TSSR Document Contents

Section Description of Section Contents (Hyperlinked to actual page)


1 Cover Sheet
2 Index / Table of Contents
3 Site Access Information
ii Guidance
iii Min. Tools Req'd
iv Photos Guide - Ground Based Structures
v Photos Guide - Rooftop Based Structures
vi Photos Guide - IBS Sites
4 Site Type and Info - Part 1 of 2
5 Site Type and Info - Part 2 of 2
6 Maps
7 Service Rack Footprint
8 CME Visual Checklist
9 Building and Surroundings
10 Equipment Room
11 AC Distribution - Part 1 of 3
12 AC Distribution - Part 2 of 3
13 AC Distribution - Part 3 of 3
14 Earthing and Grounding - Part 1 of 2
15 Earthing and Grounding - Part 2 of 2
16 Power, Transmision, CME (Overview)
17 Antenna Mounting Structure (Self-Supported Lattice Tower) - Part 1 of 3
18 Antenna Mounting Structure (Self-Supported Lattice Tower) - Part 2 of 3
19 Antenna Mounting Structure (Self-Supported Lattice Tower) - Part 3 of 3
20 Antenna Mounting Structure (Monopole)
21 Antenna Mounting Structure (Rooftop Pole)
22 Antenna Mounting Structure (Guyed Mast)
23 Antenna Mounting Structure (Mobile BTS)
24 Signal Cables & Distribion Frames
25 Radio Transmission Equipment (TRM)
26 RF Information
27 Antenna Observed on Structure
28 Obstacle Diagram
29 Transmission Link Summary
30 Transmission Route and Path Profile
31 Transmission Line of Site (LOS) Photos
32 Transmission Frequency Scan Data (Near end)
33 Transmission Frequency Scan Screen Capture (Near End) Vertical
34 Transmission Frequency Scan Screen Capture (Near End) Horizontal
35 Transmission Frequency Scan Data (Far end)
36 Transmission Frequency Scan Screen Capture (Far End) Vertical
37 Transmission Frequency Scan Screen Capture (Far End) Horizontal
38 Dismantling - Part 1 of 2
39 Dismantling Part 2 of 2
40 List of Photos
41 Photos
42 Checklist of Photos Taken
43 List of Drawings
44 Sample Drawings
45 Document Control Sheet
46 Template Approval Sheet

Controlled Document
455569170.xlsx
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued : #REF!

TSSR Document Guidance and minimum standards of working safely and technically.

1 All Guidance pages including this page, Min. Tools Req'd page, Photos Guide pages, etc. to be deleted from the submitted reports.

All "Proposed information" particularly in the RF sections to be filled in prior to site visit for the Technical Site Survey (TSS), with such information to have been
2 provided by Vendor Radio Network Planning and Transmission Planning departments.
Vendor and/or Vendor Approved Service Provider (Subcontractor) must us qualified, competent, trained, certified personnel in the performance of the Technical
3 Site Survey, and production of the Technical Site Survey Report (TSSR).

Vendor and/or Vendor Approved Service Provider (Subcontractor) must work in accordance with International best practices for Occupational Health and Safety,
and all personnel going on sites must work in accordance with safe working practices, at a minimum in alignment with Indosat and Ooredoo group policy, manual,
4 procedures and safety instructions.
All personnel must be fully certified at a minimum to Indonesian regulatory standards and requirements, and furthermore, to Indosat, Vendor own and any
additional requirements, and have been provided OJT, and certified competent to perform the job both technically and safely by the Vendor.

Vendor and/or Vendor Approved Service Provider (Subcontractor) must provide at a minimum, the Indosat specified minimum tools, equipment, PPE and First
Aid kit required for TSSRs, and furthermore additional as recommended by the Vendor, and as required per the Site Specific Safe Working Method Statement
5 (SWMS), and Job-Safety Analysis, both of which also must be performed and approved by the Vendor prior to any personnel going on any sites to perform the
TSSRs.

Aside from the requirement of the main Vendor and their ASPs / subcontractors to have performed Job Safety Analysis and written proper Safe Working Method
Statements for each type of TSS to be done on each type of site, in generic form but specific to the area and situations and safety issues to be found in each area
6 and site type, enforcement of the usage of all required Personal Protection Equipment is mandatory, and the responsibility of the Vendor, including the wearing
and usage of personal radiation monitors, and the instruction of all personnel in the function and usage of these.

All photographs taken per the requirements of the various sections of the TSSR must be both included in the TSSR from a report perspective, in the specified
sections, and additionally, must be uploaded in the appropriate directory allocated to the TSSR within the Site Specific directory in Site Binders part of Share-
7 point. Guidance on the sub-directories required to be created and photos to be uploaded is contained within the Required Photos sections of this document, as
well as the specified sections for photo placement. Where in doubt, more photos should be taken, and uploaded.

All photographs must be taken with the minimum required capability camera, including the ability to geo-tag, time-stamp, and date-stamp the photos, with such
8 properties preserved in the raw photo upload to Share-point.

All photographs must be properly labelled, and for the raw photo upload, properly oriented for storage in Share-point, without loss or modification of Geo-
9 tagging, timestamp and datestamp properties.

Panoramic View (30°, 60°, 90°, 120°, 150°, 180°, 210°, 240°, 270°, 300°, 330°, 360°)
Panoramic views for tower/monopole site must be taken either from top of tower/monopole or above the existing antenna under survey. Panoramic views for
10 rooftop pole site must be taken from the center of building at highest point if possible. If it is not doable, panoramic views must be taken from each building
corner correspond to compass north reading. Sector views must be taken for existing antennas under survey in order to align the current coverage objective with
panoramic photos taken.

Earth resisitivity measurements must be made with the appropriate test equipment, and where there is no earthing in place as identified either visually or during
11 the earth resisitivity measurement test, Vendor must immediately notify Indosat Tower Management Group and Network Operations of this so that the site may
be rectified.

12 The proper filenaming convention must be followed as specified in the Site Binders file naming convention, e.g..
RAN Modernisation Project RAN MBS Project RAN Modernisation Project
12.1 RAN - Macro Site 01JKB002_RBS_TSSR_RMBS_2013 01JKB002_RBS_TSSR_RANM_2013
12.2 RAN - In-Building System 01JKB002_IBS_TSSR_RMBS_2013 01JKB002_IBS_TSSR_RANM_2013
12.3 Power Supply 01JKB002_PWR_TSSR_RMBS_2013 01JKB002_PWR_TSSR_RANM_2013
12.4 Transmission 01JKB002_TRM_TSSR_RMBS_2013_01JKB036 01JKB002_TRM_TSSR_RANM_2013_01JKB036
12.5 Mini-CME 01JKB002_CME_TSSR_RMBS_2013 01JKB002_CME_TSSR_RANM_2013
12.6 Combined Multi-Scope 01JKB002_CME_TSSR_RMBS_2013 01JKB002_RAN_TSSR_RANM_2013
The TSSR must be saved in the proper directory for TSSRs in within the Site Specific directory in Site Binders part of Share-point, ie. Directory 22 TSSRs (all SoW).
13 It is within this directory that a sub-directory referring to the specific TSSR, e.g. TSSR_RMBS_2013 or TSSR_RANM_2014 shall be created, and under that, the raw
photos uploaded into the specified sub-subdirectories.
14 For Transmission specific TSSRs, two separate site reports may be combined for submission of a single "link" or "hop" TSSR.
15 Further guidance to be added in later revisions

Controlled Document

455569170.xlsx
TSSR Engineer / Technician Essential Tools

Engineer / Technician Name ::


Item Provider Brand Amount Supplier

Vehicle & Fuel & Insurance for Vehicle+Driver(s)+3rd Party Vendor or Vendor ASP 1
Persons and Property
Proof of personal insurance coverage (by own company) for Vendor or Vendor ASP 1
medical / death / permanent disabililty / hospitalisation

Digital Camera (>5Mpixel with capability to have the Vendor or Vendor ASP Samsung 1
Geographic location, time, date information embedded within
photo metadata)
Mobile Phone (for communication purposes only) Vendor or Vendor ASP 1
Notebook / Laptop PC Vendor or Vendor ASP 1

Mobile Internet Facility Vendor or Vendor ASP Speedy USB Dongle 1

GPS with compass + Vehicle Charger Vendor or Vendor ASP 1


Laser height / distance meter Vendor or Vendor ASP 1 www.alatsurvey.com

Magnetic Compass (Optional backup to digital compass) Vendor or Vendor ASP Suunto 1
Infrared Thermometer Vendor or Vendor ASP Fluke Series 60, or equiv. 1 http://www.fluke.com/fluke/usen/thermomete
Earth Resistivity Tester Vendor or Vendor ASP 1
Downtilt Gauge (angle measuring level) Vendor or Vendor ASP 1
BTS Rack Access Keys (If Required) Vendor or Vendor ASP 1

Safety Equipment (specs as per attached file) Inspector

First Aid Certificate (current within last 12 months) Vendor or Vendor ASP 1
Working At Height certification (current within last 2yrs, and Vendor or Vendor ASP 1
valid) - Menakertrans
Basic Telecommunications tower climbing certification - Vendor or Vendor ASP 1
Indosat Approved training providers
Intermediate / Practical Working at Height certification - Vendor or Vendor ASP 1
Indosat Approved training providers

Hard hat (for climbing) Vendor or Vendor ASP 1


Hard hat (for ground work) Vendor or Vendor ASP 1
Safety Spectacles, Glasses or goggles (Anti UV) Vendor or Vendor ASP 1pr
Safety Boots or Safety Shoes Vendor or Vendor ASP 1pr
Full Body Climbing Harness Vendor or Vendor ASP 1
Lanyard for full body climbing harness Vendor or Vendor ASP 1
- Shock Absorbing double end lanyard
Lanyards for full body climbing harness Vendor or Vendor ASP 1
- Positioning Lanyard
Climbing Overalls - Orange colour Vendor or Vendor ASP 1
High Visibility Jacket or Vest Vendor or Vendor ASP 1
Gloves Vendor or Vendor ASP 1pr
Personal Radiation Monitor (Occupational) Vendor or Vendor ASP 1 Berca [Vicky Alphonse : 0
First Aid Kit Vendor or Vendor ASP 1

General Tool Kit Case Vendor or Vendor ASP 1


Tower Climbing Tool Bag (Leather or Canvas) Vendor or Vendor ASP 2
Lanyards for tieing off tools and survey equipment to prevent Vendor or Vendor ASP > 10 (as many as
them from being dropped at height. required)
ESP Wriststrap + Cable attachment Vendor or Vendor ASP 1
Fluke Digi Multimeter (or equiv brand) Vendor or Vendor ASP 1
Steel Retractable Tape Measure - 5m Vendor or Vendor ASP 1
Flashlight - Penlight Vendor or Vendor ASP 1

Documentation Vendor
TSSR Form in electronic form on computer and/or tablet Vendor MANY
device
Copy of Indosat Safety Policy & Instructions Vendor 1
Copy of Vendor Safety Policy & Instructions Vendor 1
Copy of Site/Work Emergency Response Plan and Site Specific I Vendor 1
Copy of Safe Working Method Statement Vendor 1
Copy of TSSR Method Of Procedure (MOP) Vendor 1
Accident Report Form Vendor 5
TSSR Technician Tool List Vendor 1
NOTE :: All tools must be of good quality and ALL safety equipment bear labels providing conformation of interna
The maintenance and care of all supplied equipement and tools is the prime responsibility of the Quality

Controlled Document
sential Tools

Remarks

Indosat must provide this

Samsung 7.7" P6800, Samsung Galaxy Note 8"

For communication purposes with Indosat PIC, TLP PIC, etc.


For use in preparing the reports, not necessarily to bring to site, but must be available to personnel who will prepare the
TSSRs, upload the information collected, etc. per requirements of this template.
For use in preparing the reports, not necessarily to bring to site, but must be available to personnel who will prepare the
TSSRs in the area, for timely submission and upload the information collected, reports, etc. per requirements of this
template.

Tape measures could be alternatively used, however Laser height / distance meter is the preferred tools for a professional,
good quality TSSR.
Not required if the GPS has a compass facility - Preferable Option
Where applicable Temperature inside the service cabinet should be measured.
Insert Hyperlink to picture
Insert Hyperlink to picture

Must comply with Indosat standard SI001 PPE - Indosat Telecommunications Field & Site Work v.01.0 (2013-07-18) or later
revision.
Scanned copy to be submitted in Sharepoint along with scan copy of KTP for verification
Scanned copy to be submitted in Sharepoint along with scan copy of KTP for verification

Scanned copy to be submitted to Sharepoint along with scan copy of KTP for verification. This may be already provided by
the Working At Height certification, however proof of this (by way of submission of course outline) must be provided.
Scanned copy to be submitted to Sharepoint along with scan copy of KTP for verification. This may be already provided by
the Working At Height certification, however proof of this (by way of submission of course outline) must be provided.

