Sr.No. JOB TYPE AREA/COMPT. JOBS DESCRIPTION
NO.
1 Removal of bb7,bb8,bb9,bb10,bb11
17 Temp. gauges
18 Removal of fql_pr1,fql_pr2
Accessory compartment
19 Removal of fire detectors
TREG Solenoid Voltage # Mismatch
20
Requested State.
CARD-VCMI,SLOT-1 CONTROLLER-R,CODE-44,DES-125 VOLT BUS GROUND
21
=21.17 VOLT IS OUTSIDE OF LIMIT
SYSTEM
MARK VI PANEL
22 DEFECTS CARD VPRO ETR RELAY 02 MISMATCH REQUESTED STATE
23 ANALOG INPUT 05 UNHEALTHY TR96WI1
46 PM of GR-01
47 10-ESD-6832
48 10-SOV-6833
49 10-SOV-6869
64 Refixing of bb7,bb8,bb9,bb10,bb11
71 Refixing of 96GN1,2,3
Turbine compartment roof
72 side instruments Refixing of pressure switches of turbine vent fans and load gear Vent fans
81 Refixing of fql_pr1,fql_pr2
Accessory compartment
82 Refixing of CO2 fire detectors
83 Cable Laying & glanding All 9 instruments branch and field to Mark-VI cables laying and glanding
84 GT UPRATE JB Fixing and Termination Filed JB fixing and cable termination both sides
JOBS
85 Instruments fixing Instruments fixing and tubing to be done
86 Cold & Hot loop checking Cold & Hot loop checking
I/O configuration and
87 I/O configuration and Mimic modification in Mark-VI system
Mimic modification
88 APU system APU system air inlet line tapping and support welding
89 Warren pump lube oil skid
90 GT Hall Warren pump lube oil skid
91 Warren pump lube oil Return oil
92 GVM module GVM ON/Off valve
93 LLF JOBS Liquid fuel line pressure switch
94 Accessory compartment Liquid fuel line DPT
95 Lube oil tank temp switch
96 Generator DE Brg all instruments
Load gear compartment
97 LUBE OIL PRESSURE SWITCH
98 Offbase GAS SEP SKID VENT VAVLE 1&2