4. FINISH WORK ITEMS
Actual (%) Plan (%)
4.1 BLOCK 62
2 Transport waste material 80% Supply putty layer at new ceiling level 3
4 Install new gypsum board at ceiling: 3300--->3310 100% Reinstall new tile at bathroom wall level 2, 3
Waterproofing floor and skirting in wc room level 1-2-3 ( Waterproofing floor and skirting in wc room level
1 100%
ZONE 01 ) 1-2-3 ( ZONE 02 )
2 Tiling of wall and floor in WC level 1,2,3 ( ZONE 01 ) 70% Tiling of wall and floor in wc level 2
4 Install new ceiling room in level 1-2-3 ( ZONE 01 ) 100% Painting External wall
page 1/10
1 Waterproofing floor and skirting in wc room level 1-2-3 / 100% Screeding in WC and bedroom level 3
3 Replastering wall and screeding floor in WC level 1-2-3 100% Tiling of wall and floor in wc level 1-2-3
4 Painting of wall and floor in bedroom level 1-2-3 20% Painting of wall and floor in bedroom level 1-2-3
5 Install new ceilng in bedroom level 3 100% Painting work in bedroom level 3
4.4 VILLA
Drill and install Starter Bars on balcony by Adhesive: B1- Drill and install Starter Bars on balcony by
1 80% 100%
>B6, B8->B15 ( zone 2 ), BOH Adhesive: B1->B6, B8->B15 ( zone 2 ), BOH
Supply paint and repaint Exterior Wall : B3 - B4 - B5- B8 - Supply paint and repaint Exterior Wall : B3 - B4 -
3 50% 100%
B10 - B9 - B10 - B11 B5- B8 - B10 - B9 - B10 - B11 A 1 - 2 - 3, C 72
Supply and intall new ceiling: B1->B6, B8->B15, NT 1-> Supply and intall new ceiling B1->B6, B8->B15,
4 50%
NT6, A1->A3 NT 1-> NT6, A1->A3
A Utility Building
1 Lean concrete for ground slab 100,00% Install reinforcement ground slab
page 2/10
5 Install formwork level 1 column
B Electric Building
1 Install reinforcement level 1 column 100,00% Install reinforcement for roof floor framing
2 Install formwork level 1 column 100,00% Install formwork for roof floor framing
C Pump room
1 Install reinforcement level 1 column 100,00% Install reinforcement for roof floor framing
2 Install formwork level 1 column 100,00% Install formwork for roof floor framing
Processing
5. M&E WORK ITEMS
Actual (%) Plan (%)
Install vertical pipe for PS system at room( 3204, 3209, Install waster water pipe at room (No.
1 90%
3207) 3205,3206,3208,3210,3211
Install upvc storm dain pipe at 1st, 2nd, 3rd bock 52/1 at Install upvc storm dain pipe at 1st, 2nd, 3rd bock
2 90%
room ( 3001, 3302, 3304, 3306, 3308) 52/1 at room ( 3002, 3303, 3305, 3306, 3307)
Install pvc conduit on wall for electrical system, install box Install pvc conduit on wall for electrical system,
4 95%
contact at room( 3111,3112,3115,3117) install box contact at room( 3101,3102,3102)
Install HDPE pipe for drain water underground zone 1, Install HDPE pipe for drain water underground
5 zone 2. Install HDPE pipe for electric system at zone 90% zone 1, zone 2. Install HDPE pipe for electric
1,zone 2 system at zone 1,zone 2
6 Test waste water pipe at room ( 3001,3002,3100,3111) 80% Test waste water pipe at room( 3111,3112,3115,3117)
Pull cable for contact, socket, air conditioning at room( Pull cable for contact, socket, air conditioning at
7 80%
3110,3112) room( 3110,3113,3315,3316)
page 3/10
Test pressure for duct, test water supply pipe at Test pressure for duct, test water supply pipe at
8 room(3301,3302,3303,3304), test electric cable Villa B1- 80% room(3301,3302,3303,3304), test electric cable
B2-B3-B4 Villa B5-B6-B7-B8-B9)
Painting for fire fighting pipe, reinstall hose pipe, hydrant Painting for fire fighting pipe, reinstall hose pipe,
9 80%
pipe Block 52/ 1st, 2sd hydrant pipe Block 52/ 3rd
Install electric cable for socket, contact, install cable for Install electric cable for socket, contact, install
10 80%
tel, data Villa B1-B2-B3 cable for tel, data Villa B4-B5-B6
Install electric cable for socket, contact at Villa Install electric cable for socket, contact at Villa
B4,B5,B7,B8,B9,B10,B12,B16,B16. B4,B5,B7,B8,B9,B10,B12,B16,B16.
11 90%
test cable for data, telephone at Villa test cable for data, telephone at Villa
B1,B2,B3,B6,B11,B13,B14,B15. B1,B2,B3,B6,B11,B13,B14,B15.
Test air for exhaust duct at Block 52/1 room ( Test air for exhaust duct at Block 52/1 room (
12 90%
1100,1101,1102,1103,1104,1105) 1100,1101,1102,1103,1104,1105)
Install water supply pipe, upvc pipe for block 52/2 room ( Install water supply pipe for block 52/2 room (
13 90%
2100,2111,2112,2211,2310,2311,2312) 2100,2111,2112,2211,2310,2311,2312)
Install upvc pipe underground for drainage system for Install HDPE pipe for drainage water
16 70%
floor 1 staffhouse underground zone 6
6. Processing
INFRASTRUCTU ITEMS
RE Plan (%) Actual (%)
page 4/10
WEEKLY PHOTOS REPORT
Civil work
Interior finishing
Screeding mortar layer in corridor Hotel Block Make a hole light on ceiling Hotel Block
Screeding mortar layer in bedroom Hotel Block Install gypsum board ceiling Hotel Block
page 5/10
Painting external wall Painting putty ceiling Hotel Block
page 6/10
Install glass balcony Villa Install ceiling frame Villa
External work and infrastructure
page 7/10
Build eletric manhole Install fomwork column Electric Building
page 8/10
Constructing stormwater drainage route Installing stormwater drainage manhole
page 9/10
Install formwork column f1 Electric Buidling Install formwork roof floor
page 10/10