Must be undamaged and in a serviceable condition


Must be undamaged and in a serviceable condition

Not required if high visibility features are integrated into the Climbing Overalls

FieldSense Orange Occupational Personal Radiation Monitor


Insert Hyperlink to the specs document

Can be a small penlight, or larger flashlight.


onformation of international safety specifications
onsibility of the Quality Inspector
Dave Vipond - 26.08.2013
Example of Folder format and Photo Directory Ground Based Structure

Indosat Area code e.g.


01JKP
Note: Digital photos must be taken in high resolution size with aspect ratio 4:3 and able to zoom in without missing details.
Photos must contain geo-location (geo-tag), time-stamp, and date-stamp information in the file meta-data.
The standard digital photo file index should be indicated for each picture for future reference.
The height information should be available for each panoramic and sector view.
In case of dual/tri/multi band antennas, sector view can be represented by single photo and should be specified band and
technology applied.
Site ID Location TSSR doc
example
(01JKP009)

All raw photos to be sub


Folder
Raw (Other) Photographs

Access Road to Site


Photos to be properly rotated
All Photos should show description and Date

Cabin / Shelter

Power Distribution &


SESCO/TNB Meter

Gate and Fencing 4 Photographs

Generator Set 4 Photographs

Equipment inside the Cabin 4 Photographs

AC Power Distribution Board (ACPDB 4 Photographs


AC Power Distribution Board (ACPDB 4 Photographs

Outdoor Equipment 4 Photographs

Antenna & Microwave


4 Photographs

Feeder Entry Point (FEP), 4 Photographs


Feeder cable for RF and microwave antenna

Climbing Ladder, Vertical Cable Ladders,


Feeder cables for RF and microwave antennas
4 Photographs

Each leg of tower from bottom to top. 4 Photographs

Each leg to leg facing of tower from bottom to top. 4 Photographs

Lightning Protection, Obstruction Lights (OBL) 4 Photographs


, Control Panel and Photo Sensor

Tower Earthing Cable 4 Photographs

4 Photographs
Earthing Points

4 Photographs
Top view of whole layout site
Tower Anchor Bolts, 4 Photographs
Concrete Pedestal, Ground Connexion

Tower / Structure Load Information 4 Photographs


(Picture of plate which indicates maximum
load capacity of structure.

Structural damage information : Photos of 4 Photographs


all damage to the existing structures on
site must be taken..

Cabin and Foundation, 4 Photographs


Outdoor Air conditioning Units and Cages

Cabin and Cabin Foundation Damage Photos 4 Photographs


Photos of all damage to the existing cabin
and cabin foundation on site must be taken..

General Site Condition, 4 Photographs

Dismantling : Photos of all equipment 4 Photographs


proposed to be dismantled from site.

Dismantling : Photos of all power cable 4 Photographs


and other cabling to be dismantled from
site.

Dismantling : Photos of all Antenna and 4 Photographs


RRU's or outdoor units proposed to be
dismantled from site.

Dismantling : Photos of all appurtenances


(Booms, mounting brackets, stays, etc) to 4 Photographs
be dismantled from site.
Dismantling : Photos of all RF Feeder 4 Photographs
and/or hybrid cable, jumpers, junction
boxes, etc to be dismantled from site.

Drawings
Drawings

Photos Panoramic View


Panoramic View
(30°, 60°, 90°, 120°, 150°, 180°, 210°, 240°, 270°, 300°, 330°, 360°)
Panoramic views for tower/monopole site must be
taken either from top of tower/monopole or above
the existing antenna under survey.
Panoramic views for rooftop pole site must be
taken from the center of building at highest point
if possible. If it is not doable, panoramic views
must be taken from each building corner correspond
to compass north reading.
Sector views must be taken for existing antennas
under survey in order to align the current
coverage objective with panoramic photos taken.
ture

ng details.

and and

photos to be submiited

iption and Date


Example of Folder format and Photo Directory Rooftop Site

Indosat Area code e.g.


01JKP

Note: Digital photos must be taken in high resolution size with aspect ratio 4:3 and able to zoom in without missing details.
Photos must contain geo-location (geo-tag), time-stamp, and date-stamp information in the file meta-data.
The standard digital photo file index should be indicated for each picture for future reference.
The height information should be available for each panoramic and sector view.
In case of dual/tri/multi band antennas, sector view can be represented by single photo and should be specified band and
Site ID Location TSSR doc technology applied.
example
(01JKB001)

All raw photos t


in a Directory p
Raw (Other) Photographs
with folders

Building
Photos to be properly rotated
All Photos should show description and

Rooftop

Power Distribution &


SESCO/TNB Meter

Structure 4 Photographs /
Structure

Structural damage information : Photos of all 4


damage to the existing structures on site Photographs /
must be taken..
damage

Grounding System 4 Photographs


Antenna's 4 Photographs /
Antenna

Cabin Outside and Inside 4 Photographs

FEP 4 Photographs

Lightning Protection, Obstruction Lights (OBL) 4 Photographs


, Control Panel and Photo Sensor

ODU
4 Photographs

Dismantling : Photos of all equipment proposed to be 4 Photographs


dismantled from site.

Dismantling : Photos of all power cable and other cabling 4 Photographs


to be dismantled from site.

Dismantling : Photos of all Antenna and RRU's or outdoor 4 Photographs


units proposed to be dismantled from site.

Dismantling : Photos of all appurtenances (Booms,


mounting brackets, stays, etc) to be dismantled from site. 4 Photographs

Dismantling : Photos of all RF Feeder and/or hybrid cable, 4 Photographs


jumpers, junction boxes, etc to be dismantled from site.

General Site Condition, 4 Photographs


General Site Condition, 4 Photographs

Drawings Drawings

Panoramic View
(30°, 60°, 90°, 120°, 150°, 180°, 210°, 240°, 270°, 300°, Photos Panoramic View
330°, 360°)
Panoramic views for tower/monopole site must be
taken either from top of tower/monopole or above
the existing antenna under survey.
Panoramic views for rooftop pole site must be taken
from the center of building at highest point if possible.
If it is not doable, panoramic views must be taken
from each building corner correspond to compass
north reading.
Sector views must be taken for existing antennas
under survey in order to align the current coverage
objective with panoramic photos taken.
photos to be submited
rectory per site,
olders

iption and Date


WIBAS OSDR
BWA 10.5 GHz
PLANING DOCUMENT

SITE SENTRA CILEUNGSI


(BGRCLSBI01045)
1. SITE LOCATION

Site Name : SENTRA CILEUNGSI


Address : JL.RAYA CILEUNGSI - BEKASI KM.228

Coordinate Position
Latitude : -6.40321
Longitude : 106.99088
Elevation : 52 meters

2. CHECKLIST MATERIAL

Kode Spek Description Qty Desc. Check


WiBAS OSDR:
Full outdoor WiBAS Base Station Hub,
OSDR-10-L 10.5GHz FDD, 2xGbE 1 B2WS02VU010500104

HANT1090V WiBAS OSDR-HUB Radio Antenna. 10.5GHz, - -


90° sectorized, Vertical Polarization

WiBAS OSDR-HUB Radio Antenna. 10.5GHz,


HANT1045H 1 B2WS02VU02070010
45° sectorized, Horizental Polarization

Power over Ethernet injector 75W + AC


POE75U 1 -
plug cable

ETH-CONN-RJ45 RJ45 Connector for Ethernet Cable 8 -

M20-GLAND Cable gland M20 for OSDR 1 -

Interconnection adaptor and coaxial cable


between 10.5 GHz OSDR and external
CAB-UBR120NF 1 -
Sectoral Panel antenna (UBR120 to N-type
female)

Data Line Protector 10/100/1000 outdoor 1 Reg No LA No Available


TW-SPPOE-TS IP68 1 Reg No LA No Available
Material Installation for WiBAS OSDR :
STP Outdoor CAT 5e - Outdoor (ODU to 50 Meter
IDU)
Grounding Ø 10mm + Skun 30 Meter
Slave Rack 1 Unit
UTP-Cat5e 6 Meter
RJ 45 Connector (Metal shielded) 8 Pcs
Power Extended Outlet ( AC ) 2 Unit
Power Cable AC 1 Meter
Rubber Tape 2 Roll
Tie-wrap 1 Pack
Label Printed 1 Set
Double-Tape 2 Roll
Arm Support - Unit
3.     RF Clearance:
With Spectrum Analyzer scan 360 degrees on the Sector of Base Station with span of the targeted frequency channels planned to be used in the b
station. Take Screenshot of the Spectrum Analyzer and include in below:
4.     PARAMETER COMMISIONING
No Item Parameter Value
1 Summary
a. System Version 6.4.0_2302_R.1.12.1.build_06
b. MAC Address 00:05:59:8F:88:AD

2 System
a. Name (Sector ID) BGRCLSBI01045
b. Contact Altitude : 172 Mdpt, Tilt : 0°
c. Location SENTRA CILEUNGSI
d. SNMP Community Default
e. Inband Interface Address 172.31.154.2
f. Prefix Length 255.255.255.128
g. VLAN ID 603
h. VLAN Priority -
i. Default Gateway 172.31.154.3
j. Default Gateway Interface Inband Interface
k. High Availability Status Disable

3 Modem
a. Channel Bandwidth (MHz) 7
b. Modem Profile Normal

4 Radio
a. Frequency Tx (KHz) 10171500
b. Tx Power (dbm) 17
c. Mute Of

5 Gb Ethernet
a. Admin State (Gb Ethernet 2) Up
b. Speed (Mbps) 1000Mbps
c. Duplex mode full duplex
d. Auto Negotiation Mode Gb Ethernet 2) 1

6 Inventory
a. System Type OSDR-PMP
b. Base Unit Hardwrae RDF7346.A
c. System Software 6.4.0_2302_R.1.12.1.build_06
d. Z Code Z00-659/79.32
e. Z Serial Number 321805792524
f. Radio Hardware OSDR-10,5 L

7 License
a. Order (latest number) Take Screenshot
Need Capture Lisence Mr. Jawad
Remark

POE To Switch

For POE To AC
o be used in the base
06

06
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued : #REF!

Westindo Service Rack Footprint

Hariff Service Rack Footprint

Huawei Service Rack Footprint

Controlled Document

455569170.xlsx
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued : #REF!

Tower Base(E) = m
Tower Top(F) = m
Total Height (G) = m
Height of Straight Section(H) = m
Height of Stop Section(I) = m

Tower Bracing Type (X or K) =

Franklin Rod Length (J) = m


On Leg (A/B/C/D) =

Top OBL Mounted


On Leg(A/B/C/D) =
At Height = m

Side OBL Mounted


On Leg (A/B/C/D) = m
At Height = m

Controlled Document

455569170.xlsx
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued : #REF!

Controlled Document

455569170.xlsx
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued : #REF!

d1 = mm i = mm
d2 = mm j = mm
d = mm k = mm
e1 = mm l = mm
e = mm m = mm
f1 = mm n = mm
f2 = mm
f3 = mm

Number of Anchor Bolts (g) = pcs


Diameter of Anchor Bolt (h) = mm

BASE PLATE & PEDESTAL

Controlled Document

455569170.xlsx
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued : #REF!

MONOPOLE STRUCTURE INFORMATION

Monopole Type : Round / Polygonal


: Taper / Non-Taper

Joint Type : Flange / Slipped

Bottom Diameter (A) = mm

Top Diameter (B) = mm

Height of Section (C) = mm

Total Height of Monopole (D) = mm

Height of Pedestal from Ground Level (E) = mm

Width of Pedestal from Ground Level (F) = mm

455569170.xlsx
455569170.xlsx
#REF!

#REF!

455569170.xlsx
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued :
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued :

ROOFTOP POLE STRUCTURE INFORMATION

TOWER STRUCTURE INFORMATION

Distance Between Main Pole to Support (A) = ....................... mm


Pipe Ø ......... mm

Height of Plan Bracing (B) = ....................... mm

Height of Section (C) = ....................... mm


Cn

B5

Total Height of Pole (D) = ....................... mm

Height of Pedestal from Rooftop Level (E) = ....................... mm

Width of Pedestal \ Counterweight (F) = ....................... mm


Pipe Ø ......... mm

Lenght of Pedestal \ Counterweight (G) = ....................... mm


C3

B4

F
D

F
Pipe Ø ......... mm
B3

A
C2

G
B2

A
Pipe Ø ......... mm

F
C1

B1

G
A
E

A
Distance Between Main Pole to Support (A) = mm
Height of Plan Bracing (B) = mm

455569170.xlsx
Height of Section (C) = mm
Total Height of Pole (D) = mm
Height of Pedestal from Rooftop Level (E) = mm
Width of Pedestal \ Counterweight (F) = mm
Length of Pedestal \ Counterweight (G) = mm

Controlled Document

455569170.xlsx
#REF!

