Description Unit Quantity

Cable tray Removal-Removal of cable tray with necessary


I accessories including of all Anchor Fastner.It is required to
give removed trays and accessories back to LFS.

1 400 mm cable tray rmt 10


2 150 mm cable tray rmt 10
Cable tray Installtion-Installtion of cable tray with
necessary accessories including supply of all 8mm bullet -
Hilty make Anchor Fastner for fixing of cable tray.Cable tray
II material supplied by LFS.Scaffolding material provided by
LFS.All work as per instruction of site-incharge and
requirement of Architect. Installtion also includes zinc spray
at cutting of cable tray.
1 600mm cable tray rmt 30
2 400mm cable tray rmt 20
3 300/250mm cable tray rmt 50
5 150/100mm cable tray rmt 30
6 50mm cable tray rmt 30
III Raceway Fixing with all accessories
1 Installation of 225 / 250 x 38 mm GI trunking Mtr 10
Junction box installtion -Installtion of junction boxes for
the raceway mentioned below following sizes with cover.SS
screws with proper cutouts on the sides for conduit entry
and suitable knockouts for flexible conduit outlets as per
site condition. All junction boxes to be properly
earthed with copper earth wires as required complete in all
respects.
1 350mmX350mm No 2
2 300mmX300mm No 1
3 250mmX250mm No 1
IV DB / Isolator-Removal & Installtion
1 Removing of 12/8/6way tpn DB. No 3
ITC of 16 / 12 way tpn DB with all MCB & accessories
including minor chipping works, pvc conduits inlet and
2 No 2
outgoing connections, tagging, ferulling of wires/ cables with
earthing.
ITC of 25 A DP isolator enclousre for IDU with terminations
3 No 15
including supply of flexible gland.
ITC ofIP65 / 66 isolator enclousre for Data centre racks and
4 No 20
terminations including supply of PG glands
ITC of Customised UPS tpn DB with all MCB & accessories
including minor chipping works, pvc conduits inlet and
5 No 1
outgoing connections, tagging, ferulling of wires/ cables with
earthing.
Shifting of vtpn DB with all MCB & accessories ,pvc
6 conduits inlet and outgoing connections,cables with No 2
earthing. tagging, ferulling of wires/ cables
Cable laying-Testing & Laying of copper shielded cable
v along conduits in walls, ceilings, on trays or laid in ready-
made trench as per standard practices with earthing.

3 C 6 sqmm Cu shielded cable along in conduits in wall /


1 Mtr 400
floor raceway / cable tray
4 C 6 sqmm Cu shielded /unshielded cable along in
2 Mtr 100
conduits in wall / floor
2 C 4 sqmm Cu flexible cable along in conduits in wall / floor
3 Mtr 100
raceway
4 C 4 sqmm Cu shielded / unshielded cable along in
4 Mtr 150
conduits in wall / floor raceway / cable tray
3 C 2.5 sqmm Cu shielded cable along in conduits in wall /
5 Mtr 3000
cable tray
3.5 C 95 sqmm Cu shielded cable along in conduits in wall /
6 floor/ cable tray and through flexible GI conduit in shaft and Mtr 30
on cable tray

Conduting- Laying of following sizes of floor/Wall conduites


VI as approved by the Consultant/Site Incharge at site
including clamping . To be laid in concealed maner.

1 32/25mm conduits conceiled in wall / floor Mtr 100


2 63 mm conduits conceiled in wall / floor Mtr 50
Cable End Termination- Cables with Heavy duty Lugs &
Brass cable glands. Including cost of all crimping lugs and
VI
compression glands, cable sockets insulation tape, sealing
compound etc:
1 3 Core 6 sq.mm Cu shielded Cable nos 30
2 4 Core 6 sq.mm Cu shielded/ Unshielded Cable nos 10
3 2 Core 4 sq.mm Cu flexible Cable nos 6
4 4 Core 4 sq.mm Cu shielded/Unshielded Cable nos 8
5 3.5 Core 95 sq.mm Cu shielded Cable nos 4
6 3 Core 2.5 sq.mm Cu shielded Cable nos 110
Earthing-ITC of following size of cable for earthing through
VII
conduit / cable tray.
1 2 X 10sq.mm FRLS cable Mtr 100
8 swg cu wire instaaltion through pvc conduit / cable tray/
2 Mtr 100
trunking