QF08-04-08

INSPECTION & TESTING REPORT

Customer: Contract No.: Panel No.:

Type: Rated Voltage: kV

Main Sw. Serial No.: CT Ratio: Fuse: A

Measurement of the resistance on main circuits( DC______A)

Phase sequence Resistance (μΩ) Temperature Humidity

L1

L2 ________℃ _______%
L3

Power-frequency withstand voltage tests on auxiliary & control circuits

Circuit The insulation Resistance (500VDC) 2KV,50Hz, 1s


Before test( M Ω) After test( M Ω)

DC Circuit

AC Circuit

CT&VT Circuit

Power-frequency withstand voltage tests on main circuits

Phase No. The insulation Resistance (MΩ)(2500VDC) ____ kV, 50Hz, 1 min.
Before test( M Ω) After test( M Ω)
L1-L2+L3+E

L2-L1+L3+E

L3-L1+L2+E

Remark: _ ________________________________________________________________

__ ____________________________________________________________________

Inspected by: Checked by: Date:

Review: 1.0 2005/01/28


QF08-04-11

INSPECTION AND TESTING RECORD

Contract
Customer No. Panel No.

Type

Meter Ammeter Active Volt-ampere-hour meter


Voltmeter Reactive Volt-ampere-hour meter
Others

Inspection & test Conclusion


1. Structural Inspection(Visual check):
Yes No
1.1 All components are in compliance with requirement.
1.2 Earthing Bar installed.
1.3 Miniature line is correct.
1.4 All nameplates are in correct form and the comment is correct
1.5 All labels are correct.
1.6 The hanger and side cover installed.
1.7 Surface check OK.
1.8 Phase sequence correct.
1.9 Panel doors can open and close smoothly
1.10 Handle can be inserted and operated smoothly.
1.11 Mechanical or emergency open OK.

2. Mechanical test:
2.1 Main switch
2.1.1 Main switch can be opened and closed correctly in test position.
2.1.2Main switch can be opened and closed correctly in service position.
2.1.3 Aux.contact of ON/OFF position OK.
2.1.4 ON and OFF position indicator OK.
2.2 Truck
2.2.1 Withdrawable part can be racked IN and OUT smoothly.
2.2.2 Aux. Contact and indicator for test position OK.
2.2.3 Aux. Contact and indicator for service position OK.
2.3 Earthing switch
2.3.1 Earthing switch can be opened and closed correctly.
2.3.2 Aux. Contact of earthing switch ON and OFF OK.
2.3.3 Earthing switch indicator OK.
2.4 Interlock

Review: 1.0 2005/01/28


2.4.1 Withdrawable part cannot be racked in and out when CB is close.
2.4.2 CB truck cannot be racked into Service position. when earthing switch is close.
2.4.3 Earthing switch cannot be closed when CB truck is in Service position.
2.4.4 The door of cable cubicle cannot be opened when earthing switch is open.
2.4.5 CB cannot be closed when CB truck is neither in test position nor service positon.
2.4.6 The plug cannot be drawn out or pluged in when CB is in service position.

3. Wiring:
3.1 The wiring conforms to the schematic diagram.
3.2 All meters indicate properly.
3.3 All components operate properly.
3.4 All signals are correct.

4. Protection relay test:


4.1 Protection relay output operate properly.
4.2 Protection relay panel display and operate properly.
4.3 Automatic Transfer Controls (ATC).
4.4 Protection relay function and output test.

Protect function or function


Protect set value Result
code

5. Test of sensor and instrument transformer


CT VT
Phase
Ratio Polarity Ratio Polarity Open delta winding

L1
L2
L3

Remark:

Signature:

Inspected by:___ _____________ Checked by:_________________ Date:__ __________

Review: 1.0 2005/01/28


Review: 1.0 2005/01/28