#REF!

455569170.xlsx
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued : #REF!

GUYED MAST STRUCTURE INFORMATION


TOWER STRUCTURE INFORMATION

Width of Face (A) = ....................... mm


D

Distance Between Guyed Mast to Support (B) = ....................... mm

Height of Guy Wire Point (C) = ....................... mm

Height of Top Pole (D) = ....................... mm


Cn

Total Height of Guyed Mast (E) = ....................... mm

Height of Guyed Mast Pedestal (F) = ....................... mm

Height of Support Pedestal (G) = ....................... mm

Width of Guyed Mast Pedestal (H) = ....................... mm

Width of Support Pedestal (I) = ....................... mm

Height of Section (J) = ....................... mm


C2

Diameter of Main Leg Member (Ø1) = ....................... mm

Diameter of Bracing Member (Ø2) = ....................... mm


E

Diameter of Horizontal Member (Ø3) = ....................... mm


C1

Ø3
I H
Ø2

Ø1
A
J
F

B
G

Width of Face (A) = mm Width of Guyed Mast Pedestal (H) = mm

Distance Between Guyed mast to Support (B) = mm Width of Support Pedestal (I) = mm

Height of Guy Wire Point (C) = mm Height of Section (J) = mm

Height of Top Pole (D) = mm Diameter of Main Leg Member (01) = mm

Total Height of Guyed Mast (E) = mm Diameter of Main Leg Member (02) = mm

Height of Guyed Mast Pedastel (F) = mm Diameter of Main Leg Member (03) = mm

Height of Support Pedestal (G) = mm

455569170.xlsx
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued : #REF!

MBTS STRUCTURE INFORMATION

Distance of Arm (A) = mm

Width of Shelter (B) = mm

Height of Guy Wire Bottom Point from Ground Level (C) =

Height of Shelter from Ground Level (D) = mm

Height of Section (E) = mm

Total Height of Guyed Mast (F) = mm

Width of Guyed Mast (G) = mm

Diameter of main leg member (01) = mm

Diameter of main leg member (02) = mm

Diameter of main leg member (03) = mm

Diameter of Guy Wire (04) = mm

Diameter of Guy Wire (05) = mm

Diameter of Guy Wire (0n) = mm

455569170.xlsx
#REF!

#REF!

mm

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report Template Rev. No. : #REF! Issued : #REF!

Signal Cables and Distribution Frames


Tick the box, (√) when checked.

2G Transmission Type: Radio 2G Transport: E1 2G Transport


Fiber IP IP
Others Specify: Others

DCS Transmission Type: Radio DCS Transport: E1 DCS Transpor


Fiber IP IP
Others Specify: Others

3G Transmission Type: Radio 3G Transport: E1 3G Transport


Fiber IP IP
Others Specify: Others

Metro-E Equipment: Available N/A

Transmission DDF:
Total E1 Required: Total E1 Available:

Hops Details:-
Facing to: Site
1
E1 Capacity : (Used: / Available: )
Facing to: Site
2
E1 Capacity : (Used: / Available: )
Facing to: Site
3 E1 Capacity : (Used: / Available: )

* Note: Pls add if more that 3 links

Transmission Link Status:-

Site Origin Site 1 Site 2 Site 3 Site 4


Link X-Connect

E1 Status OK No OK No OK No OK No OK No

Site 5 Site 6 Site 7 Site 8 Site 9


Link X-Connect

E1 Status OK No OK No OK No OK No OK No

Site 10 Site 11 Site 12 Site 13 Site 14


Link X-Connect

E1 Status OK No OK No OK No OK No OK No
* Note: Pls add more columns if more that 13 sites

Controlled Document

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report Template Rev. No. : #REF! Issued : #REF!

Radio Transmission Equimpent


DIRECTION TO SITE FEEDER BASE BAND CABLE
TYPE AND MODEL FREQUENCY CAPACITY RACK
SITE ID SITE NAME TYPE SIZE

Remarks :

Other Transmission Equimpent


DIRECTION TO SITE FEEDER BASE BAND CABLE
TYPE AND MODEL FREQUENCY CAPACITY RACK
SITE ID SITE NAME TYPE SIZE

Remarks: ** If Optic transmission, specify route from Node to FDF/OTB(MSC) **

Controlled Document

455569170.xlsx
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued : #REF!
Transmission Link Summary Information
Link/Hop 1 of ###
Site Information Far End Path Length : 8.77 Km Transmit Freq. 7.18396 GHz Receive Freq. 7.79880 GHz
Province : #REF! Structure Type: Self Supporting Tower (4 Leg)
Indosat Area #REF! Structure Height: #REF!
City / District (within Indosat Area) : #REF! Elevation at Bldg Base (AMSL): #REF!
City/District ID : #REF! Elevation at Structure Base (AMSL):#REF!
Site ID: #REF! Longitude: (+/- Decimal◦) & DMS #REF!
Site Name: #REF! Latitude: (+/- Decimal◦) & DMS #REF!
Structure Owner: #REF! Site Area (m2): #REF!
For other owner please specify#REF! Main Antenna Size 1.2 m
Site type (general): #REF! Main Antenna Height on Structure 35.0 m
Site Coverage Area: #REF! Main Antenna Height (AMSL) 450.0 m
Site Equipment Location: #REF! Diversity Antenna Size 1.2 m
Structure Base: #REF! Diversity Antenna Height on Structure 30.0 m
Building Height (if a Rooftop base): #REF! Main Antenna Height (AMSL) 425.0 m
Link/Hop 1 of ###
Site Information Near End Path Length : 8.77 Km Transmit Freq. 7.79880 GHz Receive Freq. 7.18396 GHz
Province : South Sumatra Structure Type: Self Supporting Tower (4 Leg)
Indosat Area Pekanbaru Structure Height: 20.0 m
City / District (within Indosat Area) : Pekanbaru Elevation at Bldg Base (AMSL): 405.0 m
City/District ID : 06PBR Elevation at Structure Base (AMSL):425.0 m
Site ID: 06PBR059 Longitude: (+/- Decimal◦) & DMS S : 07° 24' 58.30''
Site Name: Sample MBS Site 59 Latitude: (+/- Decimal◦) & DMS E : 112° 32' 56.40''
Structure Owner: Protelindo Site Area (m2): 20.00 Sq.m
For other owner please specify: Main Antenna Size 1.2 m
Site type (general): Macro Main Antenna Height on Structure 35.0 m
Site Coverage Area: Outdoor Main Antenna Height (AMSL) 450.0 m
Site Equipment Location: Indoor Diversity Antenna Size
Structure Base: Ground Diversity Antenna Height on Structure
Building Height (if a Rooftop base): Main Antenna Height (AMSL)
Link/Hop 2 of ###
Site Information Far End Path Length : 23.15 Km Transmit Freq. 7.38396 GHz Receive Freq. 7.99880 GHz
Province : South Sumatra Structure Type: Self Supporting Tower (4 Leg)
Indosat Area Pekanbaru Structure Height: 20.0 m
City / District (within Indosat Area) : Pekanbaru Elevation at Bldg Base (AMSL): 405.0 m
City/District ID : 06PBR Elevation at Structure Base (AMSL):425.0 m
Site ID: 06PBR001 Longitude: (+/- Decimal◦) & DMS S : 00° 00' 00.00''
Site Name: Sample MBS Site Latitude: (+/- Decimal◦) & DMS E : 00° 00' 00.00''
Structure Owner: Other Site Area (m2): 100.00 Sq.m
For other owner please specifyUniversity of Indonesia Main Antenna Size 1.2 m
Site type (general): Macro Main Antenna Height on Structure 35.0 m
Site Coverage Area: Outdoor Main Antenna Height (AMSL) 450.0 m
Site Equipment Location: Indoor Diversity Antenna Size 1.2 m
Structure Base: Rooftop Diversity Antenna Height on Structure 30.0 m
Building Height (if a Rooftop base): 20.0 m Main Antenna Height (AMSL) 425.0 m
Link/Hop 2 of ###
Site Information Near End Path Length : 23.15 Km Transmit Freq. 7.99880 GHz Receive Freq. 7.38396 GHz
Province : South Sumatra Structure Type: Self Supporting Tower (4 Leg)
Indosat Area Pekanbaru Structure Height: 20.0 m
City / District (within Indosat Area) : Pekanbaru Elevation at Bldg Base (AMSL): 405.0 m
City/District ID : 06PBR Elevation at Structure Base (AMSL):425.0 m
Site ID: 06PBR059 Longitude: (+/- Decimal◦) & DMS S : 07° 24' 58.30''
Site Name: Sample MBS Site 59 Latitude: (+/- Decimal◦) & DMS E : 112° 32' 56.40''
Structure Owner: Protelindo Site Area (m2): 20.00 Sq.m
For other owner please specify: Main Antenna Size 1.2 m
Site type (general): Macro Main Antenna Height on Structure 35.0 m
Site Coverage Area: Outdoor Main Antenna Height (AMSL) 450.0 m
Site Equipment Location: Indoor Diversity Antenna Size
Structure Base: Ground Diversity Antenna Height on Structure
Building Height (if a Rooftop base): Main Antenna Height (AMSL)
Link/Hop 3 of ###
Site Information Far End Path Length : 8.77 Km Transmit Freq. 7.28396 GHz Receive Freq. 7.89880 GHz
Province : #REF! Structure Type: Self Supporting Tower (4 Leg)
Indosat Area #REF! Structure Height: #REF!
City / District (within Indosat Area) : #REF! Elevation at Bldg Base (AMSL): #REF!
City/District ID : #REF! Elevation at Structure Base (AMSL):#REF!
Site ID: #REF! Longitude: (+/- Decimal◦) & DMS #REF!
Site Name: #REF! Latitude: (+/- Decimal◦) & DMS #REF!
Structure Owner: #REF! Site Area (m2): #REF!
For other owner please specify#REF! Main Antenna Size 1.2 m
Site type (general): #REF! Main Antenna Height on Structure 35.0 m
Site Coverage Area: #REF! Main Antenna Height (AMSL) 450.0 m
Site Equipment Location: #REF! Diversity Antenna Size 1.2 m
Structure Base: #REF! Diversity Antenna Height on Structure 30.0 m
Building Height (if a Rooftop base): #REF! Main Antenna Height (AMSL) 425.0 m
Link/Hop 3 of ###
Site Information Near End Path Length : 8.77 Km Transmit Freq. 7.89880 GHz Receive Freq. 7.28396 GHz
Province : South Sumatra Structure Type: Self Supporting Tower (4 Leg)
Indosat Area Pekanbaru Structure Height: 20.0 m
City / District (within Indosat Area) : Pekanbaru Elevation at Bldg Base (AMSL): 405.0 m
City/District ID : 06PBR Elevation at Structure Base (AMSL):425.0 m
Site ID: 06PBR059 Longitude: (+/- Decimal◦) & DMS S : 07° 24' 58.30''
Site Name: Sample MBS Site 59 Latitude: (+/- Decimal◦) & DMS E : 112° 32' 56.40''
Structure Owner: Protelindo Site Area (m2): 20.00 Sq.m
For other owner please specify: Main Antenna Size 1.2 m
Site type (general): Macro Main Antenna Height on Structure 35.0 m
Site Coverage Area: Outdoor Main Antenna Height (AMSL) 450.0 m
Site Equipment Location: Indoor Diversity Antenna Size
Structure Base: Ground Diversity Antenna Height on Structure
Building Height (if a Rooftop base): Main Antenna Height (AMSL)
Controlled Document

455569170.xlsx
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued : #REF!

Google Earth view of the route between Near End and Far End

Near End Site Name :


Far End Site Name :
Path Profile using Transmission Link Planning Tool

Near End Site Name :


Far End Site Name :
Controlled Document

455569170.xlsx
#REF! Document Number : #REF!
#REF! Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
#REF! Template Rev. No. : #REF! Issued : #REF!

