Mark the Completed section once your concerns or issues have been resolved by the
developer, and keep this file for your reference.
Please note:
If you have further concerns about your unit, feel free to add your own recommendations on the list.
ELECTRICAL WORK
What to check Notes Completed
Make sure all light fixtures are fully installed
and there are no broken parts.
PLUMBING
What to check Notes Completed
KITCHEN
What to check Notes Completed
BATHROOM
What to check Notes Completed
Inspect the bathtub, shower, sink, and
toilet for chips and cracks.
Close the bathtub and sink stoppers. Add a couple
of inches of water. Wait two to three minutes to be
sure the stopper does not leak.
Flush all toilets. Check for leaks around
the base of the toilet.
Sit on the toilet to make sure it is securely fastened
to the floor.
WINDOWS
What to check Notes Completed
Check glass panes to make sure there are no cracks.
DOORS
What to check Notes Completed
Open and close all doors to their fullest and make
sure there are no dragging sounds. See if the hinges
work smoothly.
GATE
What to check Notes Completed
Make sure the gate opens and closes completely.
EXTERIOR
What to check Notes Completed
Make sure the paintwork is in the correct color and
that all surfaces are evenly covered.
Take your time. Don't feel that you need to rush through your townhouse inspection. Take as
much time as you need to go through the townhouse and list down all your comments for the
developer’s reference.
Allot time for adjustments. Allow a three to seven days between the townhouse inspection
and the official turnover day in case the developer needs time to address the issues you have
raised.
Insist that your concerns be addressed. Don't seal the deal unless the issues have been
solved.