Sunteți pe pagina 1din 3

CURRICULUM VITAE

WAQAS HABIB

PERSONAL PROFILE
Name MR. WAQAS HABIB
Father’s Name MR. HABIB ULLAH
Date of Birth 03-05-1988
N.I.C No 38303-2362950-9
Domicile KARAK KPK
Religion ISLAM
Marital status SINGLE
Nationality PAKISTANI

EDUCATION
2010 B.Sc. [Electronic Engineering] CGPA: 2.92/4 (72.44 %)
[UET Peshawar]
PEC Registration # Electro/13803

2006 F. Sc [Pre-Engineering] Percentage: 71.6 %


[PAEC Model College for Boys Chashma, Mianwali]

2004 Secondary School Certificate Examination Percentage: 81.3 %


[PAEC Model College for Boys Chashma, Mianwali]

COURSES UNDERTAKEN
 PLC COURSE FROM Pakistan Industrial & Technical Assistance Center
(PITAC), LAHORE

 INSTRUMENTATION AND PROCESS CONTROL COURSE FROM


Pakistan Industrial & Technical Assistance Center (PITAC), LAHORE

WORK HISTORY
 Working as DCS Application Engineer at Control System Engineering,
Lahore.
Duration: April 2012 to Present

PROJECTS UNDERTAKEN
 COMMISSIONING OF DCS ON 10 MW TURBINE, CURRENT.

Working on commissioning of DCS on 10 MW Turbine at Olympia Chemicals


Khusab Plant.
IO’s Count: 200
Equipments I worked on:
 SUPCON ECS-100 (DCS)
 RTD, THERMOCOUPLE, PRESSURE TRANSMITTER, FLOW
METERs, CONTROL VALVES, MOTORISED VALVES, DAMPERS,
MOTOR DRIVES etc,.

 COMMISSIONING OF SIELCO SISTEMI SCADA SYSTEM, CURRENT.

Working on SYSTEM FOR MONITORING OF FUEL CONSUMPTION using SIELCO


SCADA System.
IO’s Count: 50
Equipments I am working on:
 SCADA Cards: D1-15A, D1-35N etc,.
 Instruments: Krohne Flowmeters, Level Transmitters etc,.

 COMMISSIONING OF MITSUBISHI PLC, Completed in March 2013.


Installed Mitsubishi PLC for Automation of GEA Air Handling Unit at Nestle
Sheikhupura Plant.
IO’s Count: 20
Equipments I worked on:
 PLC: Mitsubishi FX 2N-32 MR,
 HMI: Weintek MT 8100i
 Instruments: PT 100, Danfoss VFDs(15 KW, 30 KW) etc,.

 COMMISSIONING OF DCS ON 75 TPH INDUSTRIAL BOILER, Completed


in December 2012.

Successfully commissioned SUPCON Distributed Control System (DCS) on 75


TPH CFB Boiler project for Olympia Chemicals Khushab Plant.
IO’s Count: 800
Equipments I worked on:
SUPCON ECS-100 (DCS)
RTD, THERMOCOUPLE, PRESSURE TRANSMITTER, LEVEL
TRANSMITTER, FLOW METERs, CONTROL VALVES, MOTORISED
VALVES, DAMPERS, MOTOR DRIVES etc,.
 COMMISIONING OF SIEMENS PLC, Completed, June in 2012.

Installed Siemens PLC for Automation of GEA Air Handling Unit at Nestle
Karachi Plant.
IO’s Count: 20
Equipments I worked on:
 PLC: Siemens S7-300
 HMI: Weintek MT 6070i
 Instruments: PT 100, VACON and Danfoss VFDs etc,.
SOFTWARES USED
 ADVANTRO L PRO v2.50 (SUPCON DCS Software)
 SIMATIC STEP 7 v5.5 (SIEMENS PLC Software)
 GX DEVELOPER v7.5 (MITSUBISHI PLC Software)
 WINCC FLEXIBLE 2008 (SIEMENS HMI Software)
 EASY BUILDER 8000 (WEINTEK HMI Software)
 CX-ONE PROGRAMMER (OMRON PLC Software)

PROGRAMMING LANGUAGES
 LADDER LOGIC PROGRAMMING
 FUNCTION BLOCK DIAGRAM
 STATEMENT LIST PROGRAMMING

REFERENCES
References will be provided on demand.

S-ar putea să vă placă și