Line of Sight (LOS) view from Far End to Near End

Far End Site Name :


Near End Site Name :
Line of Sight (LOS) view from Near End to Far End

Near End Site Name :


Far End Site Name :
Controlled Document

455569170.xlsx
Spectrum Undesired in
Freq WG Loss Ant Gain Desired in
CH No Polarisasi A Bw 10LogBw Reading Front Antenna RX Cal
(MHz) (dB) (dB) front (D) dB
(dB) ( U) dB

Near End to Far End


1 Lower 7135.00 V -90.00 28 14.47 -75.53 -104.25 -22.4 10.4 56 -62.1
2 Lower 7149.00 V -90.00 28 14.47 -75.53 -104.25 -22.4 10.4 56 -62.1
3 Lower 7163.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Lower 7177.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Lower 7191.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1

1 Lower 7205.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Lower 7219.00 V -87.00 28 14.47 -72.53 Ph -22.4 10.4 56 -62.1
3 Lower 7233.00 V -75.00 28 14.47 -60.53 -89.25 -22.4 10.4 56 -62.1
4 Lower 7247.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
5 Lower 7261.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1

1 Lower 7428.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1


2 Lower 7442.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
3 Lower 7456.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Lower 7470.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
5 Lower 7484.00 V -74.00 28 14.47 -59.53 -88.25 -22.4 10.4 56 -62.1

1 Lower 7498.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Lower 7512.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Lower 7526.00 V -87.00 28 14.47 -72.53 -101.25 -22.4 10.4 56 -62.1
4 Lower 7540.00 V -87.00 28 14.47 -72.53 -101.25 -22.4 10.4 56 -62.1
5 Lower 7554.00 V -87.00 28 14.47 -72.53 -101.25 -22.4 10.4 56 -62.1

1 Upper 7296.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1


2 Upper 7310.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
3 Upper 7324.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Upper 7338.00 V -80.00 28 14.47 -65.53 -94.25 -22.4 10.4 56 -62.1
5 Upper 7352.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1

1 Upper 7366.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10 56 -62.5


2 Upper 7380.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
3 Upper 7394.00 V -87.00 28 14.47 -72.53 -101.25 -22.4 10.4 56 -62.1
4 Upper 7408.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Upper 7422.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1

1 Upper 7589.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Upper 7603.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Upper 7617.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Upper 7631.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Upper 7645.00 V -84.00 28 14.47 -69.53 -98.25 -22.4 10.4 56 -62.1

1 Upper 7659.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Upper 7673.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Upper 7687.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
4 Upper 7701.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
5 Upper 7715.00 V -83.00 28 14.47 -68.53 -97.25 -22.4 10.4 56 -62.1
1 Lower 7135.00 H -90.00 28 14.47 -75.53 -104.25 -22.4 10.4 56 -62.1
2 Lower 7149.00 H -90.00 28 14.47 -75.53 -104.25 -22.4 10.4 56 -62.1
3 Lower 7163.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Lower 7177.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Lower 7191.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1

1 Lower 7205.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Lower 7219.00 H -87.00 28 14.47 -72.53 -101.25 -22.4 10.4 56 -62.1
3 Lower 7233.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
4 Lower 7247.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
5 Lower 7261.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1

1 Lower 7428.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1


2 Lower 7442.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Lower 7456.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
4 Lower 7470.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
5 Lower 7484.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1

1 Lower 7498.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Lower 7512.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Lower 7526.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
4 Lower 7540.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
5 Lower 7554.00 H -86.00 28 14.47 -71.53 -100.25 -22.4 10.4 56 -62.1

1 Upper 7296.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1


2 Upper 7310.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
3 Upper 7324.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Upper 7338.00 H -87.00 28 14.47 -72.53 -101.25 -22.4 10.4 56 -62.1
5 Upper 7352.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1

1 Upper 7366.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1


2 Upper 7380.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
3 Upper 7394.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
4 Upper 7408.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Upper 7422.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1

1 Upper 7589.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1


2 Upper 7603.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
3 Upper 7617.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Upper 7631.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Upper 7645.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1

1 Upper 7659.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1


2 Upper 7673.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Upper 7687.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Upper 7701.00 H -85.00 28 14.47 -70.53 -99.25 -22.4 10.4 56 -62.1
5 Upper 7715.00 H -69.00 28 14.47 -54.53 -83.25 -22.4 10.4 56 -62.1
D-U Result

42.15 Clear
42.15 Clear
41.15 Clear
41.15 Clear
41.15 Clear

40.15 Clear
#VALUE! #VALUE!
27.15 Potential Interference
40.15 Clear
40.15 Clear

41.15 Clear
41.15 Clear
41.15 Clear
40.15 Clear
26.15 Potential Interference

40.15 Clear
40.15 Clear
39.15 Potential Interference
39.15 Potential Interference
39.15 Potential Interference

41.15 Clear
41.15 Clear
41.15 Clear
32.15 Potential Interference
41.15 Clear

40.75 Clear
41.15 Clear
39.15 Potential Interference
41.15 Clear
41.15 Clear

40.15 Clear
40.15 Clear
41.15 Clear
41.15 Clear
36.15 Potential Interference

40.15 Clear
40.15 Clear
40.15 Clear
40.15 Clear
35.15 Potential Interference
42.15 Clear
42.15 Clear
41.15 Clear
41.15 Clear
40.15 Clear

40.15 Clear
39.15 Potential Interference
40.15 Clear
40.15 Clear
40.15 Clear

41.15 Clear
40.15 Clear
40.15 Clear
40.15 Clear
40.15 Clear

40.15 Clear
40.15 Clear
40.15 Clear
40.15 Clear
38.15 Potential Interference

41.15 Clear
41.15 Clear
41.15 Clear
39.15 Potential Interference
41.15 Clear

41.15 Clear
41.15 Clear
40.15 Clear
41.15 Clear
41.15 Clear

41.15 Clear
41.15 Clear
41.15 Clear
41.15 Clear
41.15 Clear

41.15 Clear
40.15 Clear
41.15 Clear
37.15 Potential Interference
21.15 Potential Interference
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Transmission Frequency Scan Capture - Near End (Vertical Polarity)

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

N/A

Comment: Comment:

Comment: Comment:

N/A

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

N/A

Comment: Comment:

N/A

Comment: Comment:

N/A

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

N/A

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

N/A

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Transmission Frequency Scan Capture - Near End (Horizontal Polarity)

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

N/A

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
Spectrum Undesired in
Freq WG Loss Ant Gain Desired in
CH No Polarisasi A Bw 10LogBw Reading Front Antenna RX Cal
(MHz) (dB) (dB) front (D) dB
(dB) ( U) dB

Far End to Near End


1 Lower 7135.00 V -90.00 28 14.47 -75.53 -104.25 -22.4 10.4 56 -62.1
2 Lower 7149.00 V -90.00 28 14.47 -75.53 -104.25 -22.4 10.4 56 -62.1
3 Lower 7163.00 V -90.00 28 14.47 -75.53 -104.25 -22.4 10.4 56 -62.1
4 Lower 7177.00 V -85.00 28 14.47 -70.53 -99.25 -22.4 10.4 56 -62.1
5 Lower 7191.00 V -87.00 28 14.47 -72.53 -101.25 -22.4 10.4 56 -62.1

1 Lower 7205.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Lower 7219.00 V -85.00 28 14.47 -70.53 -99.25 -22.4 10.4 56 -62.1
3 Lower 7233.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
4 Lower 7247.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
5 Lower 7261.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1

1 Lower 7428.00 V -85.00 28 14.47 -70.53 -99.25 -22.4 10.4 56 -62.1


2 Lower 7442.00 V -84.00 28 14.47 -69.53 -98.25 -22.4 10.4 56 -62.1
3 Lower 7456.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
4 Lower 7470.00 V -70.00 28 14.47 -55.53 -84.25 -22.4 10.4 56 -62.1
5 Lower 7484.00 V -70.00 28 14.47 -55.53 -84.25 -22.4 10.4 56 -62.1

1 Lower 7498.00 V -80.00 28 14.47 -65.53 -94.25 -22.4 10.4 56 -62.1


2 Lower 7512.00 V -80.00 28 14.47 -65.53 -94.25 -22.4 10.4 56 -62.1
3 Lower 7526.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
4 Lower 7540.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
5 Lower 7554.00 V -80.00 28 14.47 -65.53 -94.25 -22.4 10.4 56 -62.1

1 Upper 7296.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Upper 7310.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Upper 7324.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
4 Upper 7338.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Upper 7352.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1

1 Upper 7366.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Upper 7380.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Upper 7394.00 V -84.00 28 14.47 -69.53 -98.25 -22.4 10.4 56 -62.1
4 Upper 7408.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Upper 7422.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1

1 Upper 7589.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Upper 7603.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Upper 7617.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Upper 7631.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Upper 7645.00 V -86.00 28 14.47 -71.53 -100.25 -22.4 10.4 56 -62.1

1 Upper 7659.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Upper 7673.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
3 Upper 7687.00 V -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Upper 7701.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
5 Upper 7715.00 V -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
1 Lower 7135.00 H -90.00 28 14.47 -75.53 -104.25 -22.4 10.4 56 -62.1
2 Lower 7149.00 H -90.00 28 14.47 -75.53 -104.25 -22.4 10.4 56 -62.1
3 Lower 7163.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Lower 7177.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Lower 7191.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1

1 Lower 7205.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1


2 Lower 7219.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Lower 7233.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
4 Lower 7247.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
5 Lower 7261.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1

1 Lower 7428.00 H -85.00 28 14.47 -70.53 -99.25 -22.4 10.4 56 -62.1


2 Lower 7442.00 H -79.00 28 14.47 -64.53 -93.25 -22.4 10.4 56 -62.1
3 Lower 7456.00 H -85.00 28 14.47 -70.53 -99.25 -22.4 10.4 56 -62.1
4 Lower 7470.00 H -85.00 28 14.47 -70.53 -99.25 -22.4 10.4 56 -62.1
5 Lower 7484.00 H -87.00 28 14.47 -72.53 -101.25 -22.4 10.4 56 -62.1

1 Lower 7498.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Lower 7512.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Lower 7526.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
4 Lower 7540.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
5 Lower 7554.00 H -77.00 28 14.47 -62.53 -91.25 -22.4 10.4 56 -62.1

1 Upper 7296.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Upper 7310.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
3 Upper 7324.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Upper 7338.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Upper 7352.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1

1 Upper 7366.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1


2 Upper 7380.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
3 Upper 7394.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Upper 7408.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Upper 7422.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1

1 Upper 7589.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1


2 Upper 7603.00 H -88.00 28 14.47 -73.53 -102.25 -22.4 10.4 56 -62.1
3 Upper 7617.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Upper 7631.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Upper 7645.00 H -87.00 28 14.47 -72.53 -101.25 -22.4 10.4 56 -62.1

1 Upper 7659.00 H -87.00 28 14.47 -72.53 -101.25 -22.4 10.4 56 -62.1


2 Upper 7673.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
3 Upper 7687.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
4 Upper 7701.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
5 Upper 7715.00 H -89.00 28 14.47 -74.53 -103.25 -22.4 10.4 56 -62.1
D-U Result

42.15 Clear
42.15 Clear
42.15 Clear
37.15 Potential Interference
39.15 Potential Interference

40.15 Clear
37.15 Potential Interference
40.15 Clear
40.15 Clear
40.15 Clear

37.15 Potential Interference


36.15 Potential Interference
40.15 Clear
22.15 Potential Interference
22.15 Potential Interference

32.15 Potential Interference


32.15 Potential Interference
40.15 Clear
40.15 Clear
32.15 Potential Interference

40.15 Clear
40.15 Clear
40.15 Clear
41.15 Clear
41.15 Clear

40.15 Clear
40.15 Clear
36.15 Potential Interference
41.15 Clear
41.15 Clear

40.15 Clear
40.15 Clear
41.15 Clear
41.15 Clear
38.15 Potential Interference

40.15 Clear
41.15 Clear
41.15 Clear
40.15 Clear
40.15 Clear
42.15 Clear
42.15 Clear
41.15 Clear
41.15 Clear
41.15 Clear

41.15 Clear
40.15 Clear
40.15 Clear
40.15 Clear
40.15 Clear

37.15 Potential Interference


31.15 Potential Interference
37.15 Potential Interference
37.15 Potential Interference
39.15 Potential Interference

40.15 Clear
40.15 Clear
40.15 Clear
40.15 Clear
29.15 Potential Interference

40.15 Clear
41.15 Clear
41.15 Clear
41.15 Clear
41.15 Clear

41.15 Clear
41.15 Clear
41.15 Clear
41.15 Clear
40.15 Clear

40.15 Clear
40.15 Clear
41.15 Clear
41.15 Clear
39.15 Potential Interference

39.15 Potential Interference


41.15 Clear
41.15 Clear
41.15 Clear
41.15 Clear
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Transmission Frequency Scan Capture - Far End (Vertical Polarity)

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

N/A

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Transmission Frequency Scan Capture - Far End (Horizontal Polarity)

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

N/A

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Comment: Comment:

Comment: Comment:

Comment: Comment:

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report Template Rev. No. : #REF! Issued : #REF!

