Documente Academic
Documente Profesional
Documente Cultură
NBIC
Orientation Program
5. What is qualified Base metal thickness range for a PQR plate 5. 3/16” to 2”
thickness of 1”? 6. 4
6. What is F Number of E7018 Electrode
New
Repair /
Construction Installation In service
Alteration
PRI
Sec IX
CSD-1
Focus
Competence Balance
New
10%
30% Design (Calc) In Service + R
Welding
30%
Metals
Others
30% 10%
30% Design (Calc)
Welding (R)
30%
Metals
PRD
30%
Gain
Few Tips
10
Inspector
Overall Idea
Boilers
Pr. Vessels
Piping
Valves
11
Leaning outcome
12
Reference Materials
13
Pass Criteria
14
Practice Book
15
16
17
NB-263 RCI-1
Rules for Commissioned Inspectors
1-0 SCOPE
This Part describes the following requirements for NB Commissions and Endorsements:
18
NB-263 RCI-1
19
Inspector Supervisor
New Construction AI B
Inservice IS O
Repair
R
www.astrongroup.com OUI Trg (Day 1) 20
20
Inservice
Repair
3.2 3.1
New
Construction 4.2 4.1
NB-263 RCI-1
21
NB 263 NBIC
RCI-1 NB 23- Part 1,2
ASME
BPVC Low Pressure
Boilers
(Book)
22
Causes
23
Birth of Code
Data Conclusion
Data Analysis
Collection wwwh
24
Construction Phases
Design Fabrication
(Welding..) Examination
Material
Testing
Relief CERTIFY
Inspection
Forward
Foot note 1 Construction, as used in this Foreword, is an all-inclusive term
25
The Codes
Material
ASME Sec VIII-Div 1
ASME Sec II
Welding
ASME B31.3
ASME Sec IX
NDT
AWS D1.1 ASME Sec V
API 6D
www.astrongroup.com OUI Trg (Day 1) 26
26
Safety of Life
Comparison
AVAILABLE….! Test
Build
REQUIRED..?
Design
27
The Give up
28
Re Cap
29
Design
Parameters
Parts
Principles
30
Terminology - Vessels
1.MAWP
1. Shell
2.Design Temperature
2. Head
3.MDMT 3. Nozzle
4.RT Category /Joint Efficiency 4. Saddle / Skirt
5.PWHT
6.Toughness (Impact)
(Properties Common)
1. UTS
1. Static Head
2. SMYS
2. Lethal service
3. Design Stress
3. Toughness Enhancement
31
32
1.Sensible Heat
2.Latent Heat
3.Super Heat
4.WHRB
5.Safety Valve
6.Boiler Efficiency
7.Heating Surface
8.Steaming Capacity
9.Thermodynamic Cycle
10.Boiler Battery Limits
33
NB 331-I Rev 6
34