Gulf Cooperation Council

Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
P122 MiCOM P122
87B1-B
Bay Ref:
Substation:

REVISION
SUMMARY
PAGES 0 1
1 PURPOSE OF TESTS 2 X
2 REFERENCE DOCUMENT 2 X
3 SCOPE 2 X
4 RELAY TERMINLOGY 3 X
5 TEST EQUIPMENT 3 X
6 PRE-REQUISTES 3 X
7 PROCEDURES 4 X
8 RECORD TEST SHEET 5 X
8.1 RELAY INFORMATION
8.2 CT DATA:
8.3 PRODUCT CHECKS
8.4 MEASURMENT VALUE TEST:
8.5 87B HIGH IMPEDANCE DIFFERENTIAL PROTECTION
8.6 EXTERNAL STABILIZING RESITANCE MEASURMENT
8.7 EXTERNAL NON LINEAR RESITANCE MEASURMENT
8.8 CT SECONDARY RESISTANCE MEASURMENT :
8.9 BINARY INPUT TEST :
8.10 BINARY OUTPUT TEST:
8.11 FIXED LED INDICATIONS TEST:
8.12 LED INDICATIONS TEST:
8.13 FINAL CHECK

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV- 1 Page 1 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
P122 MiCOM P122
87B1-B
Bay Ref:
Substation:

1 PURPOSE OF TESTS

The purpose of the tests is to check the full functionality of the protection relay.

This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or
SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning
procedures.

2 REFERENCE DOCUMENTS
DOCUMENT VERSION/
DOCUMENT REMARKS
REFERENCE DATE
Protection Line Diagram
Schematic Drawing
Service Manual
Operation Manual
Protection Relay Coordination Principles
Relay setting Calculation
LED Display Configuration

3 SCOPE
Substation Name :-
Diameter:
Bay :
Panel Number :
Relay Denomination in Scheme
Scheme to be Checked Relay Functionality Test.

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV- 1 Page 2 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
P122 MiCOM P122
87B1-B
Bay Ref:
Substation:

4 TERMINOLOGY

Code ( ANSI) Terminology


87B Busbar High Impedance Differential Protection

5 TEST EQUIPMENT USED

Equipment Calibration Calibration due


Sl No Description Make
Sl No. date date
1. Secondary
Injection Kit
2. Multimeter

3. Laptop NA

Setting software Type : MICOM S1 Studio


Version : 2.14

6 PRE - REQUISITES

PRE-REQUISITES REMARKS
All Safety Condition Are Ok
All Competent Personnel Available For The Test
Ac & Dc Supply Availability And Security
PPE Safety Available.
All Other Relevant Safety Instructions Been Followed
Coordination With Other Parties ( GIS, Transformer, Etc..)

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV- 1 Page 3 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
P122 MiCOM P122
87B1-B
Bay Ref:
Substation:

7 TEST PROCEDURES
The following procedures are written for demonstrating the main protection functions of the P821
relay using an Omicron test set or similar. The tests do not test the boundaries of all available function
characteristics. They do test that the function is operating at a point on one chosen characteristic. This
document is to be referred to when performing commissioning tests in association with the
commissioning section of the service manual.
NOTE :
All the Test are performed in the Test Switch.
Omicron CMC156 Test Equipment or Any Equivalent To Be Used

7.1 87RB High Impedance Differential Relay (87 Protection)


- Inject Secondary Voltage across the metrosell (Phase R), and increase voltage until the relay operates.
- Record the operating Voltage and current at both the relay terminal and metrosell.
-Repeat same procedure above for phase Y and B.

7.2 Testing of Binary Inputs :


This test checks that all the opto-isolated inputs on the relay are functioning correctly. (3 opto-isolated
inputs for the P122).
The opto-isolated inputs should be energized one at a time. Ensuring correct polarity, connect the
auxiliary voltage to the appropriate terminals for the input being tested.
The line "INPUTS" in the "OP. PARAMETERS" menu gives the state of each input, a '1' indicating an
energized input and a '0' indicating a de-energized input. When each input is energized one of the digits
on the bottom line of the display will change to indicate the new state of the inputs.

