TUI BLUE NAM HOI AN

Address: Tam Ky City, Quang Nam Province, Viet Nam

WEEKLY ACTIVITY REPORT


Last week (29/11/2019-06/12/2019) Next week (06/12/2019-13/12/2019)
1. NCR ITEMS Processing
2. SITE
ITEMS Processing
INSTRUCTION
3. RC WORK ITEMS Processing

Processing
4. FINISH WORK ITEMS
Actual (%) Plan (%)
4.1 BLOCK 62

Countinuting creeding new mortar layer at


1 Clean around constraction area 95%
bedrooom floor and cổidor

2 Transport waste material 80% Supply putty layer at new ceiling level 3

3 Reprotect slab and built in furniture 90% Defect internal wall

4 Install new gypsum board at ceiling: 3300--->3310 100% Reinstall new tile at bathroom wall level 2, 3

Supply putty layer at new ceiling: 3100--->3109, 3200---


5 90% Reinstall new skirting at level 2 ,3
>3210

Remove furniture, protect slab - furniture,


Supply paint external wall with 2 putty layer and 1, 2
6 80% remove ceiling, hacking tile of bathroom in Zone
primer layer
2

Creeding new mortar layer at bedroom, corridor level 1:


7 90% Reinsatll maindoor at room Zone 1
3100--->3109

Creeding new mortar layer at bathroom floor: 3300---


8 100% Supply putty layer at bedroom wall
>3310

Ttransport loose furniture, built in furniture, remove


existing ceiling, hacking tile of bathroom area, bedroom
9 floor level 1_ZONE 2: 95%
3111,3112,3113,3114,3115,3116,3211,3212,3213,3214,
3215,3216,3311,3312,3313,3314,3315,3316,3318

4.2 BLOCK 52 (1)

Waterproofing floor and skirting in wc room level 1-2-3 ( Waterproofing floor and skirting in wc room level
1 100%
ZONE 01 ) 1-2-3 ( ZONE 02 )

2 Tiling of wall and floor in WC level 1,2,3 ( ZONE 01 ) 70% Tiling of wall and floor in wc level 2

Replastering wall and screeding floor in WC level 1-2-3 (


3 100% Painting of wall and floor in bedroom level 1-2-3
ZONE 01 )

4 Install new ceiling room in level 1-2-3 ( ZONE 01 ) 100% Painting External wall

5 Defect and replastering in external wall ( ZONE 01) 90%

6 Demolition wall and floor level 1,2,3 ( ZONE 02 ) 20%

4.3 BLOCK 52 (2)

page 1/10
1 Waterproofing floor and skirting in wc room level 1-2-3 / 100% Screeding in WC and bedroom level 3

Painting work and install furniture in mookup


2 Tiling of wall and floor, install new ceilng in mookup room 100%
room

3 Replastering wall and screeding floor in WC level 1-2-3 100% Tiling of wall and floor in wc level 1-2-3

4 Painting of wall and floor in bedroom level 1-2-3 20% Painting of wall and floor in bedroom level 1-2-3

5 Install new ceilng in bedroom level 3 100% Painting work in bedroom level 3

6 Painting External wall 60% Painting External wall

4.4 VILLA
Drill and install Starter Bars on balcony by Adhesive: B1- Drill and install Starter Bars on balcony by
1 80% 100%
>B6, B8->B15 ( zone 2 ), BOH Adhesive: B1->B6, B8->B15 ( zone 2 ), BOH

Apply new waterproofing for balcony: B1->B6,


2 Apply new waterproofing for balcony: B1->B6, B8->B15 50% 100%
B8->B15, NT 1-> NT6

Supply paint and repaint Exterior Wall : B3 - B4 - B5- B8 - Supply paint and repaint Exterior Wall : B3 - B4 -
3 50% 100%
B10 - B9 - B10 - B11 B5- B8 - B10 - B9 - B10 - B11 A 1 - 2 - 3, C 72

Supply and intall new ceiling: B1->B6, B8->B15, NT 1-> Supply and intall new ceiling B1->B6, B8->B15,
4 50%
NT6, A1->A3 NT 1-> NT6, A1->A3

5 Entrance door: cleaning, reinstall 50% Entrance door: cleaning, reinstall

Screeding new mortar layer, making slope to the


6 Remove glazing zone 2 100% Floor trap

7 Remove the existing tile on balcony: zone 2 100%

4.5 Water treatment tank

1 Install Drill Well 100% Pumping groundwater

2 Install larsen poles 100% Excavate

3 Pumping groundwater 50% Lean concrete for ground slab

4 Excavate 60% Install reinforcement ground slab

4.6 Utility, Pump room, Electric station

A Utility Building

1 Lean concrete for ground slab 100,00% Install reinforcement ground slab

2 Install reinforcement ground slab 70,00% Install formwork ground slab

3 Casting concrete ground slab

4 Install reinforcement level 1 column

page 2/10
5 Install formwork level 1 column

6 Casting concrete level 1 column

7 Install formwork roof slab

B Electric Building

1 Install reinforcement level 1 column 100,00% Install reinforcement for roof floor framing

2 Install formwork level 1 column 100,00% Install formwork for roof floor framing

3 Casting concrete level 1 column 100,00% Casting concrete roof floor

C Pump room

1 Install reinforcement level 1 column 100,00% Install reinforcement for roof floor framing

2 Install formwork level 1 column 100,00% Install formwork for roof floor framing

3 Casting concrete level 1 column 100,00% Casting concrete roof floor

Processing
5. M&E WORK ITEMS
Actual (%) Plan (%)

Install vertical pipe for PS system at room( 3204, 3209, Install waster water pipe at room (No.
1 90%
3207) 3205,3206,3208,3210,3211