Photo
Checklist of Photos Taken Taken
(Y/N) Remarks
Site
Site access (including access gate, access road, street name, nearest cross-street,
1 bottom and top of stairs for rooftops, top and bottom of any other access ladders or
paths for rooftops)

2 fence and gate


3 Site identity / information
4 Site Log books
5 Site Emergency Information
6 Site First Aid Kit
Tower/Monopole/Structure Overview ( Picture of all object installed on
7 tower/monopole with leg info)
Tower/Monopole Load Information (Picture of plate which indicate maximum towers
8 capacity)
Rooftop Pole Overview (Picture of all object installed on the pole including bracing,
9 concrete foundation and non-penetrating mount)
10 view to antenna placement
11 Vertical tray
12 Horizontal tray
13 View to site (clean and tidy)
13 Equipment Location Overview
14 Main Grounding Bar Existing
15 New Grounding Bar
AC Distribution System
16 view to ACPDB box (door close)
17 view to ACPDB (door open)
18 grounding door of ACPDB box
19 cable entry glands of ACPDB box
20 view to wiring diagram
21 view to MCBs and labels
22 grounding bar of ACPDB box
Service Cabinet
23 Existing Shelter(s), Service Cabinet(s), Equipment Room(s)
24 overview the service cabinet (door closed)
25 overview the service cabinet (door OPEN)
26 View of the anchor bolts.
27 view to modules inside service cabinet
28 view to the rectifier
29 Battery System
29 Air Conditioning System
30 All fans in shelter, equipment room, service cabinet
31 view to the cable entry glands left hand side
32 view to the cable entry glands right hand side
33 view to the excess hybrid cable coiled inside cabinet
33 Equipment Power Distribution System
34 view to the MCBs and label
35 view to DDF (Alarms) and label
36 View to BTS and TRS DDF
37 view to the grounding connection inside the cabinet
38 Grounding bar on the cabinet plinth
39 View the grounding connection (GI wire) to the from cabinet to main busbar
Feeder and/or Hybrid Cables
40 overview the feeder and/or hybrid cables on horizontal tray

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report Template Rev. No. : #REF! Issued : #REF!
41 overview feeder and/or hybrid cables on vertical tray
42 rout of feeder and/or hybrid cables up/down structure (every few m)
42 view the entry point of feeder and/or hybrid cables to the service cabinet
43 view to feeder and/or hybrid cables clamp on the cable tray
SECTOR I (Per existing System)
44 View of Antenna alignment with RRUs. (Sector I)
45 overview the RRUs (Sector I)
46 view to junction box (Sector I)
47 Hybrid cable route from tower to the junction box
48 view to hybrid cable connection inside junction box (sector I)
49 Hybrid cable grounded (sector I)
50 sector I antenna verticality (closed up the measurement using angle meter)
51 closed up the electrical tilt (sector I)
52 waterproofing of the connectors (sector I)
53 jumper cable connections (sector I)
54 view to the RRU's bracket (sector I)
55 RRU's grounding (sector I)
56 Junction box grounding (Sector I)
57 RF colour coding (Sector I)
58 RF Jumper supports (Sector I)
59 Grounding Bar sector 1 (Sector I)
60 Grounding Bar on Tower (Sector I)
SECTOR II (Per existing System)
61 View of Antenna alignment with RRUs. (Sector II)
62 overview the RRUs (Sector II)
63 view to junction box (Sector II)
64 Hybrid cable route from tower to the junction box
64 view to hybrid cable connection inside junction box (sector II)
65 Hybrid cable grounded (sector II)
66 sector II antenna verticality (closed up the measurement using angle meter)
67 closed up the electrical tilt (sector II)
68 waterproofing of the connectors (sector II)
69 jumper cable connections (sector II)
70 view to the RRU's bracket (sector II)
71 RRU's grounding (sector II)
72 Junction box grounding (Sector II)
73 RF colour coding (Sector II)
74 RF Jumper supports (Sector II)
75 Grounding Bar sector 1 (Sector II)
76 Grounding Bar on Tower (Sector II)

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report Template Rev. No. : #REF! Issued : #REF!
SECTOR III (Per existing System)
77 View of Antenna alignment with RRUs. (Sector III)
78 overview the RRUs (Sector III)
79 view to junction box (Sector III)
80 Hybrid cable route from tower to the junction box
80 view to hybrid cable connection inside junction box (sector III)
81 Hybrid cable grounded (sector III)
82 sector III antenna verticality (closed up the measurement using angle meter)
83 closed up the electrical tilt (sector III)
84 waterproofing of the connectors (sector III)
85 jumper cable connections (sector III)
86 view to the RRU's bracket (sector III)
87 RRU's grounding (sector III)
88 Junction box grounding (Sector III)
89 RF colour coding (Sector III)
90 RF Jumper supports (Sector III)
91 Grounding Bar sector 1 (Sector III)
92 Grounding Bar on Tower (Sector III)
Panoramic
93 Panoramic views from 0o to 360o direction at 30o interval.

94 Sector views for existing antennas under survey (Main Beam, ± 30o of Main Beam)

Microwave Radio Transmission (existing)


95 view of Antenna
Horizontal view in the direction of the Antenna, using digital compass for alignment of
96 Angle
30o downtilt view in the direction of the Antenna, using digital compass for alignment of
97 Angle
60o downtilt view in the direction of the Antenna, using digital compass for alignment of
98 Angle
96 Close-up of any potential partial or full obstructions to the Microwave Radio path

97 view of the ODU


98 Coaxial cable on vertical tray
99 coaxial cable on horizontal tray
99 ODU Grounding connection
100 Grounding Kit of coaxial cable
Dismantling: Equipment & its cable route Photos
101 All Equipment to be dismantled (separate photos of each item)
All feeder and jumper cables and their connections, route (for each item of feeder and
102 jumber cable to be dismantled)
Dismantle equipment power cable connections and route (for each item of equipment
103 to be dismantled)
104 Grounding cable connections and route (Master, Slave)
105 All outdoor cabinets, front, side, general location views
Dismantling: Equipment & its cable route Photos
105 RF Antenna to be dismantled (for each antenna to be dismantled)

106 Boom, mounting, brackets to be dismantled for each Antenna to be dismantled

107 Example Photo comments - 2G Antenna


2G Antenna Kathrine(K 739 490) Single Band,
2ports, 3units

108 Example Photo comments - Feeder andrews 1/2 inch jumper 10 m, 30m(10m X 3 sec)

109 Example Photo comments - Feeder andrews 7/8 inch feeder 30 m, 90m(30m X 3 sec)
110 Example Photo comments - RAN Main Units Unit 1
111 Example Photo comments - RAN Main Units Unit 2

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report Template Rev. No. : #REF! Issued : #REF!

Power cables from Equipment to Rectifier


112 Example Photo comments - Power Cables
- Master Cab 10m (Red, Black) = 20m

113 Example Photo comments - Power Cables


Power cables from Equipment to Rectifier
- Slave/ Extension 14m (Red, Black) = 28m

Grounding Cable:
114 Example Photo comments - Grounding Cable
- Master 15m

115 Example Photo comments - Grounding Cable


Grounding Cable:
- Slave 12m

Remarks :

455569170.xlsx
MATERIAL ITEM MATERIAL CODE
AC POWER CABLE
3 PHASE 63A BREAKER
4 CORE 3 PHASE AC POWER CABLE (3*25mm2+1*16mm2)
1 PHASE ??A BREAKER
1 PHASE AC POWER CABLE
DC POWER RACK
DC breaker 80A
W301(1-BAY)
W301(2-BAY)
S301
GND CABLE (RACK GROUNDING CABLE) (16mm2)
BATTERY
SHOTO 6-FMX-150B
BBU BASIC INFORMATION
BBU B8200 QTY
INDOOR WALL-MOUNT FRAME
INDOOR 19" RACK
DCPD4 QTY
DC Power Cable of DC PD4(RED 25mm2)
DC Power Cable of DC PD4(Black/Blue 25mm2)
NEW RACK GND CABLE (GROUNDING CABLE) (16mm2)
BBU CABLE
2m BBU POWER CABLE
5m BBU POWER CABLE
10m BBU POWER CABLE
15m BBU POWER CABLE
BBU E1 CABLE
BBU UTP-5 CABLE
RRU
RRU Brackets From ZTE
1 RRU to wall
1 RRU to pole or boom
2 RRU combined
3 RRU combined
4 RRU combined
4 RRU STEEL FRAME (INDOOR)
R8840 BASIC INFORMATION
RRU 8840 QTY
OLPU DC LENGTH

2 CORE SHIELDED POWER CABLE (4mm2) 0<LENGTH<=110M

2 CORE SHIELDED POWER CABLE (6mm2) 110<LENGTH<=170M


2 CORE SHIELDED POWER CABLE (10mm2) 170<LENGTH<=290M
2 CORE SHIELDED POWER CABLE (16mm2) 290<LENGTH
OUTDOOR GROUNDING BAR
R8860 BASIC INFORMATION
RRU 8860 QTY
OUTDOOR LPB DC LENGTH
2 CORE SHIELDED POWER CABLE (4mm2) 0<LENGTH<=90M
2 CORE SHIELDED POWER CABLE (6mm2) 90<LENGTH<=140M
2 CORE SHIELDED POWER CABLE (10mm2) 140<LENGTH<=240M
2 CORE SHIELDED POWER CABLE (16mm2) 240<LENGTH
OUTDOOR GROUNDING BAR
R8882 BASIC INFORMATION

455569170.xlsx 第 98 页
RRU 8882 QTY
OUTDOOR LPB DC LENGTH
2 CORE SHIELDED POWER CABLE (4mm2) 0<LENGTH<=60M
2 CORE SHIELDED POWER CABLE (6mm2) 60<LENGTH<=100M
2 CORE SHIELDED POWER CABLE (10mm2) 100<LENGTH<=170M
2 CORE SHIELDED POWER CABLE (16mm2) 170<LENGTH<=250
OUTDOOR GROUNDING BAR
FIBRE
OUTDOOR FIBER(2m)
OUTDOOR FIBER(3m)
OUTDOOR FIBER(5m)
OUTDOOR FIBER(10m)
OUTDOOR FIBER(20m)
OUTDOOR FIBER(25m)
OUTDOOR FIBER(30m)
OUTDOOR FIBER(35m)
OUTDOOR FIBER(40m)
OUTDOOR FIBER(45m)
OUTDOOR FIBER(50m)
OUTDOOR FIBER(60m)
OUTDOOR FIBER(70m)
OUTDOOR FIBER(80m)
OUTDOOR FIBER(90m)
OUTDOOR FIBER(100m)
OUTDOOR FIBER(115m)
OUTDOOR FIBER(145m)
OUTDOOR FIBER(160m)
OUTDOOR FIBER(175m)
OUTDOOR FIBER(190m)
OUTDOOR FIBER(205m)
OUTDOOR FIBER(220m)
OUTDOOR FIBER(235m)
OUTDOOR FIBER(250m)
OUTDOOR FIBER(280m)
OUTDOOR FIBER(310m)
OUTDOOR FIBER(350m)
JUMPER/FEEDER/ADAPTER
1/2" JUMPER,DIN-DIN,2m
1/2" JUMPER,DIN-DIN,3m
1/2" JUMPER,DIN-DIN,5m
1/2" JUMPER,N-DIN,2m
1/2" JUMPER,N-DIN,3m
1/2" JUMPER,N-DIN,5m
1/2" JUMPER,N-N,2m
1/2" JUMPER,N-N,3m
1/2" JUMPER,N-N,5m
1/2" JUMPER
7/8" FEEDER
5/4" FEEDER
D Connector
N Connector
AISG CABLES
AISG CABLE(3M)
AISG CABLE(5M)
AISG CABLE(10M)
AISG CABLE(15M)
AISG CABLE(20M)

455569170.xlsx 第 99 页
AISG CABLE LIGHTING ARRESTOR(More than 10 Meter)
ASBT
NSBT
ANTENNA
FOR OUTDOOR
APXVE26-C-A20(900M,2600H x 270W x 136D)
APXV18-206516H-C-A20(1710-2200M,1391H x 175W x 110D)
APXVRR13-C-A20(1710-2200M,1391H x 350W x 110D)
APXV9R20B-C-A20(790M-2200M,2183H x 300W x 161D)

APX13GV-15DWV-15DWVBR-C-A20(870M-2170M,2120H x 270W x 145D)

FOR INDOOR
INDOOR 3-BAND ANTENNA
RF COMPONENTS
P & U Combiner for outdoor(double unit)
G & P/U Combiner for indoor
P & U Combiner for indoor(single unit)
G & P & U Combiner for indoor
TMA
TMA for 3G(Feeder length>50M)
LOCAL PURCHASE
RRU MOUNTING BRACKET
RRU INSTALLATION TYPE - 1m Post on ballast block
RRU INSTALLATION TYPE - 1m Post with Headframe
RRU INSTALLATION TYPE - 2m Post on ground
RRU INSTALLATION TYPE - L-Bracket (floor mounted pole)
RRU INSTALLATION TYPE - L-Bracket(wall mounted pole)
RRU INSTALLATION TYPE - L-Bracket(wall mounted)
RRU INSTALLATION TYPE - U-Bracket Floor Mount Pole
RRU INSTALLATION TYPE - U-Bracket Ring
RRU INSTALLATION TYPE - U-Bracket Tower
RRU INSTALLATION TYPE - U-Bracket Wall Mount Pole
RRU INSTALLATION TYPE - H-Bracket (Tower working platform)
RRU INSTALLATION TYPE - H-Bracket(floor mounted pole)
RRU INSTALLATION TYPE - H-Bracket(wall mounted pole)
RRU INSTALLATION TYPE - H-Bracket(wall mounted)
RRU INSTALLATION TYPE - Tension Band
ANTENNA MOUNTING BRACKET
Antenna BOOM(3m)
Equipment Foundation
Adapter for base frame
Adapter for I-Beam
New base frame
New Cable Tray
200mm Width Cable Tray(Indoor)
300mm Width Cable Tray(Indoor)
400mm Width Cable Tray(Indoor)
200mm Width Cable Tray(outdoor)
300mm Width Cable Tray(outdoor)
400mm Width Cable Tray(outdoor)

455569170.xlsx 第 100 页
Description QTY
#REF! #REF!
Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
#REF!