7.3 Testing of Binary Output’s :


This test checks that all the output relays are functioning correctly. (6 output relays for the P122).The
output relays should be energised one at a time. Connect a continuity tester across the terminals
corresponding to output relay 1 .
In the following window in the "Relay Satus" sub-menu of the "OP PARAMETERS" menu:
Relay 8 7 6 5 4 3 2 1
Status 0 0 0 0 0 0 0 1
Repeat the test for each relay.
Operation will be confirmed by the continuity tester operating for a normally open contact and ceasing
to operate for a normally closed contact.
NOTE: It should be ensured that thermal ratings of anything connected to the output relays during the
test procedure is not exceeded by the associated output relay being operated for too long. It is therefore
advised that the time between application and removal of relay testing kept to the minimum.
If the Outputs are assigned for function this will be tested along with Functional test of relays.

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV- 1 Page 4 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
P122 MiCOM P122
87B1-B
Bay Ref:
Substation:

8 RECORD TEST SHEET

8.1 RELAY INFORMATION

Type No.: P122 Designation :

Model No : Nominal Current :


Serial Number Nominal Voltage` :
Firmware Version : Aux. Volts :

8.2 CT DATA:
CT rated primary current set as
CT rated secondary current set as
Ignd-CT rated primary current set as
Ignd-CT rated secondary current set as

8.3 PRODUCT CHECKS


Relay damaged?
Rating information correct for installation?
Case earth installed?
External wiring checked against diagram?
Test block connections checked?
Measured auxiliary supply V dc
LCD front panel display
Clock set to local time?
Time maintained when aux. supply removed?

8.4 MEASURMENT VALUE TEST:


Current Measurement
Current
Phase injected injected Current read on relay display (A)
(Amps)
PH-N IR IY IB IN
L1-E 1.0 0 0

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV- 1 Page 5 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
P122 MiCOM P122
87B1-B
Bay Ref:
Substation:

L2-E 1.0 0 0
L3-E 1.0 0 0
L1-L2-L3 1.0 0

8.5 HIGH IMPEDANCE DIFF CURRENT 87B:

Measured Measured Measured Current Time Operating


Phase Operating Current at Current at Setting of setting Time at 2*
Voltage Metrosell Relay Relay Oper.V
R
Y
B

8.6 EXTERNAL STABILIZING RESITANCE MEASURMENT :

Designation In Theoretical Value Measured Value


Phase
Drawing
R R111

Y R121

B R131

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV- 1 Page 6 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
P122 MiCOM P122
87B1-B
Bay Ref:
Substation:

8.7 EXTERNAL NON LINEAR (MERTCIL) RESITANCE MEASURMENT :

Designation In Theoretical Value Measured Value


Phase
Drawing
R R1

Y R2

B R3

8.8 CT SECONDARY RESISTANCE MEASURMENT :

Phase Theoretical Value Measured Value

R
Y
B

8.9 BINARY INPUT TEST :


Input No. Terminal No. Active Function Assigned sheet Result
1 22-24 High NOT USED**
2 26-28 High NOT USED**
3 17-19 High NOT USED**
* SPARE: wired up to terminal blocks.
** NOT USED: Not wired.

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV- 1 Page 7 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
P122 MiCOM P122
87B1-B
Bay Ref:
Substation:

8.10 BINARY OUTPUT TEST:


Function Assigned
Output No. Terminal No. Type sheet Result
(Aux relay operated)
2-6 NO NOT USED**
1
2-4 NC
8-12 NO NOT USED**
2
8-10 NC
3 14-16 NO TO BUS 1A GROUP-B 262
4 18-20 NO NOT USED**
5 1-3 NO SPARE* 264
6 5-7 NO SPARE* 264
* SPARE: wired up to terminal blocks.
** NOT USED: Not wired.

8.11 FIXED LED INDICATIONS TEST:


LED No. LED Label Color Result
1 Trip Red
2 Alarm Yellow
3 Warning Yellow
4 healthy Green

8.12 LED INDICATIONS TEST: ( LEFT SIDE LED)


LED No. LED Label Color Result
1
2
3
4

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV- 1 Page 8 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
P122 MiCOM P122
87B1-B
Bay Ref:
Substation:

8.13 FINAL CHECKS


Item Description Result

1 All test equipment, leads, shorts and test block removed safely?
2 Disturbed customer wiring re-checked?
3 All commissioning tests disabled?
4 Circuit breaker operations counter reset?
5 Current counters reset?
6 Event records reset?
7 Fault records reset?
8 Disturbance records reset?
9 Alarms reset?
10 LEDs reset?
11 Secondary front cover replaced? (If applicable)

REMARKS
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………

END OF REPORT

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV- 1 Page 9 of 9