Excavation L(Mtr) W(Mtr) H(Mtr) Unit Total Qty

JB excavation 10 2.6 2 CubM 52


RMC(PCC) 10 2.6 0.1 CubM 2.6
Brick work 20 0.3 2 CubM 12
5.2 0.3 2 CubM 3.12
No of Bricks N0s 7800
Plaster Work 25.2 2 Sq.M 50.4
sand back filling Cub M 100
RCC Tiles Nos 200
warning tape Mtr 50
Cement Bag Nos 19
sand CubM 4
TOTAL

Note ;- 1) Mortar CM (1:6) with 10 mm thickness of plaster


2 PCC consider for M15 ( 1:2:4) concrte with 100 mm thicknes
3 Brick size 190 mm x 90 mm x 90 mm consider for brick quan
Rate Analysis of Joint Bay

Unit Rate labour Unit Rate supply Total Amount labour Total Amount supply
200 10400
4000 10400

8 62400
300 15120
300 3000 3000 30000
50 200 10000 40000
10 25 500 1250
320 6080
3000 12000
49420 151730

th 10 mm thickness of plaster
15 ( 1:2:4) concrte with 100 mm thickness of concrete
90 mm x 90 mm consider for brick quantity
Total Amount(supply+Labour)
10400
10400

62400
15120
33000
50000
1750
6080
12000
201150