TEAM WELDER BOILER #5

FURNACE LEFT (KUO-214-078 FW1)


No Weld Name No Stamp Date Weld
1 ANGGA/ANUAR 149/150 9/4/2019

PSH HEADER INLET (FW1)


No Weld Name No Stamp Date Weld
1 RYAN/DEFRIYAWAN 148/71 9/4/2019
2 JARWO 198/235 9/4/2019
3 WANTO 84 9/4/2019
4 SUPRIYADI 101 9/4/2019
5 KAMALUDIN 123 9/4/2019
6 INDRA/SELAMET S 147/162 9/4/2019
7 RAHMAT 82 9/4/2019
8 RONIS 73 9/4/2019
9 DIDIK 235 9/4/2019

ROOF TUBE
No Weld Name No Stamp Date Weld
1 SELAMET B/BASORI 128/81 9/4/2019
3 SUYONO/PRIO N 197/195 9/4/2019
4 NURAINI/IMRON 231/232 9/4/2019

FURNACE OPEN PASS (KUO-212-146)


No Weld Name No Stamp Date Weld
1 NANANG 213 9/4/2019

TOTAL ALL JOINT DATE 28-08-2019

FIT-UP
No Weld Name No Stamp Date Weld
1 SISWANTO/ZAUZAN 77/70 9/4/2019
2 MAMAN 9/4/2019
3 AA SUMINTA/DEDE 100/99 9/4/2019
4 ARIEF 79 9/4/2019
5 DENI 226 9/4/2019
7 NUROHIM 230 9/4/2019
8 DEHARMAN 74 9/4/2019

TOTAL ALL FIT-UP DATE 28-08-2019


DER BOILER #5

KUO-214-078 FW1)
No Joint Total
35 sd 53/23 20
TOTAL 20

R INLET (FW1)
No Joint Total
A:104 sd 113. B:104 sd 109 16
A/B: 197 sd 200 8
A:54. B:50 sd 54 6
B:119 sd 126 8
A:219 sd 222. B: 218 sd 221 8
E:5 sd 9. D:10 sd 14. C:10 sd 15 16
A/B:252 sd 255 8
A/B:232 sd 235 8
D:185 sd 189. E:185/186/187 8
TOTAL 86

F TUBE
No Joint Total
249 sd 253 5
25 sd 30/50/51/52 9
69 sd 73/53/54/55 8
TOTAL 22

PASS (KUO-212-146)
No Joint Total

TOTAL 0

28-08-2019 128

T-UP
Description Total
PSH HEADER INLET FW1 20
PSH HEADER INLET FW1 20
PSH HEADER INLET FW1 30
PSH HEADER INLET FW1 30
SIRCULATION
SIRCULATION
SIRCULATION

28-08-2019 100