Err:504

#REF!
Err:504
Err:504
#REF!
#REF!
#REF!
#REF!

2 Err:504
5 Err:504
10 Err:504
15 Err:504
#REF!
2 #REF!

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

#REF!

4 Err:504

6 Err:504
10 Err:504
16 Err:504
Err:504

Err:504

4 Err:504
6 Err:504
10 Err:504
16 Err:504
Err:504

455569170.xlsx 第 101 页
Err:504

4 Err:504
6 Err:504
10 Err:504
16 Err:504
Err:504

2m Err:504
3m Err:504
5m Err:504
10m Err:504
20m Err:504
25m Err:504
30m Err:504
35m Err:504
40m Err:504
45m Err:504
50m Err:504
60m Err:504
70m Err:504
80m Err:504
90m Err:504
100m Err:504
115m Err:504
145m Err:504
160m Err:504
175m Err:504
190m Err:504
205m Err:504
220m Err:504
235m Err:504
250m Err:504
280m Err:504
310m Err:504
350m Err:504

SCF D-D 1/2" Err:504


SCF D-D 1/2" Err:504
SCF D-D 1/2" Err:504
SCF N-D 1/2" Err:504
SCF N-D 1/2" Err:504
SCF N-D 1/2" Err:504
SCF N-N 1/2" Err:504
SCF N-N 1/2" Err:504
SCF N-N 1/2" Err:504
Err:504
LCF 7/8" Err:504
LCF 5/4" Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504

455569170.xlsx 第 102 页
Err:504
Err:504
Err:504

APXVE26-C-A20 Err:504
APXV18-206516H-C-A20 Err:504
APXVRR13-C-A20 Err:504
APXV9R20B-C-A20 Err:504
APX13GV-15DWV-15DWVBR-
C-A20 Err:504

3-Band Indoor Antenna Err:504

P & U Combiner Err:504


G & P/U Combiner Err:504
P & U Combiner Err:504
G & P & U Combiner Err:504

Err:504

1m Post on ballast block Err:504


1m Post with Headframe Err:504
2m Post on ground Err:504
L-Bracket (floor mounted pole) Err:504
L-Bracket(wall mounted pole) Err:504
L-Bracket(wall mounted) Err:504
U-Bracket Floor Mount Pole Err:504
U-Bracket Ring Err:504
U-Bracket Tower Err:504
U-Bracket Wall Mount Pole Err:504
H-Bracket (Tower working platform) Err:504
H-Bracket(floor mounted pole) Err:504
H-Bracket(wall mounted pole) Err:504
H-Bracket(wall mounted) Err:504
Tension Band Err:504

Err:504

Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

455569170.xlsx 第 103 页
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

3. Site Photo
3.1 Site Overview Photo

Access Road Existing Equipment

Existing DDF Existing AC Power System

Existing AC PDB Existing Rectifer

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

N/A

Existing Battery System Exisiting Generator System

Existing Transmission Equipment Existing Cable Ladder

N/A

Existing Feeder Inlet Exisiting Antenna (RF&MW) position on Tower/Pole

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

N/A

Existing Grounding Bar Existing Shelter

N/A

Existing Sunshade (Outdoor) Exisiting Foundation Outdoor

N/A

Existing Site Boundary Wall Existing Site Gate

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

3.2 Environment Photo (Panoramic View)

EN 0° EN 30°

EN 60° EN 90°

EN 120° EN 150°

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

EN 180° EN 210°

EN 240° EN 270°

EN 300° EN 330°

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

3.3 New Equipment Proposal

N/A

Proposed New Equipment Reused Existing DDF

Reused Existing AC Power System Reused Existing Rectifier System

Reused Existing Transmission Equipment Reused Existing Battery

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Proposed New RRU Location Reused Existing Antenna

N/A

Reused Existing Grounding Bar Proposed MW Antenna Position and Direction to far end

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

3.4 Existing Antenna & Pole photo

Antenna 1(XXX°) remote view Antenna 1 close-up view

Antenna 2(XXX°) remote view Antenna 2 close-up view

Antenna 3 (XXX°) remote view Antenna 3 colse-up view

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

Ant mounting brackets Ant mounting brackets

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

3.5 Antenna Pole Proposal

N/A N/A

Reuse Existing Pole 01 Reuse Existing Pole 02

N/A N/A

Reuse Existing Pole 03 Reuse Existing Pole 04

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

3.6 Existing RF Components Photo

N/A N/A

RF Components for Sector 1 RF Components for Sector 2

N/A

RF Components for Sector 2

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

4.0 Dismantling: Equipment & its cable route Photos

N/A N/A

Equipment to be dismantled Equipment to be dismantled

N/A

Dismantle equipment power cable route Dismantle equipment grounding cable route

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report
Template Rev. No. : #REF! Issued : #REF!

4.1 Dismantling: RF Antenna, Boom, Mounting, Brackets & Feeder Route Photos

N/A N/A

RF Antenna to be dismantled RF antenna, boom, mounting, brackets to be dismantled

RF ant feeder & other cables routing to be dismantled RF ant feeder & other cables routing to be dismantled

455569170.xlsx
Document Number : _RAN_TSSR_1900_1_0
RAN Modernisation Project Doc. Rev. No. : v01.0 Issued : 30 December 1899
Template Number : ICSD140004
Technical Site Survey Report Template Rev. No. : v01.0 Issued : 30 December 1899

Photo
Checklist of Photos Taken Taken
(Y/N) Remarks
Site
Site access (including access gate, access road, street name, nearest cross-street,
bottom and top of stairs for rooftops, top and bottom of any other access ladders or
1 paths for rooftops)
( Foto Akses Menuju gerbang site dan jalan raya Utama )

fence and gate


2 ( pagar dan gerbang)

Site identity / information


3 ( Identitas situs / informasi )

Site Log books


4 ( Buku Tamu site )

Site Emergency Information


5 ( Situs Informasi Keadaan Darurat )

Site First Aid Kit


6 ( Foto P3K )

Tower/Monopole/Structure Overview ( Picture of all object installed on


7 tower/monopole with leg info)
( Foto Tower secara Utuh agar terlihat antenna yang ter Install )

Tower/Monopole Load Information (Picture of plate which indicate maximum towers


8 capacity)
( Foto Papan Keterangan Tower )

Rooftop Pole Overview (Picture of all object installed on the pole including bracing,
9 concrete foundation and non-penetrating mount)

view to antenna placement


10 ( foto pandangan untuk penempatan antena )

Vertical tray
11 ( Foto Tray Vertikal )

Horizontal tray
12 ( Foto Tray Horizontal )

View to site (clean and tidy)


13 ( foto site dari gerbang ke arah dalam site )

Equipment Location Overview


13 ( Foto Penempatan RBS Existing )

Main Grounding Bar Existing


14 ( foto Gerouding Bak Kontrol )

15 New Grounding Bar

AC Distribution System

view to ACPDB box (door close)


16 ( Foto Box ACPDB Tertutup )

view to ACPDB (door open)


17 ( Foto Box ACPDB Terbuka )

grounding door of ACPDB box


18 ( Foto Grounding Pintu ACPDB )

cable entry glands of ACPDB box


19 ( Foto kabel masuk ke Box ACPDB dari atas dan bawahnya )

view to wiring diagram


20 ( foto gambar jaringan ACPDB )

455569170.xlsx
Document Number : _RAN_TSSR_1900_1_0
RAN Modernisation Project Doc. Rev. No. : v01.0 Issued : 30 December 1899
Template Number : ICSD140004
Technical Site Survey Report Template Rev. No. : v01.0 Issued : 30 December 1899

view to MCBs and labels


21 ( Foto MCB dan label pada ACPDB )

grounding bar of ACPDB box


22 ( Foto Grounding Bar Sisi Kanan Dan Kiri ACPDB )

Service Cabinet
( Foto Kabinet RBS )

Existing Shelter(s), Service Cabinet(s), Equipment Room(s)


23 ( Foto Aktual Site di dalam Shelter dan di Luar Untuk Perangkat )

overview the service cabinet (door closed)


24 ( Foto Kabinet Tertutup )

overview the service cabinet (door OPEN)


25 ( Foto Kabinet Terbuka )

View of the anchor bolts.


26 ( Foto Mur/baut pada Perangkat 4 baut )

view to modules inside service cabinet


27 ( Foto Perangkat Per Bagian 2G / 3G )

view to the rectifier


28 ( Foto Rectifier Yang Ada Disite )

Battery System
29 ( Foto Battery Per Bank )

Air Conditioning System


29 ( Foto AC Terpasang)

All fans in shelter, equipment room, service cabinet


30 ( Foto Kipas Untuk yang ada di Kabinet 2G/3G)

view to the cable entry glands left hand side


31 ( Foto Jalur Kabel sebelah Kiri)

view to the cable entry glands right hand side


32 ( Foto Jalur Kabel sebelah Kanan )

view to the excess hybrid cable coiled inside cabinet


33 ( Foto Sisa Optik Pada Kabinet yang ada )

Equipment Power Distribution System


33 ( Foto Kabinet Power ACPDB dan Rectifier )

view to the MCBs and label


34 ( Foto MCB yang terdapat di Rectifier atau BBS di urut dari Kiri ke Kanan )

view to DDF (Alarms) and label


35 ( foto Semua DDF yang ada di site )

36 View to BTS and TRS DDF

455569170.xlsx
Document Number : _RAN_TSSR_1900_1_0
RAN Modernisation Project Doc. Rev. No. : v01.0 Issued : 30 December 1899
Template Number : ICSD140004
Technical Site Survey Report Template Rev. No. : v01.0 Issued : 30 December 1899

view to the grounding connection inside the cabinet


37 ( Foto Grounding yang ada di Kabinet )

Grounding bar on the cabinet plinth


38 ( Foto Grounding Bar yang ada di kabinet )

View the grounding connection (GI wire) to the from cabinet to main busbar
39 ( Foto Grounding dari Kabiner Ke Bus Bar )

Feeder and/or Hybrid Cables


( Foto Feeder / Hybrid yang ada di site )

overview the feeder and/or hybrid cables on horizontal tray


40 ( Foto Feeder / Hybrid di Tray Horizontal )

overview feeder and/or hybrid cables on vertical tray


41 ( Foto Feeder / Hybrid di Tray Horizontal )

rout of feeder and/or hybrid cables up/down structure (every few m)


42 ( Foto jalur Clamp Feeder / Optic agar bisa terlihat Minim 5 Clamp dari bawah ke atas
dan sebaliknya )

view the entry point of feeder and/or hybrid cables to the service cabinet
42 ( Foto jalur masuk Kabel INLET All yang ada di Shelter/cabinet untuk Outdoor )

view to feeder and/or hybrid cables clamp on the cable tray


43 ( Foto jalur Clamp Feeder / Optic agar bisa terlihat Minim 5 Clamp dari bawah ke atas
dan sebaliknya )

SECTOR I (Per existing System)

View of Antenna alignment with RRUs. (Sector II)


44 ( Foto Bearing Antenna sector 1 di Ambil kompas di atas atenna)

overview the RRUs (Sector II)


45 ( Foto Keseluruhan Antenna tampak terlihat Utuh )

view to junction box (Sector II)


46 ( Foto Junction Box terbuka dan tertutup )

Hybrid cable route from tower to the junction box


47 ( foto jalur optic dari kaki tower sampai ke Box )

view to hybrid cable connection inside junction box (sector II)


48 ( Foto Junction Box terbuka area konekan Optic )

