.33
contractor's
profit and
overheads

Cost for 1 No. 638.83

Say 638.85

3.1.1 19.6 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff
mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of
19.6.2 150 mm dia. R.C.C. pipe
Code Description Rate Unit Qty Total
Details of
cost for 10
metre
MATERIAL
1701 R.C.C. pipes 450.00 metre 10 metre 4500
NP2 class 150
mm dia

(in 2 m.
length = 5
Nos.)

1715 R.C.C. 180.00 each 5 each 900


collarsNP2
class 150 mm
dia

5 Nos.
2281 Carriage of 0.00 100 metre 10 metre 0
R.C.C. pipes
150 mm dia

Cement of 5
joints =
5x0.0008 =
0.004 cum =
0.006 tonne

0367 Portland 7000.00 tonne 0.006 tonne 42


Cement
2209 Carriage of 100.00 tonne 0.006 tonne 0.6
Cement
Fine sand for
5 joint =
0.0016x5 =
0.008 cum

0983 Fine sand 575.00 cum 0.008 cum 4.6


(zone IV)
2261 Carriage of 0.00 cum 0.008 cum 0
Fine sand (1
part
badarpur
sand : 2 parts
jamuna sand)

LABOUR
0123 Mason (brick 377.00 Day 0.39 Day 147.03
layer) 1st
class

0124 Mason (brick 342.00 Day 0.39 Day 133.38


layer) 2nd
class

0114 Beldar 257.00 Day 0.78 Day 200.46


0101 Bhisti 291.00 Day 0.16 Day 46.56
TOTAL 5974.63
Add 1 % for 59.75
water
charges

TOTAL 6034.38
Add 15 % for 905.16
contractor's
profit and
overheads

Cost for 10 6939.54


metre
Cost for 1 693.95
metre
Say 693.95

3.1.2 19.6 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff
mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of
19.6.3 250 mm dia. R.C.C. pipe
Code Description Rate Unit Qty Total
Details of
cost for 10
metre

MATERIAL
1702 R.C.C. pipes 893.00 metre 10 metre 8930
NP2 class 250
mm dia

(in 2 m.
length = 5
Nos.)

1716 R.C.C. 352.00 each 5 each 1760


collarsNP2
class 250 mm
dia

5 Nos.
2287 Carriage of 0.00 100 metre 10 metre 0
R.C.C. pipes
250 mm dia

Cement of 5
joints =
5x0.0012 =
0.006 cum =
0.009tonne

0367 Portland 7000.00 tonne 0.009 tonne 63


Cement
2209 Carriage of 100.00 tonne 0.009 tonne 0.9
Cement
Fine sand for
5 joint =
0.0024x5 =
0.012 cum

0983 Fine sand 575.00 cum 0.012 cum 6.9


(zone IV)
2261 Carriage of 0.00 cum 0.012 cum 0
Fine sand (1
part
badarpur
sand : 2 parts
jamuna sand)

LABOUR
0123 Mason (brick 377.00 Day 0.54 Day 203.58
layer) 1st
class

0124 Mason (brick 342.00 Day 0.54 Day 184.68


layer) 2nd
class

0114 Beldar 257.00 Day 1.5 Day 385.5


0101 Bhisti 291.00 Day 0.23 Day 66.93
TOTAL 11601.49
Add 1 % for 116.01
water
charges

TOTAL 11717.5
Add 15 % for 1757.63
contractor's
profit and
overheads

Cost for 10 13475.13


metre
Cost for 1 1347.51
metre
Say 1347.5
Item

= mtr