Install upvc storm dain pipe at 1st, 2nd, 3rd bock 52/1 at Install upvc storm dain pipe at 1st, 2nd, 3rd bock
2 90%
room ( 3001, 3302, 3304, 3306, 3308) 52/1 at room ( 3002, 3303, 3305, 3306, 3307)

Install pvc conduit on wall, cut wall, install box


Install pvc conduit on wall, cut wall, install box contact,
contact, install box socket on wall , paiting pipe
3 install box socket on wall , paiting pipe for fire fighting 90%
for fire fighting system at room (
system at room ( 3308,3309,3310,3313,3315,3317)
3311,3312,3314,3316)

Install pvc conduit on wall for electrical system, install box Install pvc conduit on wall for electrical system,
4 95%
contact at room( 3111,3112,3115,3117) install box contact at room( 3101,3102,3102)

Install HDPE pipe for drain water underground zone 1, Install HDPE pipe for drain water underground
5 zone 2. Install HDPE pipe for electric system at zone 90% zone 1, zone 2. Install HDPE pipe for electric
1,zone 2 system at zone 1,zone 2

6 Test waste water pipe at room ( 3001,3002,3100,3111) 80% Test waste water pipe at room( 3111,3112,3115,3117)

Pull cable for contact, socket, air conditioning at room( Pull cable for contact, socket, air conditioning at
7 80%
3110,3112) room( 3110,3113,3315,3316)

page 3/10
Test pressure for duct, test water supply pipe at Test pressure for duct, test water supply pipe at
8 room(3301,3302,3303,3304), test electric cable Villa B1- 80% room(3301,3302,3303,3304), test electric cable
B2-B3-B4 Villa B5-B6-B7-B8-B9)

Painting for fire fighting pipe, reinstall hose pipe, hydrant Painting for fire fighting pipe, reinstall hose pipe,
9 80%
pipe Block 52/ 1st, 2sd hydrant pipe Block 52/ 3rd

Install electric cable for socket, contact, install cable for Install electric cable for socket, contact, install
10 80%
tel, data Villa B1-B2-B3 cable for tel, data Villa B4-B5-B6

Install electric cable for socket, contact at Villa Install electric cable for socket, contact at Villa
B4,B5,B7,B8,B9,B10,B12,B16,B16. B4,B5,B7,B8,B9,B10,B12,B16,B16.
11 90%
test cable for data, telephone at Villa test cable for data, telephone at Villa
B1,B2,B3,B6,B11,B13,B14,B15. B1,B2,B3,B6,B11,B13,B14,B15.

Test air for exhaust duct at Block 52/1 room ( Test air for exhaust duct at Block 52/1 room (
12 90%
1100,1101,1102,1103,1104,1105) 1100,1101,1102,1103,1104,1105)

Install water supply pipe, upvc pipe for block 52/2 room ( Install water supply pipe for block 52/2 room (
13 90%
2100,2111,2112,2211,2310,2311,2312) 2100,2111,2112,2211,2310,2311,2312)

Install water supply pipe, upvc pipe for block


Install water supply pipe, upvc pipe for block 52/2 room (
52/2 room (
14 3100,3111,3112,3113,3211,3212,3213,3214,3311,3314, 90%
3100,3111,3112,3113,3211,3212,3213,3214,33
3315,3316)
11,3314,3315,3316)

Install electric cable for socket, contact at Villa


Install electric cable for socket, contact at Villa
3210,3211,3213,3215,3216,3217,3311,3312,33
3100,3111,3112,3113,3114,3115,3116,3117
15 90% 14,3315,3316
test cable for data, telephone at Villa
test cable for data, telephone at Villa
B1,B2,B3,B6,B11,B13,B14,B15.
B1,B2,B3,B6,B11,B13,B14,B15.

Install upvc pipe underground for drainage system for Install HDPE pipe for drainage water
16 70%
floor 1 staffhouse underground zone 6

Install Upvc pipe underground for family pool and sport


17 75%
pool

6. Processing
INFRASTRUCTU ITEMS
RE Plan (%) Actual (%)

Installing reinforcement, formwork and concreting


1 100% Installing sewer manhole, drainage manholes
drainage manholes

2 Installing sewer manhole, drainage manholes 95% Installing infiltration trench

3 Installing infiltration trench 20% Construction of electric manholes

4 Construction of electric manholes 50%

7. INSPECTION ITEMS Processing

page 4/10
WEEKLY PHOTOS REPORT
Civil work
Interior finishing

Uninstall built-in furniture Hacking WC Zone 2 Hotel Block

Screeding mortar layer in corridor Hotel Block Make a hole light on ceiling Hotel Block

Screeding mortar layer in bedroom Hotel Block Install gypsum board ceiling Hotel Block

page 5/10
Painting external wall Painting putty ceiling Hotel Block

Plastering balcony Villa Install ceiling frame villa

Install gypsum board ceiling Villa Apply waterproofing balcony villa

page 6/10
Install glass balcony Villa Install ceiling frame Villa
External work and infrastructure

Install reinforcement leisure pool 1 Installing reinforcement slab Staff House

Build method beam Staff House Compacting soil Staff House

page 7/10
Build eletric manhole Install fomwork column Electric Building

Install reinforcement slab Utility Cleanning slab Staff House

Install reinforcement slab leisure pool 1 Install formwork wasterwater manhole

page 8/10
Constructing stormwater drainage route Installing stormwater drainage manhole

Install reinforcement slab Staff House Backfill soil Staff House

Build eletric manhole Constructing wall of leisure pool 1

page 9/10
Install formwork column f1 Electric Buidling Install formwork roof floor

page 10/10