455569170.xlsx
Document Number : _RAN_TSSR_1900_1_0
RAN Modernisation Project Doc. Rev. No. : v01.0 Issued : 30 December 1899
Template Number : ICSD140004
Technical Site Survey Report Template Rev. No. : v01.0 Issued : 30 December 1899

Hybrid cable grounded (sector II)


49 ( Foto grounding untuk Optik pada Junction Box )

sector I antenna verticality (closed up the measurement using angle meter)


50 ( Foto Menggunakan angle meter Tilt Antenna )

closed up the electrical tilt (sector II)


51 ( Foto dari Dekat dan Jelas Untuk Electrikal Tilt )

waterproofing of the connectors (sector II)


52 ( Foto waterproofing Konekan All Sector Satu )

jumper cable connections (sector II)


53 ( Foto Jumper yang mengarah ke Antenna yang terinstal )

view to the RRU's bracket (sector II)


54 ( Foto RRU's yang terinstal yang di atas ataupun yang di bawah )

RRU's grounding (sector II)


55 ( Foto Grounding RRU's yang terInstall )

Junction box grounding (Sector II)


56 ( Foto Grounding Junction Box )

RF colour coding (Sector II)


57 ( Foto Pewarna Tanda Pada Jumper ALL )

RF Jumper supports (Sector II)


58 ( Foto Jumper yang mengarah ke Antenna yang terinstal )

Grounding Bar sector 1 (Sector II)


59 ( Foto Bus Bar Harmonika Existing )

Grounding Bar on Tower (Sector II)


60 ( Foto Bus Bar yang terpakai untuk sector 1 )

SECTOR II (Per existing System)

View of Antenna alignment with RRUs. (Sector II)


61 ( Foto Bearing Antenna sector 1 di Ambil kompas di atas atenna)

overview the RRUs (Sector II)


62 ( Foto Keseluruhan Antenna tampak terlihat Utuh )

view to junction box (Sector II)


63 ( Foto Junction Box terbuka dan tertutup )

Hybrid cable route from tower to the junction box


64 ( foto jalur optic dari kaki tower sampai ke Box )

view to hybrid cable connection inside junction box (sector II)


64 ( Foto Junction Box terbuka area konekan Optic )

455569170.xlsx
Document Number : _RAN_TSSR_1900_1_0
RAN Modernisation Project Doc. Rev. No. : v01.0 Issued : 30 December 1899
Template Number : ICSD140004
Technical Site Survey Report Template Rev. No. : v01.0 Issued : 30 December 1899

Hybrid cable grounded (sector II)


65 ( Foto grounding untuk Optik pada Junction Box )

sector 2 antenna verticality (closed up the measurement using angle meter)


66 ( Foto Menggunakan angle meter Tilt Antenna )

closed up the electrical tilt (sector II)


67 ( Foto dari Dekat dan Jelas Untuk Electrikal Tilt )

waterproofing of the connectors (sector II)


68 ( Foto waterproofing Konekan All Sector Satu )

jumper cable connections (sector II)


69 ( Foto Jumper yang mengarah ke Antenna yang terinstal )

view to the RRU's bracket (sector II)


70 ( Foto RRU's yang terinstal yang di atas ataupun yang di bawah )

RRU's grounding (sector II)


71 ( Foto Grounding RRU's yang terInstall )

Junction box grounding (Sector II)


72 ( Foto Grounding Junction Box )

RF colour coding (Sector II)


73 ( Foto Pewarna Tanda Pada Jumper ALL )

RF Jumper supports (Sector II)


74 ( Foto Jumper yang mengarah ke Antenna yang terinstal )

Grounding Bar sector 2 (Sector II)


75 ( Foto Bus Bar Harmonika Existing )

Grounding Bar on Tower (Sector II)


76 ( Foto Bus Bar yang terpakai untuk sector 2 )

SECTOR III (Per existing System)

View of Antenna alignment with RRUs. (Sector III)


77 ( Foto Bearing Antenna sector 1 di Ambil kompas di atas atenna)

overview the RRUs (Sector III)


78 ( Foto Keseluruhan Antenna tampak terlihat Utuh )

view to junction box (Sector III)


79 ( Foto Junction Box terbuka dan tertutup )

Hybrid cable route from tower to the junction box


80 ( foto jalur optic dari kaki tower sampai ke Box )

view to hybrid cable connection inside junction box (sector III)


80 ( Foto Junction Box terbuka area konekan Optic )

Hybrid cable grounded (sector III)


81 ( Foto grounding untuk Optik pada Junction Box )

sector 3 antenna verticality (closed up the measurement using angle meter)


82 ( Foto Menggunakan angle meter Tilt Antenna )

455569170.xlsx
Document Number : _RAN_TSSR_1900_1_0
RAN Modernisation Project Doc. Rev. No. : v01.0 Issued : 30 December 1899
Template Number : ICSD140004
Technical Site Survey Report Template Rev. No. : v01.0 Issued : 30 December 1899

closed up the electrical tilt (sector III)


83 ( Foto dari Dekat dan Jelas Untuk Electrikal Tilt )

waterproofing of the connectors (sector III)


84 ( Foto waterproofing Konekan All Sector Satu )

jumper cable connections (sector III)


85 ( Foto Jumper yang mengarah ke Antenna yang terinstal )

view to the RRU's bracket (sector III)


86 ( Foto RRU's yang terinstal yang di atas ataupun yang di bawah )

RRU's grounding (sector III)


87 ( Foto Grounding RRU's yang terInstall )

Junction box grounding (Sector III)


88 ( Foto Grounding Junction Box )

RF colour coding (Sector III)


89 ( Foto Pewarna Tanda Pada Jumper ALL )

RF Jumper supports (Sector III)


90 ( Foto Jumper yang mengarah ke Antenna yang terinstal )

Grounding Bar sector 3 (Sector III)


91 ( Foto Bus Bar Harmonika Existing )

Grounding Bar on Tower (Sector III)


92 ( Foto Bus Bar yang terpakai untuk sector 3 )

Panoramic

Panoramic views from 0o to 360o direction at 30o interval.


93 ( Foto 0, 30, 60, 90, 120, 150, 180, 210, 240, 270, 300, 330 )

94 Sector views for existing antennas under survey (Main Beam, ± 30o of Main Beam)

Microwave Radio Transmission (existing)


( foto Radio TRM ALL Dan tinggi nya mengunakan Meteran )

view of Antenna
95 ( foto Radio TRM ALL Dan tinggi nya mengunakan Meteran )

Horizontal view in the direction of the Antenna, using digital compass for alignment of
96 Angle
( Foto arah antenna mengunakan kompas tepat di atas antenna bersangkutan )

30o downtilt view in the direction of the Antenna, using digital compass for alignment of
97 Angle

60o downtilt view in the direction of the Antenna, using digital compass for alignment of
98 Angle

455569170.xlsx
Document Number : _RAN_TSSR_1900_1_0
RAN Modernisation Project Doc. Rev. No. : v01.0 Issued : 30 December 1899
Template Number : ICSD140004
Technical Site Survey Report Template Rev. No. : v01.0 Issued : 30 December 1899

Close-up of any potential partial or full obstructions to the Microwave Radio path
96 ( Foto dari atas tower bila ada Penghalang bila memasang TRM Baru )

view of the ODU


97 ( Foto Outdoor Unit )

Coaxial cable on vertical tray


98 ( foto Coax kabel di vertikal tray )

coaxial cable on horizontal tray


99 ( foto Coax kabel di Horizontal tray )

ODU Grounding connection


99 ( Foto Grounding Bus Bar di Out Door ALL )

Grounding Kit of coaxial cable


100 ( Foto Grounding di Out Door TRM Earting kit ke Bus Bar)

Dismantling: Equipment & its cable route Photos

All Equipment to be dismantled (separate photos of each item)


101 ( Foto Perangkat yang akan di Dismantle foto SN dan Barcode nya )

All feeder and jumper cables and their connections, route (for each item of feeder and
102 jumber cable to be dismantled)
( Foto Conector antara feeder dan Jumper yang akan di dismantle )

Dismantle equipment power cable connections and route (for each item of equipment
103 to be dismantled)
( Foto Jalur Kabel Power Yang akan Di Dismantle )

Grounding cable connections and route (Master, Slave)


104 ( Foto Jalur Kabel Grounding RBS master dan Slave )

All outdoor cabinets, front, side, general location views


105 ( Foto Kabinet depan, belakan, samping dan lokasinya secara Utuh )

Dismantling: Equipment & its cable route Photos


( Foto Kabinet dan kabel yang akan di dismantle )

RF Antenna to be dismantled (for each antenna to be dismantled)


105 ( Foto Antenna RBS yang akan di Dismantle )

Boom, mounting, brackets to be dismantled for each Antenna to be dismantled


106 ( Foto Boom Mounting yang akan di dismantle )

455569170.xlsx
Document Number : _RAN_TSSR_1900_1_0
RAN Modernisation Project Doc. Rev. No. : v01.0 Issued : 30 December 1899
Template Number : ICSD140004
Technical Site Survey Report Template Rev. No. : v01.0 Issued : 30 December 1899

107 Example Photo comments - 2G Antenna


2G Antenna Kathrine(K 739 490) Single Band,
2ports, 3units

108 Example Photo comments - Feeder andrews 1/2 inch jumper 10 m, 30m(10m X 3 sec)

109 Example Photo comments - Feeder andrews 7/8 inch feeder 30 m, 90m(30m X 3 sec)
110 Example Photo comments - RAN Main Units Unit 1
111 Example Photo comments - RAN Main Units Unit 2

112 Example Photo comments - Power Cables


Power cables from Equipment to Rectifier
- Master Cab 10m (Red, Black) = 20m

Power cables from Equipment to Rectifier


113 Example Photo comments - Power Cables
- Slave/ Extension 14m (Red, Black) = 28m

Grounding Cable:
114 Example Photo comments - Grounding Cable
- Master 15m

115 Example Photo comments - Grounding Cable


Grounding Cable:
- Slave 12m

Remarks :

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report Template Rev. No. : #REF! Issued : #REF!

List of Drawings
Note: • All CAD drawings must be scaled in A4 format size. They will additionally be required to be submitted in Autocad *.dwg format
• The north direction should be available in all CAD drawing with clear offset toward building and tower structures.
• The CAD drawing titles and acknowledgement blocks shall be in Indosat standard format
• All dimensions shall be in metric and confirmed on site unless noted on the drawing.
• All samples of CAD drawing provided in the next section are only for your reference.
• Any proposed solutions shouldn’t be included into the site drawing package.
• The As-build document standard for the Indosat RAN Modernisation project may be referred to for samples not shown in this document.

Site Drawings
1 Site Location Map
2 Site Layout (Ground or Rooftop)
3 Floor by floor DAS layout (for IBS)
4 Shelter/Telecom Room Layout
Antenna Mounting Structure Drawings
5 Tower Top view showing legs A-B-C-D, and sections with Antenna placements, direction / azimuth
6 Tower Height and Side view Face A-B,+ B-C and sections with Antenna placements (Face or Legs shown) [5, or 6 or 7 or 8]
7 Tower Height and Side view Face B-C + C-D and sections with Antenna placements (Face or Legs shown) [5, or 6 or 7 or 8]
8 Tower Height and Side view Face C-D + D-A and sections with Antenna placements (Face or Legs shown) [5, or 6 or 7 or 8]
9 Tower Height and Side view Face D-A + A-B and sections with Antenna placements (Face or Legs shown) [5, or 6 or 7 or 8]
10 Tower Leg Diagram (Band and Aperture)
11 Tower Leg dimensions, base and top dimensions, Xor K Bracings in standard drawing format
12 Overall Rooftop view top view including all Rooftop Poles
13 Rooftop Pole Side Views
14 Rooftop Pole Top Views
Antenna Mounting Configuration (each Sector and each Microwave dish)
15 Existing Antenna mounting configurations
16 Existing Antenna mounting appurtenances (booms, mounting brackets, cross-bracing, stays, etc.)
17 Antenna mounting configurations
18 Antenna mounting appurtenances (standard leg, face or stiffening mounting brackets, etc.)
Civil, Mechanical, Electrical
19 Existing EQUIPMENT Outdoor Plinth
20 Site Cable routes, Cable tray, etc.
21 Existing Power and other cable routes (above ground and buried) - logical drawing
22 Foundations (existing)
23 Vertical tray (s)
24 Horizontal tray(s)
25 Equipment Location Overview
26 Main Grounding Bar Existing
27 New Grounding Bar
Power Systems Drawings (logical drawing)
28 Wiring Diagram - Logical Wiring Diagram, including AC Power, DC Power, Battery backup, Genset and/or Hybrid Power System connection
29 ACPDB Layout
30 Equipment Power Distribution System
31 MCB Layout
32 Backup power system(s)
Alarms (logical drawing)
33 Alarm Cabling and Connections
34 External Alarm block
35 Any additional site security systems (CCTV, Motion Detection System, other)

455569170.xlsx
#REF! Document Number : #REF!
RAN Modernisation Project Doc. Rev. No. : #REF! Issued : #REF!
Template Number : #REF!
Technical Site Survey Report Template Rev. No. : #REF! Issued : #REF!
Equipment Shelter(s) and/or Service Cabinet(s)
36 Top view equipment layout (existing)
37 Front view equipment layout (existing)
38 Side view equipment layout (existing)
39 Top section view showing cable tray and upper cable routes (existing)
40 Other section views showing details not shown in other drawings (existing)
41 Drawing of inside of Service Cabinet (existing)
42 Rack Layout(s) for all equipment (existing)
43 view to modules inside service cabinet
44 Battery System
45 Air Conditioning System
46 All fans in shelter, equipment room, service cabinet
47 Feeder Entry Point (FEP) and cable entry gland entry points - Top View
48 Feeder Entry Point (FEP) and cable entry gland entry points - Side View
49 Grounding system layout
Feeder and/or Hybrid Cables
50 Existing Feeder / Hybrid Cable routes (top view)
51 Existing Feeder / Hybrid Cable routes (side view)

Remarks :

Controlled Document

455569170.xlsx
WIBAS OSDR
BWA 10.5 GHz
SITE DOCUMENTATION

SITE SENTRA CILEUNGSI


(BGRCLSBI01045)

Installation Date : 24-Sep-2018


Reported Date : 26-Sep-2018
BERITA ACARA LAPANGAN

Pada hari Senin sampai dengan hari Rabu atau tanggal 24 September 2018 sampai dengan 26 September 2
telah dilakukan Insatalasi Perangkat Radio Broadband Wireless Access (BWA 10.5 GHz). Adapun data dan
kelengkapan perangkat beserta konfigurasi site Base Station terdokumentasi dalam laporan “Dokumen Insta
Site” yang telah disusun berdasarkan data lapangan dan juga telah dilakukan pengecekan secara bersama
yang ditunjuk sebagai Waspang yang melakukan supervisi terhadap pelaksanaan kegiatan Instalasi Site Bas
Station ini

Adapun segala yang terkait dengan informasi Site Base Station terkait, secara lengkap tertuang dalam dokum
ini, dan apabila ada penambahan dan perubahan terhadap perangkat ataupun konfigurasi Base Station terka
akan dilakukan revisi atau perubahan data, guna peng-update-an pendataan site.

Demikian Berita Acara ini dibuat berdasarkan kebutuhuan dan data di lapangan, dan disetujui serta disepaka
secara bersama

Vendor : PT. Netwave Maju Abadi


Nama Tanda Tangan & Stampel

1. Ary Haryanto

2. Zulfi

Catatan : Tanggal :

User : PT. Aplikanusa Lintasarta


Nama Tanda Tangan & Stampel

Catatan : Tanggal :
1. CHECKLIST MATERIAL

Kode Spek Description Qty Desc. Check


WiBAS OSDR:
Full outdoor WiBAS Base Station Hub,
OSDR-10-L 1 B2WS02VU010500104
10.5GHz FDD, 2xGbE

WiBAS OSDR-HUB Radio Antenna. 10.5GHz,


HANT1090V 90° sectorized, Vertical Polarization - -

WiBAS OSDR-HUB Radio Antenna. 10.5GHz,


HANT1045H 1 B2WS02VU02070010
90° sectorized, Horizental Polarization

Power over Ethernet injector 75W + AC


POE75U 1 -
plug cable
ETH-CONN-RJ45 RJ45 Connector for Ethernet Cable 8 -
M20-GLAND Cable gland M20 for OSDR 1 -
Interconnection adaptor and coaxial cable
between 10.5 GHz OSDR and external
CAB-UBR120NF 1 -
Sectoral Panel antenna (UBR120 to N-type
female)

Data Line Protector 10/100/1000 outdoor 1 Reg No LA No Available


TW-SPPOE-TS IP68 1 Reg No LA No Available
Material Installation for WiBAS OSDR :
STP Outdoor CAT 5e - Outdoor (ODU to 50 Meter
IDU)
Grounding Ø 10mm + Skun 30 Meter
Slave Rack 1 Unit
UTP-Cat5e 6 Meter
RJ 45 Connector (Metal shielded) 8 Pcs
Power Extended Outlet ( AC ) 2 Unit
Power Cable AC 1 Meter
Rubber Tape 2 Roll
Tie-wrap 1 Pack
Label Printed 1 Set
Double-Tape 2 Roll
Arm Support - Unit

2. SITE LOCATION

2.1 Site Name : SENTRA CILEUNGSI


2.2 Address : JL.RAYA CILEUNGSI - BEKASI KM.288

2.3 Coordinate Position


Latitude -6.40321
Longitude106.99088
Elevation 52 Meter
3.     Environment

No REFERENCE RESULT Remark


1 Temperature & Humidity
a. Outdoor
33 °C to +55 °C 36 °C
Equipment
b. Indoor
5 °C to +45 °C 30 °C
Equipment

2 Electrical Environment
a. Phase - 90 to 264VAC 228 Volt
Neutral
b. Phase - 90 to 264VAC 229 Volt
GND
c. Neutral - Less than 1.5Volt 0.9 Volt
GND
September 2018,
un data dan
okumen Instalasi
ra bersama team
alasi Site Base

g dalam dokumen
e Station terkait

erta disepakati

pel

pel
Remark

POE To Switch

For POE To AC
Remark
SECTOR DOCUMENTAT
SITE HOTEL HORI
(BGRCLSBI010
1. DEVICE (HARDWARE)
1.1 Antenna

No Item Description
1 Type of Antenna SEC 45-10G-SG-H MB

2 Serial Number P180007570040

3 Reg. Number LA B2WS02VU02070010

4 Mechanical Tilt 0°

5 Antenna Direction 45 °

6 Position Ant. Height (AGL) 37 Meters

1.2  Outdoor Unit (ODU) and Indoor Unit (IDU)

No Item Description
1 Type of Radio BWA – PTmP ( Point to Multi Point )

2 Type of BS OSDR-10-L

3 Max Capacity 300 Mbps DL & 200 Mbps UL

4 Mac Address 00:05:59:8F:88:AD

5 Serial Number ODU 321805792524

6 Reg. Number ODU B2WS02VU010500104

7 Type of IDU PoE AC

8 Serial Number PoE MODEL : POE75U-1UP-R

9 Reg. Number PoE B2WS02VU010500625

1.3  Arrester (Lighting PROTECTOR)

NO ITEM DESCRIPTION
1 TYPE OF ARRESTER TW-SPPOE-TS (4xGDTx3Poles,6-13mm, RJ45 pass)

2 SERIAL NUMBER 1090917000017 ( Top ) 1090917000017 ( Down )

3 REG. NUMBER N/A N/A

3 MAX CAPACITY 1000 mbps

1.4 Cable

No Item Description
Type of Cable
1 STP TELDOR 8393204101 CAT5e (Outdoor)
(ODU to IDU)
2 Total cable Length 50 Meters
3 Type of Grounding Cable CU / PVC 16 mm 450 / 750 V ( NYA )
4 Total cable Length 30 Meters
2. BASE STATION PARAMETERS

No Item Parameter Value


1 Summary
a. System Version 6.4.0_2302_R.1.12.1.build_06
b. MAC Adress 00:05:59:8F:88:AD

2 System
a. Name (Sector ID) BGRCLSBI01045
b. Contact Altitude : 172 Mdpt, Tilt : 0°
c. Location SENTRA CILEUNGSI
d. SNMP Community Default
e. Inband Interface Address 172.31.154.2
f. Prefix Length 255.255.255.128
g. VLAN ID 603
h. VLAN Priority -
i. Default Gateway 172.31.154.3
j. Default Gateway Interface Inband Interface
k. High Availability Status Disable

3 Modem
a. Channel Bandwidth (MHz) 7
b. Modem Profile Normal

4 Radio
a. Frequency Tx (KHz) 10171500
b. Tx Power (dbm) 17
c. Mute Of

5 Gb Ethernet
a. Admin State (Gb Ethernet 2) Up
b. Speed (Mbps) 1000Mbps
c. Duplex mode full duplex
d. Auto Negotiation Mode Gb Ethernet 2) 1

6 Inventory
a. System Type OSDR-PMP
b. Base Unit Hardwrae RDF7346.a
c. System Software 6.4.0_2302_R.1.12.1.build_06
d. Z Code Z00-659/79.32
e. Z Serial Number 321805792524
f. Radio Hardware OSDR-10,5 L

7 License
a. Order (latest number) Take Screenshot
3. BASE STATION CHEK LIST

No Item Pass Fail

Antenna Position has Installed as


1 per planned Heading (Azimuth).

Antenna Position has Installed as


per planned Tilting.
2

3 ODU Position has Installed

4 Antenna has conneted to ODU

5 ODU/Radio Unit has Grounded

6 Indoor Arrestor has been Installed

Outdoor Arrestor has been


7 Installed

Grounding Cable connection has


8 Installed to Outdoor Arrestor

Grounding Cable connection has


9 Installed to Indoor Arrestor

10 Hub ODU – IDU Connectivity

11 POE IDU has Installed

4. BASE STATION CONNETIVITY CHEK LIST

No Item Pass Fail

1 LAN connection Hub to Backhaul

Connection TS to Hub (PMP


2 Standalone)

Connection TS to Backhaul (Over


3 the Air)

4 PING Test (No Request Time Out


100%)
5. CONNECTIVITY TEST

No Item Expected Results Pass


Connect the PoE to the power
source. On the PoE unit verify the
status of the "ON" LED
1 Verify PWR led on PoE
Green On – Power OK
Off – Power off or power failure

Connect the PoE to the ODU via


CAT5e cable (on the PoE use the
interface labeled with " IN" and on
the ODU use the interface labeled
with "OUT". On the ODU unit, check
2 Verify power to ODU the status of the green LED on the
“CONNECT”

Green – power and connection with


PoE Ok
Off – No connection with PoE

Connect a PC to the IN port of the


PoE. Open a command line window
on the PC at the Hub site and ping
the IP address of the ODU (default IP
address is 10.10.10.100). Make sure
the PC and the ODU are on the same
subnet.
3 IP connectivity to ODU
Ping reply - communication with
ODU is OK
Time Out - no communication with
ODU

Repeat the same test for the TS unit


6. POWERUP RECOVERY

No Item Expected Results Pass

Connect PC1 that running the


WebNM manager to the Hub and
connect PC2 to the TS. Ping from
PC1 to PC2 and verify that ping
reply.
1 Link is up again.

Power off the Hub by unplugging


the ODU cable, wait 10 sec, then
re-connect the cable and wait till
radio link will come up.

Time to full service (Ethernet) < 120


Ping from PC1 to PC2 and verify sec.
that ping reply. Measure the time
2 from power up till until Ethernet
service is recovered. Time to full link (Radio Link Established)
< 120 sec.

Power off the Hub unit by


disconnecting the power cable Link is up again.
3
from the PoE, wait 10 sec, then
re-connect the power cable.

Time to full service (Ethernet) < 120


Ping from PC1 to PC2 and verify sec.
that ping reply. Measure the time
4 from power up till until Ethernet
service is recovered. Time to full link (Radio Link Established)
< 120 sec.

Power off both Hub and TS units


(at the same time) by unplugging Link is up again.
5 the ODU cables, wait 10 sec, then
re-connect the cable .

Time to full service (Ethernet) < 120


Ping from PC1 to PC2 and verify sec.
that ping reply. Measure the time
6 from power up till until Ethernet
service is recovered. Time to full link (Radio Link Established)
< 120 sec.

Power off both Hub and TS units


(at the same time) by disconnect
7 the power cable from the PoE Link is up again.
wait 10 sec, then re-connect the
power cable

Time to full service (Ethernet) < 120


Ping from PC1 to PC2 and verify sec.
that ping reply. Measure the time
8 from power up till until Ethernet Time to full link (Radio Link Established)
service is recovered. < 120 sec.
7. PHOTO DOCUMENTATION

SHELTER

Cable Tray
(Indoor from FEP to Rack)
Cable Tray
(Outdoor : From FEP to ODU at Tower)

Cable Tray
(Outdoor at Tower to Radio)
Antena and ODU Space

Antenna Existing at tower/pole


Grounding Bar (Top)

Grounding Bar (Bottom)


IDU Position (Front)

IDU Position (Rear)


SWITCH

Antenna Direction ( per 30 ) -1


Antenna Direction ( per 30 ) -2

Antenna Direction ( per 30 ) -3


Mechanical Tilting

Arrestor Position ( Top )


Arrestor Position ( Bottom )

View Pole / tower


CUMENTATION
OTEL HORISON
CLSBI01045)
Remark